HomeMy WebLinkAboutMFP23003844.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP23003844
IVR Number: 23003844
Permit Information
Permit Name: P.131419
Address/Location:07/21/2023Application Date:3123059135Parcel Number: 17930 TALBOT RD S
Permit Type:10/18/2023Issue Date:Franchise
Permit Work Class:10/17/2024Expiration Date:Minor Utility
Job Number: P.131419Franchise Type:Telephone
Description: Lumen to access MH685, Ped 9640, trench approx 145’, dig 2 bore pits, bore approx. 130’, and place 1 new HH.
Pothole all existing utilities. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
Stephen Neumann
Fibe Solutions
604 W Meeker St., Suite 103
KENT, WA 98032
C: (425) 753-1916Applicant
Austin Sweeney
Century Link
23315 66th Ave S
Kent, WA 98032
C: (253) 766-7549ApplicantX
Austin Sweeney
Century Link
23315 66th Ave S
Kent, WA 98032
C: (253) 766-7549Contact
Jesse Patjens
CenturyLink / Lumen
23315 66th Ave S
Kent, WA 98032
Contact
Kim Parker
QWest Corporation
931 14th St, Suite 1000A
Denver, CO 80202
B: (303) 992-0752Contact
Michael Smith
North Sky Communications
21320 84th Ave S
Kent, WA 98032
C: (206) 305-5881Contractor
Business License Number: 36846Construction Contractor: NORTHSC857Q4
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
QWest/Century Link - Billing 23315 66th Ave S
Kent, WA 98032
Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Phone/Cell: _________________________
City/State: Zip:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
Northsky Communications
Contact Name: Tawnya Longfellow
Business Address: 22517 88th ave S
Description of Work:
Kent/WA 98031
P.131419
Lumen to access MH685, Ped 9640, trench approx 145’, dig 2 bore pits, bore approx. 130’, and
place 1 new HH
17930 Talbot Rd S
8/11/23 9/10/23
206 305 5881
MFP23003844
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 10/18/2023
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Austin Sweeney
Austin Sweeney 7/21/2023
TALBOT RD STALBOT RD SS CARR RD
S 43RD ST
TRAFFIC CONTROL PLAN
JOB # P.131419.C.69
PERMIT #
Legend
CONES
Arrowboard (Double)
MANHOLE
WORK TRUCK
WORK AREA
S SPOTTER
ONE LANE TWO WAY TAPER 50' MIN/100' MAX
Date:7/18/2023 Author:Darlene Durr, Traffic Control Supervisor Project:P.131419.C.69
TCS CERT:#ES2 000148 LUMEN:Certified Traffic Control Plan (DO NOT ALTER)
Comments: General Requirements
1. All signs and spacing to conform to the MUTCD and CITY OF RENTONrequirements.2. Channelizing devices are 28" traffic cones with retro reflective material.
3. All signs are 48' X 48' B/O unless otherwise specified.
4. Alert affected local residents and businesses.5. Crew is required to leave a minimum 11' for lane width.
6. Work hours will be DETERMINED BY CITY, COUNTY AND/OR WSDOT.
UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TO
ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN
IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:
DARLENE DURR, TCS #ES2 000148, darlene.durr@hotmail.com
7/18/2023Darlene DurrTCS # ES2 000148
Phone 253-737-5198darlene.durr@hotmail.com
_______________________Darlene Durr
NOT TO SCALE
NOTE ALL LANE WIDTHS ARE ESTIMATES; FOR ACCURANCY, MEASURE IN FIELD PRIOR TO
WORK.
REFER TO CHARTS FOR DEVICE SPACING,
SIGNAGE SPACING, SIGN SIZE, BUFFER
SPACING AND TAPER LENGTHS.
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70
35/45
25/30
40
40
30
20
80
60
ONE LANE TWO WAY TTC ZONE TAPER 20' 40' TANGENT SPACING AT ALL SPEEDS
MH 685 ROADWORKAHEADROADWORKAHEADROADWORKAHEADCENTERLANECLOSEDAHEADTHRUTRAFFICMERGELEFTROADWORKAHEAD WORK AREA
10' X +/-605'
+/-350'
+/-350'
+/-350'
+/-350'
+/-350'+/-350'
N
SPEEDLIMIT
35
SPEEDLIMIT
25
Comments: THIS IS TO ACCESS MH 685.
THIS IS A CENTER LANE CLOSURE.
SPOTTER WILL ASSIST PEDESTIRANS AT WORK AREA.
DRIVEWAYS REMAIN ACCESSIBLE AT WORK AREA.
NOTIFY TRANSIT OF LANE CLOSURE PRIOR TO WORK.
S 43RD ST @ TALBOT RD S
MH 685 ACCESS
CENTER LANE CLOSURE
ROADWORK
S
www.invarion.com
MFP23003844
TALBOT RD STALBOT R
D
S S CARR RD
S 43RD ST
S 180TH ST
SR 1
67 OFF RAMP
DAVIS AVE S
MH 685
ROADWORKAHEADROADWORKAHEAD ROADWORKAHEADROADWORKAHEADCENTERLANECLOSEDAHEADRO
A
D
WO
R
K
AH
E
A
D
RO
A
D
WO
R
K
AH
E
A
DTHRUTRAFFICMERGELEFT BUS
STOP
+/-350'
+/-350'
+/-350'
+/-350'
+/-350'
+/-350'
+/-350'
+/-200'
TRAFFIC CONTROL PLAN
JOB # P.131419.C.69
PERMIT #
Legend
WORK TRUCK
Arrowboard (Double)
ONE LANE TWO WAY TAPER 50' MIN/100' MAX
Date:7/18/2023 Author:Darlene Durr, Traffic Control Supervisor Project:P.131419.C.69
TCS CERT:#ES2 000148 LUMEN:Certified Traffic Control Plan (DO NOT ALTER)
Comments: General Requirements
1. All signs and spacing to conform to the MUTCD and CITY OF RENTONrequirements.2. Channelizing devices are 28" traffic cones with retro reflective material.
3. All signs are 48' X 48' B/O unless otherwise specified.
4. Alert affected local residents and businesses.5. Crew is required to leave a minimum 11' for lane width.
6. Work hours will be DETERMINED BY CITY, COUNTY AND/OR WSDOT.
UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TO
ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN
IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:
DARLENE DURR, TCS #ES2 000148, darlene.durr@hotmail.com
7/18/2023Darlene DurrTCS # ES2 000148
Phone 253-737-5198darlene.durr@hotmail.com
_______________________Darlene Durr
NOT TO SCALE
NOTE ALL LANE WIDTHS ARE ESTIMATES; FOR ACCURANCY, MEASURE IN FIELD PRIOR TO
WORK.
REFER TO CHARTS FOR DEVICE SPACING,
SIGNAGE SPACING, SIGN SIZE, BUFFER
SPACING AND TAPER LENGTHS.
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70
35/45
25/30
40
40
30
20
80
60
ONE LANE TWO WAY TTC ZONE TAPER 20' 40' TANGENT SPACING AT ALL SPEEDS
N
SPEEDLIMIT
35
SPEEDLIMIT
25
Comments:
THIS IS TO ACCESS MH 685.
THIS IS A CENTER LANE CLOSURE.
SPOTTER WILL ASSIST PEDESTIRANS AT WORK AREA.DRIVEWAYS REMAIN ACCESSIBLE AT WORK AREA.
NOTIFY TRANSIT OF LANE CLOSURE PRIOR TO WORK.
S 43RD ST @ TALBOT RD S
MH 685 ACCESS
CENTER LANE CLOSURE
SIGNAGE
www.invarion.com
MFP23003844
TALBOT RD STALBOT RD SS CARR RD
S 43RD ST
TRAFFIC CONTROL PLAN
JOB # P.131419.C.69
PERMIT #
Legend
CONES
WORK TRUCK
WORK AREA
S SPOTTER
PEDESTAL
BORE PIT
HANDHOLE
TRENCH
BORE
Arrowboard (Chevron)
ONE LANE TWO WAY TAPER 50' MIN/100' MAX
Date:7/18/2023 Author:Darlene Durr, Traffic Control Supervisor Project:P.131419.C.69
TCS CERT:#ES2 000148 LUMEN:Certified Traffic Control Plan (DO NOT ALTER)
Comments: General Requirements
1. All signs and spacing to conform to the MUTCD and CITY OF RENTONrequirements.2. Channelizing devices are 28" traffic cones with retro reflective material.
3. All signs are 48' X 48' B/O unless otherwise specified.
4. Alert affected local residents and businesses.5. Crew is required to leave a minimum 11' for lane width.
6. Work hours will be DETERMINED BY CITY, COUNTY AND/OR WSDOT.
UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TO
ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN
IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:
DARLENE DURR, TCS #ES2 000148, darlene.durr@hotmail.com 7/18/2023Darlene DurrTCS # ES2 000148
Phone 253-737-5198darlene.durr@hotmail.com
_______________________Darlene Durr
NOT TO SCALE
NOTE ALL LANE WIDTHS ARE ESTIMATES; FOR ACCURANCY, MEASURE IN FIELD PRIOR TO
WORK.
REFER TO CHARTS FOR DEVICE SPACING,
SIGNAGE SPACING, SIGN SIZE, BUFFER
SPACING AND TAPER LENGTHS.
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70
35/45
25/30
40
40
30
20
80
60
ONE LANE TWO WAY TTC ZONE TAPER 20' 40' TANGENT SPACING AT ALL SPEEDS ROADWORKAHEADROADWORKAHEADROADWORKAHEADROADWORKAHEAD WORK AREA
10' X +/-585'
+/-350'
+/-350'
+/-350'
+/-350'
N
SPEEDLIMIT
35
SPEEDLIMIT
25
S
NEW HHPLACEMENT
BP2
BP1
PED 9640
TRENCH
+/-145'
BORE+/-135'RIGHT LANECLOSEDAHEADMERGING TAPER
+/-205'
Comments:
THIS IS TO TRENCH FROM PED 9640 TO BP1 AND BORE FROM BP1 TO BP1
AND RESTORE AS REQUIRED.
THIS IS A RIGHT LANE CLOSURE.
SPOTTER WILL ASSIST PEDESTRIANS AT WORK AREA.DRIVEWAYS REMAIN ACCESSIBLE AT WORK AREA.
S CARR RD @ 98TH AVE S
TRENCH & BORE / NEW HH PLACEMENT / RESTORE
RIGHT LANE CLOSURE
ROADWORK
www.invarion.com
MFP23003844
TRAFFIC CONTROL PLAN
JOB # P.131419.C.69
PERMIT #
Legend
Arrowboard (Chevron)
WORK TRUCK
ONE LANE TWO WAY TAPER 50' MIN/100' MAX
Date:7/18/2023 Author:Darlene Durr, Traffic Control Supervisor Project:P.131419.C.69
TCS CERT:#ES2 000148 LUMEN:Certified Traffic Control Plan (DO NOT ALTER)
Comments: General Requirements
1. All signs and spacing to conform to the MUTCD and CITY OF RENTONrequirements.2. Channelizing devices are 28" traffic cones with retro reflective material.
3. All signs are 48' X 48' B/O unless otherwise specified.
4. Alert affected local residents and businesses.5. Crew is required to leave a minimum 11' for lane width.
6. Work hours will be DETERMINED BY CITY, COUNTY AND/OR WSDOT.
UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TOALTER THIS CERTIFIED TRAFFIC CONTROL PLAN
IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:
DARLENE DURR, TCS #ES2 000148, darlene.durr@hotmail.com
7/18/2023Darlene DurrTCS # ES2 000148
Phone 253-737-5198darlene.durr@hotmail.com
_______________________Darlene Durr
NOT TO SCALE
NOTE ALL LANE WIDTHS ARE ESTIMATES; FOR
ACCURANCY, MEASURE IN FIELD PRIOR TO
WORK.REFER TO CHARTS FOR DEVICE SPACING,
SIGNAGE SPACING, SIGN SIZE, BUFFER
SPACING AND TAPER LENGTHS.
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70
35/45
25/30
40
40
30
20
80
60
ONE LANE TWO WAY TTC ZONE TAPER 20' 40' TANGENT SPACING AT ALL SPEEDS ROADWORKAHEADROADWORKAHEADROADWORKAHEAD RIGHT LANECLOSEDAHEADROADWORKAHEADROADWORKAHEAD ROADWORKAHEADN
SPEEDLIMIT
35 SPEEDLIMIT
25
Comments:
THIS IS TO TRENCH FROM PED 9640 TO BP1 AND BORE FROM BP1 TO BP1
AND RESTORE AS REQUIRED.
THIS IS A RIGHT LANE CLOSURE.
SPOTTER WILL ASSIST PEDESTRIANS AT WORK AREA.
DRIVEWAYS REMAIN ACCESSIBLE AT WORK AREA.
+/-350'
+/-350'
+/-350'
+/-350'
+/-350'
+/-350'
+/-200'
+/-200'
S CARR RD98TH AVE S
TALBOT RD S
TALBOT RD SS 4 3RD ST
S CARR RD @ 98TH AVE S
TRENCH & BORE / NEW HH PLACEMENT / RESTORE
RIGHT LANE CLOSURE
SIGNAGE
www.invarion.com
MFP23003844
NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF BEFORE YOU DIG811CALL TWO WORKING DAYSRNGE:SECT:TOWN:GEO CODE:WC CLLI:TOTAL EXISTING CONDUIT USED:TOTAL NEW BORE:TOTAL NEW DIRT TRENCHESTIMATED TOTALSTOTAL NEW AERIAL:SIDEWALK (PCC) R&R:ASPHALT (AC) R&R:S.F.S.F.L.F.L.F.L.F.L.F.TOTAL NEW ASPHALT TRENCH:L.F.TOTAL NEW S/W TRENCH:L.F.7515014500000”NVICINITY MAPSCOPE OF WORK:IN MANHOLE 685, SPLICE LKO22, 257-258 FROM EXISTING 24 COUNT FIBER CABLE [A3KMM] TO NEW FIBER CABLE.PLACE NEW FIBER CABLE INTO EXISTING 4" NORTH ACROSS S CARR RD. ABOUT 75' TO PED 9640.PLACE/TRENCH/BORE TO NEW HANDHOLE. ABOUT 275'. IN NEW HANDHOLE, PLACE/BORE TO CUSTOMER'SBUILDING. ABOUT 20'. USE ENTRANCE FACILITIES TO TERMINATE FIBERS TO THE FDP. TEST FIBERS END TO END.TURN UP NEW EQUIPMENT.23N5E31P.131419W26251KENTWAOB17930 TALBOT RD SRENTON, WA 9805513FIBER ENGINEER: JONATHAN VAZQUEZPHONE NO: (913) 274-7029FIELD ENGINEER: DELMER JEWELLPHONE NO: (360) 918-4425EMAIL: DELMER.R.JEWELL@LUMEN.COMDRAFTED BY: MOUNTAIN LTD/DL - 06/07/23MFP23003844
TTEE CATV
CATV
CATV GG TS TS WW S S SD SD IRRIG IRRIG C/L C/L
R/W R/W R/W P/L P/L B/C B/C B
/C
EOP EOP TTTUSAMEEPWREETVTVVTSVWSSDVETTTXXX'XXX'XXX'XXX'XITEM #STATIONPSEPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHERITEM#STAHT-CL-YRXX'-X"POLE#MAKE READYEXISTING ATTACHMENTSNOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF RNGE:SECT:TOWN:GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYS23N5E31P.131419W26251KENTWAOB17930 TALBOT RD SRENTON, WA 9805523FIBER ENGINEER: JONATHAN VAZQUEZPHONE NO: (913) 274-7029FIELD ENGINEER: DELMER JEWELLPHONE NO: (360) 918-4425EMAIL: DELMER.R.JEWELL@LUMEN.COMDRAFTED BY: MOUNTAIN LTD/DL - 06/07/23MFP23003844
NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTRNGE:SECT:TOWN:JOB:SH OF GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYS23N5E31P.131419W26251KENTWAOB17930 TALBOT RD SRENTON, WA 9805533FIBER ENGINEER: JONATHAN VAZQUEZPHONE NO: (913) 274-7029401#31230590784300#31230590404300#312305911117930#312305913517910#3123059103601#3123059006FIELD ENGINEER: DELMER JEWELLPHONE NO: (360) 918-4425EMAIL: DELMER.R.JEWELL@LUMEN.COMDRAFTED BY: MOUNTAIN LTD/DL - 06/07/23NOTE:IN MANHOLE 685, SPLICE LKO22, 257-258 FROM EXISTING 24 COUNT FIBERCABLE [A3KMM] TO NEW FIBER CABLE. PLACE NEW FIBER CABLE INTO EXISTING4" NORTH ACROSS S CARR RD. ABOUT 75' TO PED 9640. PLACE/TRENCH/BORETO NEW HANDHOLE. ABOUT 275'. IN NEW HANDHOLE, PLACE/BORE TOCUSTOMER'S BUILDING. ABOUT 20'. USE ENTRANCE FACILITIES TO TERMINATEFIBERS TO THE FDP. TEST FIBERS END TO END. TURN UP NEW EQUIPMENT.SPEEDLIMITSPEEDLIMIT EOP EOP EOP EOP
R/W R/W R/W R/W R/W R/W
R
/W
R
/W
R
/W
R
/W
R
/W
R
/W
EOP R/W R/W R/W EOP EOP EOP EOP
EOP
R/W R/W R/W R/W R/W R/W
R
/W
R
/W
R
/W
R
/W
EOP R/W R/W T12'44'80'6' S/WT14'50'10'14'12'20'22'88'130'20'145'22'WWWEXISTING GRADEBORE/TRENCH DETAILBORE PLACEMENT OF 1-4" PVC36" MIN.
COVER
( 36 " MIN.)N.T.S.1-4" PVC130'NOTE:4' DEEP, MAINTAIN 5' OFCLEARANCE ON ALL SIDES.BORE PROFILEMFP23003844RESTORATION PER CITY OF RENTON STANDARDSPOTHOLE ALL EXISTING UTILITIES