Loading...
HomeMy WebLinkAboutAdden 3• C Page 1 of 1 CAG -08 -180 — Adden #3 -12 Discretionary Work Request for King County Road Services City of: renton Request Number: RN -029 Date: 10/28/2011 Problem Description: Utilization of King County Road Services Division Materials Lab for testing of materials for the following City of Renton project. Rainier Ave S (SR 167) - S Grady Way to S 2nd St Federal Aid Number: STPUL- CM0167(048) Nature of Request: Field and laboratory testing of HMA, Aggregates, Concrete. Contract Administration of materials by maintaining Record of Material, review and approval materials incorporated in the project. Location: Project location is on Rainier Ave S (SR 167) from S Grady Way to S 2nd St in the City of Renton. Attachments: Budget City Priority: Medium Special scheduling requirements: The City anticipates award of the construction contract in early Jan 2012. The City anticipates construction will start early to mid February, 2012. The number of working days in the contract is 440. A major portion of the work will be performed at night due to the high ADT of the corridor and commitments made to businesses. City Project Manager - Telephone Number: Derek Akesson - 425- 430 -7337 Authorized By: Derek Akesson Date: 10/28/2011 MENUEGUM ARMS Project #: EBS Project #: Work Order #: Form B Sent to City Date: 11/18/2011 Recommended Action: Provide lab and field materials testing for concrete, aggregates, HMA and soils. Provide materials review, documentation and certification and maintain record of materials and materials - project file. The details of this Recommended Action is detailed in Exhibit A "Scope of Work" agreed to by -the City and the County. The cost estimate is as follows based on 2012 labor rates: labor- $279,711 and equipment- $8,846. Actual cost for work in 2013 will be based on 2013 labor and vehicle rates. Proposed Schedule: As needed through the life of the Project County Project Manager: Geralyn Miller -Nucci Cost Estimate: $288,557.00 Authorized By (City - $500): Date: Comments: Denis Law, Mayor or 13- IVIA Attest: Bonnie I. Walton, City Clerk http : / /your.kingcounty.gov /kcdot/ ROADS / discretionary /dataentry.aspx ?m - -RN -029 02/09/2012 EXHIBIT A (Request Number RN -029) Pursuant to the INTERLOCAL AGREEMENT BETWEEN KING COUNTY AND THE CITY OF RENTON FOR PROVISION OF SERVICES BY THE KING COUNTY ROAD SERVICES DIVISION (CAG -08 -180), the CITY OF RENTON has requested to utilize King County for materials testing services on the Rainier Ave S (SR 167) — S Grady Way to S 2nd St project. SCOPE OF WORK King County Materials Testing Laboratory (KCMTL) shall perform material testing and special inspection services when requested by the City of Renton (COR), or designated representative, as outlined below, to comply with Project and WSDOT requirements. Assumptions: 1. COR will provide the KCMTL with one copy of the conformed set of plans and specifications. 2. KCMTL personnel will check -in with COR or designated representative each visit, upon arriving and departing the site. 3. KCMTL will immediately notify COR or designated representative of any failing tests. 4. Assessment of safety or environmental issues are not included in KCMTL Scope of Work. 5. All estimated costs for testing include travel and paperwork. 6. Wages shown in the estimate include vehicle and King County Overhead charges. 7. All provisions of the interlocal agreement CAG -08 -180 apply. Task 1 - Administration: 1.1 Develop and maintain a Record of Material (ROM) for the project. 1.2 Review and approval of Requests for Approval of Materials (RAM's) for the project. 1.3 Coordination with COR and Inspection Team for scheduling of testing. 1.4 Attend pre -con meeting and weekly construction meetings. 1.5 Review test reports for materials supplied by Contractor. 1.6 Arrange for WSDOT inspection and approval of precast concrete fabrication. Deliverables 1. Final and complete ROM for the project. 2. All RAM's submitted for approval. 3. All documentation concerning review of test reports for materials supplied by Contractor. 4. All documentation concerning WSDOT inspection and approval of precast concrete fabrication. Task 2 — Testing of Earthwork Materials: 2.1 Obtain Preliminary Sample from pit site 2.2 Laboratory Analysis (Gradation /SE) of Preliminary Sample 2.3 Obtain on -going Acceptance Samples 2.4 Laboratory Analysis (Gradation /SE) of Acceptance Samples 2.5 Proctors /Maximum Density Curves 2.6 Field Nuclear Density Testing EXHIBIT A (Request Number RN -029) Deliverables 1. All documentation concerning testing and test results for Earthwork Materials. Task 3 _ Testing of HMA: 3.1 Arrange and Cut HMA %° — Cores for Gauge Correlation 3.2 Test Core Bulk Specific Gravity in Laboratory 3.3 Run Oven Correction Factor 3.4 Obtain Sample, Run Rice Density and Mix in Ignition Oven for Asphalt Content during production 3.5 Field Nuclear Density Testing Deliverables 1. All documentation concerning testing and test results for HMA. Task 4 — Testing of Concrete: 4.1 Field Testing 4.1.1 Air Entrainment 4.1.2 Slump 4.2 Second Day Pick up of Cylinders and log in 4.3 Laboratory Testing 4.3.1 Cylinder Measurement (Unit Weight) 4.3.2 Compression Testing Deliverables 1. All documentation concerning testing and test results for concrete. EXHIBIT A (Request Number RN -029) ESTIMATE FOR REQUESTED SERVICES Task No. Task and Description EstimatecJ Hours ^,EII -',� EII�, I.�� EIII P� $ _94.44 $iuy;)h ,85.82$ 11Q�i�li 1 Review, Approve RAMS, Communicate with Contractor and Inspection Staff, Scheduling, review test reports, Maintain Record of Materials, arrange WSDOT Fabrication Inspection, attend meetings. 1150 $ 122,279.50 Obtain Preliminary Samples from pit site: 16 , ,' $ 1,374.24 Laboratory Analysis (Gr@dation/SE): 48 $ 4,533.12 Obtain on -going Acceptance Samples: 48 $ 4,122.72 2 Laboratory Analysis (Gradation /SE): 11152 $ 14,354.88 Proctors /Maximum Density Curves: j 24 __.; $ 2,266.56 Field Nuclear Density Testing: 600 $ 56,664.00 Arrange & Cut HMA 1/2" -Cores for Gauge Correlation: 6 $ 566.64 $ 515.34 Test Core Bulk Specific Gravity in Laboratory: 8 $ 755.52 Run Oven Correction Factor: 8 $ 687.12 3 Obtain Sample, Run Rice Density & Mix in Ignition Oven for Asphalt Content during production: 120 $ 10,306.80 Field Nuclear Density Testing: 96 $ 9,066.24 Field Testing (Air, Slump, Cylinders, Unit Wt): 440 $ 37,791.60 4 2nd Day Pick up of Cylinders & log in: 80 $ 6,871.20 Cylinder Measurement & Compression: 80 $ 7,555.20 28761, i4]CI; Note: (1) Wages include 2011 vehicle and 2012 King County Overhead charges (2013 wage rate increase unknown). (2) All testing includes travel and paperwork. This is an estimate only. Costs may increase due to unforseen needs of inspection staff, consultation and overtime. (3) Curb, gutter and sidewalk can be deemed "commercial ". whereas the truck ticket is checked for mix design conformance rather than field testing which will reduce the concrete testing hours. I would $ 95,762.16 1 $ 61,669.02 $ 122,279.50 WP Vehicle - 1014.00 Hours $ 288,557 5.75 perlhr JK Vehicle .:718.00 Hours 1 4.20 1 perlhr recommend periodic field tests on concrete sidewalk for specification conformance. $ 8,846.10 If Needed If Needed If Needed If Needed TOTAL