Loading...
HomeMy WebLinkAboutCOR Exhibits-Appeal Hearing 10.24.23_08.221017 ChavezEmailreCivilPlanApprovalFrom:Jonathan Chavez To:Luis Rebelo Cc:Dan Zoldak; Rob Porter; Chip Vincent; Vanessa Dolbee; Jill Ding; Brianne Bannwarth; Matthew Herrera; Thomas Main Subject:Home Depot Civil Plan Approval - Construction Bond (C22003168) Date:Monday, October 17, 2022 3:50:11 PM Attachments:Final Invoice.pdf Home Depot - Civil Plan Approval.msg Importance:High Luis, We can allow site work to start today, past the previous boundary set forth by the Early Civil Permit (C22004541), until Monday, October 24, 2022 at 4PM. This should allow Dan and Home Depot enough time to pay the attached final invoice AND secure/submit the construction bond needed to perform the rest of the work. Please keep all site work from now until the 24th limited to the site itself; the following shall not be allowed to start until the construction bond is received: Sewer Main installation. Storm Connection to public storm system on Grady. Undergrounding. Sidewalk, permitter/street landscaping, lighting and signals. Approved Full Civil Plans (C22003168), with conditions: https://fileshare.rentonwa.gov:8443/? ShareToken=D5E6EC80C7F522DF36D8EAC21629AF04C7DD3B56 Also, prior to full Civil Permit Issuance, we will need confirmation from you that you accept that approved plans with conditions/comments. Please let me know if you have any questions, JONATHAN CHAVEZ, P.E. | CIVIL ENGINEER III City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center | Online Applications and Inspections (425) 430-7288 | jchavez@rentonwa.gov