HomeMy WebLinkAboutMFP23004394.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP23004394
IVR Number: 23004394
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:08/23/2023Application Date:3340404960Parcel Number: 708 SW 13TH ST
Permit Type:08/23/2023Issue Date:Franchise
Permit Work Class:08/22/2024Expiration Date:Minor Utility
Job Number: 101159964Franchise Type:Electric
Description: Puget Sound Energy Electric WORK IS ACROSS THE STREET FROM PARCEL 3340404960. Overhead transformer
upgrade for WSDOT cabinet SUA 5287. WSDOT I 405 Renton to Bellevue Widening and Toll Lanes project.
Transformer upgrade needed to handle additional load. NO HS CUTS
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
101159964
RAYMOND AVE SW AND SW 13TH ST - ACROSS FROM 3340404960
JESSICA SCHULTZ 425-480-2925
MFP23004394
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 9/6/2023
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
SW 13th St & Raymond Ave SW Renton WA 98057 USAINTERSTATE405P011212991212SW 13TH ST
RAYMOND AVE SW
SW 12TH ST1010STOP
STOP
W20-1ROAD
WORK
AHEAD W20-4ONE LANE
ROAD
AHEAD
X'X'X'W20-7AW20-1ROADWORKAHEADW20-4ONE LANEROADAHEADX'X'X'W20-7AFROM TO
TOW AWAY AREA
PHONE 684-5444NAME OF FIRM XXX-XXX-XXXX
NO PARKINGPLACE SIGNS BOTHSIDES OF WORK AREA0'70'35'NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVYuriy Bashtovoy(425)424-6425Yuriy.Bashtovoy@pse.com1 OF 2RAYMOND AVE SW & SW 13TH ST, RENTON, WA 980570 10115996405/23/2023Notes:1. Notify WSDOT at least 5 days prior to scheduled date.2. At time of work, call wsdot radio (per region as instructed inpermit) at the time the lane is closed (or intersection flagged); andagain when the lane/intersection is opened. leave a contact nameand cell phone number with radio.3. All advanced warning signs and spacing to conform to theMUTCD and WSDOT standards.4. Channelizing devices shall be traffic drums (barrels) withsteady burning Type C lights on all State Routes and Hwys.5. All signs are 48" x 48", Black legend on Orange background.Use class B signs unless otherwise specified.6. Flaggers shall be in radio contact with each other at alltimes; flagger stations shall be illuminated during hours ofdarkness with minimum 150w lights7. All lane closures shall not infringe upon adjacent lanes.8. Alert affected residents and businesses if existing onWSDOT roadways. All sidewalks, driveways, exits andegresses shall be completely clear unless otherwiseindicated.9. Work areas will be noted as per distances between StateRoute milepost markers.10. See sheet 2 for WSDOT Notes and Tables.LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYWORK AREACHEVRONARROW BOARDFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPWORK PITTEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425MFP23004394
TEMPORARY TRAFFIC CONTROL PLAN
WSDOT NOTES & TABLES
””
–
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
Yuriy Bashtovoy
(425)424-6425
Yuriy.Bashtovoy@pse.com
2 OF 2RAYMOND AVE SW & SW 13TH ST, RENTON, WA 98057
0
101159964
05/23/2023
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425
MFP23004394
SW 13TH S
TRAYMOND AVE SWSUA 5287
NEW 50kVA 240/480V (B)
#2ACSRB
EX UG SEC
101159964N
Vicinity Map
47.4676, -122.2275
Owner / Developer Contact Info
officeATTN:
WSDOT
rhodesj@consultant.wsdot.wa.gov
JIM RHODES -
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
514088323 101159964
N/A 583072541
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
OH Xfmr
Relocation
Removal
Temporary
Job Order
Distribution
Service Stubs
HP Svc/MSA
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. SCHULTZ 425-480-2925 04/17/23
K. LIM 206-475-5503 04/17/23
N/A N/A N/A
A.VASQUEZ 714-893-2405 04/17/23
NES CITY OF RENTON
WSDOT SUA 5287
UPGRADE OH XFMR FROM 50kVA 120/240V TO 50kVA 240/480V
RAYMOND AVE SW & SW 13TH ST, RENTON, WA 98057
PUGET SOUND ENERGY
N/A N/A
N/A 101159964
AS NOTED 1 OF 1
KING N/A N/A QCSOKE
T23 R05E S19 N/A N/A
2305E074 2305E076 2305E074SW EAR-13
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:JESSICA SCHULTZ
425-480-2925
jessica.schultz@pse.com
...
...
...
-
JOB SITE
LEGEND
PROPOSED 42"X48" VAULT & PM XFMR
PROPOSED NEW UG PRIMARY
PROPOSED 4'-8" SQ VAULT & TUT
EXIST. 115KV WIRE
PROPOSED 5'X7'X5' JBOX
WSDOT SUA 5287
3.
2.
1.ALL MATERIALS TO BE INSTALLED IN ACCORDANCE WITH PSE STANDARDS. ANY
DEVIATIONS FROM THIS WORK SKETCH MUST BE AUTHORIZED BY PSE'S ENGINEERING
AND NOTED ON THE FORMAN'S COPY.
TAG CUSTOMER OWNED SERVICE ON SECONDARY(S) AT THE METER BASE AND AT THE
POINT OF DELIVERY (THE TRANSFORMER OF PSE SECONDARY HANDHOLE).
EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200
"TECHNIQUES FOR TEMPORARY EROSION AND SEDIMENT CONTROL" AND ANY
ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
POWER GENERAL NOTES
PSE NOTES:
C.
B.
1.STAKING OF GRADES AND VAULT LOCATIONS
TRANSFORMERS SHALL BE LOCATED A MINIMUM OF 3 FEET FROM NONCOMBUSTIBLE WALL OR A
MINIMUM IF 10 FEET FROM ANY DOOR, WINDOW OPENING OR COMBUSTIBLE WALL.
TRANSFORMERS SHALL BE A MINIMUM OF 6 FEET FROM ANY GAS METER AND/OR FIRE FIGHTING
EQUIPMENT.
TRANSFORMERS SHALL NOT BE LOCATED UNDER ANY BUILDING EVES.
AN AREA 10 FOOT IN FRONT OF ALL TRANSFORMERS LOCATIONS SHALL BE REASONABLY LEVEL AND
CLEAR FROM ALL OBSTRUCTIONS.
WHEN TRANSFORMERS ARE EXPOSED TO VEHICULAR TRAFFIC THEY MUST MEET THE FOLLOWING
MINIMUM CLEARANCES REQUIREMENTS: FROM THE BACK & SIDES - 5 FEET: FROM THE
FRONT (MUST ALLOW 10' MIN WORKSPACE) - 10 FEET. CLEARANCE ARE MEASURED TO ANY SURFACE
NORMALLY USED BY VEHICULAR TRAFFIC (PARKING LOTS, PARKING SPACES, ALLEYS, DRIVEWAYS
OR ROADWAYS) (SEE 0700.1600) CUSTOMER SHALL SUPPLY GUARDPOSTS WHEN THE MINIMUM
CLEARANCE REQUIREMENTS TO VEHICULAR TRAFFIC CANNOT BE MET (SEE 0700.1600).
SITE PREPARATION
WORK AREA SHALL BE AT OF FINAL GRADE, CLEAR OF SPOILS OR CONSTRUCTION MATERIAL WHICH
WOULD RESTRICT CONSTRUCTION ACCESS BEFORE WORK BEGINS.
TRENCHING AND RESTORATION.
A MINIMUM OF 36 INCHES OF COVER IS REQUIRED FOR PSE'S ELECTRICAL SYSTEMS.
ALL PSE'S CONDUITS OR DIRECT BURIED CABLES ARE REQUIRED TO BE BEDDED IN 3 INCH AND
COVERED WITH 6 INCH OF WASHED SAND.
COMPACTION, RESTORATION AND ANY BACKFILL REQUIRE WITHIN THE PROPERTY.
REMOVAL AND DISPOSAL OF MATERIALS NOT SUITABLE FOR BACKFILL.
DITCH SLOPING OR SHORING PER WASHINGTON STATE LAW FOR EXCAVATIONS DEEPER THAN 4
FEET THAT WORKERS WILL ENTER.
BACKFILL OF TRENCH SHALL BE COMPLETED PRIOR TO ENERGIZING.
THE DEVELOPER SHALL NOT OBSTRUCT ACCESS TO PSE'S EQUIPMENT OR COVER WITH
LANDSCAPING.
REQUIREMENTS AROUND CITY WATER, SEWER & STORMS LINES
1 FEET SEPARATION CROSSING OVER UTILITIES.
5 FEET SEPARATION PARALLELING CITY UTILITIES.
6 FEET SEPARATION BETWEEN POWER VAULTS & FIRE HYDRANTS.
DEVELOPER NOTES:
THE DEVELOPER IS RESPONSIBLE FOR, BUT NOT LIMITED TO
THE FOLLOWING ON PRIVATE PROPERTY.
A.
D.
E.
2.
3.
A.
B.
C.
D.
E.
F.
4.
5.
A.
B.
C.
CONSTRUCTION OF ELECTRICAL SYSTEM MUST COMPLY TO PUGET SOUND ENERGY
STANDARDS
OWNER/DEVELOPER RESPONSIBILITIES: PROVIDE ALL TRANCHING, BACKFILL
(SELECT BACKFILL AND COMPACTION TO 95% OF ORIGINAL DENSITY IN CROSSINGS) AND
RESTORATION WITHIN THIS PROJECT.
LOCATE: THE ONE CALL CENTER (1-800-424-5555) MUST BE NOTIFIED 48 HOURS IN
ADVANCE OF CONSTRUCTION SO ALL UTILITIES CAN BE LOCATED PRIOR TO ANY DIGGING
TRENCHING-PRIMARY: TRENCHES SUPPLIED FOR PRIMARY SYSTEMS OWNED &
INSTALLED BY PSE MUST BE 18 INCHES MINIMUM IN WIDTH & SHALL HAVE A MINIMUM OF
36 INCHES COVER OVER THE TOP OF THE CONDUCTOR OR FROM THE TOP OF THE
CONDUIT TO THE POINT OF FINAL GRADE, PROVIDE 3 INCHES OF SAND BEDDING BELOW
AND 6 INCHES OF SAND BACKFILL. THE REMAINNG BACKFILL MAY CONSIST OF NATIVE
MATERIAL IF SUITABLE (I.E.; FREE FROM ROCKS SHARP OBJECTS OR CORROSIVE
MATERIALS THAT MAY DAMAGE CABLES OR CONDUIT). IF NATIVE MATERIALS ARE
UNSUITABLE AS DETERMINED BY PSE OR ITS INSPECTOR, SELECT BACKFILL SHALL BE
SUPPLIED BY THE CUSTOMER. BACKFILL THE EXCAVATION TO FINISHED GRADE AT 2
INCHES BELOW THE VAULT TOP AS SOON AS PRACTICAL AFTER FACILITIES ARE PLACED
AND INSPECTED. THE SPOILS PILE MUST BE LOCATED A MINIMUM OF 24 INCHES FROM
THE OPEN TRENCH. THE TRENCH SHALL PROVIDED ADDITIONAL WIDTH AS NEEDED TO
MAINTAIN A 12 INCH MINIMUM HORIZONTAL SEPARATION BETWEEN POWER CONDUITS
OR CABLE & ADJACENT UTILITY SERVICES.
TRENCHING SERVICES: THE CUSTOMER'S SERVICE TRENCH MUST MEET SATE & LOCAL
REGULATORY REQUIREMENTS. SECONDARY TRENCHES SHALL HAVE A MINIMUM OF 24
INCHES COVER. PROVIDE 3 INCHES OF SAND BEDDING BELOW & 6 INCHES OF SAND
BACKFILL. A 48 SQUARE INCH PIT MUST BE PROVIDED AT THE METER BASE. THE TRENCH
SHALL PROVIDE ADDITIONAL WIDTH AS NEEDED TO MAINTAIN A 12 INCH MINIMUM
HORIZONTAL SEPARATION BETWEEN CONDUITS OR CABLE & ADJACENT UTILITIES
SERVICES.THE SPOILS PILE MUST BE LOCATED A MINIMUM OF 24 INCHES FROM THE
OPEN TRENCH.
VAULT AND EXCAVATION: SIX INCHES (6") OF CRUSHED ROCK TO BE USED AT THE VAULT
BASE. BACKFILL AROUND VAULTS SHOULD CONSIST OF GOOD COMPACTABLE MATERIAL
SUCH AS CLEAN EARTH FILL, CRUSHED ROCK, OR SAND. NO VOIDS SHOULD REMAIN
BETWEEN THE VAULT WALLS & SIDES OF THE EXCAVATION.
STAKING: PRIOR TO CONSTRUCTION, LOT LINE AND GARDE SKATES WILL BE PROVIDED
BY THE CUSTOMER/DEVELOPER.
SITE PREPARATION: PRIOR TO CONSTRUCTION, THE WORK AREA WILL BE AT OR NEAR
FINISHED GRADE AND CLEAR OF ANY SPOILS OR CONSTRUCTION MATERIALS WHICH
WOULD RESTRICT CONSTRUCTION ACCESS.
EQUIPMENT ACCESS: ADEQUATE SPACE IS TO BE MAINTAINED AROUND PSE'S FACILITIES,
UNIMPEDED BY FENCES, ROCKERIES, WALLS, STRUCTURES, ETC.
GENERAL UNDERGROUND NOTES
NOT TO SCALE
UNIVERAL MAP (2305E074)
NEW CUST. OWNED & INSTALLED WIRE
JOB SITE
EXISTING POLE
PROPOSED 1Ø FUSED RISER
CUSTOMER APPROVAL
I approve the location of the trench, including road crossings,
and all electrical equipment as shown on print.
________________________
Customer's Signature
________________________
Print Name/Date
SCALE: 6" = 1 MILE
OVERHEAD MAP (2305E076)
JOB SITE
EXIST. 3Ø OH/UG PRIMARY
RAYMOND AVE SWSW 13TH
S
T
1" = 20'
SITE PLAN
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
P01
317378-165555
50kVA OH 240/480v
6213200
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
317378-165555
50kVA OH 120/240V
SITE SPECIFIC NOTES
AT P01 (317378-165555) 45' CL 4, 2009
EXISTING POLE TO REMAIN
-REMOVE EXISTING OH 50kVA 120/240V OH XFMR
-INSTALL NEW OH 50kVA 240/480V OH XFMR
No
No
No
CUSTOMER
Yes
Yes
No
PSE
"Flagging Required"
"Outages Required"
"Locates Required"X X
X
X
MFP23004394