HomeMy WebLinkAboutCO 3 Denis Law 4ar+ `' ` Mayor city of i , A r� � Public Works Department-Maintenance Division C.O.#3 Page 1 of 1 CONTRACT CHANGE ORDER AGREEMENT CONTRACT: Sidewalk Rehabilitation and Replacement Project ( CAG-09-187 ' CONTRACTOR: Archer Construction,Inc. SUMMARY OF PROPOSED CHANGE: Reason/Justification:After the project was awarded,the contractor was asked to do miscellaneous work on this project that had no unit prices.This work was performed using force account.This work included:tree root removal and brush clearing,removal of thick bus stop pad,and lowering the sod behind new sidewalks. Contract Change:Add item for Miscellaneous Changes to Schedule A Add new bid items to the schedule of prices(Schedule A). Item Approx Units Description Unit Price Amount No. Quantity Schedule A#22(Added) I 1 I Lump Sum I Miscellaneous Changes I $3,410.03 I $3,410.03 Total this Change Order: $3,410.03 All work,materials,and measurement to be in accordance with the provisions of the Standard Specifications and Special Provisions for the type of construction involved. ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATE NET CHANGE ESTIMATED CONTRACT AMOUNT AMOUNT THIS ORDER TOTAL AFTER CHANGE $288,581.23 $308,192.41 $3,410.03 $311,602.44 SIGNATURES: Contractor: aei C'/iv" — Date: ?//'/v Project Manager: Vl a/ w..1 Date: 3//7-//6 Approved By: /%/jitiL . / � Date: ,�f 7� CC VV (Transportation Design Supervisor) 3555 NE 2nd Street • Renton,Washington 98056 • rentonwa.gov