HomeMy WebLinkAboutCO 4 Denis Law „r City Of
III
Mayor � Y o�,
L
Public Works Department-Maintenance Division
c.o.#4
Page 1 of 1
CONTRACT CHANGE ORDER AGREEMENT
CONTRACT: Sidewalk Rehabilitation and Replacement Project ( CAG-09-187
CONTRACTOR: Archer Construction,Inc.
SUMMARY OF PROPOSED CHANGE:
Reason/Justification:After the curb and gutter were placed in the Maplewood Glen neighborhood(Schedule B),the
grade of the sod in the planter strip was too uneven in the seven foot planter strip. It was decided to remove all the
sod and install new sod. The unit price was based on the contractor's cost to dispose of excavation that is composed
mainly of sod.
Contract Change:Add item for Unsuitable Material--Sod to Schedule B
Add new bid items to the schedule of prices(Schedule A).
Item Approx Units Description Unit Price Amount
No. Quantity
Schedule B#24(Added) I 200 I Cubic Yards 'Unsuitable Material--Sod I $43.52 I $8,704.00
Total this Change Order: $8,704.00
•
All work,materials,and measurement to be in accordance with the provisions of the Standard Specifications
and Special Provisions for the type of construction involved.
ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATE NET CHANGE ESTIMATED CONTRACT
AMOUNT AMOUNT THIS ORDER TOTAL AFTER CHANGE
$288,581.23 $311,602.44 $8,704.00 $320,306.44
SIGNATURES:
Contractor: / Date: /✓''���`'
Project Manager: Air :-, A Date: c5/3���
Approved By: / Date:
V (Transportation Design Supervisor)
3555 NE 2nd Street • Renton,Washington 98056 • rentonwa.gov