Loading...
HomeMy WebLinkAboutCOR Exhibits-Appeal Hearing 10.24.23_16.230406-230412 Emails-Chavez,Rebelo,Zoldak-KCMetroTCEExhibit 10 Page 1 of 7 2 This is not a land take or a permanent easement, nor does it prohibit the prospective buyer(s) of the Outlot(s) from  developing their lot(s). It should not change any acreage lists, all it will do is give KC Metro and their contractor  permission to legally access the site for the purposes of staging, grading, and constructing the improvements, see  screenshot below. The TCE will expire within 27 months of execution or December 2026, whichever occurs first.  I have already asked KC Metro for reduction of the TCE area and they have confirmed that this is the area needed to  complete the ROW improvements per City of Renton Standards. If Home Depot refuses to grant this TCE, KC Metro will  Exhibit 10 Page 2 of 7 Exhibit 10 Page 3 of 7 4 Daniel J. Zoldak, PE, PLS, CASp, LEED AP, QSD/P  Vice President  Lars Andersen & Associates, Inc.  CASp – LEED Accredited – QSD/QSP  4694 W Jacquelyn Avenue  Fresno, CA 93722  (559)276‐2790  Ext. 117 Office (559) 276‐0850  Fax (559) 978‐7059  Cell www.LarsAndersen.com From: Dan Zoldak   Sent: Friday, April 7, 2023 8:21 AM  To: 'Jonathan Chavez' <JChavez@Rentonwa.gov>  Cc: Luis Rebelo <LRebelo@larsandersen.com>; Nathan Janders <NJanders@Rentonwa.gov>; Jill Ding  <JDing@Rentonwa.gov>; Luis Rebelo <LRebelo@larsandersen.com>  Subject: RE: KC Metro TCE   Jonathan, we agreed on 10 feet and now I am being asker for more. I believe the discrepancies in the two ROW are  minor(the biggest discrepancy between HD proposed ROW and Metro is less than a 1 foot) . I would also like to how  Metro is not building there project to City Standard with required lights and landscape. As you can see below the TCE  request is well beyond their limit of work and at this point I believe they are asking for more than they need.  I would like to move forward with the lot line adjustment recording as submitted.  Daniel J. Zoldak, PE, PLS, CASp, LEED AP, QSD/P  Vice President  Lars Andersen & Associates, Inc.  CASp – LEED Accredited – QSD/QSP  4694 W Jacquelyn Avenue  Exhibit 10 Page 4 of 7 Exhibit 10 Page 5 of 7 Exhibit 10 Page 6 of 7 7 CASp – LEED Accredited – QSD/QSP  4694 W Jacquelyn Avenue  Fresno, CA 93722  (559)276‐2790  Ext. 117 Office (559) 276‐0850  Fax (559) 978‐7059  Cell www.LarsAndersen.com From: Jonathan Chavez <JChavez@Rentonwa.gov>   Sent: Thursday, April 6, 2023 7:58 AM  To: Dan Zoldak <DZoldak@larsandersen.com>  Cc: Luis Rebelo <LRebelo@larsandersen.com>; Nathan Janders <NJanders@Rentonwa.gov>; Jill Ding  <JDing@Rentonwa.gov>  Subject: KC Metro TCE   Importance: High  Dan,   Please see attached the Temporary Construction Easement for the KC Metro RapidRide I‐Line. As I mentioned at the site  yesterday, this is a temporary easement only, and shall be null after December 30, 2026.   Could you have your legal team review, and HD sign? Please let me know if you have any questions,   JONATHAN CHAVEZ, P.E. | CIVIL ENGINEER III  City of Renton | PW | Water Utility Engineering Division  1055 S Grady Way | 5th Floor | Renton, WA 98057   (425) 430‐7288 | jchavez@rentonwa.gov Exhibit 10 Page 7 of 7