Loading...
HomeMy WebLinkAboutMFP23004209.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP23004209 IVR Number: 23004209 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:08/14/2023Application Date:7236500035Parcel Number: 2908 NE 4TH ST Permit Type:08/21/2023Issue Date:Franchise Permit Work Class:08/20/2024Expiration Date:Minor Utility Job Number: 101165233Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO PARK IN ROW AT P01 (318115 166752) AND REPLACE EXISTING OH SECONDARY WIRE WITH NEW OH SECONDARY WIRE TO P02 (318120 166750). NO HS CUTS ANTICIPATED. TREE TRIMMING NEEDED AT P01. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101165233 2908 NE 4th ST JASON SCHAEFER 425-320-6926 MFP23004209 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 8/21/2023 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG DRIVEWAYDRIVEWAYPLEASE SCHEDULE WITH DISPATCH @ 800-343-4049 OPT.1 AND PROVIDE A COPY OF THE APPROVED TRAFFIC CONTROL PLAN K&D Services, as the preparer of this traffic control plan makes no representation as to its' general adequacy or being approved for implementation. Approval must result from the Traffic Engineer or other Public Official having statutory enforcement authority in the jurisdiction. Utilization and implementation of this plan shall be a result of that approval. Ref. MUTCD 2009 6A-01 (10) P02NOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 NOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 ONE LANEROADAHEAD ROADWORK AHEAD BE PREPAREDTO STOP ROADWORKAHEAD 100'+/-100'+/-100'+/-100'+/-ROADWORKAHEAD OFFICE: 800-343-4049 DIRECT: 425-923-9086 WATCP@KNDSERVICES.NET CUSTOMER: CONTACT: LOCATION: DATE:W/O # JASON SCHAEFER 425-320-6926 08/07/23 DESIGNED BY: WHITNEY PATERNO WSTCS#012693 5144167541 ... 2908 NE 4TH ST RENTON, WA 98056 Notes: 1.Maintain ped. access to and through crosswalks 2.Maintain Min. 10' lanes 3.Maintain local access 4.Notify Transit Authority at least 48 hrs. in advance of bus stop closure 5.Traffic control plan and all devices shall comply with MUTCD, PROWAG & WSDOT 6.DEVICE SPACING Flag Taper 20' Signs per WSDOT Tapers per WSDOT 7.28" Cones 36" Barrels 48" Signs 24" Paddle 8. Adjust to field conditions PAGE 1 OF 2 NE 4TH ST INDEX PL NENE 4TH ST STOPSTOP JEFFERSON AVE NEV01BUSINESSENTRANCEP01 SIDEWALK CLOSED SIDEWALKCLOSEDSIDEWALK CLOSED CROSS HERE DETOUR DETOUR DETOUR DETOUR Legend Cone ONE LANEROADAHEAD CW20-4 one lane road ahead Flagger DETOUR M4-9b detour for peds DETOUR M4-9b detour for peds (R) NOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 No Parking R7-T39 Pole SIDEWALKCLOSED R9-9 R9-9 SIDEWALK CLOSED CROSS HERE R9-11a(L) Sidewalk Closed, Cross Here R9-11a(L) SIDEWALK CLOSED CROSS HERE R9-11a(R) Sidewalk Closed, Cross Here R9-11a(R) ROADWORKAHEAD W20-1 road work ahead W20-7A Flagger Ahead BE PREPAREDTO STOP W20-7b be prepared to stop Work Area BE PREPARED TO STOP BE PREPARED TO STOP ROAD WORKAHEAD100'+/-SIDEWALK CLOSED CROSS HERE SPOTTER TO BE PLACED AT ANY OPEN DRIVEWAYS LOCATED IN THE WORK ZONE. TO ASSIST DRIVEWAY TRAFFIC OUT OF WORK ZONE. MAINTAIN DRIVEWAY ACCESS. IF UNABLE TO NOTIFYHOMEOWNERS OF TEMPORARY CLOSURE. PLACE NO PARKS 72 HOURS IN ADVANCE OF WORK BEING DONE. FLAGGERS WILL NEED TO HOLD TRAFFIC IN EACH DIRECTION FOR WIRE DROP. NO MORE THAN 5 MINS SPEEDLIMIT25SPEEDLIMIT 25 SPEEDLIMIT251 0 0 ' + / - www.invarion.com MFP23004209 DRIVEWAYDRIVEWAYPLEASE SCHEDULE WITH DISPATCH @ 800-343-4049 OPT.1 AND PROVIDE A COPY OF THE APPROVEDTRAFFIC CONTROL PLAN K&D Services, as the preparer of this traffic control plan makes no representation as to its' general adequacy or being approved for implementation. Approval must result from the Traffic Engineer or other Public Official having statutory enforcement authority in the jurisdiction. Utilization and implementation of this plan shall be a result of that approval. Ref. MUTCD 2009 6A-01 (10) P02 ONE LANEROAD AHEAD ROADWORKAHEAD BE PREPAREDTO STOP ROAD WORKAHEAD 100'+/-100'+/-100'+/-100'+/-ROADWORKAHEAD OFFICE: 800-343-4049 DIRECT: 425-923-9086 WATCP@KNDSERVICES.NET CUSTOMER: CONTACT: LOCATION: DATE:W/O # JASON SCHAEFER 425-320-6926 08/07/23 DESIGNED BY: WHITNEY PATERNO WSTCS#012693 5144167541 ... 2908 NE 4TH ST RENTON, WA 98056 Notes: 1. Maintain ped. access to and through crosswalks 2. Maintain Min. 10' lanes 3. Maintain local access 4. Notify Transit Authority at least 48 hrs. in advance of bus stop closure 5. Traffic control plan and all devices shall comply with MUTCD, PROWAG & WSDOT 6. DEVICE SPACING Flag Taper 20' Signs per WSDOT Tapers per WSDOT 7. 28" Cones 36" Barrels 48" Signs 24" Paddle 8. Adjust to field conditions PAGE 2 OF 2 NE 4TH ST INDEX PL NENE 4TH ST STOPSTOP JEFFERSON AVE NEV01BUSINESSENTRANCEP01 Legend Cone ONE LANEROADAHEAD CW20-4 one lane road ahead Flagger DETOUR M4-9b detour for peds DETOUR M4-9b detour for peds (R) NOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 No Parking R7-T39 Pole SIDEWALKCLOSED R9-9 R9-9 SIDEWALK CLOSEDAHEAD CROSS HERE R9-11(R) Sidewalk Closed Ahead, Cross Here R9-11(R) SIDEWALK CLOSED CROSS HERE R9-11a(L) Sidewalk Closed, Cross Here R9-11a(L) Spotter ROADWORKAHEAD W20-1 road work ahead W20-7A Flagger Ahead BE PREPAREDTO STOP W20-7b be prepared to stop Work Area BE PREPAREDTO STOP BE PREPAREDTO STOP ROADWORKAHEAD SPOTTER TO BE PLACED AT ANY OPEN DRIVEWAYS LOCATED IN THE WORK ZONE. TO ASSIST DRIVEWAY TRAFFIC OUT OF WORK ZONE. MAINTAIN DRIVEWAY ACCESS. IF UNABLE TO NOTIFY HOMEOWNERS OF TEMPORARY CLOSURE. PLACE NO PARKS 72 HOURS IN ADVANCE OF WORK BEING DONE. MAINTAIN ACCESS TO BUSINESS.SPEEDLIMIT25SPEEDLIMIT25 SIDEWALK CLOSED CROSS HERE100'+/-SPEEDLIMIT 25 NOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 NOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 SIDEWALKCLOSED SIDEWALK CLOSEDAHEAD CROSS HERE DETOUR DETOUR100'+/-DETOUR DETOUR 1 00 ' + / - www.invarion.com MFP23004209 447 409 29202914402 INDEX PL NENE 4TH ST 2908 60' ROW 60' ROW AØ45264 318114-166747 25KVA 120/240V (A) 37.5KVA 120/240V (A) AØ45261 BØ45262 CØ45263 PRE 12 318114-166746 318120-166750 318115-166752 22' J 10' 10' 60' ROW 22' NE 4TH ST 25' 40' SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map 47.4885, -122.1796 FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. 9. SCALE: 1" = 50'101165233THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: VAULTS & WORK PITS. -REQUIRED TO PROVIDE 4' X 4' WORK PIT AT V01 JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. -IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS. OVERHEAD CIRCUIT MAP 2305E088 SCALE: 6" = 1 MILE CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE PRE-12 10/18/22 265 233 239 11.57 0 0 276.57 233 239 PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. SCHAEFER 425-320-6926 2/15/23 K. TURNER 253-365-5577 N/A N/A N/A K. TURNER 425-365-5577 RENTON TOY SERVICE UPGRADE PM XFMR UPG, OH SEC REPL, OH SVC REPL 2908 NE 4TH ST, PUYALLUP,WA 98373 N/A N/A N/A XXX AS NOTED 1/2 KING N/A CSPSKEPM X 208.080 208.084 2305E062 2305E088 2305E062 PRE-12 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2/15/23 2/15/23 N/A Owner / Developer Contact Info officeATTN: KRYS TOY 2908 NE 4TH ST RENTON, WA 98056 KRYS TOY 206-388-7322 E-Mail: Cell Phone: Project Manager Contact Information: Manager:JASON SCHAEFER 425-320-6926 jason.schaefer@pse.com SCALE: NONE PARTIAL XFMR & WIRE DETAL CIRCUIT FEET ADDED: 55' LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 1500 SQ. 200 AMPS GAS 25KW 25A 2.3% 2.6% JOB SITE PSE INST. 1-RUN OH 1/0 TPX TO OH SVC ± 95' 9 5 ' SITE SPECIFIC NOTES AT V01: 318114-166747 -REMOVE (1) EXISTING 25KVA 120/240V TRF AND RETURN TO PSE YARD -INSTALL (1) 37.5KVA PM TRF 120/240V (MID 6247050) -INSTALL (3) 6-POS #6-350 KCMIL SECONDARY CONNECTION BLOCKS (MID:4842001) -INSTALL (1) 12KV ELBOW KIT PER STD 6041.1000 (ELB10J) AT J01: 318114-166746 -EXISTING J-BOX TO REMAIN -POTELCO TO DE-ENERGIZE AND RE-ENERGIZE PRIMARY CABLE (AØ45264) TO TRF AT V01 AT P01: 318115-166752 -EXISTING 40' UNK POLE TO REMAIN -REMOVE EXISTISTING OH 4/0 WIRE TO P02 -INSTALL NEW OH 4/0 TPX WIRE TO P02 AT P02: 318120-166750 -EXISTING 40' UNK POLE TO REMAIN -TRANSFER EXISTING SERVICES (2) TO POLE. M01 AT "2908": -REMOVE EXISTING OH SERVICE -INSTALL 95' OF NEW OH 1/0 TPX WIRE -EXISTING 200A METER TO OH PERM METER BASE TO REMAIN SPAN SPECIFIC NOTES -SEE SITE PLAN, ONE-LINE DRAWING AND TABLES FOR NEW INSTALL* WORKSITE YES HP Svc/MSA Perm. Service OH Misc. & Exp Tfmr Removal Superior ORDER#NOTIF# PWR PROJECT PHASE N/AN/A N/A N/A N/A N/A 514359467 N/A CABLE TV PHONE Service Meter 101165233 101165234 514167541 514359467 OH Tfmr OH Misc. & Exp Svc Removal N/A N/A N/A 00 1"2" 00 50'100'55'PSE INST. 1-RUN OH 4/0 TPX SECONDARY MAIN ± 55' 3-12 Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage 25kVA V01 318114-166747 TRANSFORMER INSTALLATION (UG) Primary phase connected to: Tested Secondary Voltage Foreman to redline the following information 37.5kVA 6247050 Installed at site: Grid Number: kVA Rating: Material ID#: V01 318114-166747 WIRE STRINGING PRIMARY & SECONDARY Location Usage Wire Size & Type Quantity of wires Length (per wire)TotalFromTo P01 P02 SEC SEC 4/0 OH TPX 1 55'1 P02 M01 SVC SEC 1/0 OH TPX 1 95'1 WIRE REMOVAL TABLE Work Location Wire Size & Type Quantity Length (per conductor) Remarks From To P01 P02 4/0 OH TPX 1 55' P02 M01 1/0 OH TPX 1 95' 584050107 TOP VIEW SIDE VIEW EXCAVATION: 4-2/3 CUBIC YARDS Rock Crushed 6" 3'-6" 2" 6' 6' 48"42" 36" 38" 42" Struts VAULT & EXCAVATION DETAIL Not to scale 6045.1000 1950 lbs ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. SCALE: NONE PARTIAL PLAN DETAL 3-13 3-3 108148922 N/A RENTON, WA 98056 MFP23004209 RESTORATION PER CITY OF RENTON STANDARDS 101165233FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 WHEN YOUR SERVICE LINE EXCEEDS 125'SERVICE MAST POWER POLE SECONDARY LINE(UTILITY OWNED) WATER WELL INTERMEDIATESERVICE POLE(UTILITY SET & OWNED)MAY BE REQUIRED 50' MIN 50' MIN SERVICE LINE(UTILITY OWNED) OVERHEAD SECONDARY CLEARANCE DETAIL SCALE: NONE MAST HEIGHT BELOW 26" METER SURFACE MOUNTED, U-BOLTS SECURE MAST SERVICE BRACKET WEATHERHEAD FLASHING 18" MIN18" MIN 24" MAX *FLASHING IN COURSESOF SHINGLES MINIMUM 2" x 6" INSTALLED SOLIDLY BETWEEN RAFTERSOR STUDS WITH HOLE BORED FOR SNUG FIT 2" x 6" INSTALLED SOLIDLY BETWEENRAFTERS AND AGAINSTROOF SHEATHING RIGID STEELCONDUIT STRUCTURAL FRAMING AND FINISHMATERIALS STUD GROUND * ADDITIONAL SUPPORT GUYS REQUIRED FOR ATTACHMENTS GREATER THAN 24" ABOVE ROOFLINE OR IF SERVICE LINE EXCEEDS 100' IN LENGTH MAST HEIGHT BELOW 26" METER SURFACE MOUNTED, GALVANIZED LAG BOLTS SECURE MAST SERVICE BRACKET WEATHERHEAD FLASHING FRONT VIEW GALVANIZED LAG-BOLTINTO FRAMING MEMBER HEAVY-WALLSTRUT-TYPECHANNELHEAVY-WALLSTRUT-TYPE CHANNEL 18" MIN24" MAX * SERVICE DROP DETAIL BLOCKING BETWEEN MAST AND BUILDING 5/16" U-BOLTS 2" x 6" BACKING SHIM METER BASE/SOCKETAND FASTEN WITHSCREWS FLUSHMETER SOCKET GROUND RIGID STEEL STRUCTURAL FRAMING AND FINISH MATERIALS 24" MAX * SERVICE DROP SERVICE BRACKET FLASHING MAST HEIGHT BELOW 26" METER FLUSH MOUNTED SERVICE DROP WEATHERHEAD MINIMUM 2' x 6" BETWEEN RAFTERS WITH HOLEBORED FOR SNUG FIT RIGID STEEL CONDUIT UN-GUYED SERVICE MAST DETAIL SCALE: NONE UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. SCHAEFER 425-320-6926 2/15/23 K. TURNER 253-365-5577 N/A N/A N/A K. TURNER 425-365-5577 RENTON TOY SERVICE UPGRADE PM XFMR UPG, OH SEC REPL, OH SVC REPL 2908 NE 4TH ST, PUYALLUP,WA 98373 N/A N/A N/A 101165233 AS NOTED 2/2 KING N/A CSPSKEPM X 208.080 208.084 2305E062 2305E088 2305E062 PRE-12 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2/15/23 2/15/23 N/A E-Mail: Cell Phone: Project Manager Contact Information: Manager:JASON SCHAEFER 425-320-6926 jason.schaefer@pse.com N/A POSSIBLE CUSTOMER ENTRY LOCATION POSSIBLE CUSTOMER ENTRY LOCATION PSE POSSIBLE CUSTOMER ENTRY LOCATION CABLE INSTALLATION DIAGRAM L Not to scale COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 6775.0035 Not to scale MFP23004209