Jonathan,
We are out of time and need to resolve this. As Dan mentioned, our plans call for a 10’ setback as originally requested, our plans have
been approved, and the LLA is ready to be executed. What time tomorrow afternoon are you available to discuss this?
Thank you,
Luis Rebelo, EIT
Sr. Project Engineer
Lars Andersen & Associates, Inc.
CASp – LEED Accredited – QSD/QSP
4694 W Jacquelyn Avenue
Fresno, CA 93722
(559) 276-2790 Ext. 115 Office
(559) 276-0850 Fax
www.LarsAndersen.com
From: Dan Zoldak <DZoldak@larsandersen.com>
Sent: Friday, April 7, 2023 2:48 PM
To: Jonathan Chavez <JChavez@Rentonwa.gov>
Cc: Luis Rebelo <LRebelo@larsandersen.com>; Nathan Janders <NJanders@Rentonwa.gov>; Jill Ding <JDing@Rentonwa.gov>; Luis Rebelo
<LRebelo@larsandersen.com>
Subject: RE: KC Metro TCE
Jonathon, I just got pinged by the purchaser of the outlot and asking the status of the recorded lot line. As I stated to you the property is
under purchase agreement with the acreage list and this is an issue.
The Purchaser wants an update title report with the recorded LLA and loan purposes.
Daniel J. Zoldak, PE, PLS, CASp, LEED AP, QSD/P
Vice President
Lars Andersen & Associates, Inc.
CASp – LEED Accredited – QSD/QSP
4694 W Jacquelyn Avenue
Fresno, CA 93722
(559) 276-2790 Ext. 117 Office
(559) 276-0850 Fax
(559) 978-7059 Cell
www.LarsAndersen.com
From: Dan Zoldak
Sent: Friday, April 7, 2023 8:21 AM
To: 'Jonathan Chavez' <JChavez@Rentonwa.gov>
Cc: Luis Rebelo <LRebelo@larsandersen.com>; Nathan Janders <NJanders@Rentonwa.gov>; Jill Ding <JDing@Rentonwa.gov>; Luis Rebelo
<LRebelo@larsandersen.com>
Subject: RE: KC Metro TCE
Jonathan, we agreed on 10 feet and now I am being asker for more. I believe the discrepancies in the two ROW are minor(the biggest
discrepancy between HD proposed ROW and Metro is less than a 1 foot) . I would also like to how Metro is not building there project to
City Standard with required lights and landscape. As you can see below the TCE request is well beyond their limit of work and at this point
I believe they are asking for more than they need.
I would like to move forward with the lot line adjustment recording as submitted.
Daniel J. Zoldak, PE, PLS, CASp, LEED AP, QSD/P
Vice President
Lars Andersen & Associates, Inc.
CASp – LEED Accredited – QSD/QSP
4694 W Jacquelyn Avenue
Fresno, CA 93722
(559) 276-2790 Ext. 117 Office
(559) 276-0850 Fax
(559) 978-7059 Cell
www.LarsAndersen.com
From: Jonathan Chavez <JChavez@Rentonwa.gov>
Sent: Thursday, April 6, 2023 3:13 PM
To: Dan Zoldak <DZoldak@larsandersen.com>
Cc: Luis Rebelo <LRebelo@larsandersen.com>; Nathan Janders <NJanders@Rentonwa.gov>; Jill Ding <JDing@Rentonwa.gov>; Luis Rebelo
<LRebelo@larsandersen.com>
Subject: RE: KC Metro TCE
Dan,
KC Metro’s response to reducing easement area:
“We are widening the roadway and pushing the curb back and so need additional room behind the sidewalk to conform
grades, restore landscaping, and tie-in existing driveways. I am attaching our 90% site preparation and paving plans along
their frontage. This should give them an idea of the extents needed for the proposed work. Let me know if you need anything
else.”
JONATHAN CHAVEZ, P.E. | CIVIL ENGINEER III
City of Renton | PW | Water Utility Engineering Division
1055 S Grady Way | 5th Floor | Renton, WA 98057
(425) 430-7288 | jchavez@rentonwa.gov
From: Dan Zoldak <DZoldak@larsandersen.com>
Sent: Thursday, April 6, 2023 12:08 PM
To: Jonathan Chavez <JChavez@Rentonwa.gov>
Cc: Luis Rebelo <LRebelo@larsandersen.com>; Nathan Janders <NJanders@Rentonwa.gov>; Jill Ding <JDing@Rentonwa.gov>; Luis Rebelo
<LRebelo@larsandersen.com>
Subject: RE: KC Metro TCE
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the
content is safe.
Jonathan we are doing a 10 foot ROW Dedication as already shown on the plat. Have them revise to a 2 foot (beyond the 10 foot) TCE –
this will allow them to install the sidewalk.
Daniel J. Zoldak, PE, PLS, CASp, LEED AP, QSD/P
Vice President
Lars Andersen & Associates, Inc.
CASp – LEED Accredited – QSD/QSP
4694 W Jacquelyn Avenue
Fresno, CA 93722
(559) 276-2790 Ext. 117 Office
(559) 276-0850 Fax
(559) 978-7059 Cell
www.LarsAndersen.com
From: Jonathan Chavez <JChavez@Rentonwa.gov>
Sent: Thursday, April 6, 2023 11:29 AM
To: Dan Zoldak <DZoldak@larsandersen.com>
Cc: Luis Rebelo <LRebelo@larsandersen.com>; Nathan Janders <NJanders@Rentonwa.gov>; Jill Ding <JDing@Rentonwa.gov>; Luis Rebelo
<LRebelo@larsandersen.com>
Subject: RE: KC Metro TCE
Dan,
We need this TCE document executed with the LLA or an update to the LLA to show 2-foot of dedication. Without either, KC Metro will
not be able to construct their improvements. Attached are Metro’s latest construction plans and easement area needed to complete the
improvements. This benefits Home Depot as it ensures a timely install of the improvements, and subsequent return of the cash surety (for
the deferrals).
The temp easement allows Metro and Metro’s contractor to step onto private property for the purposes of constructing the ROW
improvements. The easement area is wider at the driveways because Metro will be replacing driveway curbs, adding ADA ramps, and
paving the driveway (see attached). Easement area shall be restored to current condition or better.
JONATHAN CHAVEZ, P.E. | CIVIL ENGINEER III
City of Renton | PW | Water Utility Engineering Division
1055 S Grady Way | 5th Floor | Renton, WA 98057
(425) 430-7288 | jchavez@rentonwa.gov
From: Dan Zoldak <DZoldak@larsandersen.com>
Sent: Thursday, April 6, 2023 10:57 AM
To: Jonathan Chavez <JChavez@Rentonwa.gov>
Cc: Luis Rebelo <LRebelo@larsandersen.com>; Nathan Janders <NJanders@Rentonwa.gov>; Jill Ding <JDing@Rentonwa.gov>; Luis Rebelo
<LRebelo@larsandersen.com>
Subject: RE: KC Metro TCE
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the
content is safe.
Jonathan looking at this again – this is a pretty big area. We talked in the field about some addition room for construction purposes to
install the sidewalk?
Luis – please plot this on the site plan so I can see it.
Daniel J. Zoldak, PE, PLS, CASp, LEED AP, QSD/P
Vice President
Lars Andersen & Associates, Inc.
CASp – LEED Accredited – QSD/QSP
4694 W Jacquelyn Avenue
Fresno, CA 93722
(559) 276-2790 Ext. 117 Office
(559) 276-0850 Fax
(559) 978-7059 Cell
www.LarsAndersen.com
From: Jonathan Chavez <JChavez@Rentonwa.gov>
Sent: Thursday, April 6, 2023 7:58 AM
To: Dan Zoldak <DZoldak@larsandersen.com>
Cc: Luis Rebelo <LRebelo@larsandersen.com>; Nathan Janders <NJanders@Rentonwa.gov>; Jill Ding <JDing@Rentonwa.gov>
Subject: KC Metro TCE
Importance: High
Dan,
Please see attached the Temporary Construction Easement for the KC Metro RapidRide I-Line. As I mentioned at the site yesterday, this is
a temporary easement only, and shall be null after December 30, 2026.
Could you have your legal team review, and HD sign? Please let me know if you have any questions,
JONATHAN CHAVEZ, P.E. | CIVIL ENGINEER III