Loading...
HomeMy WebLinkAboutEx. 39 2023-04-07 RE KC Metro TCEHD Exhibit 39 Email Chain RE KC Metro TCE 1 From:Dan Zoldak <DZoldak@larsandersen.com> Sent:Friday, April 7, 2023 8:21 AM To:Jonathan Chavez Cc:Luis Rebelo; Nathan Janders; Jill Ding; Luis Rebelo Subject:RE: KC Metro TCE Jonathan, we agreed on 10 feet and now I am being asker for more. I believe the discrepancies in the two ROW are minor(the biggest discrepancy between HD proposed ROW and Metro is less than a 1 foot) . I would also like to how Metro is not building there project to City Standard with required lights and landscape. As you can see below the TCE request is well beyond their limit of work and at this point I believe they are asking for more than they need. I would like to move forward with the lot line adjustment recording as submitted. Daniel J. Zoldak, PE, PLS, CASp, LEED AP, QSD/P Vice President Lars Andersen & Associates, Inc. CASp – LEED Accredited – QSD/QSP 4694 W Jacquelyn Avenue Fresno, CA 93722 (559) 276-2790 Ext. 117 Office (559) 276-0850 Fax (559) 978-7059 Cell www.LarsAndersen.com CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. 2 From: Jonathan Chavez <JChavez@Rentonwa.gov> Sent: Thursday, April 6, 2023 3:13 PM To: Dan Zoldak <DZoldak@larsandersen.com> Cc: Luis Rebelo <LRebelo@larsandersen.com>; Nathan Janders <NJanders@Rentonwa.gov>; Jill Ding <JDing@Rentonwa.gov>; Luis Rebelo <LRebelo@larsandersen.com> Subject: RE: KC Metro TCE Dan, KC Metro’s response to reducing easement area: “We are widening the roadway and pushing the curb back and so need additional room behind the sidewalk to conform grades, restore landscaping, and tie-in existing driveways. I am attaching our 90% site preparation and paving plans along their frontage. This should give them an idea of the extents needed for the proposed work. Let me know if you need anything else.” JONATHAN CHAVEZ, P.E. | CIVIL ENGINEER III City of Renton | PW | Water Utility Engineering Division 1055 S Grady Way | 5th Floor | Renton, WA 98057 (425) 430-7288 | jchavez@rentonwa.gov From: Dan Zoldak <DZoldak@larsandersen.com> Sent: Thursday, April 6, 2023 12:08 PM To: Jonathan Chavez <JChavez@Rentonwa.gov> Cc: Luis Rebelo <LRebelo@larsandersen.com>; Nathan Janders <NJanders@Rentonwa.gov>; Jill Ding <JDing@Rentonwa.gov>; Luis Rebelo <LRebelo@larsandersen.com> Subject: RE: KC Metro TCE Jonathan we are doing a 10 foot ROW Dedication as already shown on the plat. Have them revise to a 2 foot (beyond th e 10 foot) TCE – this will allow them to install the sidewalk. Daniel J. Zoldak, PE, PLS, CASp, LEED AP, QSD/P Vice President Lars Andersen & Associates, Inc. CASp – LEED Accredited – QSD/QSP 4694 W Jacquelyn Avenue Fresno, CA 93722 (559) 276-2790 Ext. 117 Office (559) 276-0850 Fax (559) 978-7059 Cell www.LarsAndersen.com CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. 3 From: Jonathan Chavez <JChavez@Rentonwa.gov> Sent: Thursday, April 6, 2023 11:29 AM To: Dan Zoldak <DZoldak@larsandersen.com> Cc: Luis Rebelo <LRebelo@larsandersen.com>; Nathan Janders <NJanders@Rentonwa.gov>; Jill Ding <JDing@Rentonwa.gov>; Luis Rebelo <LRebelo@larsandersen.com> Subject: RE: KC Metro TCE Dan, We need this TCE document executed with the LLA or an update to the LLA to show 2-foot of dedication. Without either, KC Metro will not be able to construct their improvements. Attached are Metro’s latest construction plans and easement area needed to complete the improvements. This benefits Home Depot as it ensures a timely install of the improvements, and subsequent return of the cash surety (for the deferrals). The temp easement allows Metro and Metro’s contractor to step onto private property for the purposes of constructing the ROW improvements. The easement area is wider at the driveways because Metro will be replacing driveway curbs, adding ADA ramps, and paving the driveway (see attached). Easement area shall be restored to current condition or better. JONATHAN CHAVEZ, P.E. | CIVIL ENGINEER III City of Renton | PW | Water Utility Engineering Division 1055 S Grady Way | 5th Floor | Renton, WA 98057 (425) 430-7288 | jchavez@rentonwa.gov From: Dan Zoldak <DZoldak@larsandersen.com> Sent: Thursday, April 6, 2023 10:57 AM To: Jonathan Chavez <JChavez@Rentonwa.gov> Cc: Luis Rebelo <LRebelo@larsandersen.com>; Nathan Janders <NJanders@Rentonwa.gov>; Jill Ding <JDing@Rentonwa.gov>; Luis Rebelo <LRebelo@larsandersen.com> Subject: RE: KC Metro TCE Jonathan looking at this again – this is a pretty big area. We talked in the field about some addition room for construction purposes to install the sidewalk? Luis – please plot this on the site plan so I can see it. Daniel J. Zoldak, PE, PLS, CASp, LEED AP, QSD/P Vice President Lars Andersen & Associates, Inc. CASp – LEED Accredited – QSD/QSP 4694 W Jacquelyn Avenue Fresno, CA 93722 (559) 276-2790 Ext. 117 Office (559) 276-0850 Fax (559) 978-7059 Cell www.LarsAndersen.com CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. 4 From: Jonathan Chavez <JChavez@Rentonwa.gov> Sent: Thursday, April 6, 2023 7:58 AM To: Dan Zoldak <DZoldak@larsandersen.com> Cc: Luis Rebelo <LRebelo@larsandersen.com>; Nathan Janders <NJanders@Rentonwa.gov>; Jill Ding <JDing@Rentonwa.gov> Subject: KC Metro TCE Importance: High Dan, Please see attached the Temporary Construction Easement for the KC Metro RapidRide I-Line. As I mentioned at the site yesterday, this is a temporary easement only, and shall be null after December 30, 2026. Could you have your legal team review, and HD sign? Please let me know if you have any questions, JONATHAN CHAVEZ, P.E. | CIVIL ENGINEER III City of Renton | PW | Water Utility Engineering Division 1055 S Grady Way | 5th Floor | Renton, WA 98057 (425) 430-7288 | jchavez@rentonwa.gov