Loading...
HomeMy WebLinkAbout39 _C_Hazardous_Materials_Statement_230927_v1 Western Washington Division Eastern Washington Division 165 NE Juniper St., Ste 201, Issaquah, WA 98027 407 Swiftwater Blvd, Cle Elum, WA 98922 Phone: (425) 392-0250 Phone: (509) 674-7433 www.EncompassES.net Date: September 13th, 2023 To: City of Renton, Department of Community and Economic Development From: Encompass Engineering & Surveying on behalf of Lavina Wadhwani Re: Hazardous Materials Management Statement for the Index Avenue Townhomes _____________________________________________________________________________________ APPLICANT Lavina Wadhwani 10655 NE 4th Street Suite #707 Bellevue, WA 98005 lavinaw@veerarchitecture.com SITE ADDRESS 511 Airport Way, Renton, WA 98057 HAZARDOUS MATERIALS MANAGEMENT STATEMENT To Whom It May Concern, I, the undersigned property owner of Parcel No. 722930-0580, understand that the City has requested a Hazard Materials Management Statement. This letter addresses that requirement but may need to be updated by the contractor once one has been chosen for the project. 1. Fueling of Construction Vehicles and Storage of Hazardous Materials: It is anticipated that Track hoes, back hoes, dozers, vibratory rollers and loaders may all be present on site at some point during construction. It is not anticipated that Construction vehicles will need to be refueled while on site. Gas-powered hand-held construction equipment such as chain saws and cut-off saws may require refueling during the construction process. If emergency refueling of larger equipment is needed, it may be accomplished using portable fuel tanks carried in the pickup bed of the construction foreman’s truck or by the contractor’s service truck. Care will be taken at all time during refueling to ensure that no fuel is spilled. In an emergency, fuel spill containment kits will be available to limit any unintended fuel spills and the Department of Ecology will be contacted in case of a spill. Gas -powered hand-held construction equipment will be refueled using portable gas containers meeting current DOE standards. Said gas containers will typically be stored in the bed of the construction foreman’s truck or within an approved location within a construction equipment shed. It is not anticipated that any other Hazardous materials, with the possible exception of painting supplies during home construction, will be stored on site during construction. 2. Construction Debris: All construction created during construction will be removed from the site Index Ave Townhomes Hazardous Materials Management Statement 09-13-2023 Page 2 of 2 and disposed of in an approved method at an appropriate disposal site. Sincerely, Lavina Wadhwani Applicant