HomeMy WebLinkAboutCO 1 Denis Law City of Y o Y �� 1 C`l Public Works Department-Maintenance Division c.o.#1 Page 1 of 1 CONTRACT CHANGE ORDER AGREEMENT CONTRACT: Sidewalk Rehabilitation and Replacement Project CAG-09-187 CONTRACTOR: Archer Construction,Inc. SUMMARY OF PROPOSED CHANGE: Reason/Justification: After the project was awarded,it was discovered that there is no bid item in any of the schedules for removal of roadway excavation. Contract Change:Add item for roadway excavation to all schedules. Add new bid items to the schedule of prices(Schedule B). Item Approx I Units Description Unit Price Amount No. Quantity Schedule A#20(Added) 100 CY Roadway Excavation $20.00 $2,000.00 Schedule B#23(Added) 150 CY Roadway Excavation $20.00 $3,000.00 Schedule C#20(Added) 70 CY Roadway Excavation $20.00 $1,400.00 Total this Change Order: $6,400.00 All work,materials,and measurement to be in accordance with the provisions of the Standard Specifications and Special Provisions for the type of construction involved. ORIGINAL CONTRACT CURRENT CONTRACT ESTIMATE NET CHANGE ESTIMATED CONTRACT AMOUNT AMOUNT THIS ORDER TOTAL AFTER CHANGE $288,581.23 $288,581.23 $6,400.00 $294,981.23 SIGNATURES: Contractor: Date: ' ilProject Manager: Date: //7.�� � Approved By: / Date:Ak17/4 (Transportation Design Supervisor) 3555 NE 2nd Street • Renton,Washington 98056 • rentonwa.gov