HomeMy WebLinkAboutMFP23003536.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP23003536
IVR Number: 23003536
Permit Information
Permit Name: N.736672
Address/Location:07/06/2023Application Date:0823059165Parcel Number: 801 HOUSER WAY N
Permit Type:08/22/2023Issue Date:Franchise
Permit Work Class:08/21/2024Expiration Date:Minor Utility
Job Number: N.736672Franchise Type:Telephone
Description: CenturyLink/Lumen to Install new copper cable in existing conduit from Houser Way to MH 54 (in WSDOT R/W) to MH
55 @ NE 7th St/Sunset BLVD. Access MH 55 for splicing & splice at pole on Houser Way. Wreck out 1500pr after
splicing complete. Extend vacated conduit from pole to HH 800 on Houser Way (approx. 20ft), then place new
innerduct & fiber from HH 800 to MH 55
Contacts
Name Address PhoneTypeBilling
Austin Sweeney
Century Link
23315 66th Ave S
Kent, WA 98032
C: (253) 766-7549ApplicantX
Stephen Neumann
Fibe Solutions
604 W Meeker St., Suite 103
KENT, WA 98032
C: (425) 753-1916Applicant
Austin Sweeney
Century Link
23315 66th Ave S
Kent, WA 98032
C: (253) 766-7549Contact
Kim Parker
QWest Corporation
931 14th St, Suite 1000A
Denver, CO 80202
B: (303) 992-0752Contact
Fred Aston
Lumen
H: (863) 282-0001
C: (863) 258-3261
Contact
Michael Smith
North Sky Communications
21320 84th Ave S
Kent, WA 98032
C: (206) 305-5881Contractor
Business License Number: 36846Construction Contractor: NORTHSC857Q4
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
QWest/Century Link - Billing 23315 66th Ave S
Kent, WA 98032
Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
Northsky Communications
Tawnya Longfellow
22517 88th ave S Kent/WA 98031
N.736672
Houser Way & N 8th St crossing I-405 to NE 7th St & Sunset Blvd
8/6 9/6
206 305 5881
MFP23003536
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 8/1/2023
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Austin Sweeney
Austin Sweeney 7/6/23
RR
N 8TH S
T
HOUSER WAY NHOUSER W AY BYPASS
HO
U
S
E
R
W
AY N
TRAFFIC CONTROL PLAN
JOB # N.736672 C.45
PERMIT #
Legend
X POLE
HANDHOLE
WORK AREA
WORK TRUCK
CONES
Arrowboard (Chevron)
S SPOTTER
ONE LANE TWO WAY TAPER 50' MIN/100' MAX
Date:8/17/2023 Author:Darlene Durr, Traffic Control Supervisor Project:N.736672 C.45
TCS CERT:#ES2 000148 LUMEN:Certified Traffic Control Plan (DO NOT ALTER)
Comments: General Requirements
1. All signs and spacing to conform to the MUTCD and CITY OF RENTONrequirements.2. Channelizing devices are 28" traffic cones with retro reflective material.
3. All signs are 48' X 48' B/O unless otherwise specified.
4. Alert affected local residents and businesses.5. Crew is required to leave a minimum 11' for lane width.
6. Work hours will be DETERMINED BY CITY, COUNTY AND/OR WSDOT.
UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TO
ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN
IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:
DARLENE DURR, TCS #ES2 000148, darlene.durr@hotmail.com
8/17/2023Darlene DurrTCS # ES2 000148
Phone 253-737-5198darlene.durr@hotmail.com
_______________________Darlene Durr
NOT TO SCALE
NOTE ALL LANE WIDTHS ARE ESTIMATES; FOR ACCURANCY, MEASURE IN FIELD PRIOR TO
WORK.
REFER TO CHARTS FOR DEVICE SPACING,
SIGNAGE SPACING, SIGN SIZE, BUFFER
SPACING AND TAPER LENGTHS.
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70
35/45
25/30
40
40
30
20
80
60
ONE LANE TWO WAY TTC ZONE TAPER 20' 40' TANGENT SPACING AT ALL SPEEDS
X
P1HH 800
MERGING TAPER165'ROADWORKAHEADROADWORKAHEADROADWORKAHEADROADWORKAHEADRIGHT LANECLOSEDAHEAD200'
200'
200'
200'200'200'NSPEEDLIMIT
30Comments: THIS IS TO ACCESS HH 800 AND POLE P1.
THIS IS A RIGHT LANE CLOSURE.
SPOTTER WILL ASSIST AT WORK AREA.
HOUSER WAY N @ N 8TH ST
HH 800 & POLE P1 ACCESS
RIGHT LANE CLOSURE
WORK AREA11' X 210'
S
www.invarion.com
MFP23003536
SUNSET BLVD NE SUNSET BLVD NE
NE 7TH STDWY DWY
DWY
TRAFFIC CONTROL PLAN
JOB # N.736672 C.45
PERMIT #
Legend
MANHOLE
WORK TRUCK
CONES
WORK AREA
GRAVEL AREA
GUARDRAIL
ONE LANE TWO WAY TAPER 50' MIN/100' MAX
Date:8/17/2023 Author:Darlene Durr, Traffic Control Supervisor Project:N.736672 C.45
TCS CERT:#ES2 000148 LUMEN:Certified Traffic Control Plan (DO NOT ALTER)
Comments: General Requirements
1. All signs and spacing to conform to the MUTCD and CITY OF RENTONrequirements.2. Channelizing devices are 28" traffic cones with retro reflective material.
3. All signs are 48' X 48' B/O unless otherwise specified.
4. Alert affected local residents and businesses.5. Crew is required to leave a minimum 11' for lane width.
6. Work hours will be DETERMINED BY CITY, COUNTY AND/OR WSDOT.
UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TO
ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN
IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:
DARLENE DURR, TCS #ES2 000148, darlene.durr@hotmail.com
8/17/2023Darlene DurrTCS # ES2 000148
Phone 253-737-5198darlene.durr@hotmail.com
_______________________Darlene Durr
NOT TO SCALE
NOTE ALL LANE WIDTHS ARE ESTIMATES; FOR ACCURANCY, MEASURE IN FIELD PRIOR TO
WORK.
REFER TO CHARTS FOR DEVICE SPACING,
SIGNAGE SPACING, SIGN SIZE, BUFFER
SPACING AND TAPER LENGTHS.
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70
35/45
25/30
40
40
30
20
80
60
ONE LANE TWO WAY TTC ZONE TAPER 20' 40' TANGENT SPACING AT ALL SPEEDS
MH 55
NO PARKING7 AM -6 PMFROMTO
TOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555
WORK AREA
8' X 60'
200'
200'
200'200'ROADWORKAHEADROADWORKAHEADROADWORKAHEAD SHOULDERWORKNSPEEDLIMIT
30 SPEEDLIMIT
25
Comments:
THIS IS TO ACCESS MH 55.
THIS IS SHOULDER WORK.
SIDEWALK IS ACCESSIBLE AT WORK AREA.SPOTTER WILL ASSIST AT WORK AREA.
PARKING RESTRICTED AT WORK AREA.
SUNSET BLVD @ NE 7TH ST
MH 55 ACCESS
SHOULDER WORK
www.invarion.com
MFP23003536
Lumen Civil Base Map
I405 EXPRESS TOLL LANES - NE 8TH TO NE 7TH
W.S.D.O.T. - PROJECT No. XL5467
RENTON, WA
Cover Sheet
2 Legend
3
Civil Base Map Color Key:Existing FacilitiesConflict Mitigation Action (Proposed Facilities)Additional Information Needed/Notes
Estimated % Design Drawings: 90%
Jurisdiction File Name: 41_XL5467_PS_CENT01_UI 1601.pdf
Received file from Jurisdiction Date: 3/8/21
PROJECT LOCATION
FOR REFERENCE ONLY
NOTES:
ALL EXISTING AND PROPOSED CONDITIONS ARE BASED ON INFORMATIONPROVIDED BY OTHERS. LUMEN CANNOT BE RESPONSIBLE FOR THE ACCURACYOF INFORMATION AND/OR PLANS PROVIDED BY OUTSIDE PARTIES. FACILITYLOCATIONS, DEPTHS AND ELEVATIONS SHOULD BE FIELD VERIFIED PRIOR TOCONSTRUCTION.
PROPOSED DESIGN MODIFICATIONS ARE RECOMMENDATIONS ONLY ANDSHOULD BE VERIFIED PRIOR TO CONSTRUCTION.
INDEX OF SHEETS
Plans Prepared For:
Plans Prepared By:
LOCATION MAPNOT TO SCALE N
SHEET 1 of 4DATE: 08-02-21
REV. DATE DESCRIPTION
1 04-02-21 Initial TT Draft Issued
1
CTL JOB: N.GEO CODE:WC CLLI: RNTNWA01 (Renton)ENGINEER: Jesse PatjensPHONE: 206-733-8591EMAIL: jesse.patjens@lumen.comCPA: Paul ButlerPHONE: 206-348-0058EMAIL: paul.butler@centurylink.com
TT Eng: Chelsea LloydPhone: 208-755-3226E-mail: clloyd@terratechllc.netTT #: WACLhttp://www.terratechllc.net
TT Eng: Kelly CasteelPhone: 206-353-6847E-mail: kcasteel@terratechllc.netTT #: WACLhttp://www.terratechllc.net TT Eng: Tom BrownPhone: 206-799-2989E-mail: tbrown@terratechllc.net TT #: CL 16.7042http://www.terratechllc.net
TT Eng: Beth TanPhone: 206-660-6330E-mail: btan@terratechllc.net TT #: WACLhttp://www.terratechllc.net
TT Eng: Mike CockéPhone: 253-732-7075E-mail: mcocke@terratechllc.netTT #: WACLhttp://www.terratechllc.net
TT Eng: Kristal GreenhawPhone: 425-512-5061E-mail: kgreenhaw@terratechllc.netTT #: WACLhttp://www.terratechllc.net
Utility Plan
TT Eng: Cory CoatePhone: 503-961-5023E-mail: ccoate@terratechllc.netTT #: WACLhttp://www.terratechllc.net
TT Eng: Tim PersonettPhone: 509-570-8967E-mail: tpersonett@terratechllc.netTT #: WACLhttp://www.terratechllc.net
2 04-07-21 Revised Placement Notes
3 08-02-21 Added Profile Information
4 Utility Profile
Legend
X
X XXX X
X X X
HH
HH
HHX
X
X
XX XCP
)
X
Existing CenturyLink pedestalor
or
or
New CenturyLink pedestal
Existing CenturyLink pedestal to be removed
Existing CenturyLink SAI (serving area interface)
New CenturyLink SAI (serving area interface)
Existing CenturyLink SAI to be removed orabandoned
Existing CenturyLink cable or conduit to beremoved or abandoned
Existing CenturyLink handhole
New CenturyLink handhole
Existing CenturyLink handhole to be removed
Existing CenturyLink manhole (various sizes)
New CenturyLink manhole (various sizes)
Existing CenturyLink double lidded manhole(various sizes)
New CenturyLink double lidded manhole(various sizes)
Existing CenturyLink manhole to be removedor abandoned (all sizes and types)
Existing CenturyLink repeater
New CenturyLink repeater
Existing CenturyLink repeater to be removed
CP
Existing CenturyLink cool ped. - fiber/electronics
New CenturyLink cool ped. - fiber/electronics
Existing CenturyLink RT (remote terminal)
New CenturyLink RT (remote terminal)
Existing CenturyLink pole
New CenturyLink pole
Existing CenturyLink pole
Existing CenturyLink down guy and anchor
New CenturyLink down guy and anchor
New CenturyLink sidewalk down guy and anchor
Existing power company down guy and anchor
X
X
Lumen Civil Base Map 2
of 4
btel Existing buried telephone line
tduc Existing telephone duct run
afo-exist Existing aerial fiber optic
aer-tel Existing overhead telephone line
fo-exist Existing buried fiber optic
bsw-ex Existing buried service wire
asw-ex Existing aerial service wire
New overhead telephone line
BTEL New buried telephone line
TDUC New telephone duct run
BSW-NEW New buried service wire
AFO-NEW New aerial fiber optic
AER-TEL
FO-NEW New buried fiber optic
ASW-NEW New aerial service wire
Project Details
Narrative/Special Remarks:
The CenturyLink relocation scope will include:•
Construction Sequencing Description Regarding CenturyLink Relocation Scope
and Jurisdiction Project Construction:
CenturyLink's relocation scope is planned to occur prior to Jurisdiction's
Construction Start Date.
Temporary Facilities:
There are no planned temporary facilities as part of CenturyLink's relocation
scope.
Example Narrative/Special Remarks:
This project proposes to relocate CenturyLink facilities along (insertproject route) between (insert project extents) for the Constructionof (insert Jurisdiction's Project Name and Number).
Existing buried splice
New buried splice
New leased pole
Existing leased poleL
L
Abbreviations
ct. Countpr. Pairpp Pending Placementug. Underground
Existing joint use pole
New joint use pole
New foreign owned (e.g. power)
Existing foreign owned (e.g. power)
J
J
Existing CenturyLink power pedestal
New CenturyLink power pedestal
P
P
Existing CenturyLink pole to be removed
1. ALL DUCT ELEVATIONS ARE BASED ON POTHOLE INFORMATION, UNLESS
NOTED OTHERWISE, AND HAVE BEEN PROVIDED BY OTHERS. ELEVATIONS
SHOWN ARE TOP OF DUCT. DEPTHS SHOWN ARE DISTANCE BELOW
EXISTING FINISHED GRADE.
2. PROPOSED VAULT AND DUCT LOCATIONS SHALL BE FIELD VERIFIED
AGAINST EXISTING AND PROPOSED UTILITIES. ENGINEER IN CHARGE
DURING CONSTRUCTION SHALL BE NOTIFIED OF CONFLICTS.
Notes All methods, materials, content and form contained in this
material are the intellectual property of Terra Technologies
LLC, and may not be copied, reproduced, distributed, or
displayed without the express written permission of
Terra Technologies LLC.
The technology presented in this material is protected under
various U.S. and international patents and pending patent
applications, including without limitation, U.S. Patent Nos.
7,771,140; 8,016,518; and 8,061,934.
XL5467
CENT01MATCH LINE SB405 STA. 5565+00.00 MATCH LINE SB405 STA. 5550+00.00SCALE IN FEET
0 50 1001110
STA. 5550+00 TO STA. 5565+00
UI# 1601 CENTURYLINK - BURIED COMM PLAN
SEW WALL 04.52L
18" Pcssp
12" Pcssp
12" Pcssp12" Pcssp
12" Pcssp 12" Pcssp
12" Pcssp 12" Pcssp
12" PCSSP 12" PCSSP 12" PCSSP
18
" PCSSP
18
" CM
P18
" PCSSP
18" PCSSP
?
?
??
????????
??
?????????????????????????????????????????????????CV
CV ??
?????STTSTT?????
????????????STTRR??STT????MB ????
????????????STT??????MB??STT?MBMB ??????UUUUUUUUUUUUUUUUUUUUUUUUUCC CCCCCCCCCCCPPPPPPP
PP PPP
P P
PP
P
P
P
PPPPPPP
P
CV
CV SSSSSSSSSSSSPHPHPHPHCPCPCMW-201
-20 W-20
2-20 PHPHPH??
?????STTSTT?????
????????????STTRR??STT????MB ????
????????????STT??????MB??STT?MBMB ??????UUUUUUUUUUUUUUUUUUUUUUUUUCC CCCCCCCCCCCPPPPPPP
PP PPP
P P
PP
P
P
P
PPPPPPP
P
CV
CV SSSSSSSSSSSSPHPHPHPHCPCPCMW-201
-20 W-20
2-20 PHPHPHWL 4.9RBUILDINGSPACCAR PLATT ELECTRIC SUPPLY
SB I-405
NB I-405 N. 8TH STSUNSET BLVD NE
HOUSER WAY BYPASS
SUNSET BLVD NENE 7TH STWL 4.9R
SSSSSSSSSSSSSSPHPHPHPHCPCPCPHPHPHMP 4.65
MP 4.70 MP 4.75
MP 4.80
MP 4.85
MP 4.90
DESIGNED BY
ENTERED BY
CHECKED BY
PROJ. ENGR.
REGIONAL ADM.
FILE NAME
TIME
DATE 12/24/2020
c:\users\matt\documents\projectwise\workingdir\wsdot\dms09123\41_XL5467_PS_CENT01_UI 1601.dgn
REVISION BY
SHEET
OF
SHEETS
LOCATION NO.CONTRACT NO.
JOB NUMBER
REGION
NO.
STATE FED.AID PROJ.NO.
WASH10PLOTTED BY
DATE
11:12:09 AM Washington State
Department of Transportation
P.E. STAMP BOX
DATE
P.E. STAMP BOX
DATE
PLAN REF NO
TDW
MF
JMS
CALL 2 DAYS
BEFORE YOU DIG
1-800-424-5555
J. LEFOTU
MF
L. HODGSON
AND EXPRESS TOLL LANES PROJECT
I-405; RENTON TO BELLEVUE WIDENING
C9242
XL5467
TYPE 1
LOCATE AND AVOID
BURIED TELEPHONE
CENTURYLINK
UI#1601
TYPE 1
LOCATE AND AVOID
4" STW HP IN 8" CASING GAS
PSE
UI#1589
PUBLIC
RELOCATE
NEW SSMH
COR
UI#1522
CENT01A15550
75607560
7555
7550
5560
5555
5565
tduc tduc tduc
tductductductductductductductductductductdu
c
tdu
c
tdu
c
aer-tel aer-teltductductductductducHH
2-4" ducts
100 pr. buried
24 ct. ug. fiber
2-4" ducts
1500 pr. ug.
24 ct. ug. fiber
50 pr. aerial
200 pr. aerial
Pedestal
Pole
Metal Power
Pole
MH #54
8'x4'x6'
After new placement & wreck out of
1500pr is complete, remove MH 54,
split duct conduits together.
Mandrel & place mule tape
HH #800
Leave 100ft coil of fiber in HH-800
Tag & label cable with project placing #
8-4" ducts
1500 pr. ug.
Place new 200pr in existing conduit
from pole to MH 55
Place 3-1.25" innerduct & 24ct fiber
Remove DSMC-1500pr ug after
splicing complete
Pedestal w/ term
717 NE Sunset
tductduc2-4" ducts
4-4" ducts
100 pr. ug.
900 pr. ug.
Pole #A1080517
MH #55
8'x4'x6'
Leave 100ft coil of fiber in MH 55
Tag & label cable with project placing #
Pedestal w/ term
701 NE Sunset
Pole
3
of 4
To SAI X 801
Sunset BV NE
Extend spare conduits past edge
of WSDOT improvements
2-3.5" ducts
1500 pr. ug.
XL5467
NOTES:
2. FINAL GROUND LEVEL TO BE CONFIRMED.
1. TO BE UPDATED AS DESIGN PROGRESSES.
CENT01A
CENTURYLINK BURIED COMM SECTION
SECTION STA. 7558+88.27
UI# 1601 CENTURYLINK - BURIED COMM 10+0011+0010+5011+5012+00140
130
120
110
60
80
90
70
100
140
130
120
110
60
80
90
70
100 STA. 10+40.77DUCTBANK FOUND AT 93.2'POTHOLED. TOP OF STA. 11+67.80ELEVATION UNKNOWN.POTHOLED. TOP OF DUCTBANK OG
OGSTA: 5562+57.55
FINISHED I-405 SB
STA:7558+59.06
FINISHED I-405 NBDUCTBANK FOUND AT 90.8'POTHOLED. TOP OF STA. 10+34.06STA. 10+27.59CENTER OF 42" VAULT LIDDESIGNED BY
ENTERED BY
CHECKED BY
PROJ. ENGR.
REGIONAL ADM.
FILE NAME
TIME
DATE 12/24/2020
c:\users\matt\documents\projectwise\workingdir\wsdot\dms09123\41_XL5467_PS_CENT01A_UI 1601 PROFILE.dgn
REVISION BY
SHEET
OF
SHEETS
LOCATION NO.CONTRACT NO.
JOB NUMBER
REGION
NO.
STATE FED.AID PROJ.NO.
WASH10PLOTTED BY
DATE
12:52:28 PM Washington State
Department of Transportation
P.E. STAMP BOX
DATE
P.E. STAMP BOX
DATE
PLAN REF NO
TDW
MF
JMS
CALL 2 DAYS
BEFORE YOU DIG
1-800-424-5555
J. LEFOTU
MF
L. HODGSON
AND EXPRESS TOLL LANES PROJECT
I-405; RENTON TO BELLEVUE WIDENING
C9242
XL5467
CENT01
1
Existing Ground
Profile of
Existing Ducts
4
of 4
MH #54
To Be Removed
after new placement
is complete