HomeMy WebLinkAboutCO 3`NOW CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 09-171— 2009 Earlington Water and Sewer Improvements Project C.O.# 3 CONTRACTOR: Laser Underground and Earthworks, Inc. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: I t tivl Aucinional k4uantltles unser l nls c.nange uraer unit L4uanxity unit i otal Price CO3 Additional work for Sewer Utility: Installing sewer drop LS 1 $22,071.37 $22,071.37 connections, and breaking rock. Additional work for Water Utility: Capping existing water LS 1 $19,724.18 $19,724.18 lines and removing to clear corridor for sewer. Removing thrust blocks. Cutting in tee and valve instead of wet tap. Additional costs due to delay of work from crossing LS 1 $27,753.40 $27,753.40 mislocated/missing utilities. Subtotal $69,548.95 9.5% Sales Tax $6,607.15 Total $76,156.10 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE THIS ORDER ESTIMATED CONTRACT TOTAL AFTER CHANGE $2,162,511.12 $2,248,067.24 $76,156.10 $2,324,223.34 Cost Allocation Water Utility 425.455170.018.595.34.63.000 $34,748.64 Sewer Utility 426.465405.018.595.35.63.000 $41,407.46 SIGNATURE! Contractor: Project Engii Approved B) (Water Utility Supervisor) Date: �G Date: Date: $ Ib Ila'ile Sys\W"rR - Drinking Water Uti1ityiWTR-27 - Water Project F'iles\WTIt-27.3082- 2009 Earlington Water and Sewer Improvements\Constiuction\Pay rstimateslChangecOrder3_8-10-10-DOCIAWah