Loading...
HomeMy WebLinkAboutChange Order - 18/17/2023           CAG-23-027, CO #1-23 Orca Pacific, Inc.Orca Pacific Inc280 44th St NWAuburn WA 98001United States Quote#QUO04008508/14/2023 QUO0400850 1 of 1 Bill To TOTALHenry Moses Aquatic Center1719 Maple Valley HwyRenton WA 98057United States $12,489.74Expires: 9/13/2023 Expires Exp. Close Sales Rep Partner Shipping Method 9/13/2023 8/14/2023 Renee Lukins Orca Delivery Quantity Item Tax Rate Amount 1 SRVCLABPKG Service Labor Package-Estimate for ATS to program heaters into building system. Yes $11,344.00 $11,344.00 b Subtotal $11,344.00 b b Tax Total (10.1%)$1,145.74 b Total $12,489.74       ATS | 450 Shattuck Ave South | Renton, WA 98057 | 425-251-9680 | www.atsinc.org August 4, 2023Project: City of Renton | Henry Moses PoolATS is pleased to present the following pricing for the Henry Moses Pool Boiler Control Addition. Pricing is based onthe below Scope of Work, Clarifications/Assumptions, Exclusion. Scope of WorkATS is responsible for controls project management, design engineering, software programming, front-end displays/graphics, system check-out, start-up, testing, & AutoCAD drawing documentation. Base Scope $11,344.00 All low voltage installation wiring is to be provided by others. ATS has an existing Alerton VLC-1188 controller serving the pool pumps; MS/TP communication wire is to be extended from this card to the two boilers by others. ATS will provide the following; [Qty. 2] Boilers – integrate available points through the BACnet MS/TP interface from the boilers to the existing Alerton BMS. Clarifications/Assumptions 1) Existing Alerton VLC-1188 and Boilers are located in adjacent rooms. 2) ATS as-built documentation shows that existing Alerton system has control of the existing pumps. ATS will add code programming and graphics for DDC visibility and control of the [2] boilers. 3) ATS is assuming that the replacement boilers are provided with a BACnet interface. 4) All work is assumed to take place during regular business hours. 5) We have included a 1-year warranty on labor and material for the project. 6) Unless previously arranged with ATS Operations Management, the standard lead time for the start of this project is four (4) to six (6) weeks from written authorization to proceed. This lead time allows for engineering, material ordering & delivery and project scheduling. Exclusions 1) Installation of MS/TP communication pull between the boiler interface and existing Alerton control system is to be provided by others. Pricing does not include providing hard wired start/stop/status/alarm points. 2) Washington State Sales Tax, Permit fees and Construction Bonds. 3) Professional Liability, Mold and Pollution Insurance. 4) Demolition, balancing, and commissioning. 5) Painting, Patching, Cutting, Ceiling Tile Repair, Access Panels, Blank off plates. 6) Trenching, Core Drilling, Concrete Forming or Pouring. 7) Receiving, handling, and storing of materials provided by ATS but installed by others. 8) Owner to provide internet access for remote monitoring. 9) Start-up, programming and commissioning of equipment supplied controllers. Proposal is valid for 30 days. Thank you for the opportunity, we are excited at the chance to work with your team on this project. Please contact me at 206.459.2913 with any questions. Shea DeWald | Sales Engineer Main: 425.251.9680 | Cell: 206.459.2913 | Fax 425.251.0949 450 Shattuck Ave. S. | Renton, WA 98057 | www.atsinc.org Subscribe to the ATS mailing list.       Customer Summary SheetProject:Job #:Date:CO #:Salesperson:CO Name:Category Cost Rate % TDC Hours0.45 -$ 0.45 -$ 0.45 -$ -$ 18%OH + 10% Fee -$ 0.45 -$ 0.45 -$ -$ 18%OH + 10% Fee -$ -$ Escalation: 2 % on Materials -$ freight/ tax: 2 % on Materials -$ -$ Warrantee: 3 % -$ 3,504$ $146/ hr 24 hours 4,160$ $130 / hr 32 hours 2,640$ $110 / hr 24 hours 1,040$ $130 / hr 8 hours 11,344$ -$ -$ 18%OH + 10% Fee -$ -$ 18%OH + 10% Fee -$ -$ 18%OH + 10% Fee -$ 11,344$ Delta Material - Discount Multiplier: Sell Price: Misc. Sub-Contractor Mark-Up: Miscellaneous Subcontractor: Electrical Sub-Contractor Mark-Up: Electrical Subcontractor: Technician Field Work: Engineering / DDC: Project Management: Travel Mark-Up: Travel Costs (Per Diem / Hotel / Plane / Travel Labor: Subtotal ATS labor: Graphics: Alerton Material - Discount Multiplier : Total Material: Subtotal Material: 000 Dampers Mark-Up: Shea DeWald Ouside Material Mark-Up: Outside Material: Valves - Discount Multiplier: Actuators - Discount Multiplier: Dampers: 8/4/2023City of Renton Henry Moses Pool | Boiler Add Tridium Material -Discount Mulitiplier: