Loading...
HomeMy WebLinkAboutNOA_Project_Acceptance_20230914DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: September 20, 2023 PROJECT NAME/NUMBER: EVGO Services LLC / LUA23-000307, NV-A PROJECT LOCATION: 4601 NE Sunset Blvd (APN 1494500010) APPLICANT/PROJECT CONTACT PERSON: Jenny Chau / 6905 S 228th St Kent, WA 98032 / jenny.chau@pse.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/LwxRvbmJ PROJECT DESCRIPTION: The applicant, Puget Sound Energy on behalf of EVGo Services LLC, is requesting an administrative noise variance from RMC 8-7-2 (Noise Level Regulations, Maximum Environmental Noise Levels) in order to install EV charging equipment at 4601 Sunset Blvd NE. The applicant is proposing to install approximately 720 feet of new electrical cabling, a new a transformer, and switching circuits as part of the project. The applicant is proposing the work at night in order to limit disruptions to nearby businesses which may experience an outage during construction. The proposed night time work is scheduled to take place on October 6th and 7th from 10:00pm to 5:00 am. An alternate work window may be required to complete the night work. Noise levels resulting from project construction activities are expected to generate peak noise levels of 84 to 85 dBA as perceived at 50 feet from the source of the noise. These sound levels are expected to diminish from the source of the noise. A variance from RMC 8-7-2 is necessary in order to conduct the night time work, as maximum permissible environmental noise levels (per WAC 173-60-040, incorporated by reference in RMC 8-7) limit extended periods of noise from 10:00 pm to 7:00 am to levels between 45 dBA and 60 dBA, with exceedances of 5 to 15 dBA permitted for periods of 1.5 to 15 minutes in any one-hour period (WAC 173-60-040). The pieces of equipment that are proposed to be utilized to complete the work include gas-powered equipment, vehicles, and a Sawzall. Hand tools would be used when possible. DATE OF APPLICATION: September 13, 2023 NOTICE OF COMPLETE APPLICATION: September 21, 2023 PERMITS/REVIEW REQUESTED: Administrative Noise Variance OTHER PERMITS WHICH MAY BE REQUIRED: None REQUESTED STUDIES: Traffic Control Plan Comments on the above application must be submitted in writing by 5:00 PM on October 4, 2023. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: EVGO Services LLC / LUA23-000307, NV-A Name: __________________________________ Email: _______________________ Phone No. ___________________ Mailing Address: __________________________________City/State/Zip: _____________________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. CONTACT PROJECT PLANNER: Alex Morganroth, Senior Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov NE 12th St Duvall Ave NE Whitman Ct NE NE 12th St