HomeMy WebLinkAboutEx. 25 RE_ KC Metro TCE (7)HD Exhibit 25
RE_ KC Metro TCE (7)
To: Jonathan Chavez[JChavez@Rentonwa.gov]
Cc: Luis Rebelo[LRebelo@larsandersen.com]; Nathan Janders[NJanders@Rentonwa.gov]; Jill Ding[JDing@Rentonwa.gov];
Luis Rebelo[LRebelo@larsandersen.com]
From: Dan Zoldak
Sent: Mon 4/17/2023 12:33:55 PM
Importance: Normal
Subject: RE: KC Metro TCE
Received: Mon 4/17/2023 12:34:03 PM
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.
Jonathan, please get me the word version of the easement language.
Daniel J. Zoldak, PE, PLS, CASp, LEED AP, QSD/P
Vice President
Lars Andersen & Associates, Inc.
CASp – LEED Accredited – QSD/QSP
4694 W Jacquelyn Avenue
Fresno, CA 93722
(559) 276-2790 Ext. 117 Office
(559) 276-0850 Fax
(559) 978-7059 Cell
www.LarsAndersen.com
From: Jonathan Chavez <JChavez@Rentonwa.gov>
Sent: Thursday, April 6, 2023 3:13 PM
To: Dan Zoldak <DZoldak@larsandersen.com>
Cc: Luis Rebelo <LRebelo@larsandersen.com>; Nathan Janders <NJanders@Rentonwa.gov>; Jill Ding <JDing@Rentonwa.gov>; Luis Rebelo
<LRebelo@larsandersen.com>
Subject: RE: KC Metro TCE
Dan,
KC Metro’s response to reducing easement area:
“We are widening the roadway and pushing the curb back and so need additional room behind the sidewalk to conform
grades, restore landscaping, and tie-in existing driveways. I am attaching our 90% site preparation and paving plans along
their frontage. This should give them an idea of the extents needed for the proposed work. Let me know if you need anything
else.”
JONATHAN CHAVEZ, P.E. | CIVIL ENGINEER III
City of Renton | PW | Water Utility Engineering Division
1055 S Grady Way | 5th Floor | Renton, WA 98057
(425) 430-7288 | jchavez@rentonwa.gov
From: Dan Zoldak <DZoldak@larsandersen.com>
Sent: Thursday, April 6, 2023 12:08 PM
To: Jonathan Chavez <JChavez@Rentonwa.gov>
Cc: Luis Rebelo <LRebelo@larsandersen.com>; Nathan Janders <NJanders@Rentonwa.gov>; Jill Ding <JDing@Rentonwa.gov>; Luis Rebelo
<LRebelo@larsandersen.com>
Subject: RE: KC Metro TCE
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the
content is safe.
Jonathan we are doing a 10 foot ROW Dedication as already shown on the plat. Have them revise to a 2 foot (beyond the 10 foot) TCE –
this will allow them to install the sidewalk.
Daniel J. Zoldak, PE, PLS, CASp, LEED AP, QSD/P
Vice President
Lars Andersen & Associates, Inc.
CASp – LEED Accredited – QSD/QSP
4694 W Jacquelyn Avenue
Fresno, CA 93722
(559) 276-2790 Ext. 117 Office
(559) 276-0850 Fax
(559) 978-7059 Cell
www.LarsAndersen.com
From: Jonathan Chavez <JChavez@Rentonwa.gov>
Sent: Thursday, April 6, 2023 11:29 AM
To: Dan Zoldak <DZoldak@larsandersen.com>
Cc: Luis Rebelo <LRebelo@larsandersen.com>; Nathan Janders <NJanders@Rentonwa.gov>; Jill Ding <JDing@Rentonwa.gov>; Luis Rebelo
<LRebelo@larsandersen.com>
Subject: RE: KC Metro TCE
Dan,
We need this TCE document executed with the LLA or an update to the LLA to show 2-foot of dedication. Without either, KC Metro will
not be able to construct their improvements. Attached are Metro’s latest construction plans and easement area needed to complete the
improvements. This benefits Home Depot as it ensures a timely install of the improvements, and subsequent return of the cash surety (for
the deferrals).
The temp easement allows Metro and Metro’s contractor to step onto private property for the purposes of constructing the ROW
improvements. The easement area is wider at the driveways because Metro will be replacing driveway curbs, adding ADA ramps, and
paving the driveway (see attached). Easement area shall be restored to current condition or better.
JONATHAN CHAVEZ, P.E. | CIVIL ENGINEER III
City of Renton | PW | Water Utility Engineering Division
1055 S Grady Way | 5th Floor | Renton, WA 98057
(425) 430-7288 | jchavez@rentonwa.gov
From: Dan Zoldak <DZoldak@larsandersen.com>
Sent: Thursday, April 6, 2023 10:57 AM
To: Jonathan Chavez <JChavez@Rentonwa.gov>
Cc: Luis Rebelo <LRebelo@larsandersen.com>; Nathan Janders <NJanders@Rentonwa.gov>; Jill Ding <JDing@Rentonwa.gov>; Luis Rebelo
<LRebelo@larsandersen.com>
Subject: RE: KC Metro TCE
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the
content is safe.
Jonathan looking at this again – this is a pretty big area. We talked in the field about some addition room for construction purposes to
install the sidewalk?
Luis – please plot this on the site plan so I can see it.
Daniel J. Zoldak, PE, PLS, CASp, LEED AP, QSD/P
Vice President
Lars Andersen & Associates, Inc.
CASp – LEED Accredited – QSD/QSP
4694 W Jacquelyn Avenue
Fresno, CA 93722
(559) 276-2790 Ext. 117 Office
(559) 276-0850 Fax
(559) 978-7059 Cell
www.LarsAndersen.com
From: Jonathan Chavez <JChavez@Rentonwa.gov>
Sent: Thursday, April 6, 2023 7:58 AM
To: Dan Zoldak <DZoldak@larsandersen.com>
Cc: Luis Rebelo <LRebelo@larsandersen.com>; Nathan Janders <NJanders@Rentonwa.gov>; Jill Ding <JDing@Rentonwa.gov>
Subject: KC Metro TCE
Importance: High
Dan,
Please see attached the Temporary Construction Easement for the KC Metro RapidRide I-Line. As I mentioned at the site yesterday, this is
a temporary easement only, and shall be null after December 30, 2026.
Could you have your legal team review, and HD sign? Please let me know if you have any questions,
JONATHAN CHAVEZ, P.E. | CIVIL ENGINEER III
City of Renton | PW | Water Utility Engineering Division
1055 S Grady Way | 5th Floor | Renton, WA 98057
(425) 430-7288 | jchavez@rentonwa.gov