October 2, 2023
ES-6121.02
D.R. Horton
11241 Slater Avenue Northeast, Suite 200
Kirkland, Washington 98033
Attention: Tony Brandolini
Subject: Final Report
Earthwork Observation, Compaction Testing and Consulting Services
Maple Highlands
16210 Southeast 134th Street
Renton, Washington
Dear Tony:
Earth Solutions NW, LLC (ESNW) representatives provided earthwork observation, compaction
testing and consulting services at the subject site. ESNW provided the referenced geotechnical
engineering study and reviewed the referenced plans for the project. Our services included
providing earthwork observation and compaction testing on a part-time basis from June 17, 2022
to September 23, 2023. ESNW representatives made 79 site visits to observe or test stormwater
vault foundation subgrade, lot fills, utility trench backfills and pavement subgrade.
ESNW representatives conducted 178 field density tests in accordance with ASTM Test
Designation D6938 (Nuclear Gauge Method). Five representative soil samples were returned to
our laboratory for analysis of the maximum dry density and optimum moisture content in
accordance with ASTM D1557 (Modified Proctor). Density test results indicate adequate
compaction of at least 95 percent at the tested locations.
ESNW representatives observed stormwater vault foundation subgrade to be dense and suitable
for vault support.
ESNW representatives observed pavement subgrade to be dense and suitable for asphalt.
ESNW representatives observed erosion control measures to be maintained in accordance with
the project requirements and our recommendations.
Based on our observation and testing, and to the best of our knowledge, the earthwork was
accomplished in accordance with the project plans and our geotechnical recommendations.
D.R. Horton ES-6121.02
October 2, 2023 Page 2
Earth Solutions NW, LLC
We trust this letter meets your current needs. If you have any questions, please call.
Sincerely,
EARTH SOLUTIONS NW, LLC
Lewis A. Conklin Stephen H. Avril
Construction Services Manager Project Manager
Kyle R. Campbell, P.E.
Senior Principal Engineer
Attachment: Field Reports
References:
Geotechnical Engineering Study, prepared by ESNW, ES-6121, updated September 28,
2018
Project Plans, prepared by D.R. Strong Consulting Engineers, dated June 16, 2021
10/02/2023
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 06172022
Date Fri 6/17/2022 Weather Low 60’s, Overcast
Arrival/Departure Time(s) 10:45-11:00 Travel Time (hr) 1.25
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Konner Thorgerson, 206-355-9308
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
ESNW Rep requested to be onsite to observe excavation slope of concern due to erosion.
Slope observation
ESNW Rep observed slope on south side of site where excavation for storm water vault is. Slope has
been noted as having water eroding the slope in days past. Rep observed no more erosion than in
previous visits.
ESNW Rep will return when requested.
Report ID 6121.02 E 06172022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 07052022
Date Tue 7/5/2022 Weather Clear, 60s
Arrival/Departure Time(s) 0720-0750 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Report ID 6121.02 E 07052022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 07062022
Date Wed 7/6/2022 Weather Partly cloudy, 60s
Arrival/Departure Time(s) 0710-0725 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Report ID 6121.02 E 07062022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 07072022
Date Thu 7/7/2022 Weather Clear, 60s
Arrival/Departure Time(s) 0645-0705 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Report ID 6121.02 E 07072022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 07082022
Date Fri 7/8/2022 Weather Clear, 60s
Arrival/Departure Time(s) 0700-0730 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Report ID 6121.02 E 07082022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 07112022
Date Mon 7/11/2022 Weather Clear, 60s
Arrival/Departure Time(s) 0650-0700 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Report ID 6121.02 E 07112022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 07122022
Date Tue 7/12/2022 Weather Clear, 60s
Arrival/Departure Time(s) 0645-0700 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Report ID 6121.02 E 07122022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 07132022
Date Wed 7/13/2022 Weather Clear, 60s
Arrival/Departure Time(s) 0715-0730 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Report ID 6121.02 E 07132022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 07142022
Date Thu 7/14/2022 Weather Clear, 60s
Arrival/Departure Time(s) 0700-0715 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Report ID 6121.02 E 07142022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 07152022
Date Fri 7/15/2022 Weather Low 60’s, Overcast
Arrival/Departure Time(s) 7:00-7:15 Travel Time (hr)1.00
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Konner Thorgerson, 206-355-9308
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
ESNW Rep requested to be onsite to observe excavation slope of concern due to erosion.
Slope observation
ESNW Rep observed slope on south side of site where excavation for storm water vault is.
Rep observed slope in good condition with no noticeable movement or erosion since previous
visits. Slope is protected from rain by plastic sheeting anchored with sandbags.
ESNW Rep will return when requested.
Report ID 6121.02 E 07152022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 07182022
Date Mon 7/18/2022 Weather Clear, 60s
Arrival/Departure Time(s) 0720-0735 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Report ID 6121.02 E 07182022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 07192022
Date Tue 7/19/2022 Weather Clear, 60s
Arrival/Departure Time(s) 0705-0720 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Report ID 6121.02 E 07192022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 07202022
Date Wed 7/20/2022 Weather Clear, 60s
Arrival/Departure Time(s) 0710-0725 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Report ID 6121.02 E 07202022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 07212022
Date Thu 7/21/2022 Weather Low 60’s, Overcast
Arrival/Departure Time(s) 6:45-7:15 Travel Time (hr)1.25
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Konner Thorgerson, 206-355-9308
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
ESNW Rep requested to be onsite to observe excavation slope of concern due to erosion.
Slope observation
ESNW Rep observed slope on south side of site where excavation for storm water vault is located. Rep observed slope in good condition with no noticeable soil mobilization or erosion
since previous visits. Slope is protected via plastic sheeting and anchored with sandbags.
ESNW Rep will return when requested.
Report ID 6121.02 E 07212022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 07222022
Date Fri 7/22/2022 Weather Cloudy, 60s
Arrival/Departure Time(s) 0720-0735 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Report ID 6121.02 E 07222022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 07252022
Date Mon 7/25/2022 Weather Clear, 70s
Arrival/Departure Time(s) 0720-0730 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Report ID 6121.02 E 07252022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 07262022
Date Tue 7/26/2022 Weather Clear, 70s
Arrival/Departure Time(s) 0720-0735 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Report ID 6121.02 E 07262022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 07272022
Date Wed 7/27/2022 Weather Clear, 70s
Arrival/Departure Time(s) 0720-0735 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Report ID 6121.02 E 07272022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 07282022
Date Thu 7/28/2022 Weather Clear, 70s
Arrival/Departure Time(s) 0730-0745 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Report ID 6121.02 E 07282022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 07292022
Date Fri 7/29/2022 Weather 85°F Clear
Arrival/Departure Time(s) 1:45PM; 2PM Travel Time (hr) 1.5
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Willem Scherwin | 206 793 8569
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested by client, ESNW rep was onsite to observe cut slope of vault.
Cut Slope Observations
ESNW rep observed vault excavation to be cut into native brown silty sand with gravel, at approximately
a 1:1 slope. Rep observed plastic sheeting covering the slope which was held down by sandbags.
Groundwater seepage was not observed in the excavation. The cut was observed to be stable in its
current configuration, and ESNW rep will return daily to observe stability when work is being done in
excavation. The contractor is responsible for abiding by all federal and state safety regulations. ESNW
rep will return observe excavation as needed.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 08012022
Date Mon 8/1/2022 Weather 80°F Clear
Arrival/Departure Time(s) 3PM; 3:15PM Travel Time (hr) 0.75
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Willem Scherwin | 206 793 8569
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested by client, ESNW rep was onsite to observe cut slope of vault.
Cut Slope Observations
ESNW rep observed vault excavation to be cut into native brown silty sand with gravel, at approximately
a 1:1 slope. Rep observed plastic sheeting covering the slope which was held down by sandbags.
Groundwater seepage was not observed in the excavation. The cut was observed to be stable in its
current configuration, and ESNW rep will return daily to observe stability when work is being done in
excavation. The contractor is responsible for abiding by all federal and state safety regulations. ESNW
rep will return observe excavation as needed.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 08022022
Date Tue 8/2/2022 Weather Cloudy, 60s
Arrival/Departure Time(s) 0745-0800 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Report ID 6121.02 E 08022022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 08032022
Date Wed 8/3/2022 Weather 75°F Clear
Arrival/Departure Time(s) 2:15PM; 2:30PM Travel Time (hr) 0.5
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Willem Scherwin | 206 793 8569
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested by client, ESNW rep was onsite to observe cut slope of vault.
Cut Slope Observations
ESNW rep observed vault excavation to be cut into native brown silty sand with gravel, at approximately
a 1:1 slope. Rep observed plastic sheeting covering the slope which was held down by sandbags.
Groundwater seepage was not observed in the excavation. The cut was observed to be stable in its
current configuration, and ESNW rep will return daily to observe stability when work is being done in
excavation. The contractor is responsible for abiding by all federal and state safety regulations. ESNW
rep will return observe excavation as needed.
Report ID 6121.02 E 08032022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 08042022
Date Thu 8/4/2022 Weather Clear, 70s
Arrival/Departure Time(s) 0930-1000 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Report ID 6121.02 E 08042022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 08052022
Date Fri 8/5/2022 Weather Clear, 60s
Arrival/Departure Time(s) 1130-1145 Travel Time (hr)1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Report ID 6121.02 E 08052022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 08082022
Date Mon 8/8/2022 Weather 80°F Clear
Arrival/Departure Time(s) 2:15PM; 2:30PM Travel Time (hr) 1.25
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Willem Scherwin | 206 793 8569
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested by client, ESNW rep was onsite to observe cut slope of vault.
Cut Slope Observations
ESNW rep observed vault excavation to be cut into native brown silty sand with gravel, at approximately
a 1:1 slope. Rep observed plastic sheeting covering the slope which was held down by sandbags.
Groundwater seepage was not observed in the excavation. The cut was observed to be stable in its
current configuration, and ESNW rep will return daily to observe stability when work is being done in
excavation. The contractor is responsible for abiding by all federal and state safety regulations. ESNW
rep will return observe excavation as needed.
Report ID 6121.02 E 08082022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 08102022
Date Wed 8/10/2022 Weather Cloudy, 60s
Arrival/Departure Time(s) 1140-1200 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 08112022
Date Thu 8/11/2022 Weather Clear
Arrival/Departure Time(s) 4:30pm / 5:00 pm Travel Time (hr) 0.75
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Per the client’s request, ESNW representative was onsite to observe temporary cut slopes of vault
excavation at Maple Highlands. While onsite the following was observed:
ESNW rep observed temporary cut slopes of vault excavation at Maple Highlands. The temporary cut
slopes are considered stable for work within the excavation, provided daily observation by a
geotechnical engineer (or their representative) to observe the stability of the cut slopes. ESNW
rep recommends the following:
An ESNW representative should observe
the condition of the excavation on a daily
basis when work will be conducted in the
excavation;
An ESNW representative should observe
the condition of the excavation after a
heavy rainfall event (0.5 inches in 24
hours).
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 08122022
Date Fri 8/12/2022 Weather Clear
Arrival/Departure Time(s) 4:15pm / 4:30 pm Travel Time (hr) 1.00
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Per the client’s request, ESNW representative was onsite to observe temporary cut slopes of vault
excavation at Maple Highlands. While onsite the following was observed:
ESNW rep observed temporary cut slopes of vault excavation at Maple Highlands. The temporary cut
slopes are considered stable for work within the excavation, provided daily observation by a
geotechnical engineer (or their representative) to observe the stability of the cut slopes. ESNW
rep recommends the following:
An ESNW representative should observe the condition of the excavation on a daily basis
when work will be conducted in the excavation;
An ESNW representative should observe the
condition of the excavation after a heavy rainfall
event (0.5 inches in 24 hours).
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 08152022
Date Mon 8/15/2022 Weather Clear, 70s
Arrival/Departure Time(s) 1130-1230 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Report ID 6121.02 E 08152022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 08162022
Date Tue 8/16/2022 Weather Clear, 70s
Arrival/Departure Time(s) 1530-1630 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Report ID 6121.02 E 08162022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 08172022
Date Wed 8/17/2022 Weather Clear
Arrival/Departure Time(s) 4:15pm / 4:30 pm Travel Time (hr) 0.50
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Per the client’s request, ESNW representative was onsite to observe temporary cut slopes of vault
excavation at Maple Highlands. While onsite the following was observed:
ESNW rep observed temporary cut slopes of vault excavation at Maple Highlands. The temporary cut
slopes are considered stable for work within the excavation, provided daily observation by a
geotechnical engineer (or their representative) to observe the stability of the cut slopes. ESNW
rep recommends the following:
An ESNW representative should observe the condition of the excavation on a daily basis
when work will be conducted in the excavation;
An ESNW representative should observe the condition of the excavation after a heavy
rainfall event (0.5 inches in 24 hours).
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 08182022
Date Thu 8/18/2022 Weather Cloudy
Arrival/Departure Time(s) 4:00pm / 4:15pm Travel Time (hr) 0.75
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Per the client’s request, ESNW representative was onsite to observe temporary cut slopes of vault
excavation at Maple Highlands. While onsite the following was observed:
ESNW rep observed temporary cut slopes of vault excavation at Maple Highlands. The temporary cut
slopes are considered stable for work within the excavation, provided daily observation by a
geotechnical engineer (or their representative) to observe the stability of the cut slopes. ESNW
rep recommends the following:
An ESNW representative should observe the condition of the excavation on a daily basis
when work will be conducted in the excavation;
An ESNW representative should observe the condition of the excavation after a heavy
rainfall event (0.5 inches in 24 hours).
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 08192022
Date Fri 8/19/2022 Weather Clear, 70s
Arrival/Departure Time(s) 1315-1345 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 08222022
Date Mon 8/22/2022 Weather Clear, 80s
Arrival/Departure Time(s) 1420-1450 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was onsite to observe the cut slope for the vault on the south property border.
Vault Slope Observation
ESNW rep observed the over steepened slope was properly covered with plastic and held down with
anchored sandbags. The slope was observed to be stable for work within the excavation, in its current
configuration. The contractor is responsible for providing all applicable safety measures in accordance
with State and Federal regulations.
Report ID 6121.02 E 08222022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 10102022
Date Mon 10/10/2022 Weather Clear, 70s
Arrival/Departure Time(s) 1520-1605 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was on site to observe and test the water and storm trench backfill.
Water Trench Backfill
ESNW rep observed the contractor backfilling the water trench with native soil. The backfill was placed in
shallow loose lifts and compacted with a hoe pack. Compaction tests indicated an adequate compaction
of at least 95% at tested locations.
Storm Trench Backfill
ESNW rep observed the contractor backfilling the storm crossing trench with native soil. The backfill was
placed in shallow loose lifts and compacted with a hoe pack. Compaction tests indicated an adequate
compaction of at least 95% at tested locations.
Report ID 6121.02 E 10102022 Page 2 of 2
Earth Solutions NW, LLC
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of MDD
64 Water Trench Backfill SG 4 137.5 8.0 132.5 96
65 Water Trench Backfill SG 4 137.5 8.2 132.0 96
66 Water Trench Backfill SG 4 137.5 8.1 132.3 96
67 Water Trench Backfill SG 4 137.5 7.7 136.1 99
68 Storm Trench Backfill SG 4 137.5 8.2 132.1 96
69 Storm Trench Backfill SG 4 137.5 7.9 131.3 95
64
69
65
66
67
68
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 10132022
Date Thu 10/13/2022 Weather Clear, 70s
Arrival/Departure Time(s) 1300-1600 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was on site to observe the sewer trench backfill.
Sewer Trench Backfill
ESNW rep observed the contractor backfilling the sewer trench with native soil. The backfill was placed
in shallow loose lifts and compacted with a hoe pack. Compaction tests indicated an adequate
compaction of at least 95% at tested locations.
Report ID 6121.02 E 10132022 Page 2 of 2
Earth Solutions NW, LLC
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of MDD
70 Sewer Trench Backfill -4.0' 4 137.5 9.4 133.1 97
71 Sewer Trench Backfill -2.0' 4 137.5 10.0 133.0 97
72 Sewer Trench Backfill SG 4 137.5 9.9 130.1 95
70-72
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 10142022
Date Fri 10/14/2022 Weather Clear, 70s
Arrival/Departure Time(s) 1530-1615 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was on site to observe the sewer trench backfill.
Sewer Trench Backfill
ESNW rep observed the contractor backfilling the sewer trench with 5/8” minus crushed rock. The backfill
was placed in shallow loose lifts and compacted with a hoe pack. Compaction tests indicated an
adequate compaction of at least 95% at tested locations.
Report ID 6121.02 E 10142022 Page 2 of 2
Earth Solutions NW, LLC
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of MDD
73 Sewer Trench Backfill -4.0' 1 138 7.7 132.1 96
74 Sewer Trench Backfill -2.0' 1 138 7.4 130.5 95
75 Sewer Trench Backfill SG 1 138 4.3 130.6 95
73-75
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 10182022
Date Tue 10/18/2022 Weather Clear, 50s
Arrival/Departure Time(s) 1150-1220 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was on site to observe the sewer and storm trench backfill.
Sewer Trench Backfill
ESNW rep observed the contractor backfilling the sewer trench with native soil. The backfill was placed
in shallow loose lifts and compacted with a hoe pack. Compaction tests indicated an adequate
compaction of at least 95% at tested locations.
Storm Trench Backfill
ESNW rep observed the contractor backfilling the storm trench native soil. The backfill was placed in
shallow loose lifts and compacted with a hoe pack. Compaction tests indicated an adequate compaction
of at least 95% at tested locations.
Report ID 6121.02 E 10182022 Page 2 of 2
Earth Solutions NW, LLC
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of MDD
76 Storm Trench Backfill -2.0' 2 132.1 7.6 129.2 98
77 Storm Trench Backfill SG 2 132.1 7.9 129.5 98
78 Sewer Trench Backfill -4.0' 4 137.5 9.1 133.0 97
79 Sewer Trench Backfill -2.0' 4 137.5 8.9 131.8 96
80 Sewer Trench Backfill SG 4 137.5 8.9 132.2 96
76-77
78-80
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 10192022
Date Wed 10/19/2022 Weather Clear, 50s
Arrival/Departure Time(s) 1200-1300 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was on site to observe the sewer trench backfill.
Sewer Trench Backfill
ESNW rep observed the contractor backfilling the sewer trench with native soil. The backfill was placed
in shallow loose lifts and compacted with a hoe pack. Compaction tests indicated an adequate
compaction of at least 95% at tested locations.
Report ID 6121.02 E 10192022 Page 2 of 2
Earth Solutions NW, LLC
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of MDD
81 Sewer Trench Backfill -4.0' 4 137.5 8.4 133.5 97
82 Sewer Trench Backfill -2.0' 4 137.5 8.1 133.1 97
83 Sewer Trench Backfill SG 4 137.5 9.3 132.0 96
81-83
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2022 1104
Date Fri 11/4/2022 Weather Rain, 50s
Arrival/Departure Time(s) 1000-1015 Travel Time (hr)1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was on site to test the turbidity of the vault water.
Stormwater Vault Turbidity
The contractor collected a sample of the water in the stormwater vault. The sample was observed to be
at 1000NTUs, ESNW rep tested the sample with a Hanna Turbidity Meter.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 3 Report ID 6121.02 E 11102022
Date Thu 11/10/2022 Weather Clear, 50s
Arrival/Departure Time(s) 1430-1540 Travel Time (hr)1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was on site to observe a proof roll of the road subgrade for Road A.
Road Subgrade Observation
ESNW rep observed the contractor use a loader, with a full bucket of rock, proof roll the subgrade for
Road A. Four areas of moderate deflection were observed and ESNW rep recommended the
contractor over excavate these areas to a depth of 2-feet or until firm conditions are reached. The
grade should be restored using crushed rock compacted with a hoe pack or vibratory drum
roller. Alternatively, the contractor can cement treat these areas in lieu of overexcavation. ESNW
rep should observe another proof roll prior to paving.
Report ID 6121.02 E 11102022 Page 2 of 3
Earth Solutions NW, LLC
Report ID 6121.02 E 11102022 Page 3 of 3
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 3 Report ID 6121.02 E 11112022
Date Fri 11/11/2022 Weather Clear, 50s
Arrival/Departure Time(s) 1240-1335 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was on site to observe over excavation of the subgrade for Road A.
Road Subgrade Observation
ESNW rep observed the contractor over excavating the areas of deflection, as per ESNW rep’s
recommendation. The subgrade was over excavated to approximate depths of 6 to 24-inches (6 inches
of over exaction where shallow utility crossings were encountered). The contractor backfilled these areas
with crushed rock and will compact the soil by end of day.
Report ID 6121.02 E 11112022 Page 2 of 3
Earth Solutions NW, LLC
Report ID 6121.02 E 11112022 Page 3 of 3
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 11142022
Date Mon 11/14/2022 Weather Clear, 50s
Arrival/Departure Time(s) 1200-1245 Travel Time (hr)1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was on site to observe a proof roll of the bottom half of the road subgrade for
Road A.
Road Subgrade Observation
ESNW rep observed the contractor use a loader, with a full bucket of rock, proof roll the subgrade for
Road A. One area of moderate deflection were observed and ESNW rep recommended the contractor
over excavate these areas to a depth of 2-feet or until firm conditions are reached. The grade
should be restored using crushed rock compacted with a hoe pack or vibratory drum roller. As an alternative to over excavation, the contractor can cement treat these areas. ESNW rep should
observe another proof roll prior to paving.
Report ID 6121.02 E 11142022 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 11152022
Date Tue 11/15/2022 Weather Clear, 50s
Arrival/Departure Time(s) 1240-1335 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was on site to observe a proof roll of the subgrade for Road A.
Road Subgrade Observation
ESNW rep observed the contractor proof roll the road subgrade following placement of crushed rock for
the road base. Minor deflection of the rock subgrade was observed and ESNW rep recommends the
contractor minimize traffic on the crushed rock until the road is paved. A final proof roll should be
observed a few days prior to paving.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 11172022
Date Thu 11/17/2022 Weather Clear, 50s
Arrival/Departure Time(s) 1230-1330 Travel Time (hr) 1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was on site to observe and test the water trench backfill.
Water Trench Backfill
ESNW rep observed the contractor backfilling the water trench with native soil. The backfill was placed in
shallow loose lifts and compacted with a hoe pack. Compaction tests indicated an adequate compaction
of at least 95% at tested locations.
Report ID 6121.02 E 11172022 Page 2 of 2
Earth Solutions NW, LLC
Test Number Test Location Elevation Reference Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of MDD
84 Water Trench Backfill SG 4 137.5 9.0 133.2 97
85 Water Trench Backfill SG 4 137.5 9.5 133.9 97
84
85
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 2022 1207
Date Wed 12/7/2022 Weather Clear, 50s
Arrival/Departure Time(s) 1200-1230 Travel Time (hr)1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
As requested, ESNW rep was on site to observe and test the water trench backfill.
Water Trench Backfill
ESNW rep observed the contractor backfilling the water trench with native soil. The backfill was placed in
shallow loose lifts and compacted with a hoe pack. Compaction tests indicated an adequate compaction
of at least 95% at tested locations.
Report ID 6121.02 E 2022 1207 Page 2 of 2
Earth Solutions NW, LLC
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
86 Water Backfill SG 4 137.5 8.0 133.2 97
87 Water Backfill SG 4 137.5 9.9 131.9 96
86
87
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0320
Date Mon 3/20/2023 Weather Cloudy, 50s
Arrival/Departure Time(s) 1420-1740 Travel Time (hr) 2.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin & Brian H | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
ESNW rep was on-site to observe and test the off-site sewer trench backfill, southeast of the site.
Sewer Trench Backfill Observation
ESNW rep observed the contractor placing the native backfill in shallow loose lifts. The backfill was
compacted with a large hoe pack. ESNW rep collect a sample of the native soil and transported it to the
laboratory for proctor analysis. The native soil was observed to be too far above the optimum moisture
content to receive adequate compaction at this time. ESNW rep recommends, re-testing the backfill
at a later date, adding cement mix to the native soil or backfill the top few feet of the trench with
granular non-moisture sensitive structural fill.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0321
Date Tue 3/21/2023 Weather Cloudy, 50s
Arrival/Departure Time(s) 1400-1530 Travel Time (hr) 2.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin & Brian H | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
ESNW rep was on-site to observe and test the off-site sewer trench backfill, southeast of the site.
Sewer Trench Backfill Observation
ESNW rep observed the contractor placing the native backfill in shallow loose lifts for the lifts a depth and
placing imported silty gravel in the top few feet. The backfill was compacted with a large hoe pack.
ESNW rep collect a sample of the imported soil and transported it to the laboratory for proctor analysis.
The imported soil was observed to be too far above the optimum moisture content to receive adequate
compaction at this time. ESNW rep recommends, re-testing the backfill at a later date, adding
cement mix or backfill the top few feet of the trench with granular non-moisture sensitive
structural fill.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0322
Date Wed 3/22/2023 Weather Partly cloudy, 50s
Arrival/Departure Time(s) 1500-1645 Travel Time (hr) 1.25
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin & Brian H | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
ESNW rep was on-site to observe and test the off-site sewer trench backfill.
Sewer Trench Backfill Observation
ESNW rep observed the contractor placing imported sandy gravel backfill in shallow loose lifts. The
backfill was compacted with a large hoe pack. ESNW rep collect a sample of the imported soil and
transported it to the laboratory for proctor analysis. Compaction tests indicated an adequate compaction
of at least 95% at the tested locations.
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
86 Sewer Trench Backfill -4.0' 7 134.5 7.5 130.2 97
87 Sewer Trench Backfill -2.0' 7 134.5 8.3 128.9 96
88 Sewer Trench Backfill SG 7 134.5 8.4 128.1 95
86-88
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0323
Date Thu 3/23/2023 Weather Rain, 48°F
Arrival/Departure Time(s) Proctor transport: 10:15 AM – 11:15 AM Travel Time (hr)0.0
Project Name Maple Highlands
Location 16210 S.E. 132nd Street, Renton
ESNW Rep. & Phone Maricel Fee (425) 984-9615
Client Info/Contact D.R. Horton | Tony Brandolini
Reviewed By LAC
Initials/Date
SSR
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for
obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible
for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations,
is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
ESNW rep collected proctor sample and transported it to lab for analysis.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 2023 0327
Date Mon 3/27/2023 Weather Partly cloudy, 40s
Arrival/Departure Time(s) 1145-1630 Travel Time (hr) 2.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Brian Hebert | 206-474-9643
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
ESNW rep. on site to observe and test sewer trench compaction and backfill.
Sewer Installation and Backfill Observations:
ESNW rep. observed the contractor excavate a trench for the sewer installation. ESNW rep. observed
the contractor bed the sewer pipe with pea gravel. ESNW rep. observed groundwater when contractors
were installing manhole, and contractors over-excavated 4 feet at the manhole location and put 3 feet of
2–4-inch quarry spalls, and 1 foot of pea gravel as a base for the manhole. ESNW rep observed the
contractor backfill with imported sandy gravel (type 17 gravel). The backfill was placed in shallow loose
lifts and compacted with a large hoe pack. Compactions test taken showed a compaction of at least 95%
at test locations.
Report ID 6121.02 E 2023 0327 Page 2 of 2
Earth Solutions NW, LLC
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
89 Sewer Trench Backfill -2.0' 7 134.5 7.4 128.3 95
90 Sewer Trench Backfill SG 7 134.5 6.9 127.2 95
89 90
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 2023 0328
Date Tue 3/28/2023 Weather Cloudy, 40s
Arrival/Departure Time(s) 12:30-15:45 Travel Time (hr) 2.25
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Brian Hebert | 206-474-9643
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
ESNW rep. on site to observe and test sewer trench compaction and backfill.
Sewer Installation and Backfill Observations:
ESNW rep. observed the contractor excavate a trench for the sewer installation. ESNW rep. observed
the contractor bed the sewer pipe with pea gravel and backfill trench in even, hoe-pack compacted lifts
with native soil and the top 2-foot lift with gravel borrow. Compactions test taken showed a compaction of
at least 95% at approximate test locations.
Report ID 6121.02 E 2023 0328 Page 2 of 2
Earth Solutions NW, LLC
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density (pcf)
Test
Moisture (%)
Test
Dry Density (pcf)
% of
MDD
93 Sewer Trench Backfill -4' 10 133.3 10.0 127.5 96
94 Sewer Trench Backfill -2' 10 133.3 10.3 126.6 95
95 Sewer Trench Backfill SG 7 134.5 7.4 129.9 97
93
95 94
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0329
Date Wed 3/29/2023 Weather 40s
Arrival/Departure Time(s) 1:00, 3:45 Travel Time (hr)2.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Brian Hebert | 206-474-9643
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
ESNW rep. on site to observe and test sewer trench compaction and backfill.
Sewer Installation and Backfill Observations:
ESNW rep. observed the contractor excavate a trench for the sewer installation. ESNW rep. observed
the contractor bed the sewer pipe with pea gravel and backfill trench in even, hoe-pack compacted lifts
with native soil and the top 2-foot lift with gravel borrow. Compactions test taken showed a compaction of
at least 95% at approximate test locations.
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
96 Sewer Trench Backfill -4'10 133.3 11.4 127.4 96
97 Sewer Trench Backfill SG 7 134.5 9.1 130.6 97
96
97
9
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 2023 0330
Date Thu 3/30/2023 Weather 40s
Arrival/Departure Time(s) 1:00, 2:45 Travel Time (hr)2.25
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Brian Hebert | 206-474-9643
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
ESNW rep. on site to observe and test sewer trench compaction and backfill.
Sewer Installation and Backfill Observations:
ESNW rep. observed the contractor excavate a trench for the sewer installation. ESNW rep. observed
the contractor bed the sewer pipe with pea gravel and backfill trench in even, hoe-pack compacted lifts
with native soil and the top 2-foot lift with gravel borrow. Compaction test taken showed a compaction of
at least 95% at approximate test locations.
Report ID 6121.02 E 2023 0330 Page 2 of 2
Earth Solutions NW, LLC
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
98 Sewer Trench Backfill -4'10 133.3 10.5 126.0 95
99 Sewer Trench Backfill -2'10 133.3 9.8 126.9 95
100 Sewer Trench Backfill SG 7 134.5 8.6 131.4 98
100 99
98
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 2023 0404
Date Tue 4/4/2023 Weather 40s
Arrival/Departure Time(s) 12:30, 2:30 Travel Time (hr)1.0
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Brian Hebert | 206-474-9643
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
ESNW rep. on site to observe and test sewer trench compaction and backfill.
Sewer Installation and Backfill Observations:
ESNW rep. observed the contractor excavate a trench for the sewer installation. ESNW rep. observed
the contractor bed the sewer pipe with pea gravel and backfill trench in even, hoe-pack compacted lifts
with native soil and the top 2-foot lift with type 17 gravel borough. The native soil tested above optimal in
moisture content, and ESNW rep. recommended testing at a later date.
Report ID 6121.02 E 2023 0404 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0405
Date Wed 4/5/2023 Weather 40s
Arrival/Departure Time(s) 1:00-3:30 on site, proctor to office 3:30-5:00 Travel Time (hr) 2.5
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Brian Hebert, Jacob Calvin | 206-474-9643
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
ESNW rep. on site to observe and test sewer trench compaction and backfill.
Sewer Installation and Backfill Observations:
ESNW rep. observed the contractor excavate a trench for the sewer installation. ESNW rep. observed
the contractor bed the sewer pipe with pea gravel and backfill trench in even, hoe-pack compacted lifts
with native soil and the top 2-foot lift with type 17 gravel borough. The native soil tested above optimal in
moisture content, and ESNW rep. recommended testing at a later date.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0412
Date Wed 4/12/2023 Weather Mostly Clear
Arrival/Departure Time(s) 12:30pm / 3:15pm Travel Time (hr)0.50
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen - 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Test
Number Test Location Elevation Reference
Proctor
Maximum Dry Density
(pcf)
Test Moisture
(%)
Test Dry Density
(pcf)
% of MDD
101 Sewer Trench Backfill -2' SG 7 134.5 7.5 129.3 96
102 Sewer Trench Backfill SG 7 134.5 7.8 130.2 97
ESNW representative was on site to observe and test sewer trench backfill compaction at Maple
Highlands. While on site, the following was observed:
ESNW rep observed contractor backfilling for sewer trench. ESNW rep observed contractor placing
native and imported backfill in shallow loose lifts, compacting using hoe pack. Compaction tests
conducted indicate an adequate compaction of at least 95% of the modified proctor maximum dry
density at the tested locations.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0414
Date Fri 4/14/2023 Weather Mostly Clear
Arrival/Departure Time(s) 1:30pm / 2:00pm Travel Time (hr)0.50
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen - 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Test
Number Test Location Elevation Reference
Proctor
Maximum Dry Density
(pcf)
Test Moisture
(%)
Test Dry Density
(pcf)
% of MDD
103 Sewer Trench Backfill SG 7 134.5 8.1 129.6 96
104 Sewer Trench Backfill -2' SG 7 134.5 8.5 131.0 97
ESNW representative was on site to observe and test sewer trench backfill compaction at Maple
Highlands. While on site, the following was observed:
ESNW rep observed contractor backfilling for sewer trench. ESNW rep observed contractor placing
native and imported backfill in shallow loose lifts, compacting using hoe pack. Compaction tests
conducted indicate an adequate compaction of at least 95% of the modified proctor maximum dry
density at the tested locations.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0417
Date Mon 4/17/2023 Weather Mostly Clear
Arrival/Departure Time(s) 1:30pm / 1:45pm Travel Time (hr)0.50
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen - 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
105 Sewer Trench Backfill -4' SG 10 133.3 11.5 126.9 95
106 Sewer Trench Backfill -3' SG 10 133.3 11.3 127.2 95
107 Sewer Trench Backfill -2' SG 7 134.5 8.0 129.4 96
108 Sewer Trench Backfill SG 7 134.5 8.2 129.8 97
ESNW representative was on site to observe and test sewer trench backfill compaction at Maple
Highlands. While on site, the following was observed:
ESNW rep observed contractor backfilling for sewer trench. ESNW rep observed contractor placing
native and imported backfill in shallow loose lifts, compacting using hoe pack. Compaction tests
conducted indicate an adequate compaction of at least 95% of the modified proctor maximum dry
density at the tested locations.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0418
Date Tue 4/18/2023 Weather Cloudy
Arrival/Departure Time(s) 12:15pm / 1:45pm Travel Time (hr) 1.00
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen - 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
ESNW representative was on site for construction meeting regarding offsite sewer trench work at Maple
Highlands. While on site, the following was observed:
ESNW rep observed meeting between ESNW, King County, City of Renton, and D.R. Horton
representatives. Contractor will be using a sheep’s foot roller for compaction of native material. ESNW
rep will return to observe and test sewer trench backfill compaction, as requested.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 2023 0419
Date Wed 4/19/2023 Weather Cloudy
Arrival/Departure Time(s) 2:00pm / 2:30pm Travel Time (hr) 0.50
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen - 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
109 Sewer Trench Backfill -4' SG 10 133.3 10.8 126.3 95
110 Sewer Trench Backfill -3' SG 10 133.3 10.5 126.7 95
111 Sewer Trench Backfill -2' SG 7 134.5 8.4 129.4 96
112 Sewer Trench Backfill SG 7 134.5 8.0 128.6 96
ESNW representative was on site to observe and test sewer trench backfill compaction at Maple
Highlands. While on site, the following was observed:
ESNW rep observed contractor backfilling for sewer trench. ESNW rep observed contractor placing
native and imported backfill in shallow loose lifts, compacting using sheep’s foot roller and hoe pack,
respectively. Compaction tests conducted indicate an adequate compaction of at least 95% of the
modified proctor maximum dry density at the tested locations. ESNW rep will return, as requested.
Report ID 6121.02 E 2023 0419 Page 2 of 2
Earth Solutions NW, LLC
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 2023 0421
Date Fri 4/21/2023 Weather 49°F, overcast
Arrival/Departure Time(s) 1:30PM/3:45PM Travel Time (hr) 0.75
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Ryan Sanderson|206.565.4683
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
ESNW rep was onsite to observe and test sewer main backfill on 135th street. While onsite, the following
was observed:
Sewer backfill:
ESNW rep observed contractors in the process of burying a 12-inch diameter sewer pipe in an
approximately 24-foot deep trench. Pipe bedding consisted of pea gravel, and backfill consisted of
imported Gravel Barrow, compacted in 18-inch lifts with a hoe-pack. Compaction testing indicated
contractor had achieved at least 95% compaction where tested (See figure and table 1)
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
113 Sewer Trench Backfill -4' 7 134.5 9.3 131.0 97
114 Sewer Trench Backfill -2' 7 134.5 9.3 132.2 98
115 Sewer Trench Backfill SG 7 134.5 8.8 129.2 96
Table 1) Compaction tests
Report ID 6121.02 E 2023 0421 Page 2 of 2
Earth Solutions NW, LLC
113,114,115
Sewer construction
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0623
Date Fri 6/23/2023 Weather Clear
Arrival/Departure Time(s) 11:15am / 11:45am Travel Time (hr) 0.50
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen - 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
113 Storm Trench Backfill -1’ SG 2 138.7 11.0 132.4 95
114 Storm Trench Backfill SG 2 138.7 10.4 132.1 95
ESNW representative was on site to observe and test storm trench backfill compaction at Maple
Highlands. While on site, the following was observed:
ESNW rep observed contractor backfilling for storm trench. ESNW rep observed contractor placing
native trench backfill in shallow loose lifts, compacting using hoe pack. Compaction tests conducted
indicate an adequate compaction of at least 95% of the modified proctor maximum dry density at the
tested locations. ESNW rep will return to observe and test storm trench backfill compaction.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0626
Date Mon 6/26/2023 Weather Clear
Arrival/Departure Time(s) 4:15pm / 5:30pm Travel Time (hr) 1.00
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen - 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
115 Storm Trench Backfill -6' SG 2 138.7 12.1 131.2 95
116 Storm Trench Backfill -4' SG 2 138.7 11.8 132.0 95
117 Storm Trench Backfill -2' SG 2 138.7 13.2 132.4 95
118 Storm Trench Backfill SG 2 138.7 12.7 131.4 95
ESNW representative was on site to observe and test storm trench backfill compaction at Maple
Highlands. While on site, the following was observed:
ESNW rep observed contractor backfilling for storm trench. ESNW rep observed contractor placing
native trench backfill in shallow loose lifts, compacting using hoe pack. Compaction tests conducted
indicate an adequate compaction of at least 95% of the modified proctor maximum dry density at the
tested locations. ESNW rep will return to observe and test storm trench backfill compaction.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0627
Date Tue 6/27/2023 Weather Partly Cloudy
Arrival/Departure Time(s) 3:45pm / 4:15pm Travel Time (hr) 0.75
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen - 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
119 Storm Trench Backfill -2' SG 2 138.7 12.3 132.8 96
120 Storm Trench Backfill SG 2 138.7 13.0 132.3 95
ESNW representative was on site to observe and test storm trench backfill compaction at Maple
Highlands. While on site, the following was observed:
ESNW rep observed contractor backfilling for storm trench. ESNW rep observed contractor placing
native trench backfill in shallow loose lifts, compacting using hoe pack. Compaction tests conducted
indicate an adequate compaction of at least 95% of the modified proctor maximum dry density at the
tested locations. ESNW rep will return to observe and test storm trench backfill compaction.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0628
Date Wed 6/28/2023 Weather Partly Cloudy
Arrival/Departure Time(s) 11:30am / 12:00pm Travel Time (hr) 0.75
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen - 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
121 Storm Trench Backfill -4' SG 2 138.7 13.0 131.9 95
122 Storm Trench Backfill -2' SG 2 138.7 12.8 131.3 95
123 Storm Trench Backfill SG 2 138.7 13.3 132.4 95
ESNW representative was on site to observe and test storm trench backfill compaction at Maple
Highlands. While on site, the following was observed:
ESNW rep observed contractor backfilling for storm trench. ESNW rep observed contractor placing
native trench backfill in shallow loose lifts, compacting using hoe pack. Compaction tests conducted
indicate an adequate compaction of at least 95% of the modified proctor maximum dry density at the
tested locations. ESNW rep will return to observe and test storm trench backfill compaction.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0630
Date Fri 6/30/2023 Weather Partly Cloudy
Arrival/Departure Time(s) 2:45pm / 3:00pm Travel Time (hr) 0.75
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen - 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
124 Storm Trench Backfill -6' SG 2 138.7 12.5 133.5 96
125 Storm Trench Backfill -4' SG 2 138.7 12.4 131.8 95
126 Storm Trench Backfill -2' SG 2 138.7 13.1 132.0 95
127 Storm Trench Backfill SG 2 138.7 12.9 133.2 96
ESNW representative was on site to observe and test storm trench backfill compaction at Maple
Highlands. While on site, the following was observed:
ESNW rep observed contractor backfilling for storm trench. ESNW rep observed contractor placing
native trench backfill in shallow loose lifts, compacting using hoe pack. Compaction tests conducted
indicate an adequate compaction of at least 95% of the modified proctor maximum dry density at the
tested locations. ESNW rep will return to observe and test storm trench backfill compaction.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0706
Date Thu 7/6/2023 Weather Mostly Clear
Arrival/Departure Time(s) 3:45pm / 4:15pm Travel Time (hr) 1.00
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen - 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
128 Storm Trench Backfill -4' SG 2 138.7 9.8 131.4 95
129 Storm Trench Backfill -2' SG 2 138.7 10.3 132.7 96
130 Storm Trench Backfill SG 2 138.7 9.7 131.4 95
131 Storm Trench Backfill -2' SG 2 138.7 12.2 132.5 96
132 Storm Trench Backfill SG 2 138.7 11.8 132.0 95
ESNW representative was on site to observe and test storm trench backfill compaction at Maple
Highlands. While on site, the following was observed:
ESNW rep observed contractor backfilling for storm trench. ESNW rep observed contractor placing
native trench backfill in shallow loose lifts, compacting using hoe pack. Compaction tests conducted
indicate an adequate compaction of at least 95% of the modified proctor maximum dry density at the
tested locations. ESNW rep will return to observe and test storm trench backfill compaction.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0707
Date Fri 7/7/2023 Weather Mostly Clear
Arrival/Departure Time(s) 4:30pm / 4:45pm Travel Time (hr) 1.00
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen - 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
133 Storm Trench Backfill SG 2 138.7 12.5 131.7 95
134 Storm Trench Backfill SG 2 138.7 12.8 132.1 95
ESNW representative was on site to observe and test storm trench backfill compaction at Maple
Highlands. While on site, the following was observed:
ESNW rep observed contractor backfilling for storm trench. ESNW rep observed contractor placing
native trench backfill in shallow loose lifts, compacting using hoe pack. Compaction tests conducted
indicate an adequate compaction of at least 95% of the modified proctor maximum dry density at the
tested locations. ESNW rep will return to observe and test storm trench backfill compaction.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0710
Date Mon 7/10/2023 Weather Mostly Clear
Arrival/Departure Time(s) 5:00pm / 5:30pm Travel Time (hr) 1.00
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen - 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
135 Storm Trench Backfill -4' SG 2 138.7 13.0 132.5 96
136 Storm Trench Backfill -2' SG 2 138.7 12.3 131.9 95
137 Storm Trench Backfill SG 2 138.7 12.5 131.7 95
ESNW representative was on site to observe and test storm trench backfill compaction at Maple
Highlands. While on site, the following was observed:
ESNW rep observed contractor backfilling for storm trench. ESNW rep observed contractor placing
native trench backfill in shallow loose lifts, compacting using hoe pack. Compaction tests conducted
indicate an adequate compaction of at least 95% of the modified proctor maximum dry density at the
tested locations. ESNW rep will return to observe and test storm trench backfill compaction.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0711
Date Tue 7/11/2023 Weather Mostly Clear
Arrival/Departure Time(s) 5:15pm / 5:30pm Travel Time (hr) 1.00
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen - 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
138 Storm Trench Backfill SG 2 138.7 11.7 132.9 96
139 Storm Trench Backfill SG 2 138.7 12.1 132.5 96
ESNW representative was on site to observe and test storm trench backfill compaction at Maple
Highlands. While on site, the following was observed:
ESNW rep observed contractor backfilling for storm trench. ESNW rep observed contractor placing
native trench backfill in shallow loose lifts, compacting using hoe pack. Compaction tests conducted
indicate an adequate compaction of at least 95% of the modified proctor maximum dry density at the
tested locations. ESNW rep will return to observe and test storm trench backfill compaction.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0712
Date Wed 7/12/2023 Weather Clear
Arrival/Departure Time(s) 12:30pm / 12:45pm Travel Time (hr) 1.00
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen - 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
140 Storm Trench Backfill -4' SG 2 138.7 10.6 132.2 95
141 Storm Trench Backfill -2' SG 2 138.7 11.0 132.9 96
142 Storm Trench Backfill SG 2 138.7 10.2 131.6 95
ESNW representative was on site to observe and test storm trench backfill compaction at Maple
Highlands. While on site, the following was observed:
ESNW rep observed contractor backfilling for storm trench. ESNW rep observed contractor placing
native trench backfill in shallow loose lifts, compacting using hoe pack. Compaction tests conducted
indicate an adequate compaction of at least 95% of the modified proctor maximum dry density at the
tested locations. ESNW rep will return to observe and test storm trench backfill compaction.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0713
Date Thu 7/13/2023 Weather Clear
Arrival/Departure Time(s) 3:45pm / 5:15pm Travel Time (hr) 1.00
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen - 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
143 Storm Trench Backfill -4' SG 2 138.7 9.5 131.8 95
144 Storm Trench Backfill -2' SG 2 138.7 10.6 132.2 95
145 Storm Trench Backfill SG 2 138.7 9.2 131.3 95
ESNW representative was on site to observe and test storm trench backfill compaction at Maple
Highlands. While on site, the following was observed:
ESNW rep observed contractor backfilling for storm trench. ESNW rep observed contractor placing
native trench backfill in shallow loose lifts, compacting using hoe pack. Compaction tests conducted
indicate an adequate compaction of at least 95% of the modified proctor maximum dry density at the
tested locations. ESNW rep will return to observe and test storm trench backfill compaction.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0714
Date Fri 7/14/2023 Weather Clear
Arrival/Departure Time(s) 4:15pm / 4:30pm Travel Time (hr) 1.00
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen - 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
146 Storm Trench Backfill SG 2 138.7 9.8 131.6 95
147 Storm Trench Backfill SG 2 138.7 10.8 132.8 96
ESNW representative was on site to observe and test storm trench backfill compaction at Maple
Highlands. While on site, the following was observed:
ESNW rep observed contractor backfilling for storm trench. ESNW rep observed contractor placing
native trench backfill in shallow loose lifts, compacting using hoe pack. Compaction tests conducted
indicate an adequate compaction of at least 95% of the modified proctor maximum dry density at the
tested locations. ESNW rep will return to observe and test storm trench backfill compaction.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0718
Date Tue 7/18/2023 Weather Mostly Clear
Arrival/Departure Time(s) 3:45pm / 4:30pm Travel Time (hr) 0.25
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen - 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
148 Storm Trench Backfill -12' SG 2 138.7 10.3 132.4 95
149 Storm Trench Backfill -10' SG 2 138.7 10.5 133.0 96
150 Storm Trench Backfill -8' SG 2 138.7 9.6 132.0 95
152 Storm Trench Backfill -6' SG 2 138.7 10.2 133.3 96
153 Storm Trench Backfill -4' SG 2 138.7 9.3 132.5 96
154 Storm Trench Backfill -2' SG 2 138.7 9.9 132.1 95
155 Storm Trench Backfill SG 2 138.7 10.5 133.0 96
ESNW representative was on site to observe and test storm trench backfill compaction at Maple
Highlands. While on site, the following was observed:
ESNW rep observed contractor backfilling for storm trench. ESNW rep observed contractor placing
native trench backfill in shallow loose lifts, compacting using hoe pack. Compaction tests conducted
indicate an adequate compaction of at least 95% of the modified proctor maximum dry density at the
tested locations. ESNW rep will return to observe and test storm trench backfill compaction.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0719
Date Wed 7/19/2023 Weather Clear
Arrival/Departure Time(s) 2:30pm / 3:30pm Travel Time (hr) 1.00
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen - 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
156 Storm Trench Backfill -8' SG 2 138.7 10.1 131.5 95
157 Storm Trench Backfill -6' SG 2 138.7 10.9 132.9 96
158 Storm Trench Backfill -4' SG 2 138.7 9.7 132.0 95
159 Storm Trench Backfill -2' SG 2 138.7 9.4 131.6 95
160 Storm Trench Backfill SG 2 138.7 10.0 132.5 96
ESNW representative was on site to observe and test storm trench backfill compaction at Maple
Highlands. While on site, the following was observed:
ESNW rep observed contractor backfilling for storm trench. ESNW rep observed contractor placing
native trench backfill in shallow loose lifts, compacting using hoe pack. Compaction tests conducted
indicate an adequate compaction of at least 95% of the modified proctor maximum dry density at the
tested locations. ESNW rep will return to observe and test storm trench backfill compaction.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 1 Report ID 6121.02 E 2023 0720
Date Thu 7/20/2023 Weather Clear
Arrival/Departure Time(s) 1:45pm / 2:15pm Travel Time (hr) 0.75
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Blake Rasmussen - 206-331-6937
Client Info/Contact D.R. Horton | Brandon Anderson
General Contractor Info/Contact
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Test
Number Test Location Elevation Reference
Proctor
Maximum
Dry Density
(pcf)
Test
Moisture
(%)
Test
Dry Density
(pcf)
% of
MDD
161 Storm Trench Backfill -4' SG 2 138.7 10.5 132.2 95
162 Storm Trench Backfill -2' SG 2 138.7 10.8 132.8 96
163 Storm Trench Backfill SG 2 138.7 9.9 131.4 95
ESNW representative was on site to observe and test storm trench backfill compaction at Maple
Highlands. While on site, the following was observed:
ESNW rep observed contractor backfilling for storm trench. ESNW rep observed contractor placing
native trench backfill in shallow loose lifts, compacting using hoe pack. Compaction tests conducted
indicate an adequate compaction of at least 95% of the modified proctor maximum dry density at the
tested locations. ESNW rep will return to observe and test storm trench backfill compaction.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 esnw.com
FIELD REPORT
Project No. 6121.02 Page 1 of 2 Report ID 6121.02 E 2023 0923
Date Wed 9/27/2023 Weather Rain, 60s
Arrival/Departure Time(s) 1400-1445 Travel Time (hr) 1.25
Project Name Maple Highlands
Location 16210 SE 134th St, Renton
ESNW Rep. & Phone Jacob Calvin | 206-602-9880
Client Info/Contact D.R. Horton | Brandon Anderson
Reviewed By LAC
Initials/Date
SHA
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
ESNW rep was on site to observe and test lot fill.
Lot Fill Observation
Prior to arrival, the lot fill was placed in 12-inch loose lifts and compacted with a vibratory drum roller and
a sheep’s foot vibratory roller. Compaction tests indicated an adequate compaction of at least 95% of the
modified proctor at the tested locations.
Test Number Test Location Elevation Reference Proctor
Maximum Dry Density (pcf)
Test Moisture (%)
Test Dry Density (pcf)
% of MDD
164 Lot Fill -2.0' 2 138.7 8.5 133.5 96
165 Lot Fill SG 2 138.7 8.2 138.1 100
165 Lot Fill -2.0' 2 138.7 10.6 132.3 95
166 Lot Fill SG 2 138.7 10.3 133.0 96
167 Lot Fill -2.0' 2 138.7 9.3 135.3 98
168 Lot Fill SG 2 138.7 8.4 134.9 97
169 Lot Fill -2.0' 2 138.7 9.9 133.2 96
170 Lot Fill SG 2 138.7 6.9 136.2 98
171 Lot Fill -2.0' 2 138.7 7.8 131.8 95
172 Lot Fill SG 2 138.7 8.0 136.0 98
173 Lot Fill SG 2 138.7 9.4 133.5 96
174 Lot Fill SG 2 138.7 6.6 137.1 99
175 Lot Fill SG 2 138.7 9.0 133.2 96
176 Lot Fill SG 2 138.7 8.0 134.1 97
177 Lot Fill SG 2 138.7 7.9 133.0 96
Report ID 6121.02 E 2023 0923 Page 2 of 2
Earth Solutions NW, LLC
164-165
172
173
174 175
166-167 168-169 170-171
176
177