HomeMy WebLinkAboutChange Order - 1CITY OF RENTON
Community Services Department
CONTRACT CHANGE ORDER AGREEMENT
DATE 08/17/2023
CONTRACT:North Highlands - Boiler Replacement
CAG #22 - 410
CONTRACTOR:Copper Mechanical
CHANGE ORDER:1
SUMMARY OF PROPOSED CHANGE:
Reason/Justification:
DESCRIPTION:
Item Qty. Description Unit Price Amount
No.w/ WSST
1 1 Additional Work 32,834.00$ 32,834.00$
Total this Change Order: 32,834.00$
ORIGINAL CONTRACT CURRENT CONTRACT NET CHANGE REVISED CONTRACT
AMOUNT (W/ WSST) AMOUNT THIS ORDER (W/ WSST) TOTAL AFTER CHANGE
Additional Calendar Days:
(xx calendar days) (written #) calendar days - Extension of Time. Completion Date is November 1st, 2023.
SIGNATURES:
Contractor:Date:
Project Manager:Date
Approved By:Date:
(position of appoval authority)
Additional work required; new Housekeeping Pad, 4 new Air Vents, Update Makeup Water Connection,
Updated Water connection, New Expansion Tank and disposal.
The payment specified and agreed to in this change order includes every claim by the contractor for any
extra payment with respect to the work described in this change order. The work covered by this change
order must be performed under the same terms and conditions as that included in the original
agreement. All of the other terms of the original agreement remain in effect.
135,006.03$ 135,006.03$32,834.00$167,840.03$
8.17.23
8/17/2023
CAG-22-410, CO #1-23
PO Box 2496 Battle Ground, WA 98604
WA License # COPPEML792D3
W: CopperMechanical.com
E: DĂƚƚ@coppermechanical.com
P: DĂƚƚƐƚĞď (360)ϱϲϲͲϯϱϲϱ
KηϭZĞƉůĂĐĞKůĚDĞĐŚĂŶŝĐĂůƋƵŝƉŵĞŶƚͬhƉĚĂƚĞͬDƵůƚŝĨĂƌŝŽƵƐ
Project Info:
Job Name:North Highlands Neighborhood Center Boiler Replacement
Job Address: 3000 NE 16th Street, Renton, WA 98057
Prevailing Wage acknowledged.
** Due to these uncertain times, any price increases that Copper Mechanical may be subject to on our material and
equipment that exceeds 10% rise from the date listed on this Bid proposal will be forwarded onto the owner.
Scope of work includes:
x EĞǁϰΗĐŽŶĐƌĞƚĞŚŽƵƐĞŬĞĞƉŝŶŐƉĂĚ
x ĞŵŽͬDŽǀĞ ΘZĞƉůĂĐĞWZsƐƚĂƚŝŽŶ
x ĞŵŽͬZĞƉůĂĐĞ,ĞĂƚŝŶŐǁĂƚĞƌŵĂŬĞͲƵƉǁĂƚĞƌ
x ĞŵŽͬZĞƉůĂĐĞ,ĞĂƚŝŶŐǁĂƚĞƌdžƉĂŶƐŝŽŶƚĂŶŬ
x ĞŵŽͬ,ĂƵůŽĨĨĞdžŝƐƚŝŶŐŽůĚtĂƚĞƌ,ĞĂƚĞƌ
x /ƐŽůĂƚĞĚŽŵĞƐƚŝĐůŝŶĞƐƚŽďĂƐĞŵĞŶƚďĂƚŚƌŽŽŵ
x /ŶƐƚĂůů;ϰͿ,ĞĂƚŝŶŐǁĂƚĞƌŚŝŐŚƉŽŝŶƚǀĂůǀĞƐŝŶĂƚƚŝĐ
Exclusions:
Anything not included in scope listed above
KηϭŵŽƵŶƚ:ΨϯϮ͕ϴϯϰ͘ϬϬ (ŝŶcluĚĞƐ ϭϬ͘ϭйt^^dtax)
Approved by:____________________________ Date:______________
.Labor Rate DirectQty Unit Unit Price Tax Qty Unit Unit Pricehours $ Labor Cost1$0$0$0 $0.00 $0 $02 New 4" concrete housekeeping pad $2,06016 $95.69 $1,531 $1,531 1 $480.00 $48.48 $528 $03 Demo / Move & Replace PRV station $4,42532 $95.69 $3,062$3,062 1 $1,238.00 $125.04 $1,363 $04 Demo / Replace Hydronics make-up water $5,90231 $95.69 $2,966$2,966 1 $2,666.00 $269.27 $2,935 $06 Demo / Replace Hydronics Expansion tank$5,17928 $95.69 $2,679$2,679 1 $2,270.00 $229.27 $2,499 $07 Demo / Haul off existing old Water Heater$2242 $95.69 $191$191 1 $30.00 $3.03 $33 $08 Isolate domestic lines to basement bathroom$2,03816 $95.69 $1,531$1,531 1 $460.00 $46.46 $506 $09 Install (4) high point valves in attic $6,05838 $95.69 $3,636$3,636 1 $2,200.00 $222.20 $2,422 $011$0$0$0 $0.00 $0 $012$0$0 $0 $0.00 $0 $013$0$0$0 $0.00 $0 $014$0$0$0 $0.00 $0 $015$0$0$0 $0.00 $0 $016$0$0$0 $0.00 $0 $017$0$0$0 $0.00 $0 $018$0$0$0 $0.00 $0 $019$0$0$0 $0.00 $0 $020$0$0$0 $0.00 $0 $021$0$0$0 $0.00 $0 $022$0$0$0 $0.00 $0 $023$0$0$0 $0.00 $0 $024$0$0$0 $0.00 $0 $025$0$0$0 $0.00 $0 $026$0$0$0 $0.00 $0 $027$0$0$0 $0.00 $0 $028$0$0$0 $0.00 $0 $029$0$0$0 $0.00 $0 $030$0$0$0 $0.00 $0 $031$0$0$0 $0.00 $0 $032$0$0$0 $0.00 $0 $0$25,885 163 $670 $15,597 $15,597 $10,288 $0% Markup100101200 A10.3%200 BIncrease in Bond Due to Change Order$00.0%300 A8.0%400 A15.0%400 B5.0%500Matt Esteb(signed)Item #TotalProfit for work preformed by Sub-tier SubcontractorsTotal Change Order Request(dated)8/12/2023$32,834Profit for work preformed by own forcesDescriptionTotal Sub CostOverhead for work preformed by sub-tier forces$2,666Total Subcontractor CostTotal Sub-tier Subcontractor CostTotal$0$32,834$0Material$4,283$25,885Overhead for worked preformedProject Name: North Highlands NCBREquipmentTotalLaborChange Order #1 Description: Replace Old Mechanical Equipment / Update / 1 of 1