Minor Franchise Permit: MFP23005031
IVR Number: 23005031
Permit Information
Permit Name: Zayo Bandwidth Northwest, Inc
Address/Location:10/03/2023Application Date:2823059009Parcel Number: 16950 116TH AVE SE
Permit Type:10/18/2023Issue Date:Franchise
Permit Work Class:10/17/2024Expiration Date:Minor Utility
Job Number: ISO-0678049Franchise Type:Cable
Description: Zayo Bandwidth Northwest (Ord 5497) On SE 168th ST at 116th Ave SE replace existing vault with 3030LA vault.
Directional bore 149' east to bore pit at 16812 Access Road then south 35', exit Right of Way. Install (1) 2" conduit and
pull (1) 12ct fiber through. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Scott Morrison
Zayo
B: (206) 832-4862
C: (253) 441-0653
Applicant
Stephen Neumann
Fibe Solutions
604 W Meeker St., Suite 103
KENT, WA 98032
C: (425) 753-1916ApplicantX
McMullen Construction 6016 98th St NE
Marysville, WA 98270
B: (360) 651-9589Contractor
Business License Number: 56695Construction Contractor: MCMULCL819P1
Frederick Luco
Zayo Group
B: (253) 686-3896
H: (253) 686-3896
C: (253) 686-3896
Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ZAYO - Billing 1805 29th St, 2050
Boulder, CO 80301
B: (253) 655-1100Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 3/18/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 3/18/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐ Electronic Copy of the TCP Application
☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
▪ Include map(s) showing the location of the project and work area.
▪ Be legible lettering and clear, contrasting, symbols of viewing or printing.
▪ Must indicate street names, and north arrow and scale.
▪ Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
ISO-0678049 Black River Elem School
16950 166th Ave SE
TBD TBD 7am 5pm
McMullen Construction
Dennis McMullen 206-900-1041
6010 98th St NE Marysville, WA.
On SE 168th ST at 116th Ave SE replace existing vault with 3030LA vault. Directional bore 149' east to bore pit
at 16812 Access Road then south 35', exit Right of Way. Install (1) 2" conduit and pull (1) 12ct fiber through.
X
X
98270
Monday - Friday 8:00AM - 3:00PM
MFP23005031
Scott Warlick CED 10/17/2023
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 3/18/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
• Must have approved Traffic Control Plan (TCP) prior to commencing the work.
• Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
• WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
• All permit conditions shall be met.
NOTES:
• Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
• Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
• In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 3/18/2021
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Stephen Neumann/Fibe Solutions / Auth. Agent
10/03/2023
SE 168TH STSE 168TH STTRAFFIC CONTROL PLANSHORT TERM STATIONARY WORK ZONEFOR UNDERGROUND WORKCONTACT INFO:FIBE SOLUTIONSPROJECT MANAGERRON DESMET206.571.2230TYPE OF WORK:WORK HOURS:UNDERGROUNDM-F 7AM-5PMLONGITUDINAL BUFFER SPACE = BBUFFER DATATRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = RHOST VEHICLE WEIGHT9,900 TO 22,000 lbs.HOST VEHICLE WEIGHT> 22,000 lbs.PROTECTIVE VEHICLE (WORK VEHICLE) = RSIGN SPACING = X ALL SIGNS ARE BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.36" x 36"MINIMUM TAPER LENGTH IN FEET (L)10 FEETLANEWIDTHSHOULDER TAPERS(ASSUMES 10' SHOULDERS)LL/2LL/211 FEETLL/212 FEETCHANNELIZING DEVICE SPACING (FEET)MPHTAPER *TANGENT*FOR ONE-LANE, TWO-WAY AND DOWNSTREAM TAPERS,20 FOOT DEVICE SPACING SHALL BE USED AT ALL SPEEDS.116T AVE SE 116T AVE SEXXXBEPREPAREDTO STOPW3-4W20-7AAHEADWORKROADW20-1POLICEOFFICERACCESS ROAD
XXX
AHEADWORKROADW20-1BEPREPAREDTO STOPW3-4W20-7AXXXW20-7ABEPREPAREDTO STOPW3-4AHEADWORKROADW20-1XXXAHEADWORKROADW20-1AHEADCLOSEDLEFT LANEW20-5LW20-7AWORK ZONECROSS HERESIDEWALK CLOSEDR9-11ALDETOURM4-9BLENTRYSIDEWALK CLOSEDCROSS HEREAHEADR9-11R116T AVE SE SPEEDLIMIT30SPEEDLIMIT30SPEEDLIMIT30SPEEDLIMIT30SE 170TH PL XAHEADWORKROADW20-1R3-2SPEEDLIMIT25CLOSEDSIDEWALKR9-9PPEDESTRIANSPOTTERXW20-7Abefore you digCallMFP23005031
ISO-0678049 BLACK RIVER ELEM SCHOOL16950 116TH AVE SERENTON, WA 98058 1 - COVER SHEET AND PROJECT LOCATION 2 - ZAYO GENERAL NOTE 3 - LINE TYPES AND SYMBOL LEGEND 4 - STANDARD DETAILS 5 - PLAN VIEW 6 - DETAILED UNDERGROUND PLAN VIEWPROJECT LOCATIONCONTACT PERSON:SHEET INDEX:CITY OF RENTONFibe SolutionsProject ManagerRon Desmet604 W Meeker St, Suite 103Kent, Washington 98032(Cell) 206.571.2230(Email) rdesmet@fibesolutions.comZayo GroupProject Manager - OSPElliot Coons4905 Pacific Hwy E Suite #4Fife, WA 98424(Office) 206.832.4860(Cell) 206.274.7372(Email) elliot.coons@zayo.comPROJECT DESCRIPTIONMFP23005031
before you digCallMFP23005031
SYMBOL LEGENDBOREPITLINE TYPE LEGEND#R100 SCALE LINE TYPE LEGENDXXXXXXXX144CTSPLICEXXX'HATCH TYPES#POLE ATTACHMENT BLOCKRbefore you digCallMFP23005031
(OPTIONAL SOLID BASE)BASENo. 3030-BNo. 3030-PCOVER3030-LANo. 3030-SBbefore you digCallMFP23005031
SEE DETAILED UNDERGROUND
PLAN VIEW ON SHEET 6NEW MID-SHEATHSPLICE12CT12CT12CT12CT12CT1
2
C
T
144CT
10037555-SOUTH RENTONbefore you digCallMFP23005031
SE 168TH ST16812N/A3030LAVAULT1212149' DIRECTIONAL BORE11635116261671516723SE 168TH ST16812 ACCESS ROAD11635 PROPERTY LINECASCADE VISTAATHLETIC CLUB BASEBALL FIELDCONTACT: FORREST MARSHALL-VICE PRESIDENT425-442-034616812 PROPERTY LINEBUS STOP3BOREPIT35'SPECIFIC NOTE:32before you digCallMFP23005031Bore path shall be aminimum of 3' deep toavoid the criticalroot zone of thestreet treesRESTORATION PER CITY OF RENTON STANDARDSPOTHOLE ALL EXISTING UTILITIES