Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Ex. 18 - KC Metro Talbot Lighting Plan 60% Design
HD Exhibit 18 King County Metro Talbot Lighting Plan 60% Design 25+27 24+0025+0010+00 11+00 12+00 13+0014+00915460- 0005 915460-0010192305-9 0 2 3C:\ pw_ workdir\ den003\ jeg_ ex- sahad\d0601389\ 1 L1. 01.dwg | Layout: 1L1. 08PLOTTED: Nov 05, 2021-11:45: 58am By dxsXREFS: X- LEGEND.dwg; X- SHEETCUTS_ Overall.dwg; KCMTD-BORDER_ 2020.dwg; X- ALIGN. dwg; X- PV_RENTON. dwg; X-SN- CHANN_ RENTON.dwg; X- STATION_RENTON.dwg; X-SIGNAL_ RENTON.dwg; X-EL_RENTON.dwg; 18229-SV-BS_Renton. dwg; X- TOPO. dwg; X- LD_RENTON. dwg; X- DR_ RENTON. dwg; X-ROW_RENTON.dwg; X-RDWY_RENTON.dwg; X-IL_RENTON_BASE. dwg; X-PARCEL-INFO.dwg; X-IL_ RENTON.dwg; 18229-SV-ROW.dwgIMAGES: No.REVISION DATEBYAPP'D DESIGNED:DRAWN:CHECKED: CHECKED:APPROVED:PROJECT NO:CONTRACT NO:METRO TRANSIT CAPITAL DIVISION DATE:DRAWING NO: SHEET NO: OF METRO RAPIDRIDE I LINENOVEMBER 2021P. ENG E00566E18 CXXXXXXXX XXXX 60% SUBMITTAL METRO PROJECT ENGINEER R ERSGEITE D 20'40'SCALE: 1" = 20'0'S GRADY WAYTALBOT RD S TAL- B-LINE)(GRA-LINE)RENTON SEGMENT LIGHTING PLAN GRA 24+ 00 TO TAL-B 14+00 1L1.08 443 X. CHEN W. DING X. ZHANG 2 5 1 INSTALL NEW STREET LIGHT POLE AND FOUNDATION WITH NEW LED FIXTURE PER CITY OF RENTON STANDARD PLAN 117. 1. INSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.10- 04.INSTALL TYPE 8 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.30- 04. SERVICE CABINET. SEE SIGNAL DRAWINGS FOR DETAILS.6 7 24 7 28 5 6 5 5 12 29 1 5 4 REMOVE EXISTING STREET LIGHT POLE, FOUNDATION, BRACKET ARM, LUMINAIRE AND ASSOCIATED WIRING.INSTALL NEW STREET LIGHT POLE AND FOUNDATION WITH STREET AND PEDESTRIAN COMBO LIGHT PER CITY OF RENTON STANDARD PLAN 117.1.25 7 2 3 REPLACE EXISTING LUMINAIRE ON EXISTING POLE.3 4 2 271 WIRING SCHEDULE CONDUIT WIRE SPAN OR CONDUIT SIZE EXISTING CONDUCTORS STREET LIGHTING PEDESTRIAN LIGHTING GROUND NOTES 1 2" PVC 2/C# 10 1-#6 2" PVC STUBOUT 1' FROM EDGE OF CONCRETE FOUNDATION, CAP FOR FUTURE USE 3 2" PVC 4-# 6 1-# 6 2" PVC SPARE 5 3" PVC 4-#6 1-#6 3" PVC SPARE 6 2" PVC 2/C# 10 2/C#10 1-#6 2" PVC STUBOUT 1' FROM EDGE OF CONCRETE FOUNDATION, CAP FOR FUTURE USE 7 2" PVC 4-#6 4-#6 1-#6 2" PVC SPARE 10 2" PVC 4-#6 1-#6 2" PVC SPARE 14 2" PVC 4-#6 2-#6 1-#6 2" PVC SPARE 18 3" PVC 4-# 6 4-# 6 1-#6 3" PVC SPARE 20 EX 1" 14+00 15+00 16+00 17+00 18+00 192305-9094 202305-9007 192305 9 0 2 3 C:\pw_workdir\den003\ jeg_ ex- sahad\ d0601389\ 1 L1.01. dwg | Layout: 1L1.09PLOTTED: Nov 05, 2021- 11:46: 28am By dxsXREFS: X- LEGEND.dwg; X- SHEETCUTS_Overall.dwg; KCMTD- BORDER_2020. dwg; X- ALIGN.dwg; X- PV_ RENTON.dwg; X-SN- CHANN_RENTON.dwg; X- STATION_RENTON.dwg; X-SIGNAL_RENTON. dwg; X- EL_RENTON. dwg; 18229-SV-BS_Renton.dwg; X-TOPO.dwg; X-LD_ RENTON. dwg; X- DR_RENTON. dwg; X- ROW_ RENTON. dwg; X-RDWY_RENTON.dwg; X-IL_RENTON_BASE.dwg; X-PARCEL-INFO. dwg; X-IL_RENTON.dwg; 18229-SV- ROW.dwgIMAGES: No.REVISION DATEBYAPP'D DESIGNED:DRAWN:CHECKED:CHECKED:APPROVED:PROJECT NO: CONTRACT NO:METRO TRANSIT CAPITAL DIVISION DATE:DRAWING NO:SHEET NO: OF METRO RAPIDRIDE I LINE NOVEMBER 2021P. ENG E00566E18 CXXXXXXXX XXXX 60% SUBMITTAL METRO PROJECT ENGINEER R ERSGEITE D 20'40'SCALE: 1" = 20' 0' TALBOT RD S TAL- B- LINE) RENTON SEGMENT LIGHTINGPLAN TAL-B 14+ 00 TO TAL-B 18+50 1L1.09 444 X. CHEN W. DING X. ZHANG 2 5 1 INSTALL NEW STREET LIGHT POLE AND FOUNDATION WITH NEW LED FIXTURE PER CITY OF RENTON STANDARD PLAN 117.1.INSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.10- 04. INSTALL TYPE 8 JUNCTION BOX PER WSDOT STANDARD PLAN J- 40.30-04.9 4 REMOVE EXISTING STREET LIGHT POLE, FOUNDATION, BRACKET ARM, LUMINAIRE AND ASSOCIATED WIRING.INSTALL NEW CONDUITS INTO EXISTING JUNCTION BOX.5 30 2 1 31 2 1 32 2 1 33 51 34 21 9 4 4 WIRING SCHEDULE CONDUIT WIRE SPAN OR CONDUIT SIZE EXISTING CONDUCTORS STREET LIGHTING PEDESTRIAN LIGHTING GROUND NOTES 1 2" PVC 2/ C#10 1-#6 2" PVC STUBOUT 1' FROM EDGE OF CONCRETE FOUNDATION, CAP FOR FUTURE USE 2 2" PVC 2-#6 1-# 6 2" PVC SPARE 3 2"