HomeMy WebLinkAbout7945.04 E 2023 0911Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 3 Report ID 7945.04 E 2023 0911 Date Mon 9/11/2023 Weather 70°F Clear Arrival/Departure Time(s) 9AM; 9:30AM Travel Time (hr)1.0 Project Name Canopy Property Location 413 Lincoln Ave NE, Renton ESNW Rep. & Phone Willem Scherwin | 206 793 8569 Client Info/Contact Century Communities | Stacia Bloom General Contractor Info/Contact Contractor #2 Info/Contact Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was onsite to observe and test water main backfill. Water Main Backfill Upon arrival, ESNW rep observed the contractor had excavated approximately 4’ into native tan sandy silt with gravel to place water main. ESNW rep observed the contractor had bedded the water main with coarse sand and backfilled in lifts with native structural soil. The soil was compacted with a hoe pack. ESNW rep took compaction tests and observed adequate compaction of at least 95% of the modified proctor at the tested locations. Please see map and table below. Test Number Test Location Elevation Reference Proctor Maximum Dry Density (pcf) Test Moisture (%) Test Dry Density (pcf) % of MDD 192 Water Main Backfill SG 9 128.5 10.5 121.7 95 193 Water Main Backfill SG 9 128.5 10.8 123.2 96 Report ID 7945.04 E 2023 0911 Page 2 of 3 Earth Solutions NW, LLC Report ID 7945.04 E 2023 0911 Page 3 of 3 Earth Solutions NW, LLC 192 193