Loading...
HomeMy WebLinkAboutEx. 33 FW_ Home Depot RentonHD Exhibit 33 FW_Home Depot Renton To: Jonathan Chavez[JChavez@Rentonwa.gov] Cc: Luis Rebelo[LRebelo@larsandersen.com] From: Dan Zoldak Sent: Fri 3/24/2023 1:32:06 PM Importance: Normal Subject: FW: Home Depot Renton Received: Fri 3/24/2023 1:32:18 PM CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Jonathan, I will need to dig a little deeper on emails – but the highlight below is part of the conversation that I at least understood there is a waiver along Talbot within the ROW Daniel J. Zoldak, PE, PLS, CASp, LEED AP, QSD/P Vice President Lars Andersen & Associates, Inc. CASp – LEED Accredited – QSD/QSP 4694 W Jacquelyn Avenue Fresno, CA 93722 (559) 276-2790 Ext. 117 Office (559) 276-0850 Fax (559) 978-7059 Cell www.LarsAndersen.com From: Jill Ding <JDing@Rentonwa.gov> Sent: Friday, October 7, 2022 9:38 AM To: Luis Rebelo <LRebelo@larsandersen.com> Cc: Dan Zoldak <DZoldak@larsandersen.com>; Jonathan Chavez <JChavez@Rentonwa.gov> Subject: RE: Home Depot Renton Luis, The entire frontage also includes Talbot at this point as a deferral has not formally been requested or approved. The waiver of the improvements along Talbot only included improvements within the right-of-way, not the onsite landscaping improvements. JILL DING, Senior Planner City of Renton | CED | Planning Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center | Online Applications and Inspections (425) 430-6598 | jding@rentonwa.gov From: Luis Rebelo <LRebelo@larsandersen.com> Sent: Friday, October 7, 2022 9:34 AM To: Jill Ding <JDing@Rentonwa.gov> Cc: Dan Zoldak <DZoldak@larsandersen.com>; Jonathan Chavez <JChavez@Rentonwa.gov> Subject: RE: Home Depot Renton CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Understood. We will change the spec to call for stamped concrete instead then. Noted. I am also attaching the revised ROW planting plan for your review. We are showing the 10’ LS along the entire frontage. Please confirm this is acceptable. Thank you, Luis Rebelo, EIT Sr. Project Engineer Lars Andersen & Associates, Inc. CASp – LEED Accredited – QSD/QSP 4694 W Jacquelyn Avenue Fresno, CA 93722 (559) 276-2790 Ext. 115 Office (559) 276-0850 Fax www.LarsAndersen.com From: Jill Ding <JDing@Rentonwa.gov> Sent: Friday, October 7, 2022 8:49 AM To: Luis Rebelo <LRebelo@larsandersen.com> Cc: Dan Zoldak <DZoldak@larsandersen.com>; Jonathan Chavez <JChavez@Rentonwa.gov> Subject: RE: Home Depot Renton Thank you Luis, Acid wash concrete was not an approved concrete treatment as outlined in the Hearing Examiner’s decision. His decision specified that the walkways needed to be comprised of stamped concrete or pavers. The revised site plan for the seasonal sales area screening is acceptable, pending approval of a landscape plan. Thanks, JILL DING, Senior Planner City of Renton | CED | Planning Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center | Online Applications and Inspections (425) 430-6598 | jding@rentonwa.gov From: Luis Rebelo <LRebelo@larsandersen.com> Sent: Friday, October 7, 2022 8:38 AM To: Jill Ding <JDing@Rentonwa.gov> Cc: Dan Zoldak <DZoldak@larsandersen.com>; Jonathan Chavez <JChavez@Rentonwa.gov> Subject: RE: Home Depot Renton CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. We are already specifying acid washed concrete per previous discussions. Furthermore, I have attached an exhibit showing the proposed site plan revisions to provide screening to the Seasonal Sales Area. We have added an 8’ wide planter down the middle of a parking aisle for trees to provide screening. The affected parking stalls would now be compact. Please confirm this is acceptable. Thank you, Luis Rebelo, EIT Sr. Project Engineer Lars Andersen & Associates, Inc. CASp – LEED Accredited – QSD/QSP 4694 W Jacquelyn Avenue Fresno, CA 93722 (559) 276-2790 Ext. 115 Office (559) 276-0850 Fax www.LarsAndersen.com From: Jill Ding <JDing@Rentonwa.gov> Sent: Thursday, October 6, 2022 2:10 PM To: Jonathan Chavez <JChavez@Rentonwa.gov> Cc: Luis Rebelo <LRebelo@larsandersen.com>; Dan Zoldak <DZoldak@larsandersen.com> Subject: Home Depot Renton Jonathan, I have received the revised civil site plan that shows the pedestrian crossings as discussed in the meeting with Chip yesterday. I have added a note to the plans stating that “all pedestrian walkways, including the three pedestrian crossing areas proposed over the drive aisle abutting the lumber canopy, main building entrance, and garden center entrance, and the paved apron abutting the chamfered entrance to the garden center shall be delineated by stamped concrete or pavers”. Is this sufficient to add to the approved civil set that was issued early, like we discussed this morning or do they need to provide a detail for the concrete? JILL DING, Senior Planner City of Renton | CED | Planning Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center | Online Applications and Inspections (425) 430-6598 | jding@rentonwa.gov