HomeMy WebLinkAboutCO 4CITY OF RENTON VMW CITY OF RENTON "'" Public Works Department OCT 19 2010 CONTRACT CHANGE ORDER AGREEMENT RECEIVED !`ITV (`I ^WWI ^� CONTRACT: CAG 09-171— 2009 Earlington Water and Sewer Improvements Project C.O.# 4 CONTRACTOR: Laser Underground and Earthworks, Inc. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: ITEM Additional Quantities Under This Change Order Unit Quantity Unit Total Pric( C04 Sunset Blvd. 8" thick asphalt patch. LS 1 $12,810.00 $12,810.00 Replace pavement in Earlington alley for street SY 240 $18.00 $4,320.00 maintenance department. Pulverize, grade, and pave existing roadway in lieu of SY 22,000 NC NC remove and replace existing for roadway reconstruction. Subtotal $17,130.00 9.5% Sales Tax $1,627.35 Total $18,757.35 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE THIS ORDER ESTIMATED CONTRACT TOTAL AFTER CHANGE $2,162,511.12 $2,324,223.34 $18,757.35 $2,342,980.69 SIGNATURES: Contractor: Project Engineer: Approved By: _ (Water Utility Supervisor) Date: � �r " e Date: Date: 0q/16 (`.AUsers\I3rc1 Internet Pilcs\('ontcnt.0utlook\21'Y13QQR9\('hangcOr(Icr4 9-14-1(LI)OCIAWah