Loading...
HomeMy WebLinkAboutEx. 38 [2023-03-27] RE Talbot - Home DepotHD Exhibit 38 Email Chain re Talbot - Home Depot From:Brianne Bannwarth To:Vanessa Dolbee Cc:Nathan Janders Subject:RE: Talbot - Home Depot Date:Monday, March 27, 2023 4:57:13 PM Yes BRIANNE BANNWARTH, P.E., LEED AP | Development Engineering Director City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center | Online Applications and Inspections (425) 430-7299 | bbannwarth@rentonwa.gov From: Vanessa Dolbee <VDolbee@Rentonwa.gov> Sent: Monday, March 27, 2023 2:40 PM To: Brianne Bannwarth <BBannwarth@Rentonwa.gov> Cc: Nathan Janders <NJanders@Rentonwa.gov> Subject: RE: Talbot - Home Depot Street Lighting and Street Trees along the entire Talbot Frontage including out lot 2, the Urgent Care site? VANESSA DOLBEE, Planning Director City of Renton | CED | Planning Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center | Online Applications and Inspections (425) 430-7314 | vdolbee@rentonwa.gov From: Brianne Bannwarth <BBannwarth@Rentonwa.gov> Sent: Monday, March 27, 2023 2:08 PM To: Vanessa Dolbee <VDolbee@Rentonwa.gov> Cc: Nathan Janders <NJanders@Rentonwa.gov> Subject: RE: Talbot - Home Depot No, the only items that we want covered along Talbot are the street lighting and street trees. BRIANNE BANNWARTH, P.E., LEED AP | Development Engineering Director City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center | Online Applications and Inspections (425) 430-7299 | bbannwarth@rentonwa.gov From: Vanessa Dolbee <VDolbee@Rentonwa.gov> Sent: Monday, March 27, 2023 2:01 PM To: Brianne Bannwarth <BBannwarth@Rentonwa.gov> Cc: Nathan Janders <NJanders@Rentonwa.gov> Subject: RE: Talbot - Home Depot Does the deferral include the frontage along Out Lot 2, the one for the urgent care? VANESSA DOLBEE, Planning Director City of Renton | CED | Planning Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center | Online Applications and Inspections (425) 430-7314 | vdolbee@rentonwa.gov From: Brianne Bannwarth <BBannwarth@Rentonwa.gov> Sent: Monday, March 27, 2023 1:35 PM To: Vanessa Dolbee <VDolbee@Rentonwa.gov> Cc: Nathan Janders <NJanders@Rentonwa.gov> Subject: RE: Talbot - Home Depot We requested that the street trees and lighting along the talbot frontage be included in the deferral as it is not a requirement of KC Metro’s project, and they could drop these items if they need “value engineer” their project and eliminate these from their proposed project. We discussed this originally with Chip and he at that time agreed to these items being included in the deferral. If there is a change, please let us know. BRIANNE BANNWARTH, P.E., LEED AP | Development Engineering Director City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center | Online Applications and Inspections (425) 430-7299 | bbannwarth@rentonwa.gov From: Vanessa Dolbee <VDolbee@Rentonwa.gov> Sent: Monday, March 27, 2023 11:03 AM To: Brianne Bannwarth <BBannwarth@Rentonwa.gov> Subject: FW: Talbot - Home Depot See e-mail below. Johnathan is out, do you have any background/update you can provide me? VANESSA DOLBEE, Planning Director City of Renton | CED | Planning Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center | Online Applications and Inspections CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. (425) 430-7314 | vdolbee@rentonwa.gov From: Dan Zoldak <DZoldak@larsandersen.com> Sent: Monday, March 27, 2023 9:01 AM To: Vanessa Dolbee <VDolbee@Rentonwa.gov> Cc: Jill Ding <JDing@Rentonwa.gov>; Jonathan Chavez <JChavez@Rentonwa.gov>; Luis Rebelo <LRebelo@larsandersen.com> Subject: Talbot - Home Depot Vanessa, I think I have an email already but cant find it right now on the road. There were prior conversations on Talbot and Home Depot vs. Metro responsibilities. At least my recoloration was Metro was going to do from the ROW out to the street and HD ROW in. The question has come back up with Jonathon team about the construction of this work. Can you confirm my understanding above and let me know if we need a follow up conversation on the issue.