HomeMy WebLinkAboutEx. 32 - Email RE Frontage Improvement DeferralHD Exhibit 32 Email RE Frontage Improvement Deferral 1 McKee, Lisa D. From:Jonathan Chavez <JChavez@Rentonwa.gov> Sent:Friday, March 24, 2023 12:58 PM To:Dan Zoldak; Luis Rebelo Cc:Huy Huynh; Nathan Janders Subject:RE: Frontage Improvement Deferral Attachments:KC Metro Talbot Frontage 90% Design.pdf Dan,     If you could send me that email, I’d appreciate it. Just to recap: we are only looking for the cost of the trees and lights  that Metro is proposing to install, in the even that their project is dropped. See attached their proposed tree and lighting  plan    JONATHAN CHAVEZ, P.E. | CIVIL ENGINEER III  City of Renton | PW | Water Utility Engineering Division  1055 S Grady Way | 5th Floor | Renton, WA 98057   (425) 430‐7288 | jchavez@rentonwa.gov    From: Dan Zoldak <DZoldak@larsandersen.com>   Sent: Thursday, March 23, 2023 4:46 PM  To: Jonathan Chavez <JChavez@Rentonwa.gov>; Luis Rebelo <LRebelo@larsandersen.com>  Cc: Huy Huynh <HHuynh@rentonwa.gov>; Nathan Janders <NJanders@Rentonwa.gov>  Subject: RE: Frontage Improvement Deferral       Jonathan I believe we been through this a few times already. Shall I confirm with Chip as this is not my understanding  that HD has any responsibility here.  I believe there is a prior email on this.          Daniel J. Zoldak, PE, PLS, CASp, LEED AP, QSD/P Vice President Lars Andersen & Associates, Inc. CASp – LEED Accredited – QSD/QSP  4694 W Jacquelyn Avenue  Fresno, CA 93722  (559) 276‐2790  Ext. 117 Office  (559) 276‐0850  Fax  (559) 978‐7059  Cell  www.LarsAndersen.com     CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. 2                                   From: Jonathan Chavez <JChavez@Rentonwa.gov>   Sent: Thursday, March 23, 2023 3:30 PM  To: Luis Rebelo <LRebelo@larsandersen.com>  Cc: Dan Zoldak <DZoldak@larsandersen.com>; Huy Huynh <HHuynh@rentonwa.gov>; Nathan Janders  <NJanders@Rentonwa.gov>  Subject: RE: Frontage Improvement Deferral     Luis,     If KC Metro cannot fund their project for construction, we need to assure that the improvements are still constructed by  the developers per Title 4. As it stands now, Kc Metro has submitted the 90% design for review. We still have not  approved or issued them a construction permit.     JONATHAN CHAVEZ, P.E. | CIVIL ENGINEER III  City of Renton | PW | Water Utility Engineering Division  1055 S Grady Way | 5th Floor | Renton, WA 98057   (425) 430‐7288 | jchavez@rentonwa.gov    From: Luis Rebelo <LRebelo@larsandersen.com>   Sent: Thursday, March 23, 2023 2:50 PM  To: Jonathan Chavez <JChavez@Rentonwa.gov>  Cc: Dan Zoldak <DZoldak@larsandersen.com>  Subject: RE: Frontage Improvement Deferral     Jonathan,     I am confused; if Metro is in charge of all Talbot ROW improvements, including street trees and lights, why are we  having to show these items on our deferral cost estimate?     Thank you,       Luis Rebelo, EIT Sr. Project Engineer Lars Andersen & Associates, Inc. CASp – LEED Accredited – QSD/QSP  4694 W Jacquelyn Avenue  Fresno, CA 93722  (559) 276‐2790  Ext. 115 Office  (559) 276‐0850  Fax  www.LarsAndersen.com    From: Jonathan Chavez <JChavez@Rentonwa.gov>   Sent: Wednesday, March 22, 2023 8:06 AM  To: Luis Rebelo <LRebelo@larsandersen.com>   CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. 3 Cc: Dan Zoldak <DZoldak@larsandersen.com>  Subject: RE: Frontage Improvement Deferral     Luis,     Could you revise the deferral estimate per the attached comments, and provide the updated landscape plan? I will also  need the excel bond qty worksheet you used for the estimates, to back check.     Thank you,     JONATHAN CHAVEZ, P.E. | CIVIL ENGINEER III  City of Renton | PW | Water Utility Engineering Division  1055 S Grady Way | 5th Floor | Renton, WA 98057   (425) 430‐7288 | jchavez@rentonwa.gov    From: Luis Rebelo <LRebelo@larsandersen.com>   Sent: Friday, March 3, 2023 5:11 PM  To: Jonathan Chavez <JChavez@Rentonwa.gov>  Cc: Dan Zoldak <DZoldak@larsandersen.com>  Subject: RE: Frontage Improvement Deferral     Hello Jonathan,    Please see link below with the Deferral Application and supporting documentation. Please let me know if you have any  questions.    https://www.dropbox.com/scl/fo/1zee78m35p7dvvcmbm33a/h?dl=0&rlkey=5afnkhi77kaxq65c03fngrnaj    Thank you,       Luis Rebelo, EIT Sr. Project Engineer Lars Andersen & Associates, Inc. CASp – LEED Accredited – QSD/QSP  4694 W Jacquelyn Avenue  Fresno, CA 93722  (559) 276‐2790  Ext. 115 Office  (559) 276‐0850  Fax  www.LarsAndersen.com    From: Jonathan Chavez <JChavez@Rentonwa.gov>   Sent: Thursday, February 2, 2023 7:55 AM  To: Dan Zoldak <DZoldak@larsandersen.com>  Cc: Luis Rebelo <LRebelo@larsandersen.com>  Subject: RE: Frontage Improvement Deferral   Importance: High     CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. 4 Dan,     The surety has to be cash. I apologize, I’m being briefed on this in live time. I’m not in the loop as to the conversations  you are having with Chip.     As I’ve been told: cash surety of the deferred improvements, 3 years of allowed deferral to be looked at each year.    JONATHAN CHAVEZ, P.E. | CIVIL ENGINEER III  City of Renton | CED | Development Engineering Division  1055 S Grady Way | 6th Floor | Renton, WA 98057   Virtual Permit Center | Online Applications and Inspections  (425) 430‐7288 | jchavez@rentonwa.gov    From: Dan Zoldak <DZoldak@larsandersen.com>   Sent: Wednesday, February 1, 2023 4:45 PM  To: Jonathan Chavez <JChavez@Rentonwa.gov>  Cc: Luis Rebelo <LRebelo@larsandersen.com>; Vanessa Dolbee <VDolbee@Rentonwa.gov>  Subject: RE: Frontage Improvement Deferral     Ok what is the security device … Bond?    How is the deferral renewed .. can we get 4 years or somehow allowed  extensions?    From: Jonathan Chavez <JChavez@Rentonwa.gov>   Sent: Wednesday, February 1, 2023 12:09 PM  To: Dan Zoldak <DZoldak@larsandersen.com>  Cc: Luis Rebelo <LRebelo@larsandersen.com>; Vanessa Dolbee <VDolbee@Rentonwa.gov>  Subject: RE: Frontage Improvement Deferral     Dan,     The way the deferral works is you submit the application with the quantities and plans, and a justification narrative for  us to review. We will issue you the deferral permit and an approval letter (w/ conditions, if any) and request bonding  from you, for the deferred improvements.     Let me know if that make sense. I’ve attached an example from one of my previous projects, for reference only.     JONATHAN CHAVEZ, P.E. | CIVIL ENGINEER III  City of Renton | CED | Development Engineering Division  1055 S Grady Way | 6th Floor | Renton, WA 98057   Virtual Permit Center | Online Applications and Inspections  (425) 430‐7288 | jchavez@rentonwa.gov    From: Dan Zoldak <DZoldak@larsandersen.com>   Sent: Tuesday, January 31, 2023 6:43 PM  To: Jonathan Chavez <JChavez@Rentonwa.gov>  Cc: Luis Rebelo <LRebelo@larsandersen.com>; Vanessa Dolbee <VDolbee@Rentonwa.gov>  Subject: RE: Frontage Improvement Deferral      CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. 5 Johnathan, I need to see draft language of the deferral agreement. Can you provide that?    From: Jonathan Chavez <JChavez@Rentonwa.gov>   Sent: Tuesday, January 31, 2023 2:29 PM  To: Dan Zoldak <DZoldak@larsandersen.com>  Cc: Luis Rebelo <LRebelo@larsandersen.com>; Vanessa Dolbee <VDolbee@Rentonwa.gov>  Subject: RE: Frontage Improvement Deferral     Dan,     Here is the deferral form and items that need to be submitted to me for review. For the “Detailed list of items,  quantities, and estimated cost”, please submit a new Bond Quantity Worksheet.     https://edocs.rentonwa.gov/Documents/DocView.aspx?id=8461913&dbid=0&repo=CityofRenton    Let me know if you have any other questions, thank you    JONATHAN CHAVEZ, P.E. | CIVIL ENGINEER III  City of Renton | CED | Development Engineering Division  1055 S Grady Way | 6th Floor | Renton, WA 98057   Virtual Permit Center | Online Applications and Inspections  (425) 430‐7288 | jchavez@rentonwa.gov    From: Dan Zoldak <DZoldak@larsandersen.com>   Sent: Monday, January 30, 2023 2:22 PM  To: Jonathan Chavez <JChavez@Rentonwa.gov>  Cc: Luis Rebelo <LRebelo@larsandersen.com>  Subject: RE: Frontage Improvement Deferral       Jonathan, can you please forward the template for deferral agreement.          Daniel J. Zoldak, PE, PLS, CASp, LEED AP, QSD/P Vice President Lars Andersen & Associates, Inc. CASp – LEED Accredited – QSD/QSP  4694 W Jacquelyn Avenue  Fresno, CA 93722  (559) 276‐2790  Ext. 117 Office  (559) 276‐0850  Fax  (559) 978‐7059  Cell  www.LarsAndersen.com   CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.  CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. 6                                     From: Vanessa Dolbee <VDolbee@Rentonwa.gov>   Sent: Friday, January 27, 2023 3:02 PM  To: Dan Zoldak <DZoldak@larsandersen.com>  Cc: Brianne Bannwarth <BBannwarth@Rentonwa.gov>; Jonathan Chavez <JChavez@Rentonwa.gov>; Jill Ding  <JDing@Rentonwa.gov>  Subject: Frontage Improvement Deferral     Dan,    As a follow up from our meeting yesterday afternoon, we can address the frontage improvement deferral through our  normal deferral process.  As discussed, via extensions we can authorize up to three years for the deferral.  Please work  with Jonathan, copied here, on formalizing this deferral.      VANESSA DOLBEE, Planning Director  City of Renton | CED | Planning Division  1055 S Grady Way | 6th Floor | Renton, WA 98057   Virtual Permit Center | Online Applications and Inspections  (425) 430‐7314 | vdolbee@rentonwa.gov