Loading...
HomeMy WebLinkAboutPost-Installed Anchors.City of Renton Gene Coulon Memorial Beach Park (T).C21005257.2023-06-06.M7221137.0020POST-INSTALLED ANCHORS REPORT Report Number:M7221137.0020 Service Date:06/06/23 20225 Cedar Valley Rd Ste 110 Report Date:06/07/23 Lynnwood, WA 98036-6365 425-742-9360 Client Project City of Renton WA City of Renton Gene Coulon Memorial Beach Park (T) Attn: Alan J. Wyatt 1201 Lake Washington Blvd N 1055 S Grady Way Renton, WA Renton, WA 98057-3232 Project Number: M7221137 Services: Special Inspections / Materials Testing Mayes/Terracon Rep.: Craig Williams Reported To:American Construction Company Contractor:American Construction Report Distribution: (1) City of Renton WA, Alan J. Wyatt (1) American Construction Co Inc, Aaron McMahill (1) American Construction Co Inc, John Blair (1) Mayes Testing Engineers, Inc, Jim Kay Reviewed By:____________________________________ (1) WSP USA Inc, Garth Nelson, P.E. Barry Tuttle Project Field Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. DM010, 04-29-22 Rev.3 Page 1 of 1 Permit No.: C21005257 GENERAL INFORMATION Aaron with American Construction requested Terracon be on site for adhesive anchor observation of the adhesive anchors being installed by American Construction. Results of observations performed today were reported to Aaron with American Construction. The construction documents referenced for this observation included: Approved plans and documents. Anchor System Information The following adhesive types were used during today’s observation: Adhesive No.ICC Report Adhesive Lot No.Exp. Date Time Until Full Cure Referenced 1 3814 Hilt Hit-RE 500 V3 15177710 1/31/24 4 hrs 1/C-9 on S-13 & Email from Garth Nelson E.O.R. Anchor Installation Anchor installation was observed utilizing the adhesive(s), noted above, as follows: (2) Water line Support Anchors Adhesive No. Time Installed Locations Quantity Anchor Size & Type Length & Embedment Spacing & Edge Distance Status* 1 1000 North and South bridge abutments 8 3/4" All- Thread 6.5" & 5"Per plan & 16" Complies * See below for more information Holes were cleaned prior to installation by compressed air, brush. Ambient Temperature during observation was 74° F. COMPLIANCE STATEMENT Based on our observations and testing, the above noted items appear to be in general accordance with the project documents.