HomeMy WebLinkAboutMFP23004214.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP23004214
IVR Number: 23004214
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:08/14/2023Application Date:3344500122Parcel Number: 1921 JONES AVE NE
Permit Type:08/30/2023Issue Date:Franchise
Permit Work Class:08/29/2024Expiration Date:Minor Utility
Job Number: 105102468Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO REPLACE BO POLE AT P01. INSTALL NEW TRANSFORMER AND RISER
ON POLE AND EXTEND UG WIRE APPROX 10' IN ROW. RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
105102468
1921 JONES AVE NE
Jason Schaefer 425) 320-6926
MFP23004214
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 8/30/2023
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
1921 Jones Ave NE
Renton
WA 98056
USA
P01HH1
P02
11111010
1010
NE 20TH ST
JONES AVE NEJONES AVE NETHE CREW SHALL CEASE
WORK FOR A FLAGGER/SPOTTER
TO ESCORT PEDESTRIANS
AROUND THE WORK AREA
RESIDENT(S) WILL BE INFORMED OF
TEMPORARY DRIVEWAY CLOSUREFROMTOTOW AWAY AREAPHONE 684-5444NAME OF FIRM XXX-XXX-XXXXNO PARKINGPLACE SIGNS BOTH
SIDES OF WORK AREA
STOP
STOP
STOP W20-1ROADWORKAHEADW20-4ONE LANEROADAHEADX'X'X'
W20-7A
W20-1ROAD
WORK
AHEAD W20-4ONE LANEROADAHEAD
X'X'X'W20-7AW20-1ROADWORKAHEADW20-4ONE LANEROADAHEADX'X'X'W20-7A0'60'30'
N
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
Yuriy Bashtovoy
(425)424-6425
Yuriy.Bashtovoy@pse.com
1 OF 11921 JONES AVE NE Renton, WA 98056
0
513686280
08/09/2023
Notes:
1. All signs and spacing to conform to the
MUTCD and City of RENTON standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 10' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
MINIMUM TAPER LENGTH=L (FT.)
LANE
WIDTH
10
11
12
20
70
75
80
25
105
115
125
30
150
165
180
35
205
225
245
40
270
295
320
45
475
495
540
POSTED SPEED (MPH)
50
500
550
600
55
550
605
660
60
-
660
720
65
-
-
780
70
-
-
840
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
WORK AREA
CHEVRONARROW BOARD
FLAGGER
UNIFORMED
POLICE OFFICERPOLICE
STOP
POLE
TEMPORARY TRAFFIC CONTROL PLAN
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425
MFP23004214
1700
1703
1916
2019
1931
1925
2007
2001
1917 JONES AVE NE1921
318881-166359
25 kVA (A)
318916-166344
37.5 kVA (B)
SLAH5177
318902-166343
50 kVA 120/240V (A)
SLAH4970
ROW
60'#6CUBHIG
15
#21W A
PSE INST. 1-RUN #350 UG TPX ±240' W/4/0 UG TPX TAIL ±10'
CUSTOMER SUPPLIED
1-3" SCH'L 40 DISCONTINUOUS PVC CONDUIT ±235'
4' X 4' WORK PITCUSTOMER SUPPLIED
3/4" CUBIC YARD SAND
CUSTOMER SUPPLIED
5 X 5' WORK PIT
CUSTOMER SUPPLIED
4' X 4' WORK PIT
CUSTOMER SUPPLIED
PSE INST. 1-RUN #350 UG TPX ±45'
CUSTOMER SUPPLIED
1-3" SCH'L 40 DISCONTINUOUS PVC CONDUIT ±15'
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
N
Vicinity Map
47.509, -122.197
Owner / Developer Contact Info
officeATTN:
Vyacheslav Syrbu
1917 Jones Ave NE
Renton, WA 98056
Vyacheslav Syrbu (Sam)206-920-8587
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
HIG-15
9/2022
148 124 114
2.72 --
150.72 124 114
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
CIRCUIT FEET ADDED: 0'
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
4681 SQ. FT.
200AMPS
GAS
18.6KW
140A
2.7%
3.8%
8.
9.
SCALE: 1" = 50'105102468THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT
MANAGER PRIOR TO STARTING ANY SITE WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL,
COMPACTION & RESTORATION PER
PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT
BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
VAULTS & WORK PITS.
-REQUIRED TO PROVIDE 4' X 4' WORK PIT AT P01
-REQUIRED TO PROVIDE 5' X 5' WORK PIT AT HH1
-REQUIRED TO PROVIDE 4’ X 4’ WORK PIT & 3/4 CUBIC YARD OF SAND
AT M01
TRENCHING & CONDUIT.
-INSTALL ± 15' OF 1-3" SCH'L 40 GREY PVC CONDUIT FROM P01 TO HH1.
-INSTALL ± 235' OF 1-3" SCH'L 40 GREY PVC CONDUIT FROM HH1 TO
M01.
-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN
ALL OF THE CONDUITS.
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS
DAYS PRIOR TO CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT
MANAGER AND LOCAL MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I,
CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR
TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT
WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY
OF CONSTRUCTION TO COMPLETE BACKFILLING.
- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE
APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS
UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE
PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE
MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
SITE SPECIFIC NOTES
AT P01: 318902-166343
-REMOVE EXISTING B/O 1975 40' UNK CL POLE
-INSTALL NEW 45' CL-3 DISTRIBUTION POLE W/ GROUNDS PER STD
6010.1000 (PD453)
-INSTALL (1) 12kVA POLE TOP PIN PER STD 6031.1010 (TAN112)
-INSTALL (1) STIRRUP, BOLTED & HOT CLAMP #4-4/0 & TAP BØ (MID: 2254000
& 2153100)
-INSTALL (1) 50kVA OH TRF 120/240v W/ LB C/O (FUSE @ 15T) PER STD
6025.1000 (TRFRXF)
-TRANSFER EXISTING STREET LIGHT
-RECONNECT EXISTING GUY
-RE-USE (1) EXISITNG RISER (RETURN 1 TO PSE YD)
AT P02: 318916-166344
-EXISTING 1960 50' UN CL POLE TO REMAIN
-EXISTING 37.5kVA 120/240V TRF TO REMAIN
AT HH1 - NEW:
-INSTALL (1) 17" X 30" PE SEC HAND HOLE PER STD 6050.2000 (HH16350)
-INSTALL (3) 6-POS #10-350 CONNECTOR BAR (MID #7651006)
-INTERCEPT & CONNECT EXISTING SVCS (1917 & 1925)
M01 AT "1921": NEW METER BASE
-INSTALL 200A METER
SPAN SPECIFIC NOTES
**SEE SITE PLAN, TABLE(S) & DIAGRAM(S) FOR REMOVAL(S) & INSTALL(S)**
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
P01
318902-166343
50kVA
6211350
POLE TABLE (NEW)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P01 318902-166343 45 3 PSE Equip #
POLE TABLE (REMOVAL)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P01 318902-166343 40 UNK 1975 PSE Equip #
SECONDARY CABLE & CONDUIT TABLE
Work
Location
Cable Conduit
Voltage
Drop
Voltage
Flicker
As Built Information
Size Length
Design
(ft)
Size Length
Design
(ft)
Bends Foreman - Complete
FROM TO (1/0,4/0,350)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable)
P01 HH1 #350 UG TPX 45'3"15'0 0 0 0 1.7%1.8%
HH1 M01 #350 UG TPX 240'3"235'1 0 0 0 2.7%3.7%
TAIL 4/0 UG TPX 10'3"0 0 0 0 2.7%3.8%
TOTALS #350 UG TPX 285'TOTAL CUSTOMER SUPPLIED 3" CONDUIT=250'
4/0 UG TPX 10'
WIRE REMOVAL TABLE
Work
Location Wire Size & Type Quantity
Length
(per
conductor)
Remarks
From To
P01 P02 1/0 OH SEC TPX 1 150'
00 1"2"
00 50'100'
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
JASON SCHAEFER 425-320-6926 2/09/2023
ANN BETTENCOURT 206-584-4182 02/09/2023
ANN BETTENCOURT 206-584-4182 2/09/2023
RW-128932 Renton
Syrbu Residence
B/O POLE/ NEW TRF/INSTALL HH/ UG TO UG PERM SVC
1921 Jones Ave NE, Renton, WA 98056
N/A N/A
N/A 105102468
AS NOTED 1 OF 2
KING N/A N/A CSPSKEPM
SW 5-23N-05E N/A N/A
2305E019 2305E040 2305E019 HIG-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
PHONE
CABLE TV
PROJECT PHASE
PWR
NOTIF#ORDER#
513686280
104351512
105102468
New UG Service
Wire Removal
Misc & Expense
Superior
594153350
108143814
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:Jason Schaefer
425-320-6926
jason.schaefer@pse.com
513845876
NEW CABLE & CONDUIT DIAGRAM
NOT TO SCALE
MFP23004214
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS
105102468METER DETAIL @ M01
SCALE: NONE
32"
Typical
24"
Min
24"-36"
4'Top View
Electric & Joint Utility
Work Pit Dimensions
36"
Min
Drainage Pipe
12" Minimum Clearance
from Gas Service Lines
Conduit Depth
24" to 36" Max
Regulator
Gas Meter
Assembly
48"
4'8"
Service (Permanent Detail:)
Not to Scale
ConduitEndsClosed
4'8"
24" Min
36" Typical
3'
To Trench
Property Line
Conduit Stakes
Customer Provided
3" Schedule 40 Grey PVC
Power Cable Conduit
Customer Provided
Gas Service Line Conduit
3" Conduit Service Riser
Customer Provided
Elec. Mtr Base
Elec Mtr
utility provided
Gas Meter
Relief Vent
Building Wall
Elec. Mtr
Vent
Utility
Provided
Seal
24"-36"
TV & TEL Electric Service Cable in Conduit
3" Schedule 40 Grey PVC
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover
Backfill for Conduit
Free of rocks
larger than 8"
in diameter
Separation
6" Min
in Conduit
Schedule 40 White PVC
Gas Service Line
32" Typical
(Power, Gas,
Phone & Cable)
Separation
4" Min
12" Min
Separation
36" MINIMUM COVER
IN RIGHT OF WAY
JOINT TRENCH DETAIL
Joint Service Line in Conduit (NTS)
To Excavated Dirt Pile
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS.
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
UTILITY POLE EROSION CONTROL DETAIL
TOP VIEW
DRY DRAINAGE DITCH or DRY VEGETATED SITE
SLOPE
Place gravel bags for
Sediment Trap
Place straw mulch
on disturbed areaExcavated or
Augered Hole
Pole
SLOPE
Not to scale Drainage ditches or Dry vegetated sites
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
JASON SCHAEFER 425-320-6926 2/09/2023
ANN BETTENCOURT 206-584-4182 02/09/2023
ANN BETTENCOURT 206-584-4182 2/09/2023
Required Renton
Syrbu Residence
B/O POLE/ NEW TRF/INSTALL HH/ UG TO UG PERM SVC
1921 Jones Ave NE, Renton, WA 98056
N/A N/A
N/A 105102468
AS NOTED 2 OF 2
KING N/A N/A CSPSKEPM
SW 5-23N-05E N/A N/A
2305E019 2305E040 2305E019 HIG-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
Field Face
Quadrant
Road Face
Quadrant
Climbing
Space
5" Min
CL Direction of Vehicular TrafficCL
TOP VIEW
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit
CONDUIT RISER PLACEMENT DETAIL (P??)
SCALE: NONE
4'x4' Work Pit
PSE 1730 POLYETHELYNE HANDHOLE PLAN VIEW
2"
APPROX
30"
APPROX
17"ELECTRIC
4' - 5"
PENTABOLT
LOCK COVER
5' - 6"
18"
SIDE VIEW4" X 4"
KNOCKOUT
(2 PLACES)
APPROX 27"APPROX 40"20"
CONDUITS ENTER FROM BENEATH
AT ONE END OF HANDHOLE
SINGLE PHASE SECONDARY HANDHOLE EXCAVATION DETAIL
Not to scale
MFP23004214
1909
2004
2010
1913
1917
1916
1925
1703
1931
1725
2001
2007 1700
2019
2021
2
1
1712
JONES AVE NE0
0
2
WNØ40TUNK 25kVA 120/240V 25kVA 120/240V
37.5kVA 120/240V
A#2TW
#6CUBB#6CUGPS
GPS
GPS
GPS
318880-166343
318881-166359
318902-166344
318880-166374
D2305E040, R2305E020, A2305E020No gas grid information available
The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“
01-09-2023
Scale 1:675
Lat\Long=47.5097, -122.1963
MFP23004214