HomeMy WebLinkAboutChange Order - 13Public Works Facilities Division CONTRACT NO:CAGͲ21Ͳ180 CO 13 CONTRACT CHANGE ORDER (CO)PROJECT TITLE:FAMILY FIRST COMMUNITY CENTER TO: COMER GC, Inc. (CONTRACTOR) Description Amount $2,415.00 $16,215.00 CCD 72ͲDucts at Roof 25,188.00$ CCD 86ͲReduce Water Meter Connections 4,653.00$ CCD 91ͲAdd Dryer Duct 9,371.00$ CCD 92ͲAdd Fire Extinguhsers and Devices per FM 4,778.00$ 10,951.00$ CCD 100ͲAdd Lids To Gym Storage Closets 16,032.00$ Ͳ$ Subtotal 89,603.00$ WSST 9,049.90$ TOTAL THIS CHANGE ORDER 98,652.90$ CONTRACT SUM: 98,652.90$ (WASHINGTON STATE SALES TAX INCLUDED) CONTRACT TIME: 0 CALENDAR DAYS CONTRACT SUMMARY (Internal Use Only) ORIGINAL CONTRACT SUM w/ WSST 12,474,330.00$ PREVIOUS ADDITIONS/DELETIONS 684,812.82$ PREVIOUS TOTAL 13,159,142.82$ CHANGE AMOUNT THIS CHANGE ORDER 98,652.90$ REVISED CONTRACT TOTAL 13,257,795.72$ PERCENT TOTAL CHANGE FROM ORIGINAL 6.28% SUBSTANTIAL COMPLETION DATE PREVIOUS CONTRACT CALENDAR DAYS 187 REVISED FINAL COMPLETION DATE August 31, 2023 REVISED CONTRACT CALENDAR DAYS THIS CHANGE ORDER 0 CURRENT FINAL COMPLETION DATE August 31, 2023 FFCCF AcknowledgementDate Contractor AcknowledgementDate Jason A. Seth, City Clerk DATE The following mutually agreed to and Owner approved Contract Change Directive(s) are hereby incorporated by reference into the contract. CCD 53ͲMain Entrace Door Revisions CCD 42ͲLow Voltage Revisions CCD 93ͲAdd Ladders in Mech Wells Per Inspector February 25, 2023 The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full force and effect. The City of Renton hereby accepts the foregoing changes. This formal acceptance constitutes a Change to the contract only when authorizing signature is affixed. Invoices incorporating this Change Order constitute acceptance by the Contractor as total reimbursement due in connection with this Change Order. OF: CONTRACT Description CCD 72ͲDuct CCD 86ͲRedu CCD 91ͲAdd CCD 92ͲAdd CCD 100Ͳ Add The following m CCD 53ͲMain CCD 42ͲLow CCD 93ͲAdd CONTRACT TO: NO CHANGE INCREASE DECREASE NO CHANGE INCREASE DECREASE Architect Acknowledgement 6/27/2023 6/27/2023          CAG-21-180, CO #13-23 Mayor Armondo Pavone 10-18-2023 PUBLICWORKS FacilitiesDivision ProjectNo:CCD#42 CONSTRUCTIONCHANGEDIRECTIVE ProjectName: (CCD) (CONTRACTOR) Youaredirectedtoprepareacostproposalfortheworkdescribedbelowand/ordetailedontheattachmentreferredto: SOURCEOFCHANGE: DATEPROPOSALREQUIRED:4/27/23 CHANGEORIGINATEDBY:Contractor PROPOSALREQUESTEDBY:Architect DESIGNER CORPM WEAGREETOPERFORMALLCHANGEINTHEWORKDESCRIBEDINTHEPROPOSALREQUESTFOR: CONTRACTSUM: (WASHINGTONSTATESALESTAXEXCLUDED) Inaccordancewiththegeneralcondition,CostEstimateDetailSheet(s)areattachedhereto. CONTRACTTIME: OF 0 CALENDARDAYS BY: CONTRACTOR SIGNATURE DATE Wehavecarefullyexaminedthisproposalandfindthecosttobereasonable.Therefore,werecommendacceptance. DESIGNER DATE HEALTHPOINT DATE CityofRentonAuthorizedSignature Tobeutilizedforchangesrequested byHealthPoint CITYOFRENTON DATE FamilyFirstCommunityCenter TO:ComerGC,Inc. Theforegoingamountcoverseverythingrequiredinconnectionwiththechange.Allotherprovisionsofthecontractremaininfull forceandeffect. Weunderstandthatthisproposaldoesnotconstituteauthorizationtoproceedwiththespecifiedchangesintheworkuntil incorporationofthisCOPintoaChangeOrderbytheCityofRenton. Revisionstolowvoltageroutingingallery 08/19/22ProposalRequestDate: EXPLANATION:Perabove TO:ApolloMoonfire TO:RussWoodruff 2,415.00$ CAG21Ͳ180 WE AGREE CONTRAC DATE PROP You are direct SOURCE OF Revisions CONSTRU TO:Come EXPLANATI TO:Apollo NO CHANGE INCREASE DECREASE NO CHANGE INCREASE DECREASE Design Contractor Owner Code/AHJUnknown Conditions HealthPoint Other 6/27/2023 ARCHITECT 6/27/2023COMER GC, Inc.                                                                                                        1 Russ Woodruff From:Meredith Everist <everistm@baylisarchitects.com> Sent:Thursday, June 8, 2023 3:04 PM To:Russ Woodruff Cc:16-0996 Family First Community Center Subject:FW: FFCC - CI-042- RFI-028 - Electrical Low Voltage Bldg Access & Routing Attachments:FFCC - CI-042- RFI-028 - Electrical Low Voltage Bldg Access & Routing.pdf HiRuss,wehavereviewedthischangeitemanditappearsreasonablefortheaddedaccessportsforthelightingdrivers.  Thanks,Meredith  Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz  From:RyanArp<Ryan@siderbyers.com> Sent:Thursday,June8,20231:26PM To:MeredithEverist<everistm@baylisarchitects.com> Cc:16Ͳ0996FamilyFirstCommunityCenter<16Ͳ0996@baylisarchitects.com> Subject:RE:FFCCͲCIͲ042ͲRFIͲ028ͲElectricalLowVoltageBldgAccess&Routing  Itshardtotellexactlywhatmaterialsandlaborwereprovidedforthisitem,asthereisnobreakdownfromSystem Solutionsontheworkperformed.AllwehaveistheRFI. Moreinformationmightbehelpful…..thatsaidthisitemisaprettylowcost,soitmaynotbeworththetime/effortto exploreintoomuchdetail.  From:MeredithEverist<everistm@baylisarchitects.com> Sent:Thursday,May11,20232:41PM To:RyanArp<Ryan@siderbyers.com> Cc:16Ͳ0996FamilyFirstCommunityCenter<16Ͳ0996@baylisarchitects.com> Subject:FW:FFCCͲCIͲ042ͲRFIͲ028ͲElectricalLowVoltageBldgAccess&Routing  HiRyan,willyoupleasereviewandcommentontheattachedChangeItem?  Thanks,Meredith  Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.            2 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz  From:LukeComer<luke@comergc.com> Sent:Thursday,April27,20231:20PM To:'RussWoodruff'<RWoodruff@Rentonwa.gov>;MeredithEverist<everistm@baylisarchitects.com> Cc:'TimComer'<tim@comergc.com>;JonScofield<jon@comergc.com> Subject:FFCCͲCIͲ042ͲRFIͲ028ͲElectricalLowVoltageBldgAccess&Routing  Team– Attachedispricingfor:FFCCͲCIͲ042ͲRFIͲ028ͲElectricalLowVoltageBldg.Access&Routing,whichincludes costsassociatedwithallowingaccesstolightingdriversinthegalleryceiling.   Russ–ThisisfinalpricingthatcameinWAYundertheROM!সহ঺঻.IfyourecallthisRFIandplaceholderhadaROMof $25,000,becausetherewereseriousconcernsaboutgettingacrossthegallerywithlighting,lowͲvoltage,electrical,etc. thatcouldn’tgoUG.ThankfullywewereabletomakethisworkhappenwithoutadditionalcostsfromSystemSolutions, andthischangeonlyrelatestotheaccessportsinthegalleryceiling.   Thank you,  Luke Comer C:425Ͳ765Ͳ4118IP:425Ͳ636Ͳ8934IF:425Ͳ285Ͳ9785            PUBLICWORKS FacilitiesDivision ProjectNo:CCD#53 CONSTRUCTIONCHANGEDIRECTIVE ProjectName: (CCD) (CONTRACTOR) Youaredirectedtoprepareacostproposalfortheworkdescribedbelowand/ordetailedontheattachmentreferredto: SOURCEOFCHANGE: DATEPROPOSALREQUIRED:4/26/23 CHANGEORIGINATEDBY:Contractor PROPOSALREQUESTEDBY:Owner Architect CORPM WEAGREETOPERFORMALLCHANGEINTHEWORKDESCRIBEDINTHEPROPOSALREQUESTFOR: CONTRACTSUM: (WASHINGTONSTATESALESTAXEXCLUDED) Inaccordancewiththegeneralconditions,CostDetailSheet(s)areattachedhereto. CONTRACTTIME: OF 0 CALENDARDAYS BY: CONTRACTOR SIGNATURE DATE Wehavecarefullyexaminedthisproposalandfindthecosttobereasonable.Therefore,werecommendacceptance. Architect DATE HEALTHPOINT DATE CityofRentonAuthorizedSignature Tobeutilizedforchangesrequested byHealthPoint CITYOFRENTON DATE 16,215.00$ CAG21Ͳ180 ComerGC,Inc. FamilyFirstCommunityCenter TO:ComerGC,Inc. Theforegoingamountcoverseverythingrequiredinconnectionwiththechange.Allotherprovisionsofthecontractremaininfull forceandeffect. WeunderstandthatthisproposalrequiresincorporationofthisCCDintoaChangeOrderbytheCityofRenton. RevisionstoMainEntryandADAAccess 04/15/23ProposalRequestDate: EXPLANATION:Perabove TO:TO:RussWoodruff WE AGREE CONTRAC TO: DATE PROP You are direct SOURCE OF Revisions CONSTRU TO:Come EXPLANATI NO CHANGE INCREASE DECREASE NO CHANGE INCREASE DECREASE Design Contractor Owner Code/AHJUnknown Conditions HealthPoint Other 6/27/2023 6/27/2023                                                                                                        1 Russ Woodruff From:Meredith Everist <everistm@baylisarchitects.com> Sent:Thursday, May 11, 2023 12:00 PM To:Russ Woodruff Cc:16-0996 Family First Community Center Subject:FW: FFCC - CI-053 - RFI-032 & CCD-020 Main Entry and Door 102A & 110A Attachments:FFCC - CI-053 - RFI-032 & CCD-020 Main Entry and Door 110A.pdf HiRuss,Ireviewedthelaborandmaterialcostbreakdownforthischangeandthinktherequestisreasonableandfair.  Thanks,Meredith  Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz  From:LukeComer<luke@comergc.com> Sent:Wednesday,April26,202311:01AM To:'RussWoodruff'<RWoodruff@Rentonwa.gov>;MeredithEverist<everistm@baylisarchitects.com> Cc:'TimComer'<tim@comergc.com>;JonScofield<jon@comergc.com> Subject:FFCCͲCIͲ053ͲRFIͲ032&CCDͲ020MainEntryandDoor102A&110A  Team– Attachedispricingfor:FFCCͲCIͲ053ͲRFIͲ032&CCDͲ020MainEntryandDoor102A&110A,whichrelatesto additionalcostsprimarilyrelatedtotheentryvestibuleanddoor110A.Summarizedherein,thecostsincludetheadded pedestalandnewADAbuttons(basecontractADAskinnybuttonstobeturnedovertoowner),associatedelectrical laborwithfinalizingtheentryvestibuleperRFIͲ032andCCDͲ020,aswellasnewhardwarefordoor110Apercity inspectortoensureproperexitingwithpanicbars.Essentiallyoriginaldoor110Ahardwarewasinstalledon102Ain ordertomakethatfunctionproperlyforADA/accesscontrolelectricalfunctioning.Theoriginaldoor102Ahardware wouldnotaccommodatethatandwouldnotsufficeon110A,whichiswhynewhardwarewasrequired.   Thank you,  Luke Comer C:425Ͳ765Ͳ4118IP:425Ͳ636Ͳ8934IF:425Ͳ285Ͳ9785  CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.            PUBLICWORKS FacilitiesDivision ProjectNo:CCD#71 CONSTRUCTIONCHANGEDIRECTIVE ProjectName: (CCD) (CONTRACTOR) Youaredirectedtoprepareacostproposalfortheworkdescribedbelowand/ordetailedontheattachmentreferredto: SOURCEOFCHANGE: DATEPROPOSALREQUIRED:2/16/23 CHANGEORIGINATEDBY:Contractor PROPOSALREQUESTEDBY:Architect Architect CORPM WEAGREETOPERFORMALLCHANGEINTHEWORKDESCRIBEDINTHEPROPOSALREQUESTFOR: CONTRACTSUM: (WASHINGTONSTATESALESTAXEXCLUDED) Inaccordancewiththegeneralconditions,CostDetailSheet(s)areattachedhereto. CONTRACTTIME: OF 0 CALENDARDAYS BY: CONTRACTOR SIGNATURE DATE Wehavecarefullyexaminedthisproposalandfindthecosttobereasonable.Therefore,werecommendacceptance. Architect DATE HEALTHPOINT DATE CityofRentonAuthorizedSignature Tobeutilizedforchangesrequested byHealthPoint CITYOFRENTON DATE 25,188.00$ CAG21Ͳ180 ComerGC,Inc. FamilyFirstCommunityCenter TO:ComerGC,Inc. Theforegoingamountcoverseverythingrequiredinconnectionwiththechange.Allotherprovisionsofthecontractremaininfull forceandeffect. WeunderstandthatthisproposalrequiresincorporationofthisCCDintoaChangeOrderbytheCityofRenton. Revisionstoductatroofwelltocorrespondtostructuralrequirements 11/02/22ProposalRequestDate: EXPLANATION:Perabove TO:TO:RussWoodruff WE AGREE CONTRACT TO: DATE PROPO You are direct SOURCE OF C Revisions t CONSTRUC TO:Comer EXPLANATIO NO CHANGE INCREASE DECREASE NO CHANGE INCREASE DECREASE Design Contractor Owner Code/AHJUnknown Conditions HealthPoint Other 6/27/2023 6/27/2023                                                                                                                            1 Russ Woodruff From:Meredith Everist <everistm@baylisarchitects.com> Sent:Wednesday, April 19, 2023 3:47 PM To:Russ Woodruff Cc:16-0996 Family First Community Center Subject:RE: FFCC - CI-071 - RFI-045 - Ducts at Roof Well Attachments:RE: FFCC - CI-071 - RFI-045 - Ducts at Roof Well; FFCC - CI-071 - RFI-045 - Ducts at Roof Well.pdf HiRuss,revisitingmycommentbelow,andComer’sinputintheattachedemail,IthinkthisChangeItem#071isfairand reasonable.Thoughitwouldbeachallengetounderstandhowthediscrepancycameabout,IthinkComermadeevery efforttosolveitquicklyandwithminimalcostandtimeimpacts.  Thanks,Meredith  Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz  From:MeredithEverist Sent:Monday,February20,20232:50PM To:RussWoodruffͲCityofRenton(RWoodruff@Rentonwa.gov)<rwoodruff@rentonwa.gov> Cc:16Ͳ0996FamilyFirstCommunityCenter<16Ͳ0996@baylisarchitects.com> Subject:FW:FFCCͲCIͲ071ͲRFIͲ045ͲDuctsatRoofWell  HIRuss,IthinksomeofthesereͲdocostsfallunderthemeansandmethodscategorythataretheresponsibilityofthe contractor.Itmaybeimpossibletodeterminewhythedimensionsinthemechanicalwellfellshort.Itcouldhavebeen aninconsistencyinthedocuments,oritcouldhavebeenamishapwiththeframing,orsomecombinationof both.Ideallyanydiscrepancyisdiscoveredlongbeforetheelementsareconstructed.Inthiscase,sincetheissuewas discoveredafterthefact,werelyontheGCtoconfirmthedimensionsavailableandfeasibleoptionstoachievewhatis intheengineer’sdocuments.  Iwillcallyouformorediscussiononthisone.  Thanks,Meredith  Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.            2 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz  From:LukeComer<luke@comergc.com> Sent:Friday,February17,20233:18PM To:MeredithEverist<everistm@baylisarchitects.com>;'RussWoodruff'<RWoodruff@Rentonwa.gov> Cc:'TimComer'<tim@comergc.com>;'JonScofield'<jon@comergc.com>;16Ͳ0996FamilyFirstCommunityCenter<16Ͳ 0996@baylisarchitects.com> Subject:FFCCͲCIͲ071ͲRFIͲ045ͲDuctsatRoofWell  Team– Attachedispricingfor:FFCCͲCIͲ071ͲRFIͲ045ͲDuctsatRoofWell,whichrelatestothemodifiedductworkinto thenorthandsouthmechanicalwells,aswellastheirframedopeningstoaccommodatetheroofdesignandtolerance beneath.OriginalRFImodifiedtheopeningsandductworkthatendedupnotworkingforthefinaldeterminedrequired locationforopeningsabovetheroofing.CostsincludethereͲframingofopenings,addedwoodenplatformforduct accessaboverestroom,removalofductworkandbothrefabricationsoftheseopenings.    Thank you,  Luke Comer C:425Ͳ765Ͳ4118IP:425Ͳ636Ͳ8934IF:425Ͳ285Ͳ9785            PUBLICWORKS FacilitiesDivision ProjectNo:CCD#86 CONSTRUCTIONCHANGEDIRECTIVE ProjectName: (CCD) (CONTRACTOR) SOURCEOFCHANGE: DATEPROPOSALREQUIRED:4/27/23 CHANGEORIGINATEDBY:Contractor PROPOSALREQUESTEDBY:Owner Architect CORPM WEAGREETOPERFORMALLCHANGEINTHEWORKDESCRIBEDINTHEPROPOSALREQUESTFOR: CONTRACTSUM: (WASHINGTONSTATESALESTAXEXCLUDED) Inaccordancewiththegeneralconditions,CostDetailSheet(s)areattachedhereto. CONTRACTTIME: OF 0 CALENDARDAYS BY: CONTRACTOR SIGNATURE DATE Wehavecarefullyexaminedthisproposalandfindthecosttobereasonable.Therefore,werecommendacceptance. Architect DATE HEALTHPOINT DATE CityofRentonAuthorizedSignature Tobeutilizedforchangesrequested byHealthPoint CITYOFRENTON DATE FamilyFirstCommunityCenter TO:ComerGC,Inc. Theforegoingamountcoverseverythingrequiredinconnectionwiththechange.Allotherprovisionsofthecontractremaininfull forceandeffect. WeunderstandthatthisproposalrequiresincorporationofthisCCDintoaChangeOrderbytheCityofRenton. Youaredirectedtoprepareacostproposalfortheworkdescribedbelowand/ordetailedontheattachmentreferred to: RevisionstositewatertoaccommodatereducedwaterservŝĐĞsize 04/27/23ProposalRequestDate: EXPLANATION:Perabove TO:TO:RussWoodruff 4,653.00$ CAG21Ͳ180 ComerGC,Inc. WE AGREE CONTRACT TO: DATE PROPO SOURCE OF C You are dir Revisions t CONSTRUC TO:Comer EXPLANATIO NO CHANGE INCREASE DECREASE NO CHANGE INCREASE DECREASE Design Contractor Owner Code/AHJUnknown Conditions HealthPoint Other 6/27/2023 6/27/2023                                            1 Russ Woodruff From:Meredith Everist <everistm@baylisarchitects.com> Sent:Monday, May 15, 2023 9:27 AM To:Russ Woodruff Cc:16-0996 Family First Community Center Subject:FW: FFCC - CI-086 - Reduce Water Meter - Soos Creek GFC's Attachments:FFCC - CI-086 - Reduce Water Meter - Soos Creek GFC's.pdf HiRuss,wethinkthisChangeItemrequestisreasonable.  Thanks,Meredith  Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz  From:KeithKruger<KeithK@cplinc.com> Sent:Monday,May15,20238:34AM To:MeredithEverist<everistm@baylisarchitects.com> Cc:16Ͳ0996FamilyFirstCommunityCenter<16Ͳ0996@baylisarchitects.com> Subject:RE:FFCCͲCIͲ086ͲReduceWaterMeterͲSoosCreekGFC's  Thesecostslookreasonableforthescopeofwork.  Keith Kruger, PE, LEED AP Associate Principal COUGHLINPORTERLUNDEEN STRUCTURAL CIVIL SEISMIC ENGINEERING 801 SECOND AVE / SUITE 900 / SEATTLE WA 98104 P: 206.343.0460 / cplinc.com  From:MeredithEverist<everistm@baylisarchitects.com> Sent:Thursday,May11,20232:36PM To:KeithKruger<KeithK@cplinc.com> Cc:16Ͳ0996FamilyFirstCommunityCenter<16Ͳ0996@baylisarchitects.com> Subject:FW:FFCCͲCIͲ086ͲReduceWaterMeterͲSoosCreekGFC's  HiKeith,willyoupleasereviewthischangeitemandletmeknowifitlooksfairandreasonabletoyou?  Thanks,Meredith CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.            2  Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz  From:LukeComer<luke@comergc.com> Sent:Thursday,April27,20238:29AM To:'RussWoodruff'<RWoodruff@Rentonwa.gov>;MeredithEverist<everistm@baylisarchitects.com> Cc:'TimComer'<tim@comergc.com>;JonScofield<jon@comergc.com> Subject:FFCCͲCIͲ086ͲReduceWaterMeterͲSoosCreekGFC's  Team– Attachedispricingfor:FFCCͲCIͲ086ͲReduceWaterMeterͲSoosCreekGFC's,whichrelatestoadditionalcosts perreducingthewatermetersizeandtherequirementsperSoosCreek.   Thank you,  Luke Comer C:425Ͳ765Ͳ4118IP:425Ͳ636Ͳ8934IF:425Ͳ285Ͳ9785            PUBLICWORKS FacilitiesDivision ProjectNo:CCD#91 CONSTRUCTIONCHANGEDIRECTIVE ProjectName: (CCD) (CONTRACTOR) Youaredirectedtoprepareacostproposalfortheworkdescribedbelowand/ordetailedontheattachmentreferredto: SOURCEOFCHANGE: DATEPROPOSALREQUIRED:3/31/23 CHANGEORIGINATEDBY:Contractor PROPOSALREQUESTEDBY:Architect Architect CORPM WEAGREETOPERFORMALLCHANGEINTHEWORKDESCRIBEDINTHEPROPOSALREQUESTFOR: CONTRACTSUM: (WASHINGTONSTATESALESTAXEXCLUDED) Inaccordancewiththegeneralconditions,CostDetailSheet(s)areattachedhereto. CONTRACTTIME: OF 0 CALENDARDAYS BY: CONTRACTOR SIGNATURE DATE Wehavecarefullyexaminedthisproposalandfindthecosttobereasonable.Therefore,werecommendacceptance. Architect DATE HEALTHPOINT DATE CityofRentonAuthorizedSignature Tobeutilizedforchangesrequested byHealthPoint CITYOFRENTON DATE CAG21Ͳ180 ComerGC,Inc. FamilyFirstCommunityCenter TO:ComerGC,Inc. Theforegoingamountcoverseverythingrequiredinconnectionwiththechange.Allotherprovisionsofthecontractremaininfull forceandeffect. WeunderstandthatthisproposalrequiresincorporationofthisCCDintoaChangeOrderbytheCityofRenton. Addductfordryervent 02/25/23ProposalRequestDate: EXPLANATION:Perabove TO:TO:RussWoodruff 9,371.00$ WE AGREE CONTRACT DATE PROPO You are direct SOURCE OF C Add duct CONSTRUC TO:Comer f EXPLANATIO TO: NO CHANGE INCREASE DECREASE NO CHANGE INCREASE DECREASE Design Contractor Owner Code/AHJUnknown Conditions HealthPoint Other 6/27/2023 6/27/2023                                                                                    1 Russ Woodruff From:Meredith Everist <everistm@baylisarchitects.com> Sent:Friday, April 28, 2023 5:27 PM To:Russ Woodruff Cc:16-0996 Family First Community Center Subject:FW: FFCC - CI-091 - RFI-055 - Added Ducting for Dryer Vent Attachments:FFCC - CI-091 - RFI-055 - Added Ducting for Dryer Vent.pdf HiRuss,IreviewedthisChangeItemandatfirstglancethenumberseemedhighforthework,butthedetailComer providedtobackuptheirtimeandeffortvalidatesthecostandseemsreasonabletome.  Thanks,Meredith  Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz  From:LukeComer<luke@comergc.com> Sent:Monday,April10,20234:09PM To:'RussWoodruff'<RWoodruff@Rentonwa.gov>;MeredithEverist<everistm@baylisarchitects.com> Cc:'TimComer'<tim@comergc.com>;JonScofield<jon@comergc.com> Subject:FFCCͲCIͲ091ͲRFIͲ055ͲAddedDuctingforDryerVent  Team– Attachedispricingfor:FFCCͲCIͲ091ͲRFIͲ055ͲAddedDuctingforDryerVent,whichrelatestothescope relatedtoaddingdrywallductingforventingoutofthebuilding.Scopeincludesremovalofuppercaseworkcabinet, cuttingoutdrywall,installingductworkinwallupintoceiling,routingductingaboveceilingspacewhereceilingtilesand gridwascomplete,andstubbedoutofthewall.ExteriorMWP’smodifiedtotrimoutforventing,penetration waterproofed,drywallreͲinstalledinthelaundryroomandmud/tapefinishedforreͲpaintingandhangingthecabinet backup.    Thank you,  Luke Comer C:425Ͳ765Ͳ4118IP:425Ͳ636Ͳ8934IF:425Ͳ285Ͳ9785  CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.            PUBLICWORKS FacilitiesDivision ProjectNo:CCD#92 CONSTRUCTIONCHANGEDIRECTIVE ProjectName: (CCD) (CONTRACTOR) Youaredirectedtoprepareacostproposalfortheworkdescribedbelowand/ordetailedontheattachmentreferredto: SOURCEOFCHANGE: DATEPROPOSALREQUIRED:2/22/23 CHANGEORIGINATEDBY:Contractor PROPOSALREQUESTEDBY:Architect Architect CORPM WEAGREETOPERFORMALLCHANGEINTHEWORKDESCRIBEDINTHEPROPOSALREQUESTFOR: CONTRACTSUM: (WASHINGTONSTATESALESTAXEXCLUDED) Inaccordancewiththegeneralconditions,CostDetailSheet(s)areattachedhereto. CONTRACTTIME: OF 0 CALENDARDAYS BY: CONTRACTOR SIGNATURE DATE Wehavecarefullyexaminedthisproposalandfindthecosttobereasonable.Therefore,werecommendacceptance. Architect DATE HEALTHPOINT DATE CityofRentonAuthorizedSignature Tobeutilizedforchangesrequested byHealthPoint CITYOFRENTON DATE FamilyFirstCommunityCenter TO:ComerGC,Inc. Theforegoingamountcoverseverythingrequiredinconnectionwiththechange.Allotherprovisionsofthecontractremaininfull forceandeffect. WeunderstandthatthisproposalrequiresincorporationofthisCCDintoaChangeOrderbytheCityofRenton. Addfireextiguishersandcabinetsperfiremarshal 02/25/23ProposalRequestDate: EXPLANATION:Perabove TO:TO:RussWoodruff 4,778.00$ CAG21Ͳ180 ComerGC,Inc. WE AGREE CONTRACT DATE PROPO You are direct SOURCE OF C Add fire CONSTRUC TO:Comer ex EXPLANATIO TO: NO CHANGE INCREASE DECREASE NO CHANGE INCREASE DECREASE Design Contractor Owner Code/AHJUnknown Conditions HealthPoint Other 6/27/2023 6/27/2023                                                      1 Russ Woodruff From:Meredith Everist <everistm@baylisarchitects.com> Sent:Wednesday, April 26, 2023 10:05 AM To:Russ Woodruff Cc:16-0996 Family First Community Center Subject:FW: FFCC - CI-092 - RFI-057 - Added FE's and FEC's Per Fire Marshal Attachments:FFCC - CI-092 - RFI-057 - Added FE's and FEC's Per Fire Marshal.pdf HiRuss,thisChangeItemfortherequiredFireExtinguishersandcabinetslooksreasonabletome.  Thanks,Meredith  Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz  From:LukeComer<luke@comergc.com> Sent:Wednesday,February22,202311:19AM To:'RussWoodruff'<RWoodruff@Rentonwa.gov>;MeredithEverist<everistm@baylisarchitects.com> Cc:'TimComer'<tim@comergc.com>;JonScofield<jon@comergc.com> Subject:FFCCͲCIͲ092ͲRFIͲ057ͲAddedFE'sandFEC'sPerFireMarshal   Team– Attachedispricingfor:FFCCͲCIͲ092ͲRFIͲ057ͲAddedFE'sandFEC'sPerFireMarshal,whichrelatestothe addedFE’srequiredbytheFireMarshalperRFIͲ057.Pertheresponse,thereare(5)cabinetsaddedandwewillbegoing backtotheinstalledFE’sandinstallingcabinetsoncearrived.   Thank you,  Luke Comer C:425Ͳ765Ͳ4118IP:425Ͳ636Ͳ8934IF:425Ͳ285Ͳ9785  CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.            PUBLICWORKS FacilitiesDivision ProjectNo:CCD#93 CONSTRUCTIONCHANGEDIRECTIVE ProjectName: (CCD) (CONTRACTOR) Youaredirectedtoprepareacostproposalfortheworkdescribedbelowand/ordetailedontheattachmentreferredto: SOURCEOFCHANGE: DATEPROPOSALREQUIRED:2/23/23 CHANGEORIGINATEDBY:Contractor PROPOSALREQUESTEDBY:Architect Architect CORPM WEAGREETOPERFORMALLCHANGEINTHEWORKDESCRIBEDINTHEPROPOSALREQUESTFOR: CONTRACTSUM: (WASHINGTONSTATESALESTAXEXCLUDED) Inaccordancewiththegeneralconditions,CostDetailSheet(s)areattachedhereto. CONTRACTTIME: OF 0 CALENDARDAYS BY: CONTRACTOR SIGNATURE DATE Wehavecarefullyexaminedthisproposalandfindthecosttobereasonable.Therefore,werecommendacceptance. Architect DATE HEALTHPOINT DATE CityofRentonAuthorizedSignature Tobeutilizedforchangesrequested byHealthPoint CITYOFRENTON DATE FamilyFirstCommunityCenter TO:ComerGC,Inc. Theforegoingamountcoverseverythingrequiredinconnectionwiththechange.Allotherprovisionsofthecontractremaininfull forceandeffect. WeunderstandthatthisproposalrequiresincorporationofthisCCDintoaChangeOrderbytheCityofRenton. Addladdersforroofaccessperelectricalinspector 02/16/23ProposalRequestDate: EXPLANATION:Perabove TO:TO:RussWoodruff 10,951.00$ CAG21Ͳ180 ComerGC,Inc. WE AGREE CONTRACT TO: DATE PROPO You are direct SOURCE OF C Add ladder CONSTRUC TO:Comer EXPLANATIO NO CHANGE INCREASE DECREASE NO CHANGE INCREASE DECREASE Design Contractor Owner Code/AHJUnknown Conditions HealthPoint Other 6/27/2023 6/27/2023                                                      1 Russ Woodruff From:Meredith Everist <everistm@baylisarchitects.com> Sent:Wednesday, April 26, 2023 10:11 AM To:Russ Woodruff Cc:16-0996 Family First Community Center Subject:RE: FFCC - CI-093 - Added Ladders in Mechanical Wells Attachments:FFCC - CI-093 - Added Ladders in Mechanical Wells.pdf HiRuss,thisChangeItemtoaddladdersatthemechanicalwellslooksreasonabletome.  Thanks,Meredith  Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz  From:LukeComer<luke@comergc.com> Sent:Thursday,February23,20238:16AM To:MeredithEverist<everistm@baylisarchitects.com>;'RussWoodruff'<RWoodruff@Rentonwa.gov> Cc:'TimComer'<tim@comergc.com>;'JonScofield'<jon@comergc.com>;16Ͳ0996FamilyFirstCommunityCenter<16Ͳ 0996@baylisarchitects.com> Subject:FFCCͲCIͲ093ͲAddedLaddersinMechanicalWells  Team– Attachedispricingfor:FFCCͲCIͲ093ͲAddedLaddersinMechanicalWells,whichrelatestotherequiredladder accessoutofthesouthmechanicalwelltoserviceequipmentperAHJ.Thesouthwellrequired(2)laddersand(1)was addedinthenorthforfuturemaintenanceconvenienceperdiscussionbetweenLCandRW.    Thank you,  Luke Comer C:425Ͳ765Ͳ4118IP:425Ͳ636Ͳ8934IF:425Ͳ285Ͳ9785  CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.            PUBLICWORKS FacilitiesDivision ProjectNo:CCD# 100 CONSTRUCTIONCHANGEDIRECTIVE ProjectName: (CCD) (CONTRACTOR) Youaredirectedtoprepareacostproposalfortheworkdescribedbelowand/ordetailedontheattachmentreferredto: SOURCEOFCHANGE: DATEPROPOSALREQUIRED:4/11/23 CHANGEORIGINATEDBY:Contractor PROPOSALREQUESTEDBY:Owner Architect CORPM WEAGREETOPERFORMALLCHANGEINTHEWORKDESCRIBEDINTHEPROPOSALREQUESTFOR: CONTRACTSUM: (WASHINGTONSTATESALESTAXEXCLUDED) Inaccordancewiththegeneralconditions,CostDetailSheet(s)areattachedhereto. CONTRACTTIME: OF 0 CALENDARDAYS BY: CONTRACTOR SIGNATURE DATE Wehavecarefullyexaminedthisproposalandfindthecosttobereasonable.Therefore,werecommendacceptance. Architect DATE HEALTHPOINT DATE CityofRentonAuthorizedSignature Tobeutilizedforchangesrequested byHealthPoint CITYOFRENTON DATE CAG21Ͳ180 ComerGC,Inc. FamilyFirstCommunityCenter TO:ComerGC,Inc. Theforegoingamountcoverseverythingrequiredinconnectionwiththechange.Allotherprovisionsofthecontractremaininfull forceandeffect. WeunderstandthatthisproposalrequiresincorporationofthisCCDintoaChangeOrderbytheCityofRenton. Addlidstogymstoragespacesforprotectionofequipment 04/11/23ProposalRequestDate: EXPLANATION:Perabove TO:TO:RussWoodruff 16,032.00$ WE AGREE CONTRACT DATE PROPO You are direct SOURCE OF C Add lids CONSTRUC TO:Comer to EXPLANATIO TO: NO CHANGE INCREASE DECREASE NO CHANGE INCREASE DECREASE Design Contractor Owner Code/AHJUnknown Conditions HealthPoint Other 6/27/2023 6/27/2023                                                                          1 Russ Woodruff From:Meredith Everist <everistm@baylisarchitects.com> Sent:Friday, April 28, 2023 5:32 PM To:Russ Woodruff Cc:16-0996 Family First Community Center Subject:FW: FFCC - CI-100 - PR-009 - Gym Storage Lids Attachments:FFCC - CI-100 - PR-009 - Gym Storage Lids.pdf HIRuss,IthinkthisChangeItemforthelidsatthegymisveryreasonableandfair.Ithinktheydidanicejobwiththose.  Thanks,Meredith  Meredith Everist | AIA | NOMA | LEED AP BD+C Principal Pronouns: she | her 10801 Main Street, # 110 | Bellevue, WA 98004 O: 425.454.0566 D: 425.679.5205 F: 425.453.8013 everistm@baylisarchitects.com | BaylisArchitects.com Facebook | LinkedIn | Houzz  From:LukeComer<luke@comergc.com> Sent:Tuesday,April11,20237:31AM To:'RussWoodruff'<RWoodruff@Rentonwa.gov>;MeredithEverist<everistm@baylisarchitects.com> Cc:'TimComer'<tim@comergc.com>;JonScofield<jon@comergc.com> Subject:FFCCͲCIͲ100ͲPRͲ009ͲGymStorageLids  Team– Attachedispricingfor:FFCCͲCIͲ100ͲPRͲ009ͲGymStorageLids,whichrelatestothescoperelatedtoadding 2x6framingandfencingforgymstorageroomlids.    Thank you,  Luke Comer C:425Ͳ765Ͳ4118IP:425Ͳ636Ͳ8934IF:425Ͳ285Ͳ9785  CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.