Loading...
HomeMy WebLinkAboutMFP23004474.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP23004474 IVR Number: 23004474 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:08/29/2023Application Date:3664500185Parcel Number: 13014 156TH AVE SE, LOT Permit Type:09/25/2023Issue Date:Franchise Permit Work Class:09/24/2024Expiration Date:Minor Utility Job Number: 101164082Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO PARK IN ROW AT P01 TO PULL OUT/IN NEW PRIMARY WIRE. CREW WILL RELOCATE PADMOUNT TRANSFOMER AT V01 TO MOVE OUT OF THE NEW ROW DEDICATION. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101164082 13014 156TH AVE SE Jason Schaefer 425-320-6926 MFP23004474 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 9/25/2023 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG P01W20-7AW20-4ONE LANEROADAHEADX'X'X'ROADWORKAHEADW20-1W20-7AW20-4ONE LANEROADAHEADX'X'X'ROAD WORK AHEAD W20-1STOP FLAGGER STOP FLAGGER 1111 1111 156TH AVE SESE 128TH ST FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARKFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV jose.rodriguez@pse.com 425-424-6658 JOSE RODRIGUEZ 1 OF 2 13014 156TH AVE SE, RENTON, WA 98059 0 514136771 08/28/2023 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 10' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY WORK AREA CHEVRONARROW BOARD FLAGGER UNIFORMED POLICE OFFICERPOLICE STOP WORK PIT TEMPORARY TRAFFIC CONTROL PLAN Puget Sound Energy Traffic Control Supervisor: John Crofoot Card No. 012613Card Exp. 10/31/24John.Crofoot@pse.com(425)424-6658 0'50'25' MFP23004474 V01 M M01 W20-7AW20-4ONE LANEROAD AHEADX'X'X'ROAD WORK AHEAD W20-1STOP FLAGGER STOP FLAGGER FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARKFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSUREW20-7AW20-4ONE LANEROADAHEADX'X'X'ROADWORKAHEADW20-1156TH AVE SESE 128TH ST 1111 1111 Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV jose.rodriguez@pse.com 425-424-6658 JOSE RODRIGUEZ 2 OF 2 13014 156TH AVE SE, RENTON, WA 98059 0 514136771 08/28/2023 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 10' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY WORK AREA CHEVRONARROW BOARD FLAGGER UNIFORMED POLICE OFFICERPOLICE STOP WORK PIT TEMPORARY TRAFFIC CONTROL PLAN Puget Sound Energy Traffic Control Supervisor: John Crofoot Card No. 012613Card Exp. 10/31/24John.Crofoot@pse.com(425)424-6658 0'50'25' N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 MFP23004474 90° R=36"265'50'10'156TH AVE SE13008 13010 13016 13014 317998-167911 10 kVA 120/240V (A) T79023 (40T) MAP 13 60' ROW MCMTWDWY CBA318004-167915 50 kVA 120/240V (A) 75 KVA 120/240V (A) 30' EOC 156TH AVE SEROW 60' 40' 13'9' 1' 10' 2' 12' 30' EOC 8' 9'CURB156TH AVE SESITE PLAN SCALE: 1" = 50' POWER GENERAL NOTES - RESIDENTIAL PROJECT 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or as required by your local municipality. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. 8. 9. N Vicinity Map 47.486, -122.1319 ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) NEW CONDUIT DIAGRAM NOT TO SCALE 10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE MAP-13 10/2022 217.00 228.00 249.00 5.34 0.00 0.00 222.34 228.00 249.00 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP E-Mail: Cell Phone: Project Manager Contact Information: Manager:JASON SCHAEFER 425-320-6926 JASON.SCHAEFER@PSE.COM PROJECT PHASE PWR NOTIF#ORDER#101164082Owner / Developer Contact Info officeATTN: KUSHAL VARMA 2609 NE 5TH CT RENTON, WA 98059 KUSHAL VARMA 206-353-3168 CIRCUIT FEET ADDED: SQ. FOOTAGE: PANEL SIZE: HEAT TYPE: EST. DEMAND: LRC: % V. DROP: % FLICKER: 514276717 514136771 104354954 594155755 584049974 101164082 UG Remote Temp UG Misc & Exp TRF Relocation Superior 00 1"2" 00 50'100' 10' 4,969 SQ FT 200A GAS 28kW 117A 2.5% 3.7% 3-12 JOB SITE J. SCHAEFER 425-320-6926 07/06/23 K. TURNER 425-365-5577 07/06/23 E. SCHOTT 714-893-2405 07/06/23 RW-130944 RENTON VARMA VAULT REMOVE/INSTALL NEW TRF FOR NEW UG SVC 13014 156TH AVE SE, RENTON, WA 98059 N/A N/A N/A 101164082 AS NOTED 1/2 KING N/A N/A CSPSKEPM NE 14-23N-05E N/A N/A 2305E053 2306E076 2305E053 MAP-13 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A D. BRINKMAN 253-234-6445 CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: VAULTS & WORK PITS. -REQUIRED TO PROVIDE 6' X 6' WORK PIT WITH 6” CRUSHED ROCK AT V01 -REQUIRED TO PROVIDE 4’ X 4’ WORK PIT & 3/4 CUBIC YARD OF SAND AT M01 TRENCHING & CONDUIT. -INSTALL ± 315' OF 1-3" SCH'L 40 GREY PVC CONDUIT FROM V01 TO M01. -REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS. JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . CUSTOMER SUPPLIED 3/4" CUBIC YARD OF SAND CUSTOMER SUPPLIED 4X4 WORK PIT CUSTOMER SUPPLIED 6" BEDDING OF CRUSHED ROCK CUSTOMER SUPPLIED 6X6 WORK PIT CUSTOMER SUPPLIED 3" SCH'L 40 DISCONTINUOUS PVC CONDUIT ± 310' EXISTING 1-2" SCH'L 40 CONTINUOUS PVC CONDUIT Primary Cable & Conduit Table (Foreman to Complete) LOCATION CONDUIT PRIMARY CABLE QTY OF LUBE (gal.)AS BUILT INFORMATION From To Size (in) Qty Design Length (ft) Actual Length (ft) BENDS PULL (lbs) PULL Rev (lbs) Cable Size Design Length (ft) Actual Length (ft) CABLE NUMBERS MANUFACTURING INFORMATION FOR FEEDER CABLE ONLY Check applicable box 90°45°22°11°A B C Manufacturer Compound Year Tape CN #4/0 NEU Design As Built Actual Amount Installed (Conduit & Cable) P01 V01 2"1 0 0 0 0 107.4 126.4 PRI 12KV 1/0 UG EJG040 SITE SPECIFIC NOTES AT P01: 317998-167911 -EXISTING 2013 45' CL-2 POLE AND 10kVA 120/240V TRF TO REMAIN -DISCONNECT & REMOVE CABLE AØEHM632 -INSTALL NEW CABLE TAG AT V01: 318004-167915 -REMOVE EXISTING VAULT -REMOVE EXISTING 50kVA 120/240V PM TRF & RETURN TP PSE YARD -INSTALL (1) 48" X 48" X 38" HH WITH GROUNDS 6045.1010 (CUID: MINU1LR) -INSTALL NEW 75KVA 120/240V (6247150) -INSTALL (3) #6-350 KCMIL SECONDARY CONNECTION BLOCKS (MID: 4842001) -INSTALL (1) ELBOW KIT 6041.1000 (ELB10J) -INSTALL (1) DUST CAP (MID: 7630600) -RECONNECT EXISTING SVC TO NEW TRF -INSTALL CABLE TAG #EJG040 -INSTALL GRID NUMBER M01 AT "13014": REMOTE TEMP TO PERM -INSTALL 200A REMOTE TEMP TO PERM METER SPAN SPECIFIC NOTES -SEE SITE PLAN, ONE LINE DRAWINGS & TABLES FOR NEW INSTALLS & REMOVALS 10'210' UG Remote Temp to Perm NEW CABLE DIAGRAM NOT TO SCALE CUSTOMER SUPPLIED 6" BEDDING OF CRUSHED ROCK CUSTOMER SUPPLIED 6X6 WORK PIT PSE INST. 1-RUN 350 UG TPX ±340' W/ 4/0 TAIL ± 10' PSE INST. 1-RUN 1/0 UG JKT CABLE, ± 210' SECONDARY CABLE & CONDUIT TABLE Work Location Cable Conduit Voltage Drop Voltage Flicker As Built Information Size Length Design (ft) Size Length Design (ft) Bends Foreman - Complete FROM TO (1/0,4/0,350)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable) V01 M01 SEC 4/0 UG TPX 10'3"310'1 0 0 0 2.50%3.70% PRI CABLE ABANDON/ REMOVAL TABLE Work Location Wire Size & Type Quantity Length (per conductor) Remarks From To P01 V01 1/0 AL UG PRI 1 200' PSE SUPPLIED & INSTALLED 1-2" DB120 CONTINUOUS PVC CONDUIT ±10' 2-60 (2) Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage V01 318004-167915 50kVA TRANSFORMER INSTALLATION (PM) Primary phase connected to: Tested Secondary Voltage Foreman to redline the following information 75kVA 6247150 Installed at site: Grid Number: kVA Rating: Material ID#: V01 318004-167915 PARTIAL PLAN DETAIL SCALE: 1" = 20' POLE 514276732 SEWER LATERAL CLEANOUT SEWER MANHOLE 9' 14'10'SEWER PLAN DETAIL SCALE: 1" = 40' MFP23004474 POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS VAULT & EXCAVATION DETAIL Not to scale 6045.1000 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP TOP VIEW SIDE VIEW EXCAVATION: 4-2/3 CUBIC YARDS Rock Crushed 6" 3'-6" 2" 6' 6' 48"42" 36" 38" 42" Struts 1950 lbs J. SCHAEFER 425-320-6926 07/06/23 K. TURNER 425-365-5577 07/06/23 E. SCHOTT 714-893-2405 07/06/23 RW-130944 RENTON VARMA VAULT REMOVE/INSTALL & TRF TRANS FOR NEW UG SVC 13014 156TH AVE SE, RENTON, WA 98059 N/A N/A N/A 101164082 AS NOTED 2/2 KING N/A N/A CSPSKEPM NE 14-23N-05E N/A N/A 2305E053 2306E076 2305E053 MAP-13 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A D. BRINKMAN 253-234-6445 TV & TEL Electric Service Cable in Conduit 3" Schedule 40 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Backfill for Conduit Free of rocks larger than 8" in diameter Separation 12" Min in Conduit Schedule 40 Yellow PVC Gas Service Line 32" Typical (Power, Gas, Phone & Cable) Separation 12" Min 12" Min Separation 36" MINIMUM COVER IN RIGHT OF WAY JOINT TRENCH DETAIL Joint Service Line in Conduit (NTS) To Excavated Dirt Pile Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS. 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 NOT TO SCALE CROSS SECTION - 156TH AVE SE LOOKING NORTH E 60' ROW CL W POLE COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PM TRF & VAULT CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 1.5' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA Not to scale 1.5' MIN 3' MIN 3' MIN 3' MIN 10' MIN3' MIN 10' 10' APPROVED TRANSFORMER AREA 10' TRANSFORMER CLEARANCES FROM COMBUSTIBLE SURFACESCOMBUSTIBLE BUILDING WALLS AND ROOFPOSSIBLE CUSTOMER ENTRY LOCATION POSSIBLE CUSTOMER ENTRY LOCATION PSE POSSIBLE CUSTOMER ENTRY LOCATION CABLE INSTALLATION DIAGRAM L Not to scale UNDERGROUND REMOTE SERVICE NOT TO SCALE METER POST 1 9 2 6' MAX 4' MIN 3 24" MIN 4 1012 36" MIN LINE 11 4'7 6 CUSTOMER’S CONDUCTOR TO MOBILE HOME. INSTALL ACCORDING TO NEC. 24" MIN 8 5 LOAD CONDUIT TO BE RIGIDLY FASTENED TO SUPPORT Items owned and installed by customer 1 6" x 6" x 8' min fully pressure-treated post, mason block, or concrete 2 Service entrance equipment 3 Service conduit as specified in Table 7 4 Ground wire, in accordance with NEC/WAC 5 Ground rod(s), in accordance with NEC/WAC 6 Service conductor to building/residence 7 Elbow, 45˚ or 90˚ bend, 24" min radius 8 Bell end Items owned and installed by PSE 9 Meter 10 PSE service line PSE owned but customer provided and installed 11 Conduit (required in residential plats) 12 Bell end JOB SITE SCALE: 6" = 1 MILE OVERHEAD CIRCUIT MAP 2306E076 SCALE: 6" = 1 MILE UNDERGROUND CIRCUIT MAP 2305E053 MFP23004474