HomeMy WebLinkAboutConcrete Observation.City of Renton Gene Coulon Memorial Beach Park (T).C21005257.2023-07-12.M7221137.0027CONCRETE OBSERVATION REPORT Report Number:M7221137.0027 Service Date:07/12/23 20225 Cedar Valley Rd Ste 110 Report Date:07/17/23 Lynnwood, WA 98036-6365 425-742-9360 Client Project City of Renton WA City of Renton Gene Coulon Memorial Beach Park (T) Attn: Alan J. Wyatt 1201 Lake Washington Blvd N 1055 S Grady Way Renton, WA Renton, WA 98057-3232 Project Number: M7221137 Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Samuel Owens Reported To:American Construction Company Contractor:American Construction Report Distribution: (1) City of Renton WA, Alan J. Wyatt (1) American Construction Co Inc, Aaron McMahill (1) American Construction Co Inc, John Blair (1) Mayes Testing Engineers, Inc, Jim Kay Reviewed By:____________________________________ (1) WSP USA Inc, Garth Nelson, P.E. Barry Tuttle Project Field Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. DM010, 04-29-22 Rev.3 Page 1 of 1 Permit No.: C21005257 GENERAL INFORMATION American Construction Company Inc requested Terracon be on site for concrete observation of the following elements: slab. These elements are being constructed by American Construction. The results of observations for today were reported to Aaron with American Construction. The construction documents referenced for this inspection included: S-1 dated 08/11/2022. REINFORCING STEEL Reinforcing steel was previously inspected by Craig Williams with Mayes Terracon on 06/15/2023. CONCRETE PLACEMENT Terracon observed concrete placement as follows: Element Location Yardage Supplier Mix ID Mix Description Slab-on- ground (1) North and south bridge abutment slabs (top 8 inches) 4yds Cadman P2D35476 Normal Weight, 5000-psi, air-entrained concrete Placement Method: Buggy Consolidation Method: Mechanical Vibrator Protection Method: Not Observed TESTS PERFORMED Cast (4) 4x8” lab cure cylinders for compressive strength testing. ADDITIONAL COMMENTS The contractor secured loose rebar before placing each topping slab. This concrete load had graphite color (79022) in it for dye. COMPLIANCE STATEMENT Based on our observations and testing, the above noted items appear to be in general accordance with the project documents. Photo Log Report Number:M7221137.0027 Service Date:07/12/23 20225 Cedar Valley Rd Ste 110 Report Date:07/17/23 Lynnwood, WA 98036-6365 425-742-9360 City of Renton WAAttn: Alan J. Wyatt CT0001, 10-16-13, Rev.10 Page 1 of 1 (P1) After concrete was placed, looking north. (P2) Excerpt from S-1 indicating concrete strength.