HomeMy WebLinkAboutCO 1CITY OF RENTON �* Public Works Department *WW CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG 09-171— 2009 Earlington Water and Sewer Improvements Project C.O.# 1 CONTRACTOR: Laser Underground and Earthworks, Inc. SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: ITEM Additional Quantities Under This Change Order Unit Quantity Unit Total Price C01 Additional work for rock excavation, core drills for sewer LS 1 $24,236.41 $24,047.90 drop connections, and downtime for mis-locatedjmissing utilities. See attached for cost summary breakdown. Subtotal $24,047.90 9.5% Sales Tax $2,284.55 Total $26,332.45 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE THIS ORDER ESTIMATED CONTRACT TOTAL AFTER CHANGE $2,162,511.12 $2,162,511.12 $26,332.45 $2,188,843.57 SIGNATURES: Contractor: Project Engineer: Approved By: _ piza LA*E KiRwa„i Uw% (-kw, (Utilities System Director) Date: 3 a t0 Date: J �� Date: C:\Documents and Settings\LuAnn\Local SettingsUemporary Internet Files\Content.Outlook\CPLQUIML\ChangeOrderl_4-27-10.DOC/AWah