Loading...
HomeMy WebLinkAboutEx. 19 KC Metro Lighting Wiring Schematics 60% DesignHD Exhibit 19 King County Metro Lighting Wiring Schematics 60% Design C:\pw_workdir\den003\ jeg_ ex- sahad\ d0601389\ 1 L2.01. dwg | Layout: 1L2.02PLOTTED: Nov 05, 2021- 12:25: 55pm By dxsXREFS: KCMTD- BORDER_2020.dwgIMAGES: No.REVISIONDATEBYAPP' D DESIGNED:DRAWN: CHECKED:CHECKED: APPROVED:PROJECT NO: CONTRACT NO:METRO TRANSIT CAPITAL DIVISION DATE:DRAWING NO:SHEET NO: OF METRO RAPIDRIDE I LINE NOVEMBER 2021P. ENG E00566E18 CXXXXXXXX XXXX 60% SUBMITTAL METRO PROJECT ENGINEER R ERSGEITE D WIRING SCHEMATIC TABLOT RD S 1 L1.07, 1 L1.08, 1 L1. 09 NTS RENTON SEGMENT LIGHTIN WIRING SCHEMATICS 1L2.02 459 X. CHEN W. DING X. ZHANG S GRADY WAY 2/ C#10 (B) 2/C#10 (D) 1-#6 GND 2-# 6 (B)2-# 6 (D)1-#6 GND TALBOT RD S2/C#10 (A) 2/C#10 ( C)1-#6 GND 2/C#10 (B) 2/C#10 ( D)1-#6 GND 2/C#10 (C) 1-#6 GND 2/C#10 (D) 1-#6 GND 4-# 6 (A/B) 4-#6 (C/D) 1-#6 GND 4-# 6 (A/B) 4-#6 (C/D) 1-#6 GND 4-# 6 (A/B) 4-#6 (C/ D)1-# 6 GND 4-#6 ( A/B)4-# 6 (C/D)1-# 6 GND4-#6 (A/ B)4-#6 ( C/D)1-#6 GND PROPOSED SERVICE POINT SERVICE CABINET 2/ C#10 (D)1-# 6 GND 2/ C#10 (C)1-# 6 GND2-#6 (D) 1-#6 GND 4-#6 (C/D) 1-#6 GND 2/ C#10 (B) 2/C#10 (D) 1-#6 GND 4-#6 (A/B) 4-#6 (C/D) 1-#6 GND 4-#6 (A/B) 2#6 (C/ D)1-#6 GND 4-#6 (A/ B)1-#6 GND 2/C#10 ( A)2/C#10 ( C)1-#6 GND 4-#6 ( A/B) 1-#6 GND 4-#6 (A/ B)1-# 6 GND TALBOT RD S2/ C#10 (B)1-# 6 GND 2/ C# 10 ( A)1-#6 GND 16 17 18 19 20 2/C10 ( B)1-#6 GND 22 23 24 4-#6 (A/ B) 4-# 6 (C/D)1-# 6 GND 25 27 4-#6 ( A/B)1-# 6 GND 4-#6 (A/ B)1-#6 GND 4-#6 (A/ B)1-#6 GND 33 34 2/C# 10 (B)1-# 6 GND 2-#6 ( B)1-#6 GND 28 4-#6 ( A/B)1-# 6 GND 2/C#10 ( A)1-#6 GND 29 4-#6 ( A/B)1-# 6 GND 4-#6 (A/B) 1-#6 GND 2/C#10 ( B)1-#6 GND 30 4-#6 (A/ B)1-#6