HomeMy WebLinkAboutBurnett Project - Addendum No 22Burnett Avenues S Sidewalk & Utilities Replacement Project Addendum No. 2 Page 1 of 2 BURNETT AVENUE S SIDEWALK & UTILITIES REPLACEMENT PROJECT CITY PROJECT NO. 4244 ADDENDUM NO. 2 DATE OF ADDENDUM ISSUE: September 25, 2023 BID DUE DATE: September 26, 2023 DATE OF BID OPENING: September 26, 2023 NOTE TO ALL PLANHOLDERS: This Addendum No. 2, containing the following revisions, additions, deletions, and/or clarifications, is hereby made a part of the Plans and Contract Provisions (Contract Documents) for the above-named project. Bidders shall take this Addendum into consideration when preparing and submitting their bids. Bidders shall acknowledge receipt and acceptance of this Addendum No. 2 in the space provided on the Proposal Signature Page or by signing in the space provided below and submitting the signed addendum with the bid package. Failure to provide this written acknowledge may result in disqualification of the Bidder’s submittal. SCHEDULE OF PRICES · The attached form “Proposal for Incorporating Recycled Materials into the Project” included with this Addendum no.2 must be completed and submitted as part of the bid. ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT. Sincerely, Abdoul Gafour Water Utility Engineering Manager City of Renton Receipt acknowledged, and conditions agreed to this _____ day of ________, 2023 Bidder _______________________________ Signature APWA-WA Division 1 Committee rev. 1/8/2016 Proposal for Incorporating Recycled Materials into the Project In compliance with a new law that went into effect January 1, 2016 (SHB1695), the Bidder shall propose below, the total percent of construction aggregate and concrete materials to be incorporated into the Project that are recycled materials. Calculated percentages must be within the amounts allowed in Section 9-03.21(1)E, Table on Maximum Allowable Percent (By Weight) of Recycled Material, of the Standard Specifications. Proposed total percentage: _____________________________ percent. Note: Use of recycled materials is highly encouraged within the limits shown above, but does not constitute a Bidder Preference, and will not affect the determination of award, unless two or more lowest responsive Bid totals are exactly equal, in which case proposed recycling percentages will be used as a tie-breaker, per the APWA GSP in Section 1-03.1 of the Special Provisions. Regardless, the Bidder’s stated proposed percentages will become a goal the Contractor should do its best to accomplish. Bidders will be required to report on recycled materials actually incorporated into the Project, in accordance with the APWA GSP in Section 1-06.6 of the Special Provisions. Bidder: Signature of Authorized Official: Date: Addendum No. 2 Page 2 of 2