HomeMy WebLinkAboutContract - Vol 2 PlansINTERSTATE
405
INTERSTATE
405 BURNETT AVE SWILLIAMS AVE SWELLS AVE SS 2ND ST
S 3RD ST
HOUS
E
R
W
A
Y
S
BID
DOCUMENT
CAG-23-241
King County CDBG Project No. C19352
JUNE 2023
SCHEDULE OF DRAWINGS
DOWNTOWN CORE STREETSCAPE PHASE 2
WILLIAMS AVE SOUTH
Seattle Wenatchee KPG.com
Tacoma
2502 Jefferson Ave
Tacoma, WA 98402 253.627.0720
WILLIAMS AVENUE S
PROJECT VICINITY
WILLIAMS AVENUE S
Approved for Construction
Approved for Bid
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
21036793JUSTIN R A YMO
N
D WUMAYOR CITY COUNCIL
WELLS AVENUE S
6-29-2023Michael Sippo 6/29/23
Michael Sippo 8/29/23
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
21089-LGD.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Seattle Wenatchee KPG.com
Tacoma
2502 Jefferson Ave
Tacoma, WA 98402 253.627.0720
CDBG #C19352
JUNE 2023
21089
KPG PSOMAS DOWNTOWN CORE STREETSCAPE PHASE 2
WILLIAMS AVE SOUTH
6-29-2023--------
LEGEND AND ABBREVIATIONS
192
KAB
JRW
OBP
OBP
2
•••••••••••••••••
••••••••••••
EXISTING LEGEND ABBREVIATIONS
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
21036793JUSTIN R A Y MO
N
D WU
ALIGNMENT DATAWILLIAMS AVE S ALIGNMENT DATA
ALIGNMENT DATAWELLS AVE S ALIGNMENT DATA
HORIZONTAL AND VERTICAL DATUM
NOTES S 3RD STWILLIAMS AVE S
S 2ND STS 3RD STS 2ND STWELLS AVE S
PLAN
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
21089-INDX.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Seattle Wenatchee KPG.com
Tacoma
2502 Jefferson Ave
Tacoma, WA 98402 253.627.0720
CDBG #C19352
JUNE 2023
21089
KPG PSOMAS DOWNTOWN CORE STREETSCAPE PHASE 2
WILLIAMS AVE SOUTH
6-29-2023--------
SHEET INDEX, ALIGNMENT PLAN & SURVEY CONTROL
193
KAB
JRW
OBP
OBP
3
SHEET INDEX
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
21036793JUSTIN R A YMO
N
D WUPLAN
CONDUIT TRENCH DETAIL
MATERIAL CODE
TYPICAL SECTION GENERAL NOTES
CEMENT CONC DRIVEWAY ENTRANCE DETAIL
TYPICAL SECTION A
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
21089-RDW-SECT.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Seattle Wenatchee KPG.com
Tacoma
2502 Jefferson Ave
Tacoma, WA 98402 253.627.0720
CDBG #C19352
JUNE 2023
21089
KPG PSOMAS DOWNTOWN CORE STREETSCAPE PHASE 2
WILLIAMS AVE SOUTH
6-29-20234
OBP
OBP
JRW
KAB
4 19--------
ROADWAY TYPICAL SECTIONS AND DETAILS
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERNEPRFO
E NNALIO
E
S IGS
21036793JUSTIN R A YMO
N
D WU
ROOF DRAIN DETAIL
PARKING AND DRIVEWAY PAVEMENT DETAIL BUSINESS ACCESS SIGN
BUSINESS NAME
BUSINESS NAME
BUSINESS NAME
BUSINESS NAME
BUSINESS NAME
OPEN DURING
CONSTRUCTION
CEMENT CONC CURB CUT DETAIL
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
21089-RDW-SECT.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Seattle Wenatchee KPG.com
Tacoma
2502 Jefferson Ave
Tacoma, WA 98402 253.627.0720
CDBG #C19352
JUNE 2023
21089
KPG PSOMAS DOWNTOWN CORE STREETSCAPE PHASE 2
WILLIAMS AVE SOUTH
6-29-2023--------195
KAB
JRW
OBP
OBP
5
ROADWAY TYPICAL SECTIONS AND DETAILS
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERNEPRFO
E NNALIO
E
S IGS
21036793JUSTIN R A YMO
N
D WU
S 3RD STWILLIAMS AVE S S 2ND ST GENERAL NOTES CONSTRUCTION NOTES
LEGEND
WELLS AVE S
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
21089-SP-TESC.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Seattle Wenatchee KPG.com
Tacoma
2502 Jefferson Ave
Tacoma, WA 98402 253.627.0720
CDBG #C19352
JUNE 2023
21089
KPG PSOMAS DOWNTOWN CORE STREETSCAPE PHASE 2
WILLIAMS AVE SOUTH
6-29-2023--------
SITE PREPARATION AND TESC PLAN
196
KAB
JRW
OBP
OBP
6
PLAN
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERNEPRFO
E NNALIO
E
S IGS
21036793JUSTIN R A Y MO
N
D WUPLAN
S 3RD STWILLIAMS AVE S S 2ND STGENERAL NOTES CONSTRUCTION NOTES
LEGEND
WELLS AVE S
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
21089-RDW.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Seattle Wenatchee KPG.com
Tacoma
2502 Jefferson Ave
Tacoma, WA 98402 253.627.0720
CDBG #C19352
JUNE 2023
21089
KPG PSOMAS DOWNTOWN CORE STREETSCAPE PHASE 2
WILLIAMS AVE SOUTH
6-29-2023--------
ROADWAY AND DRAINAGE PLAN
197
KAB
JRW
OBP
OBP
7
PLAN
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
21036793JUSTIN R A YMO
N
D WUPLAN
WILLIAMS AVE S
GENERAL NOTES
WELLS AVE S
WILLIAMS AVE S FLOWLINE POINTS
WILLIAMS AVE S LAYOUT POINTS WILLIAMS AVE S LAYOUT POINTS
WILLIAMS AVE S LAYOUT POINTS
WELLS AVE S FLOWLINE POINTS
WELLS AVE S LAYOUT POINTS
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
21089-GRAD.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Seattle Wenatchee KPG.com
Tacoma
2502 Jefferson Ave
Tacoma, WA 98402 253.627.0720
CDBG #C19352
JUNE 2023
21089
KPG PSOMAS DOWNTOWN CORE STREETSCAPE PHASE 2
WILLIAMS AVE SOUTH
6-29-2023--------
GRADING PLAN
198
JRW
JRW
OBP
OBP
8
PLAN
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
21036793JUSTIN R A YMO
N
D WUPLAN
S 3RD STWILLIAMS AVE S S 2ND STGENERAL NOTES
CONSTRUCTION NOTES
LEGEND
LUMINAIRE SCHEDULE
LUMINAIRE SCHEDULE
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
21089-ILL.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFO
ETATSERNEPRFO
E NNALIO
E
S IGS
39324JAN C IGANI
K
Seattle Wenatchee KPG.com
Tacoma
2502 Jefferson Ave
Tacoma, WA 98402 253.627.0720
CDBG #C19352
JUNE 2023
21089
KPG PSOMAS DOWNTOWN CORE STREETSCAPE PHASE 2
WILLIAMS AVE SOUTH
6-29-2023--------
ILLUMINATION PLAN
199
EH
TD
JC
OBP
9
PLAN
WIRE NOTES
S 3RD STWILLIAMS AVE S S 2ND STGENERAL NOTES
CONSTRUCTION NOTES
WELLS AVE S
WASTE RECEPTACLE SCHEDULE TREE GRATE SCHEDULE
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
21089-URB.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Seattle Wenatchee KPG.com
Tacoma
2502 Jefferson Ave
Tacoma, WA 98402 253.627.0720
CDBG #C19352
JUNE 2023
21089
KPG PSOMAS DOWNTOWN CORE STREETSCAPE PHASE 2
WILLIAMS AVE SOUTH
6-29-2023--------
URBAN DESIGN PLAN
1910
MR
MR
PN
OBP
10
PLAN
PHU O N G N. NG
U
Y
ENNO. 1 493 EXP. 0 9 /1 6 /2023STATE O F W A SHI
N
GTONLAND
S
CA P E A R C H ITECTPLAN
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
21089-URB.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Seattle Wenatchee KPG.com
Tacoma
2502 Jefferson Ave
Tacoma, WA 98402 253.627.0720
CDBG #C19352
JUNE 2023
21089
KPG PSOMAS DOWNTOWN CORE STREETSCAPE PHASE 2
WILLIAMS AVE SOUTH
6-29-2023--------
URBAN DESIGN DETAILS
1911OBP
11
PHU O N G N. NG
U
Y
E
NNO. 1 493 EXP. 0 9 /1 6 /2023STATE O F W A SHI
N
GTONLAND
S
CA P E A R C H ITECTSCORE JOINT DETAILEXPANSION JOINT DETAILSURFACE MOUNT DETAIL
CEMENT CONC. SIDEWALK LAYOUT DETAIL
CEMENT CONC. DRIVEWAY ENTRANCE LAYOUT AT WILLIAMS AVE S DETAIL
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
21089-URB.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Seattle Wenatchee KPG.com
Tacoma
2502 Jefferson Ave
Tacoma, WA 98402 253.627.0720
CDBG #C19352
JUNE 2023
21089
KPG PSOMAS DOWNTOWN CORE STREETSCAPE PHASE 2
WILLIAMS AVE SOUTH
6-29-2023MR
MR
PN
TREE GRATE DETAIL
PLANTER EDGE DETAIL
CEMENT CONC. DRIVEWAY ENTRANCE LAYOUT AT WELLS AVE S
LANDSCAPE STRIP FENCING DETAIL
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
21089-URB.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Seattle Wenatchee KPG.com
Tacoma
2502 Jefferson Ave
Tacoma, WA 98402 253.627.0720
CDBG #C19352
JUNE 2023
21089
KPG PSOMAS DOWNTOWN CORE STREETSCAPE PHASE 2
WILLIAMS AVE SOUTH
6-29-2023PHU O N G N. NG
U
Y
ENNO. 1 493 EXP. 0 9 /1 6 /2023STATE O F W A SHI
N
GTONLAND
S
CA P E A R C H ITECTURBAN DESIGN DETAILS
OBP
JUNCTION BOX LAYOUT DETAIL
MR
MR
PN
12
1912
S 3RD STWILLIAMS AVE S
S 2ND ST CONSTRUCTION NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
21089-LS.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Seattle Wenatchee KPG.com
Tacoma
2502 Jefferson Ave
Tacoma, WA 98402 253.627.0720
CDBG #C19352
JUNE 2023
21089
KPG PSOMAS
COREEN E L I Z A BETH S
CHMI
DTNO. 1 377 EXP. 0 5 /2 4 /2024STATE O F W A SHI
N
GTONLANDS
CA P E A R C H ITECTDOWNTOWN CORE STREETSCAPE PHASE 2
WILLIAMS AVE SOUTH
6-29-2023--------
LANDSCAPE PLAN
1913
MR
MR
CS
OBP
PLAN
SEE SHEET 14 FOR
PLANTING DETAILS AND
GENERAL NOTES
13
PLANT SCHEDULE
GENERAL NOTES
TREE PLANTING NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
21089-LS.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Seattle Wenatchee KPG.com
Tacoma
2502 Jefferson Ave
Tacoma, WA 98402 253.627.0720
CDBG #C19352
JUNE 2023
21089
KPG PSOMAS
COREEN E L I Z A BETH S
CHMIDTNO. 1 377 EXP. 0 5 /2 4 /2024STATE O F W A SHI
N
GTONLAND
S
CA P E A R C H ITECTDOWNTOWN CORE STREETSCAPE PHASE 2
WILLIAMS AVE SOUTH
6-29-2023NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
21089-LS.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Seattle Wenatchee KPG.com
Tacoma
2502 Jefferson Ave
Tacoma, WA 98402 253.627.0720
CDBG #C19352
JUNE 2023
21089
KPG PSOMAS
COREEN E L I Z A BETH S
CHMIDTNO. 1 377 EXP. 0 5 /2 4 /2024STATE O F W A SHI
N
GTONLAND
S
CA P E A R C H ITECTDOWNTOWN CORE STREETSCAPE PHASE 2
WILLIAMS AVE SOUTH
6-29-2023--------1914
MR
MR
CS
OBP
ROOT BARRIER DETAILTYPICAL ORNAMENTAL GRASS PLANTING DETAIL
TYPICAL STREET TREE PLANTING DETAIL TREE GRATE PLANTING DETAIL
14
LANDSCAPE DETAILS
TREE RELOCATION GENERAL NOTES
MORRIS AVE SS 3RD ST
S 2ND ST
S 2ND STWELLS AVE SMAIN AVE SWILLIAMS AVE SS TOBIN ST
TREE RELOCATION CONSTRUCTION NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
21089-LS.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Seattle Wenatchee KPG.com
Tacoma
2502 Jefferson Ave
Tacoma, WA 98402 253.627.0720
CDBG #C19352
JUNE 2023
21089
KPG PSOMAS
COREEN E L I Z A BETH S
CHMIDTNO. 1 377 EXP. 0 5 /2 4 /2024STATE O F W A SHI
N
GTONLAND
S
CA P E A R C H ITECTDOWNTOWN CORE STREETSCAPE PHASE 2
WILLIAMS AVE SOUTH
6-29-2023--------1915
CS
CS
CS
OBP
TREE RELOCATION LAYOUT PLAN
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
21089-LS.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Seattle Wenatchee KPG.com
Tacoma
2502 Jefferson Ave
Tacoma, WA 98402 253.627.0720
CDBG #C19352
JUNE 2023
21089
KPG PSOMAS
COREEN E L I Z A BETH S
CHMIDTNO. 1 377 EXP. 0 5 /2 4 /2024STATE O F W A SHI
N
GTONLAND
S
CA P E A R C H ITECTDOWNTOWN CORE STREETSCAPE PHASE 2
WILLIAMS AVE SOUTH
6-29-202315
SEE SHEET 14 FOR
PLANTING DETAILS AND
GENERAL NOTES
TREE RELOCATION PLAN
S 3RD STWILLIAMS AVE S
S 2ND ST CONSTRUCTION NOTES
IRRIGATION LEGEND
PIPE SIZE CHART
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
21089-IRR.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTONELIZABETH GIB
S
O
NNO. 5
38 EXP. 0 8 /1 6 /2023STATE O F W A SHI
N
GTONLAND
S
CA P E A R C H ITECTSeattle Wenatchee KPG.com
Tacoma
2502 Jefferson Ave
Tacoma, WA 98402 253.627.0720
CDBG #C19352
JUNE 2023
21089
KPG PSOMAS DOWNTOWN CORE STREETSCAPE PHASE 2
WILLIAMS AVE SOUTH
6-29-2023--------
IRRIGATION PLAN
1916
LG
LG
LG
OBP
16
PLAN
SEE SHEETS 17-18 FOR COMPLETE
IRRIGATION SCHEDULE, DETAILS
AND GENERAL NOTES
GENERAL NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
21089-IRR.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTONELIZABETH GIB
S
O
NNO. 5
38 EXP. 0 8 /1 6 /2023STATE O F W A SHI
N
GTONLAND
S
CA P E A R C H ITECTSeattle Wenatchee KPG.com
Tacoma
2502 Jefferson Ave
Tacoma, WA 98402 253.627.0720
CDBG #C19352
JUNE 2023
21089
KPG PSOMAS DOWNTOWN CORE STREETSCAPE PHASE 2
WILLIAMS AVE SOUTH
6-29-2023--------
IRRIGATION DETAILS
1917
LG
LG
LG
OBP
17
IRRIGATION SCHEDULE
DRIP ACCESS VALVE BOX IN PAVEMENT FOR CONNECTION TO LUMINAIRE POLE DRIP LOW FLOW CONTROL VALVE
PIPE AND CONTROL WIRE BUNDLE INSTALLATION
CONTROL VALVE
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
21089-IRR.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTONELIZABETH GIB
S
O
NNO. 5
38 EXP. 0 8 /1 6 /2023STATE O F W A SHI
N
GTONLAND
S
CA P E A R C H ITECTSeattle Wenatchee KPG.com
Tacoma
2502 Jefferson Ave
Tacoma, WA 98402 253.627.0720
CDBG #C19352
JUNE 2023
21089
KPG PSOMAS DOWNTOWN CORE STREETSCAPE PHASE 2
WILLIAMS AVE SOUTH
6-29-2023--------
IRRIGATION DETAILS
1918
LG
LG
LG
OBP
18
FLOOD BUBBLER ASSEMBLY MANUAL SHUT OFF BRASS VALVE
POP-UP HEAD WITH TRIPLE SWING JOINT RISER
S 3RD STWILLIAMS AVE S S 2ND STGENERAL NOTES
CHANNELIZATION NOTES
LEGEND
SIGN SCHEDULE
WELLS AVE S
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
21089-CHAN.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Seattle Wenatchee KPG.com
Tacoma
2502 Jefferson Ave
Tacoma, WA 98402 253.627.0720
CDBG #C19352
JUNE 2023
21089
KPG PSOMAS DOWNTOWN CORE STREETSCAPE PHASE 2
WILLIAMS AVE SOUTH
6-29-2023--------
CHANNELIZATION AND SIGNING PLAN
1919
KAB
JRW
OBP
OBP
19
PLAN
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
21036793JUSTIN R A YMO
N
D WUPLAN
R7-6 NO PARKING LOADING ZONE 12"x24"
R7-201P TOW AWAY PLAQUE 12"x6"
R7-108 2-HR PARKING 12"x18"
8:00 AM
TO 6:00 PM
EXCEPT
SUNDAYS AND
HOLIDAYS