Loading...
HomeMy WebLinkAboutMFP23004198.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP23004198 IVR Number: 23004198 Permit Information Permit Name: Century Link Permits Address/Location:08/11/2023Application Date:7227900075Parcel Number: 2900 NE 10TH ST Permit Type:08/29/2023Issue Date:Franchise Permit Work Class:08/28/2024Expiration Date:Minor Utility Job Number: P.088589Franchise Type:Telephone Description: Century Link To install new HH and conduit in the ROW. See site plans for details. Contacts Name Address PhoneTypeBilling Stephen Neumann Fibe Solutions 604 W Meeker St., Suite 103 KENT, WA 98032 C: (425) 753-1916Applicant Prime Electric Inc 3460 161ST Ave SE Bellevue, WA 98008 Applicant Nathan Macleod Lumen 7850 S Trafton St, Bldg B Tacoma, WA 98409 C: (253) 583-6283ApplicantX Austin Sweeney Century Link 23315 66th Ave S Kent, WA 98032 C: (253) 766-7549Applicant Kim Parker QWest Corporation 931 14th St, Suite 1000A Denver, CO 80202 B: (303) 992-0752Contact Austin Sweeney Century Link 23315 66th Ave S Kent, WA 98032 C: (253) 766-7549Contact Jesse Patjens CenturyLink / Lumen 23315 66th Ave S Kent, WA 98032 Contact Michael Smith North Sky Communications 21320 84th Ave S Kent, WA 98032 C: (206) 305-5881Contractor Business License Number: 36846Construction Contractor: NORTHSC857Q4 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner QWest/Century Link - Billing 23315 66th Ave S Kent, WA 98032 Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1.Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2.The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. -Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3.Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: P.088589 Permit #: Site Address: 2900 NE 10TH ST Renton WA 98056 Work Date: From ____08-21-2023_________ To ____08-24-2023_________ Work Time: Start ________8 AM ______ End _____5 PM__TBD_______ Construction Company: North Sky Communications Phone/Cell: 2535836283_____________________ City/State: Tacoma/WA Zip: 98409 Contact Name: Nathan Macleod Business Address: 7850 S Trafton ST BLD B Tacoma WA Description of Work: Access 2 developer placed HH's. Pull fiber through 224' of existing 4' conduit. Once placed we will come back to splice. Access HH 2--3031 to splice. Approval By: _________________________________________________ Date:____________________ Transportation Engineering X X Scott Warlick CED 8/29/2023 Monday - Friday 8:00AM - 3:00PM MFP23004198 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) Nathan Macleod 08/11/2023 Nathan Macleod MFP23004198 NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF BEFORE YOU DIG811CALL TWO WORKING DAYSRNGE:SECT:TOWN:GEO CODE:WC CLLI:TOTAL EXISTING CONDUIT USED:TOTAL NEW BORE:TOTAL NEW DIRT TRENCHESTIMATED TOTALSTOTAL NEW AERIAL:SIDEWALK (PCC) R&R:ASPHALT (AC) R&R:S.F.S.F.L.F.L.F.L.F.L.F.TOTAL NEW ASPHALT TRENCH:L.F.TOTAL NEW S/W TRENCH:L.F.3500000000”NVICINITY MAPSCOPE OF WORK:AT HANDHOLE 2-3031 (NE 10TH ST AND KIRKLAND AVE), CONTRACTOR WILL SPLICE LRE23, 557-560 FROM EXISTING 24CTCABLE [RY02] TO EXISTING 24CT FIBER CABLE [A3CZT]. COUNT WILL FALL TO POLE A1379677 (PSE: 3188508-166750) AT THESOUTHWEST CORNER OF JEFFERSON AVE AND NE 10TH STREET ON CABLE [A3CZM]. CONTRACTOR WILL PULL CABLE[A3CZM] BACK TO POLE A1379677 (PSE: 3188508-166750) WHERE THE BUILDER WILL INSTALL A NEW 1X4" POLE ANDHANDHOLE AT POLE. CONTRACTOR WILL PULL [A3CZM] INTO THE NEW HANDHOLE AND LEAVE AN APPROPRIATE SERVICELOOP. CONTRACTOR WILL PROVIDE AND PLACE A SPLICE CASE IN THE NEW HANDHOLE AND SPLICE A NEW CONTRACTORPROVIDED ~350' 24CT FIBER TO [A3CZM] TO PROVIDE F1 PATH TO THE PROPERTY VIA BUILDER PROVIDED 1X4" UG CONDUITUNDER JEFFERSON AVE NE TO A NEW HANDHOLE LOCATED BEHIND THE SIDEWALK AT THE SOUTHWEST CORNER OF NE10TH STREET AND JEFFERSON AVE NE, THEN CONTINUING UNDER NE 10TH STREET APPROXIMATELY 200' NORTH TO A JOINTPULL-BOX AT THE FRONT OF THE PROPERTY.FIELD ENGINEER: DELMER JEWELLPHONE NO: (360) 918-4425EMAIL: DELMER.R.JEWELL@LUMEN.COMFIBER ENGINEER: DAN SWANKPHONE NO: (425) 877-7782DRAFTED BY: MOUNTAIN LTD/DL - 05/30/2223N5E9P.088589W26226RNTNWA012900 NE 10TH STRENTON, WA 9805613MFP23004198 TTEE CATV CATV CATV GG TS TS WW S S SD SD IRRIG IRRIG C/L C/L R/W R/W R/W P/L P/L B/C B/C B /C EOP EOP TTTUSAMEEPWREETVTVVTSVWSSDVETTTXXX'XXX'XXX'XXX'XITEM #STATIONPOLE OWNERPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHERITEM#STAHT-CL-YRXX'-X"POLE#MAKE READYEXISTING ATTACHMENTSNOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF RNGE:SECT:TOWN:GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYSFIELD ENGINEER: DELMER JEWELLPHONE NO: (360) 918-4425EMAIL: DELMER.R.JEWELL@LUMEN.COMFIBER ENGINEER: DAN SWANKPHONE NO: (425) 877-7782DRAFTED BY: MOUNTAIN LTD/DL - 05/30/2223N5E9P.088589W26226RNTNWA012900 NE 10TH STRENTON, WA 9805623MFP23004198 NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTRNGE:SECT:TOWN:JOB:SH OF GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYS2900#7227900075NOTE:AT HANDHOLE 2-3031 (NE 10TH ST AND KIRKLAND AVE), CONTRACTOR WILL SCOUNT WILL FALL TO POLE A1379677 (PSE: 3188508-166750) AT THE SOUTHWEST CORNER OF JEFFERSON AVE AND NE 10TH STREET O CONTRACTOR WILL PULL CABLE [A3CZM] BACK TO POLE A1379677 (PSE: 3188508-166750) WHERE THE BUILDER WILL INSTALL A NEW 1X4" POLE AND HANDHOLE AT POLE. CONTRACTOR WILL PULL INTO THE NEW HANDHOLE AND LEAVE AN APPROPRIATE SERVICE LOOP. CONTRACTOR WILL PROVIDE AND PLACE A SPLICE CASE IN THE NEW HANDHOLE AND SPLICE A NEW CONTRACTOR PROVIDED ~350' 24CT FIBER TO TO PROVIDE F1 PATH TO THE PROPERTY VIA BUILDER PROVIDED 1X4" UG CONDUIT UNDER JEFFERSON AVE NE TO A NEW HANDHOLE LOCATED BEHIND THE SIDEWALK AT THE SOUTHWEST CORNER OF NE 10TH STREET AND JEFFERSON AVE NE, THEN CONTINUING UNDER NE 10TH STREET APPROXIMATELY 200' NORTH TO A JOINT PULL-BOX AT THE FRONT OF THE PROPERTY.FIELD ENGINEER: DELMER JEWELLPHONE NO: (360) 918-4425EMAIL: DELMER.R.JEWELL@LUMEN.COMFIBER ENGINEER: DAN SWANKPHONE NO: (425) 877-7782DRAFTED BY: MOUNTAIN LTD/DL - 05/30/2223N 5E9P.088589W26226RNTNWA012900 NE 10TH STRENTON, WA 980563 3TSPEEDLIMIT EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W EOP EOP EOP R/W R/W R/W R/W EOP EOP EOP R/W R/W R/W R/W R/W R/W EOP T R/W R/W R/W R/W 32'60'64'34'36'60'24'48'32'60'34'60'24'200'14'1ITEM # STATION POLE OWNER PROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER1PSE23'-06"A3775241NEUTRAL = 28'STREETLIGHT = 26'004 = 24'-06"005 = 23'-06"INSTALL NEW 1x4" POLE.EXISTING ATTACHMENTSSPEEDLIMITLumen: Delash fiber 170'. PL fiber down CBO 4" conduit to new devo PL'd HHDeveloper place new HH'sDeveloper place 1 new 4" conduit from building to pole Index Ave NEJefferson Ave NEriser