Loading...
HomeMy WebLinkAbout11-28-2022 M7221137.0004 City of Renton Gene Coulon psrkSTRUCTURAL STEEL OBSERVATIONS REPORT Report Number: M7221137.0005 Service Date: 11/28/22 20225 Cedar Valley Rd Ste 110 Report Date: 11/28/22 Lynnwood, WA 98036-6365 425-742-9360 Client Project City of Renton WA City of Renton Gene Coulon Memorial Beach Park (T) Attn: Alan J. Wyatt 1201 Lake Washington Blvd N 1055 S Grady Way Renton, WA Renton, WA 98057-3232 Project Number: M7221137 Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Danielle Candelaria Reported To: Contractor: American Construction Company Inc Report Distribution: (1) City of Renton WA, Alan J. Wyatt (1) American Construction Co Inc, John Blair (1) Mayes Testing Engineers, Inc, Belinda Rix (1) Mayes Testing Engineers, Inc, Jim Kay Reviewed By: __________________________________ __ (1) WSP USA Inc, Garth Nelson, P.E. Dennis Sanborn Senior Project Field Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 Permit No.: C21005257 GENERAL INFORMATION Arrived on site for visual inspection of welded headed rebar dowels to piles. Visually inspected completed welding for conformance with the approved WPS, AWS D1.4, detail 2/S-9, and city of Renton specifications. Visually inspected completed welding on (3) piles at the north abutment, east, west, and center piles. (4) of the welds at the west and center piles were not in conformance with the approved detail for length. Spoke with Aaron from American Construction about the issue, the issue is being addressed. Welding continued on the south side abutment at the east, west, and center piles. COMPLIANCE STATEMENT Preliminary Observation(s) Welding in progress.