HomeMy WebLinkAboutChange Order - 18PUBLIC WORKS DEPARTMENT M E M O R A N D U M DATE: September 11, 2023 TO: Armondo Pavone, Mayor FROM: Martin Pastucha, Public Works Administrator STAFF CONTACT: Russ Woodruff, Capital Projects Coordinator SUBJECT: Family First Community Center – Change Order 18 - CAG 21-180 Scope: Attached is Change Order 18 to CAG 21-180 for the Family First Community Center. CO 18 total amount including WSST is $92,165.81. CO 18 is the final change order for the project and includes the following Contract Change Directives. I reviewed all costs along with the architect and design team. We found the costs to be reflective of scope and fair in price. CCD 55 – Added CCTV Cameras and additional door alarms on exit doors to provide proper monitoring and security for the building. The initial design assumptions did not provide adequate coverage throughout the building. CCD 70 – Sunshade Structural Revisions – Site review by structural engineer determined additional structural revisions were required to properly support exterior steel sunshades. CCD 73 - Locker Room Mirror Upgrades – Review by the architect determined an upgrade was beneficial to enhance durability over the base product. CCD 88 – Wall Penetrations and Waterproofing – Details were added to address waterproofing of exterior trim and electrical boxes not denoted in bid plans. CCD 101 – Additional card readers with required support devises and 3 remote lock- down buttons were added to provide appropriate security for the main building entrance. Budget with GL numbers: The current contract total is $13,565,716.79. This amendment will add $92,165.81 including WSST for a new contract total of $13,657.882.60, paid via GL 346.220062.020.594.75.62. DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE CAG-21-180, CO #18-23 Public Works Facilities Division CONTRACT NO:CAG‐21‐180 CO 18 CONTRACT CHANGE ORDER (CO)PROJECT TITLE:FAMILY FIRST COMMUNITY CENTER TO: COMER GC, Inc. (CONTRACTOR)  Description Amount  $              29,908.00   $              14,275.00  CCD 73 ‐ Locker Room Mirror Changes 2,121.00$                 CCD 88 ‐ Wall Penetrations and Siding 16,814.00$               CCD 101 ‐ Low‐Voltage Revisions 20,593.00$               ‐$  Subtotal 83,711.00$               WSST 8,454.81$                 TOTAL THIS CHANGE ORDER 92,165.81$               CONTRACT SUM: 92,165.81$               (WASHINGTON STATE SALES TAX INCLUDED) CONTRACT TIME: 0 CALENDAR DAYS CONTRACT SUMMARY (Internal Use Only)      ORIGINAL CONTRACT SUM w/ WSST 12,474,330.00$               PREVIOUS ADDITIONS/DELETIONS 1,091,386.79$                     PREVIOUS TOTAL 13,565,716.79$                  CHANGE AMOUNT THIS CHANGE ORDER 92,165.81$                  REVISED CONTRACT TOTAL 13,657,882.61$          PERCENT TOTAL CHANGE FROM ORIGINAL 9.49% SUBSTANTIAL COMPLETION DATE PREVIOUS CONTRACT CALENDAR DAYS 309 REVISED FINAL COMPLETION DATE December 31, 2023 REVISED CONTRACT CALENDAR DAYS THIS CHANGE ORDER 0 CURRENT FINAL COMPLETION DATE December 31, 2023 Architect Acknowledgement       Date Contractor Acknowledgement      Date CITY OF RENTON MAYOR Armondo Pavone Jason A. Seth, City Clerk DATE The City of Renton hereby accepts the foregoing changes. This formal acceptance constitutes a Change to the contract only when  authorizing signature is affixed. Invoices incorporating this Change Order constitute acceptance by the Contractor as total reimbursement  due in connection with this Change Order. OF: The following mutually agreed to and Owner approved Contract Change Directive(s) are hereby incorporated by reference into the contract.  The  additional days are added to allow for close‐out with L&I and City. CCD 70 ‐ Sunshade Modifications CCD 55 ‐ Revisions to Cameras and Keypads February 25, 2023 The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full force  and effect. NO CHANGE INCREASE DECREASE NO CHANGE INCREASE DECREASE COMER GC, Inc.9/5/239/5/2023 DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE 9-15-2023 PUBLIC WORKS Facilities Division Project No:  CCD #55 CONSTRUCTION CHANGE DIRECTIVE Project Name: (CCD) (CONTRACTOR)   You are directed to prepare a cost proposal for the work described below and/or detailed on the attachment referred to: SOURCE OF CHANGE: DATE PROPOSAL REQUIRED:4/26/23 CHANGE ORIGINATED BY: Contractor (14 days from Request Date, unless other date agreed to) PROPOSAL REQUESTED BY: Architect ARCHITECT           COR PM WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR: CONTRACT SUM:        (WASHINGTON STATE SALES TAX EXCLUDED) In accordance with the general condition, Cost Estimate Detail Sheet(s) are attached hereto. CONTRACT TIME: OF 0 CALENDAR DAYS BY: CONTRACTOR SIGNATURE      DATE We have carefully examined this proposal and find the cost to be reasonable.  Therefore, we recommend acceptance. ARCHITECT DATE City of Renton Authorized Signature CITY OF RENTON DATE 29,908.00$          CAG 21‐180 Family First Community Center TO: Comer GC, Inc. The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full  force and effect. We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until  incorporation of this COP into a Change Order by the City of Renton. Add additional CCTV cameras and increase access control points 03/08/23  Proposal Request Date: EXPLANATION: Per above TO: Meredith Everist TO:                         Russ Woodruff NO CHANGE INCREASE DECREASE NO CHANGE INCREASE DECREASE Design Contractor Owner Code/AHJUnknown Conditions HealthPoint Other COMER GC, Inc.9/5/23 9/5/2023 DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE 9/11/2023 | 3:45 PM PDT CHANGE ITEM PRICING To: Meredith Everist Baylis Architects 10801 Main St. Ste 110 Reference: CI-055: RFI-035 and CCD-020 - Final CCTV Camera Changes Bellevue, WA 98004 Project: Family First Community Center A. TOTAL MATERIAL BASE COST 114.53$ B. TOTAL LABOR COST 1,314.87$ C. TOTAL EQUIPMENT COST 115.20$ Subtotal:1,544.60$ C. OVERHEAD AND PROFIT (15%) 231.69$ SUBTOTAL 1,776.28$ Hrs Cost D. SUBCONTRACT COST 80.0 23,694.00$ << System Solutions 8.0 874.00$ <<Todd Robinson Painting -$ << -$ << Subtotal:88.0 24,568.00$ E. OVERHEAD AND PROFIT ON SUBCONTRACT COST (8%) 1,965.44$ SUBTOTAL 26,533.44$ F. BOND (GC ONLY) 452.96$ G. GL INSURANCE 657.63$ H. UMBRELLA INSURANCE 319.62$ I. BUILDER'S RISK INSURANCE 167.90$ SUBTOTAL 1,598.10$ Total Change Order Value: 29,908.00$ CONTRACT TIME ADJUSTMENT Undetermined - Mitigation Efforts Ongoing COMER GC, Inc. CONTRACTOR NAME AND TITLE Luke Comer, Project Manager DATE 8/18/2023 Should the scope of this change proposal be desired differently then what we have priced, advise before providing your acceptance so that we can perform and price the final scope as desired. Otherwise, we asssume our pricing reflects the correct scope of this change as interpreted by COMER GC and its subcontractors/suppliers. Changes that have proceeded were to incorporate work into the project in a timely and cost effective manner consistent with mutual understandings to do so. COMER GC and its subcontractors reserves the right for time and compensation for the direct and indirect affect of this change on unchanghed work. DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE CHANGE ITEM PRICING COP No. Project: General Contractor ITEM DESCRIPTION Qty UNIT MATERIAL UNIT COST MATERIAL COST LABOR UNIT COST LABOR COST EQUIP UNIT COST EQUIPMENT COST TOTAL COST Work by COMER GC: Labor HR -$ -$ 75.00$ -$ -$ -$ -$ Materials ea -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Project / Sub Support 7.68 mhs 5.85$ 44.93$ 75.00$ 576.00$ -$ -$ 620.93$ Project Time and Schedule -$ -$ 500.00$ -$ -$ 500.00$ Transport Debris to Dumpster (3.5 cf/mh)26.88 cf -$ -$ 2.19$ 58.87$ -$ -$ 58.87$ Dumpster service (converted to cy)1.00 cy 60.00$ 60.00$ -$ -$ -$ -$ 60.00$ Forklift and trash hoppers 2.40 hr 4.00$ 9.60$ 75.00$ 180.00$ 48.00$ 115.20$ 304.80$ Additional Sanican cleaning Due to Additional manpower hours EA -$ -$ -$ -$ 255.00$ -$ -$ -$ -$ -$ -$ TOTAL GC COST 114.53$ 1,314.87$ 115.20$ 1,544.60$ (CI #055) COMER GC, Inc.Family First Community Center 2 DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE Project Name: 021C Project No. 4/26/2023 CI-055 a.6,987.50$ b.-$ c.-$ DIRECT LABOR SUBTOTAL 6,987.50$ d.-$ e.-$ 6,988.00$ a.783.30$ b.-$ 783.00$ a.750.00$ b.-$ 750.00$ a.-$ -$ 8,521.00$ a.1,022.52$ 1,023.00$ a.12,354.00$ b. c. d.-$ 12,354.00$ a.988.32$ 988.00$ a. 2.00 % of 1 b. 2.00 % of 1-7 457.72$ 458.00$ a. 1.50 % of 1-8 350.16$ 350.00$ 23,694.00$ System Solutions Change Order Summary Sheet Family First Community Center COP No. Source Documents:CI-055 / CCD-020 Date: foreman G. Contractor: COMER GC, Inc. Contractor Ref. No. Changes per CCD-020: CCTV Camera Locations, relates to RFI-035 1. CRAFT LABOR COSTS Itemize all costs on attached COP Cost Breakdown form. Direct Labor Costs: crew (apprentices, journeymen, & laborers) 2. MATERIAL COSTS lead foreman Supervision: direct supervison (NTE 12% of 1a) safety (NTE 2% of lines 1a, b, & c) 1. CRAFT LABOR COSTS 2. MATERIAL COSTS material costs freight costs (itemize) 3. EQUIPMENT COSTS owned equipment (per spec approved source) rental equipment (per invoices attached) 3. EQUIPMENT COSTS 5. OVERHEAD & PROFIT 4. SMALL TOOLS small tools (NTE 5% of 1a & b) 4. SMALL TOOLS SUBTOTAL 1 thru 4 5. OVERHEAD & PROFIT NTE 12% portion of 1, 2, 3, & 4 7. OVERHEAD & PROFIT ON SUB-SUBCONTRACTORS 6. SUB-SUBCONTRACTORS Electrotech 6. SUB-SUBCONTRACTORS 7. OVERHEAD & PROFIT ON SUB-SUBCONTRACTORS NTE 8% of Line 6 up to $50,000 for each sub TOTAL COST 8. INSURANCE payroll driven liability insurance volume driven liability insurance 8. INSURANCE 9. B&O B&O 9. BOND DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE Electrical Technology Inc Prepared by Chris Davis 3/8/23 Page 1 Electrical Technology LLC P.0. Box 13889 Mill Creek, WA 98082 PH#(206)931-3128 Fax#(866)798-9241 Proposal for IP CCTV System In Favor of:Date:March 8, 2023 System Solutions of Washington Inc.Quotation Reference: Dan Russell Project Name:FFC CCD-020 425-249-2076 Site Address 16200 116th Ave SE 206-379-0630 Site City/State/Zip Renton WA 17151 Sealawn Drive Edmonds WA 98026 We are pleased to quote the following services for your project: QTY.ITEM DESCRIPTION PRICE 3 3MP Outdoor IP Dome Camera 7 3MP Indoor IP Dome Camera 10 SV821 Dome Wall Mount Mount 1 SW08P 24Channel POE Switch 1 ICC24-5 24 port Punch Down 10 Wire & Fittings per Device The Total Installed Price Per Building of the following System is 17,354.00$ There is no cost for relocating existing cameras because we are in the rough in stage of this project This proposal is good for 90 days from above date do to rapid changing equipment costs Thank You Chris Davis $12,354 DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE 1 Russ Woodruff From:Meredith Everist <everistm@baylisarchitects.com> Sent:Tuesday, September 5, 2023 10:28 AM To:Russ Woodruff Cc:16-0996 Family First Community Center Subject:FW: FFCC - CI-055 - RFI-035 & CCD-020 - CCTV Cameras Attachments:FFCC - CI-055 - RFI-035 & CCD-020 - CCTV Cameras_Revised 8.18.23.pdf Hi Russ, Based on Luke’s email clarification and the reduction of the change order amount by approximately $6,400, I  think this Change Item is reasonable and acceptable.      Thanks, Meredith    Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz   From: Luke Comer <luke@comergc.com>   Sent: Friday, August 18, 2023 1:51 PM  To: Meredith Everist <everistm@baylisarchitects.com>  Cc: 'Tim Comer' <tim@comergc.com>; 'Jon Scofield' <jon@comergc.com>; 'Russ Woodruff ‐ City of Renton'  <rwoodruff@rentonwa.gov>; 16‐0996 Family First Community Center <16‐0996@baylisarchitects.com>  Subject: RE: FFCC ‐ CI‐055 ‐ RFI‐035 & CCD‐020 ‐ CCTV Cameras    Team –                  Sorry for the delay in getting this back to you, Chris is recovering and we finally got him to review. It sounds as  though they did install cameras in the Makerspace, but should have only been R/I. It also looks like there were some  cameras added in HP, but ended up not being needed since HP added some of their own, I believe that may be part of  the discrepancy (Cameras were left onsite). The POE switch did get upsized as the amount of recording time and final  cameras dictated what size switch in the end, which cost more than their original bid anticipation.     All of this was a very convoluted scope that was a difficult process throughout the construction process, and didn’t get  final direction on exact scope until late. With that in mind, we are hoping Electrotech and System Solutions reduction of  $5k in the final camera scope, which results in this change being reduced by nearly $6,400 is enough to settle this final  change.     Attached is revised pricing, totaling $29,908 in lieu of the originally submitted $36,287. Hoping this is approved by the  team, and we can wrap up the final CO. সহ঺঻    Thank you,  CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.   DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE 2   Luke Comer C: 425‐765‐4118  I  P: 425‐636‐8934  I  F: 425‐285‐9785      From: Meredith Everist <everistm@baylisarchitects.com>   Sent: Wednesday, June 14, 2023 6:43 PM  To: Luke Comer <luke@comergc.com>  Cc: 'Tim Comer' <tim@comergc.com>; Jon Scofield <jon@comergc.com>; Russ Woodruff ‐ City of Renton  (RWoodruff@Rentonwa.gov) <rwoodruff@rentonwa.gov>; 16‐0996 Family First Community Center <16‐ 0996@baylisarchitects.com>  Subject: FW: FFCC ‐ CI‐055 ‐ RFI‐035 & CCD‐020 ‐ CCTV Cameras    Hi Luke, will you please provide us with a more detailed breakout of Electrotech’s costs and confirm the number of new  cameras?  My count is similar to Ryan’s below.  I am counting 7 new cameras (3 exterior and 4 interior).    Also for Electrotech, if they will clarify their base bid and change request for the POE switch – please see Ryan’s  comments below.    Thanks, Meredith    Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz   From: Ryan Arp <Ryan@siderbyers.com>   Sent: Thursday, June 8, 2023 1:23 PM  To: Meredith Everist <everistm@baylisarchitects.com>  Cc: 16‐0996 Family First Community Center <16‐0996@baylisarchitects.com>  Subject: RE: FFCC ‐ CI‐055 ‐ RFI‐035 & CCD‐020 ‐ CCTV Cameras    Hi Meredith,    Ok I finally had a spare hour+ to look thru these items, so there will be a batch of responses coming your way….    First up, the CCTV….  This is a complex change since it is a design build scope, I was not part of the design meetings with the DB Sub, and the  shop drawings “tracking these changes” are incredibly hard to read/understand.  However, it is a substantial change  order, so I think we need more information to justify it.  Here is some commentary I have based on the CCD notes and  reviewing our BOD drawings vs. the preliminary shop drawings.    There is no breakdown of labor or material costs from the DB Sub ElectroTech.  This would be really helpful to  understand the true costs.   DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE 3   On System Solutions breakdown, 48 total hours to install 200‐feet of conduit and 20 outlet boxes feels like a high  number of hours.  This all depends on when the change was made….if it came after the fact and they had to go back and  work around conduit/materials already installed then it might be more justified. (but we are not installers so this is a  very difficult thing for us to discern)    Per the memo at then end of the CCD I count 6 cameras added, possibly 7 depending on coverage needs.  The CCD has  10 cameras added.  Were these 10 actually required and accounted for?      As far as materials are concerned, we had 2 cameras in the maker space under the original scope which changed to be  rough‐in only based on RSD feedback.  Those cameras were shown on the original CCTV shop drawings, so it would seem  the material costs for camera & mounting brackets were already included in the scope budget.  So in my view that  would mean only 8 camera materials were added to the project scope.  Can you confirm that the Maker Space cameras  were indeed NOT INSTALLED as RSD requested?    The other material item is they added a 24channel POR Switch & punch down port.  Was this item truly needed as an  add?    Our original design showed 24 cameras and the specs call for a system that supports the cameras shown plus and  additional 25% capacity in the future.  Taking a closer look at the CCTV Shop drawings, they originally provided a 24‐port  POE switch for 24 cameras.  I am not an expert on these systems, but this would appear to not meet the spec  requirement of 25% additional capacity (which would have required at least 30 ports).    If 10 cameras were added to the scope then that is likely to exceed the extra 25% capacity.  However POE switches  typically come in port increments of 5, 8, 16, 24, or 48 and if they truly provided a system with 25% extra capacity why  did they need to add a 24‐port switch instead of something smaller?     Let me know if this all makes sense.  Thanks    Ryan Arp Electrical Engineer SIDER + BYERS MECHANICAL + ELECTRICAL ENGINEERS   192 Nickerson St., Suite 300  Seattle, WA 98109  206-285-2966 Ryan@siderbyers.com   From: Meredith Everist <everistm@baylisarchitects.com>   Sent: Thursday, May 11, 2023 2:26 PM  To: Ryan Arp <Ryan@siderbyers.com>  Cc: 16‐0996 Family First Community Center <16‐0996@baylisarchitects.com>  Subject: FW: FFCC ‐ CI‐055 ‐ RFI‐035 & CCD‐020 ‐ CCTV Cameras    Hi Ryan, will you please review this Change item and let me know if it appears fair and reasonable to you?    Thanks, Meredith    Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE 4 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz   From: Luke Comer <luke@comergc.com>   Sent: Wednesday, April 26, 2023 11:21 AM  To: 'Russ Woodruff' <RWoodruff@Rentonwa.gov>; Meredith Everist <everistm@baylisarchitects.com>  Cc: 'Tim Comer' <tim@comergc.com>; Jon Scofield <jon@comergc.com>  Subject: FFCC ‐ CI‐055 ‐ RFI‐035 & CCD‐020 ‐ CCTV Cameras    Team –   Attached is pricing for: FFCC ‐ CI‐055 ‐ RFI‐035 & CCD‐020 ‐ CCTV Cameras, which relates to additional costs per  the final CCD‐020 summarized scope for the CCTV cameras, which relates to the RFI‐035 response.        Thank you,   Luke Comer C: 425‐765‐4118  I  P: 425‐636‐8934  I  F: 425‐285‐9785      DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE PUBLIC WORKS Facilities Division Project No:  CCD #70 CONSTRUCTION CHANGE DIRECTIVE Project Name: (CCD) (CONTRACTOR)   You are directed to prepare a cost proposal for the work described below and/or detailed on the attachment referred to: SOURCE OF CHANGE: DATE PROPOSAL REQUIRED:2/23/23 CHANGE ORIGINATED BY: Contractor (14 days from Request Date, unless other date agreed to) PROPOSAL REQUESTED BY: Architect ARCHITECT           COR PM WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR: CONTRACT SUM:        (WASHINGTON STATE SALES TAX EXCLUDED) In accordance with the general condition, Cost Estimate Detail Sheet(s) are attached hereto. CONTRACT TIME: OF 0 CALENDAR DAYS BY: CONTRACTOR SIGNATURE      DATE We have carefully examined this proposal and find the cost to be reasonable.  Therefore, we recommend acceptance. ARCHITECT DATE City of Renton Authorized Signature CITY OF RENTON DATE CAG 21‐180 Family First Community Center TO: Comer GC, Inc. The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full  force and effect. We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until  incorporation of this COP into a Change Order by the City of Renton. Structural revisions required to support sunshades 01/25/23  Proposal Request Date: EXPLANATION: Per above TO: Meredith Everist TO:                         Russ Woodruff 14,275.00$         NO CHANGE INCREASE DECREASE NO CHANGE INCREASE DECREASE Design Contractor Owner Code/AHJUnknown Conditions HealthPoint Other COMER GC, Inc.9/5/23 9/5/2023 DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE 9/11/2023 | 3:45 PM PDT DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE 1 Russ Woodruff From:Meredith Everist <everistm@baylisarchitects.com> Sent:Wednesday, July 26, 2023 10:54 AM To:Russ Woodruff Cc:16-0996 Family First Community Center Subject:FW: FFCC - CI-070 - RFI-041 - Structural Site Visit Report - Added Framing related to Sunshades Attachments:FFCC - CI-070 - RFI-041 - Structural Site Visit Report - Added Framing related to Sunshades.pdf Hi Russ, Kelly and I reviewed this Change Item and Kelly provided her comments in the email below.      Following up on the Re‐engineering fee that Kelly commented on ($1200), this is a fee by the subcontractor, AWS, who is  responsible for the design/build.  I think the sunscreens were a challenge, evidenced by the previous Change Item #15,  and with the added framing outlined in this change, AWS needed to check the engineering.    I think this change is reasonable based on the work involved.    Thanks, Meredith    Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz   From: Kelly Lowe <kellyl@cplinc.com>   Sent: Friday, April 28, 2023 1:17 PM  To: Meredith Everist <everistm@baylisarchitects.com>; Ben Barlow <BenB@cplinc.com>  Cc: 16‐0996 Family First Community Center <16‐0996@baylisarchitects.com>  Subject: RE: FFCC ‐ CI‐070 ‐ RFI‐041 ‐ Structural Site Visit Report ‐ Added Framing related to Sunshades    Hi Meredith,    Looks like there are two major line items contributing to the cost of this COR, the first being related to a wood framing  RFI. It could be debatable whether this is a true change or a misinterpretation of our drawings, but with that being said,  the cost appears to be reasonable for the RFI fix.     The second line item is related to “re‐engineering” of sunshade brackets. It’s unclear to us what contributed to this  change as the structural framing revisions should not have required bracket revisions. I alsIt might be good to ask what  drove this change.    Thanks,      CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.   DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE 2 Kelly Lowe (she/her) COUGHLINPORTERLUNDEEN   From: Meredith Everist <everistm@baylisarchitects.com>   Sent: Wednesday, April 26, 2023 10:16 AM  To: Kelly Lowe <kellyl@cplinc.com>; Ben Barlow <BenB@cplinc.com>  Cc: 16‐0996 Family First Community Center <16‐0996@baylisarchitects.com>  Subject: FW: FFCC ‐ CI‐070 ‐ RFI‐041 ‐ Structural Site Visit Report ‐ Added Framing related to Sunshades    HI Kelly, will you please review the framing costs in this change item when you get a chance and let me know if it looks  reasonable and fair to you?    Thanks, Meredith    Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz   From: Luke Comer <luke@comergc.com>   Sent: Thursday, February 23, 2023 11:23 AM  To: Meredith Everist <everistm@baylisarchitects.com>; 'Russ Woodruff' <RWoodruff@Rentonwa.gov>  Cc: 'Tim Comer' <tim@comergc.com>; 'Jon Scofield' <jon@comergc.com>; 16‐0996 Family First Community Center <16‐ 0996@baylisarchitects.com>  Subject: FFCC ‐ CI‐070 ‐ RFI‐041 ‐ Structural Site Visit Report ‐ Added Framing related to Sunshades    Team –   Attached is pricing for: FFCC ‐ CI‐070 ‐ RFI‐041 ‐ Structural Site Visit Report ‐ Added Framing related to  Sunshades, which relates to the added framing per RFI‐041, as well as costs associated with rushing brackets/separate  powder coating and additional engineering changing from thru‐bolt to wood lag attachment. The RFI response also  included the change to metal roof at the location above the demonstration kitchen door.          Thank you,   Luke Comer C: 425‐765‐4118  I  P: 425‐636‐8934  I  F: 425‐285‐9785      DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE PUBLIC WORKS Facilities Division Project No:  CCD #73 CONSTRUCTION CHANGE DIRECTIVE Project Name: (CCD) (CONTRACTOR)   You are directed to prepare a cost proposal for the work described below and/or detailed on the attachment referred to: SOURCE OF CHANGE: DATE PROPOSAL REQUIRED:1/16/23 CHANGE ORIGINATED BY: Contractor (14 days from Request Date, unless other date agreed to) PROPOSAL REQUESTED BY: Architect ARCHITECT           COR PM WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR: CONTRACT SUM:        (WASHINGTON STATE SALES TAX EXCLUDED) In accordance with the general condition, Cost Estimate Detail Sheet(s) are attached hereto. CONTRACT TIME: OF 0 CALENDAR DAYS BY: CONTRACTOR SIGNATURE      DATE We have carefully examined this proposal and find the cost to be reasonable.  Therefore, we recommend acceptance. ARCHITECT DATE City of Renton Authorized Signature CITY OF RENTON DATE 2,121.00$           CAG 21‐180 Family First Community Center TO: Comer GC, Inc. The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full  force and effect. We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until  incorporation of this COP into a Change Order by the City of Renton. Upgrade Locker Room Mirrors 12/05/22  Proposal Request Date: EXPLANATION: Per above TO: Meredith Everist TO:                         Russ Woodruff NO CHANGE INCREASE DECREASE NO CHANGE INCREASE DECREASE Design Contractor Owner Code/AHJUnknown Conditions HealthPoint Other COMER GC, Inc.9/5/23 9/5/2023 DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE 9/11/2023 | 3:45 PM PDT DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE 1 Russ Woodruff From:Meredith Everist <everistm@baylisarchitects.com> Sent:Tuesday, July 18, 2023 6:35 PM To:Russ Woodruff Cc:16-0996 Family First Community Center Subject:FW: FFCC - CI-073 - Locker Room Mirror Changes Attachments:FFCC - CI-073 - Locker Room Mirror Changes.pdf Hi Russ, I think this change request is reasonable for the higher quality and longer lasting mirror.    Thanks,   Meredith    Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz   From: Luke Comer <luke@comergc.com>   Sent: Monday, January 16, 2023 10:31 AM  To: 'Russ Woodruff' <RWoodruff@Rentonwa.gov>; Meredith Everist <everistm@baylisarchitects.com>  Cc: 'Tim Comer' <tim@comergc.com>; Jon Scofield <jon@comergc.com>  Subject: FFCC ‐ CI‐073 ‐ Locker Room Mirror Changes    Team –   Attached is pricing for: FFCC ‐ CI‐073 ‐ Locker Room Mirror Changes, related to onsite discussions included  within.         Thank you,   Luke Comer C: 425‐765‐4118  I  P: 425‐636‐8934  I  F: 425‐285‐9785       CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.   DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE PUBLIC WORKS Facilities Division Project No:  CCD #88 CONSTRUCTION CHANGE DIRECTIVE Project Name: (CCD) (CONTRACTOR)   You are directed to prepare a cost proposal for the work described below and/or detailed on the attachment referred to: SOURCE OF CHANGE: DATE PROPOSAL REQUIRED:4/23/23 CHANGE ORIGINATED BY: Contractor (14 days from Request Date, unless other date agreed to) PROPOSAL REQUESTED BY: Architect ARCHITECT           COR PM WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR: CONTRACT SUM:        (WASHINGTON STATE SALES TAX EXCLUDED) In accordance with the general condition, Cost Estimate Detail Sheet(s) are attached hereto. CONTRACT TIME: OF 0 CALENDAR DAYS BY: CONTRACTOR SIGNATURE      DATE We have carefully examined this proposal and find the cost to be reasonable.  Therefore, we recommend acceptance. ARCHITECT DATE City of Renton Authorized Signature CITY OF RENTON DATE 16,814.00$         CAG 21‐180 Family First Community Center TO: Comer GC, Inc. The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full  force and effect. We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until  incorporation of this COP into a Change Order by the City of Renton. Additional work required to manage wall penetrations 02/12/23  Proposal Request Date: EXPLANATION: Per above TO: Meredith Everist TO:                         Russ Woodruff NO CHANGE INCREASE DECREASE NO CHANGE INCREASE DECREASE Design Contractor Owner Code/AHJUnknown Conditions HealthPoint Other COMER GC, Inc.9/5/23 9/5/2023 DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE 9/11/2023 | 3:45 PM PDT DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE 1 Russ Woodruff From:Meredith Everist <everistm@baylisarchitects.com> Sent:Wednesday, July 19, 2023 10:51 AM To:Russ Woodruff Cc:16-0996 Family First Community Center Subject:FW: FFCC - CI-088 - Wall Penetration and Siding Systems - 1.16.23 email Attachments:FFCC - CI-088 - Wall Penetration and Siding Systems - 1.16.23 email.pdf HI Russ, I reviewed this change order and take no exceptions to this request.  The time and costs for the work looks  reasonable.    Thanks, Meredith    Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz   From: Luke Comer <luke@comergc.com>   Sent: Thursday, April 13, 2023 12:09 PM  To: 'Russ Woodruff' <RWoodruff@Rentonwa.gov>; Meredith Everist <everistm@baylisarchitects.com>  Cc: 'Tim Comer' <tim@comergc.com>; Jon Scofield <jon@comergc.com>  Subject: FFCC ‐ CI‐088 ‐ Wall Penetration and Siding Systems ‐ 1.16.23 email    Team –   Attached is pricing for: FFCC ‐ CI‐088 ‐ Wall Penetration and Siding Systems ‐ 1.16.23 email, which relates to the  scope associated with blocking, waterproofing, and flashing at numerous appurtenances on the building that were not  ever elevated or shown on the exterior elevations. This relates to the email from 1/16/23, which is also attached  herein.          Thank you,   Luke Comer C: 425‐765‐4118  I  P: 425‐636‐8934  I  F: 425‐285‐9785       CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.   DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE PUBLIC WORKS Facilities Division Project No:  CCD # 101 CONSTRUCTION CHANGE DIRECTIVE Project Name: (CCD) (CONTRACTOR)   You are directed to prepare a cost proposal for the work described below and/or detailed on the attachment referred to: SOURCE OF CHANGE: DATE PROPOSAL REQUIRED:4/27/23 CHANGE ORIGINATED BY: Contractor (14 days from Request Date, unless other date agreed to) PROPOSAL REQUESTED BY: Owner ARCHITECT           COR PM WE AGREE TO PERFORM ALL CHANGE IN THE WORK DESCRIBED IN THE PROPOSAL REQUEST FOR: CONTRACT SUM:        (WASHINGTON STATE SALES TAX EXCLUDED) In accordance with the general condition, Cost Estimate Detail Sheet(s) are attached hereto. CONTRACT TIME: OF 0 CALENDAR DAYS BY: CONTRACTOR SIGNATURE      DATE We have carefully examined this proposal and find the cost to be reasonable.  Therefore, we recommend acceptance. ARCHITECT DATE City of Renton Authorized Signature CITY OF RENTON DATE CAG 21‐180 Family First Community Center TO: Comer GC, Inc. The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full  force and effect. We understand that this proposal does not constitute authorization to proceed with the specified changes in the work until  incorporation of this COP into a Change Order by the City of Renton. Low voltage revisions for access controls to provide adequate access and security 02/07/23  Proposal Request Date: EXPLANATION: Per above TO: Meredith Everist TO:                         Russ Woodruff 20,593.00$         NO CHANGE INCREASE DECREASE NO CHANGE INCREASE DECREASE Design Contractor Owner Code/AHJUnknown Conditions HealthPoint Other COMER GC, Inc.9/5/23 9/5/2023 DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE 9/11/2023 | 3:45 PM PDT DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE 1 Russ Woodruff From:Meredith Everist <everistm@baylisarchitects.com> Sent:Wednesday, July 19, 2023 9:55 AM To:Russ Woodruff Cc:16-0996 Family First Community Center Subject:FW: FFCC - CI-101 - CCD-020 - Low Voltage Changes - Card Readers, LD Buttons Attachments:FFCC - CI-101 - CCD-020 - Low Voltage Changes - Card Readers, LD Buttons.pdf Hi Russ, I reviewed this change Item for the low voltage revisions and believe the cost is fair and reasonable.    Thanks, Meredith    Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz   From: Luke Comer <luke@comergc.com>   Sent: Thursday, April 27, 2023 11:48 AM  To: 'Russ Woodruff' <RWoodruff@Rentonwa.gov>; Meredith Everist <everistm@baylisarchitects.com>  Cc: 'Tim Comer' <tim@comergc.com>; Jon Scofield <jon@comergc.com>  Subject: FFCC ‐ CI‐101 ‐ CCD‐020 ‐ Low Voltage Changes ‐ Card Readers, LD Buttons      Team –   Attached is pricing for: FFCC ‐ CI‐101 ‐ CCD‐020 ‐ Low Voltage Changes ‐ Card Readers, LD Buttons, which  includes costs associated with CCD‐020 Low Voltage scope as related to card readers, and lock down buttons.       Thank you,   Luke Comer C: 425‐765‐4118  I  P: 425‐636‐8934  I  F: 425‐285‐9785       CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.   DocuSign Envelope ID: 90AD00FB-1DCB-4C4C-8FF5-A4B80EAFCFAE