Minor Franchise Permit: MFP23004490
IVR Number: 23004490
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:08/29/2023Application Date:2963900085Parcel Number: 613 SMITHERS AVE S
Permit Type:09/11/2023Issue Date:Franchise
Permit Work Class:09/10/2024Expiration Date:Minor Utility
Job Number: 101161800Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO PARK IN ROW AT P01 (317626 165990) UPGRADE TRANSFORMER AT
P01
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
101161800
613 Smithers Ave S
Tony Contreras 206-637-3648
MFP23004490
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 9/11/2023
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
613 Smithers Ave S Renton WA 98057 USAS 7TH ST SMITHERS AVE STALBOT RD SBURNETT AVE S1818 181813
13
S 6TH ST
P01
ALLEY
ALLEYFROMTOTOW AWAY AREAPHONE 684-5444NAME OF FIRM XXX-XXX-XXXXNO PARKINGPLACE SIGNS BOTHSIDES OF WORK AREAW20-1ROADWORKAHEAD100'100'SHOULDERCLOSEDW20-301W1-4RW20-1ROAD
WORK
AHEAD100'100'W1-4LW20-1ROADWORKAHEADW20-1ROADWORKAHEAD100'
100'
KEEP
R4-7B
RIGHT
KEEPR4-7BRIGHTS/WCLOSEDR9-9CROSS HERES/W CLOSEDAHEADR9-11S/W
CLOSEDR9-9CROSS HERE
S/W CLOSEDAHEAD
R9-11W21-1maintain (2) 11' lanesW20-1ROADWORKAHEAD0'50'25'
N
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
Jaber Tofan
206-406-8460
jaber.tofan@pse.com
1 OF 1613 SMITHERS AVE S Renton,WA 98057
0
514112207
05/24/2023
Notes:
1. All signs and spacing to conform to the
MUTCD and City of RENTON standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 10' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
MINIMUM TAPER LENGTH=L (FT.)
LANE
WIDTH
10
11
12
20
70
75
80
25
105
115
125
30
150
165
180
35
205
225
245
40
270
295
320
45
475
495
540
POSTED SPEED (MPH)
50
500
550
600
55
550
605
660
60
-
660
720
65
-
-
780
70
-
-
840
TEMPORARY TRAFFIC CONTROL PLAN
Puget Sound Energy
Traffic Control Supervisor:
John Crofoot
Card No. 012613Card Exp. 10/31/24John.Crofoot@pse.com(425)424-6658
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
MFP23004490
544
600
602
541
603
611
613
621
619
608
612
616
620
628
622 623
627
536
617
540
600
618
629
621
S 6TH ST
SMITHERS AVE SSMITHERS AVE SS 6TH ST
DWY
397.5 MCM AACGRA15ABC
317626-165990
25 kVA 120/240V (A)
37.5 kVA 120/240V (A)
SLAU3858
36'
EOP
60'
ROW
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
N
Vicinity Map
47.4748, -122.2098
Owner / Developer Contact Info
officeATTN:
QINGHUI LIU
13809 SE 42ND ST
BELLEVUE, WA 98006
QINGHUI LIU 425-502-5586
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
GRA-15
10-22
138.00 127.00 110.00
4.31 0.00 0.00
142.31 127.00 110.00
OH SVC Removal
OH SVC Replc Conv
OH Xfmr Removal
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
108147401
101161935514193820
583073276
CABLE TV
PHONE
GAS
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
SCALE: 1" = 50'101161800THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
101161800514112207
CIRCUIT FEET ADDED: 0'
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
1340 SQ. FT
200 AMPS
ELECTRIC
29.5 KW
65 A
3.7%
1.5 %
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
T. CONTRERAS 206-637-3648 5/18/23
H. DAY 253-243-5816 5/18/23
H. DAY 253-243-5816 5/18/23
NOT NEEDED RENTON
LIU RESIDENCE
XFMR UPGRADE, OH SERVICE REPLACEMENT
613 SMITHERS AVE S, RENTON, WA 98057
N/A N/A
N/A 101161800
AS SHOWN 1 OF 1
KING N/A N/A CSPSKEPM
SE 18-23N-05E N/A N/A
2305E072 2305E076 2305E072SE GRA-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:TONY CONTRERAS
206-637-3648
TONY.CONTRERAS@PSE.COM
SITE SPECIFIC NOTES
AT P01: 317626-165990
-EXISTING 45, 2012 CL-3 POLE TO REMAIN
-REMOVE (1) EXISTING 25KVA 120/240V TRF
-INSTALL (1) 37.5KVA OH TRF 120/240V W/ LB C/O (FUSE @ 15T) PER STD 6025.1000 (TRFPXF)
M01 AT "613": METER BASE
-REMOVE EXISTING 100A METER
-INSTALL 200A METER
SPAN SPECIFIC NOTES
SEE SITE PLAN, ONE-LINE DRAWING &
TABLES FOR REMOVALS & INSTALLS
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
317626-165990
15kVA
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (OH)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
37.5kVA 120/240v
6211300
P01
317626-165990
SERVICE BRACKET SERVICE DROP
NO. 6 COPPERWELD,AIRCRAFT CABLE
OR EQUIVALENT 3/4" RIGID GALVANIZED
45˚MIN
18" MIN
SEE
DETAIL 1
FLASHING
STRUCTURAL FRAMING
AND FINISH MATERIALS
5/16" U-BOLT2" X 4" BACKING BLOCKING BETWEENMAST AND BUILDING
RIGID STEEL
CONDUIT
STRUCTURALFRAMINGAND FINISH
MATERIALS
GROUND GROUND
5/16" U-BOLT
2" X 4" BACKING
RIGID STEEL
CONDUIT
CONDUIT OR EQUIVALENT ENDSFLATTENED AND DRILLED
SHARP BEND; NO RADIUS(SEE DETAIL 2)45˚MIN
COLLARS,
CYCLONE
FENCECLAMP OR
EQUIVALENTWITH 3/8" MIN
BOLT SIZE
WEATHERHEAD
DETAIL 1 DETAIL 2
GALVANIZEDTHIMBLE AND CABLECLAMP
FLASHING OR MASTIC
METHOD OF GUYING
ATTACHMENT
SEE DETAIL 1
GALVANIZED BOLT;EYE-BOLT OPTIONAL
PULL
60˚ - 90˚
GUY WIRES60˚ - 90˚
APART
PULL
COLLARS, CYCLONE FENCECLAMP OR EQUAL WITH
3/8" MIN BOLT SIZE
GUYED SERVICE MAST DETAIL
SCALE: NONE
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER
PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5
BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS.
Minimum clearance requirements upon installation
SERVICE LINE(UTILITY OWNED)
TEMPORARY
SERVICE
26'
17-1/2'
12'10'
STATE HIGHWAYS STREETS, ALLEYS, COUNTY ROADS,
PARKING AREAS, AND DRIVEWAYS
RESIDENTIALPROPERTY
OVERHEAD TEMPORARY SERVICE CLEARANCE DETAIL
SCALE: NONE
00 1"2"
00 50'100'
JOB SITE
JOB SITE
317640-166006
317610-165990
50 kVA 120/240V (B)
SLAG6986
317641-165990
37.5 kVA 120/240V (C)
SLAP0373
WIRE STRINGING
PRIMARY & SECONDARY
Location
Usage Wire Size & Type
Quantity
of wires
Length
(per wire)TotalFromTo
P01 M01 SEC 1/0 OH TPX 1 50'50'
SECONDARY CABLE REMOVAL TABLE
Work
Location Wire Size Quantity
Length
(per
conductor)
Remarks
From To
P01 M01 #2 ACSR 1 50'EXISTING
3-11
18" MIN
18" MIN
4' MIN
6' MAX5' PREFERRED
6" MIN
6' MAX
3' MIN
3' MIN
Neare
s
t
S
i
d
e
W
a
l
l
or Ob
s
t
r
u
c
t
i
o
n
An
y
O
b
s
t
r
u
c
t
i
o
n
Ab
o
v
e
M
e
t
e
r
CT
E
n
c
l
o
s
u
r
e
Working SpaceMETER & CT Clearances
SCALE: NONE
MFP23004490
RESTORATION PER CITY OF RENTON STANDARDS