HomeMy WebLinkAboutExhibit_6LEGEND EXISTING PROPERTY LINE EXISTING UG RISER NEW UG RISER J-BOXJ NEW TRENCH LINE EXIST. 3Ø WIRE EXISTING CENTER LINE EXISTING CONDUCTOR TO BE REMOVED DISCONNECT - FUSED EXIST. 1Ø WIRE EXISTING RIGHT OF WAY PROPOSED PULL VAULTP EXISTING POLE DOWN GUY EXISTING SECONDARY SERVICE LINE DISCONNECT - UNFUSED EXISTING STREETLIGHT NEW POLE PROPOSED PADMOUNT TRANSFORMER EXISTING PADMOUNT TRANSFORMER HANDHOLE BROTHERTON CADILLAC SCHEDULE 73 OH TO UG CONVERSION NOTE: DEVELOPER TO PROVIDE ALL CIVIL WORK: TO AND INCLUDING EXCAVATION, BACKFILL, SHORING, TRENCH MAINTENANCE, SANDING FOR DUCT, SELECT 5/8" CRUSH FOR UNDER VAULTS, COMPACTION, ALL HARDSURACE RESTORATION AND RELATED LANDSCAPING RESTORATION. DEVELOPER TO PROVIDE TEMPORARY EXCAVATION PLATING (IF REQUIRED). & ANY ADDITIONAL LOCAL JURISDICITON REQUIREMENTS. EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES EROSION & SEDIMENT CONTROL REQUIREMENTS STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION GENERAL 1. Pre-construction Notify appropriate City or County 48 to 72 hours or as required by permitting agency before starting work on any right-of-way involving a permit. Follow all requirements as outlined by the permitting agency. Locate and mark all underground utilities prior to start of construction. If there is a conflict with the intended trench route as shown on the site plan and existing utilities or obstructions, trench route may need to be moved to opposite side of street. Cooperation with Quality Inspector, Puget Sound Energy Contractor, City or County authorities during Pre-construction meeting will determine the final trench route. 2. Existing Utilities Hand excavate (pothole) all marked utility crossings to verify exact location and depth at point of crossing. Protect underground utilities during excavation. Use hand excavation methods if necessary to avoid damage. Fabricate and install adequate temporary structures to support and protect underground utilities while exposed during construction. Maintain 6" minimum clearance at crossings between existing utilities and new duct installations. Transition trench or tunnel profile gradually as required at crossings. Maintain 24" minimum separation between new trench or tunnel and parallel existing utilities or as required by the permit agency. In the event of damage to an underground utility, notify Puget Sound Energy at once. Contractor agrees to make work force and resources available at once to Puget Sound Energy or municipal authorities to repair damage at no cost. 3. Work Drawings Maintain on site, in good condition, a complete file of all work drawings. These drawings shall be available at all times to a Puget Sound Energy representative. Corrections and changes made during the job shall be recorded continuously on these drawings. All underground electrical facilities shall have a minimum of 36 inches of cover. Any change must be approved by the PSE engineer or project manager. Furnish Puget Sound Energy a complete set of as built prints (foreman's copies) at the end of the job. 4. Safety Provide signs, barricades, and traffic control in conformance with local jurisdictions and regulations. Provide flagging and or other vehicle traffic control as needed in conformance with local regulations. (see SPM # 100.4000) Provide adequate signage and protection to traffic during non-working hours. Maintain traffic flow as required by permitting agency. Provide signs and barricades to warn pedestrians, motorcycles and bicycles. Install warning barricades at least every 50 feet along the trench route from the time the trench is opened until the trenching is complete. 5. Existing Systems Maintain existing electrical system in service until new system is complete, tested, and ready for service. Disable existing system only to make cutovers and connections as directed by Puget Sound Energy's representative. Provide temporary wiring and connections to maintain existing systems in service during construction; if a scheduled outage is not possible. When work must be performed on energized equipment or circuits, use qualified personnel for such operations. EARTHWORK See Puget Sound Energy SPM 6800.4050 1. Back hoe, Hand Dug Excavations Paved Surfaces Cut the edges of the trench prior to digging. Use the narrowest bucket practical or plow off the edge of paved surface far enough to minimize asphalt disturbance. Repair any blow out areas (where edge has been broken) by sawing. The depth of the trench shall be enough to allow 36" of cover . Backfill material shall be Controlled Density Fill (CDF) cover or select fill (5/8" minus) to meet permit requirements. Unpaved Surfaces Conduit/cable trenches are to be excavated just off the existing road edge or in the shoulder of the road behind the existing ditch line. Contractor shall use a back hoe with the narrowest width bucket practical or plow. Trench shall be deep enough to allow a minimum of 36" of cover over the top most cable. All ditch crossings shall have a minimum of 36" cover from the lowest point within the existing ditch line. Culverts; when installing facilities under a culvert, excavation must be filled with packed crush rock. If any culvert is damaged it will be repaired or replaced in accordance with permitting agency and contractors responsibility. Spoils shall be removed quickly to minimize blocking of traffic. All spoils and wastes become the property of the contractor immediately upon removal. Remove spoils and wastes promptly to an approved disposal site. Remove spoils containing asphalt or concrete to a disposal site specifically approved for such materials. Provide Puget Sound Energy with a disposal receipt for all spoils. 2. Backfill Unpaved Road Surfaces Backfill for unpaved road crossings shall consist of 1-1/2" to 2-1/2" material compacted to 95% density. Backfill for unpaved road sections shall consist of native material compacted to 95% density. At the end of each workday, backfill or plate all trench, remove all spoils and clean roadway surface of large hazardous debris. 3. Surface Restoration Unpaved Surfaces Restore ground surface to original contour. Restore to original condition or better. 4. Landscaping Arrange and perform work to minimize impact to existing landscaping. Restore landscaping that has been disturbed during the course of work, including seeding of banks and fills. Vaults set in bank areas may require re-sloping the surrounding land to avoid sloughing. Leave area in its original state or better at the end of construction. Hand dig if required to prevent damage to tree roots. ELECTRICAL 1. Conduit Conduit for installation in unpaved areas shall be 2", 3", 4", or 6" PVC DB120 or 2", 3", 4", or 6" DB120 for direct burial. Maintain 36" minimum cover above top conduit at all times or as required by the permitting agency. Where conduit is routed from road edge to vault location, maintain 36" minimum cover above top conduit at all times or as required by the permitting agency. Bends shall be made with as long a radius as possible (48" minimum). Avoid making sharp bends or kinks in conduit during installation. Obtain exact location of conduit entrance into vault from Puget Sound Energy before penetrating vault. Penetrate the vault using existing knockout or use core drilled holes. Stub the 4" or 6" PVC 2"-3" into vault interior and grout between the conduit and vault wall. Leave a 10' minimum of extra pull rope in each end of installed conduit where 4" or 6" PVC is installed and cap conduit to prevent the entry of dirt and moisture. Arrange work so conduit plays directly off reel into trench. Place the conduit in the trench as straight as possible. Avoid vertical and horizontal "snaking" of the conduit. Multiple conduit runs may be stacked vertically. Where conduit must be pulled through a trench to allow a crossing under an existing utility, cap conduit end before pulling to avoid contamination. If a kink occurs, cut the conduit ahead of kink and splice to new conduit to continue run. 2. Underground Primary Cable Primary cable shall be 1/O Alum Sol Jacketed Cable rated for 15 KV service with a polyethylene jacket. Primary cable shall be 61 strand 750 MCM aluminum conductor rated for 15 KV service with a copper tape neutral conductor and polyethylene jacket. A 4/0 copper neutral shall be run with each 3 phase circuit of 750 MCM. Install cable into existing or new conduit systems using approved installation equipment. Approved equipment includes either cable pullers and/or cable pushers. Pulling socks shall be non-conductive or similar material. Steel pulling socks are prohibited. Bare steel cable shall not be used to pull cable. Cable pulling equipment (winches, hoist, driven reels, etc.) shall be equipped with instrumentation to continually monitor and record peak tension encountered during a pull. Before installing cable, obtain rated pulling tension for cable from Puget Sound Energy. Do not exceed rating at any time during installation. Notify Puget Sound Energy immediately if pulling tension equals or exceeds rating (828/1657lbs for 1/0 or 5000lbs for 750 .) Do not exceed minimum bend radius of cable or impose kinks or sharp bends on cable during pulling operations. Install cable directly off reel without dragging it on the ground. Apply Puget Sound Energy approved lubricant to cable continually during pulling to reduce pulling tension and to permit future removal. Install adequate amounts of 3/4 " plywood on existing sidewalk areas to support pulling equipment and prevent un-necessary damage to sidewalks. Train and coil cables in vaults as required to form a smooth transition from conduit to termination. if terminations are to be performed by others, coil 15' of cable in vault and cap end. 3. Terminations and Splices Install approved terminations on cables in accordance with Puget Sound Energy SPM 2247.5115- 5119. Unless otherwise directed, approved terminations will be load break elbows in vaults and cold shrink pin terminals on pole risers per Puget Sound Energy SPM 2247.9317. Splice cable with approved splice kits in vaults, hand holes or similar enclosures. Do not splice cables in runs between vaults. See Puget Sound Energy SPM 2233.2075-2076. 4. Concrete Vaults Excavate, install base material, and compact base material in accordance with Puget Sound Energy SPM 6775.0040. Install and seal precast sections in accordance with Puget Sound Energy SPM 6775.0040. Use precast neck and shaft sections to bring manhole entrance to proper elevation. Install manholes plumb. Set the top of each manhole to finished elevation or no higher than 6" above existing road elevation. Install hillholders as required on sketch or by construction notes. 5. Grounding Install ground rod per Puget Sound Energy SPM 6275.6100 at each vault in which primary cable is terminated. Locate rod in trench excavation wherever possible to obtain maximum driven depth in undisturbed soil. Connect each ground individually to ground loop inside vault with bare no. 2 copper jumper or to Concentric neutral at each splice vault location. Minimum grounding requirement is 4 grounds per mile. 6. Existing Underground Primary Cable (if applicable) Abandon existing primary cable in place. Cut off old cable ends inside vault flush with wall. Before cutting, pigtail concentric neutral strands and connect to ground loop inside vault. Return scrap cable and existing cable tags to Puget Sound Energy. Remove or fill existing vaults as required by permitting agency. 7. Traffic Control All traffic control to comply with current specifications in M.U.T.C.D. GENERAL OVERHEAD NOTES: 1. Poles, conductors, devices to be installed per PSE Standards & Specifications. 2. Poles are to be installed or relocated as staked. 3. All new poles set shall be the class indicated on the sketch or better. 4. Install ground plate assembly on all new poles. 5. Install grid numbers on all new and existing poles as shown on sketch. 6. Treat all field-drilled poles with copper Naphthenate wood preservative. 7. Customer/Developer to coordinate between utilities. 8. All new and relocated poles -locations- to be approved by King Co. OVERHEAD CIRCUIT MAP (1602E008) SCALE: 6" = 1 MILE WORKZONE PREL I M I N A R Y NOT F O R C O N S T R U C T I O N N Vicinity Map 47.469457, -122.220439 FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. JOB SITE PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CHAU 253-208-9480 02/22/23 R. REYNOLDS 253-262-7409 02/22/23 E. SCHOTT 714-893-2405 02/22/23 N/A RENTON BROTHERTON CADILLAC SCH'L 73 209 SW 12TH ST, RENTON, WA 98055 N/A N/A N/A 101158373 AS NOTED 1 OF 2 KING N/A N/A CSPSKEPM NW 19-23N-05E N/A N/A 2305E074 2305E076 2305E074SE GRA-26 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A E-Mail: Cell Phone: Project Manager Contact Information: Manager:JENNY CHAU 253-208-9480 JENNY.CHAU@PSE.COM GAS PHONE CABLE TV PROJECT PHASE PWR NOTIF#ORDER#101158373Owner / Developer Contact Info officeATTN: BROTHERTON CADILLAC 209 SW 12TH ST RENTON, WA 98055 BRAD BROTHERTON 425-981-1000 513130149 594153794 593250058 108144539 101158373 Dist UG Maint Dist OH Maint Removal Superior DocuSign Envelope ID: 38C5462B-3449-4BF4-9564-2CB3ED7160E6 SW 12TH S T ROW50'317450-165764 T145/1 112.5 kVA 208V (ABC) GRA 26 317443-165738 T144/19X 317444-165761 T0/13 50 kVA 120/240V (B) SLAG7001 101 215 317433-165738 T0/14 37.5 kVA 120/240V (B) SW#_____ (SB) 209 336ACSR 317444-165747 SW#_____ (100T) SW#_____ (SB) 317441-165730 336ACSR 6"MIN FROM EOP 4' X 4' WORK PIT CUSTOMER SUPPLIED 4' X 4' WORK PIT CUSTOMER SUPPLIED PSE INST. 1-RUN 750 FEEDER CABLE ± 290' 1-6" SCH'L 80 DISCONTINUOUS PVC CONDUIT ± 230' (AØEJN448) (BØEJN449) (CØEJN450) PSE PROVIDED & CUSTOMER INSTALLED PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED 90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE P01 P02 6 1 230'703 703 3Ø 750 290'EJN448 EJN449 EJN450 - 2" PVC (FT) & BENDS =230'0 0 0 0 1/0 AL JKT TOTAL (FT) =290' Communications Primary Power Cables or Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min 12" Min Separation 36" Min Cover 48" Max Backfill (No rocks over 10" diameter) Separation 12" Min Gas 4" Sand Bedding 32" Typical (Power, Gas, and Communications) JOINT TRENCH DETAIL Primary-Mainline Gas & Communications (NTS) Separation 12" Min 6" or 12" Min Sand Shading after Compaction - A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter. UTILITY POLE EROSION CONTROL DETAIL TOP VIEW DRY DRAINAGE DITCH or DRY VEGETATED SITE SLOPE Place gravel bags for Sediment Trap Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Drainage ditches or Dry vegetated sites FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS. 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 Field Face Quadrant Road Face Quadrant Climbing Space 5" MinC L Direction of Vehicular TrafficC LTOP VIEW Standoff Bracket 15" Min Length Conduit Clamp Conduit CONDUIT RISER PLACEMENT DETAIL (P01 & P02) SCALE: NONE 4'x4' Work Pit 00 1"2" 00 50'100' INSTALL SITE PLAN SCALE: 1" = 50' ASPLUNDH CONSTRUCTION CORP. - QA/QC T. MYER THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) NEW CABLE & CONDUIT DIAGRAM NOT TO SCALE SITE SPECIFIC NOTES AT P01: 317444-165747 -INSTALL NEW 45' CL-1 DISTRIBUTION POLE W/ GROUNDS PER STD 6010.1000 (PD451) -INSTALL (1) 12kV 1/0 AND FEEDER TERMINATION DEADEND PER STD 6043.1022 (TSU6D31) -INSTALL SWITCH #T__________ -INSTALL SWITCH #T__________ -INSTALL (1) 4" PRIMARY RISER ON NEW STANDOFF BRACKETS PER STD 6042.1000(RIS4CSS) *FOR 3Ø L/E ON WO#_____________ -INSTALL (1) 6" PRIMARY RISER ON NEW STANDOFF BRACKETS PER STD 6042.1000(RIS6CSS) -INSTALL (1) TRIPLE HELIX ANCHOR 30' WEST PER STD 6012.1000(ANDH3) -INSTALL (2) 7/16" PRIMARY DOWNGUY PER STD 6013.0100 (GYD7SA) -INSTALL (1) 7/16" NEUTRAL DOWNGUY PER STD 6013.0100 (GYD7SAN) -INSTALL GRID# AT P02: 317433-165738 -EXISTING 1962 75' CL-1 POLE TO REMAIN EXISTING 37.5kVA 120/240V XFMR TO REMAIN -INSTALL 3Ø 336.6 DEADEND UNDERBUILD PER STD 6043.1042 (DEH015) -INSTALL (1) 12kV 3Ø FEEDER TERMINATION ALT PER STD 6043.1020 (TSU3DF1A) *RELOCATE XFMR CUTOUT TO 9' ARM IF NEEDED. -INSTALL SWITCH #T__________ -INSTALL (1) 6" PRIMARY RISER ON NEW STANDOFF BRACKETS PER STD 6042.1000(RIS6CSS) -INSTALL (1) TRIPLE HELIX ANCHOR 30' E PER STD 6012.1000(ANDH3) -INSTALL (1) 7/16" PRIMARY SPAN GUY 60' EAST TO P02A PER STD 6013.0170 (GYD7OW) -INSTALL (1) 3/8" NEUTRAL SPAN GUY 60' EAST TO P02A PER STD 6013.0170 (GYD3OW) AT P02A: 317441-165730 -INSTALL NEW 35' CL-1 SERVICE POLE 6010.1100 (PS351) -INSTALL (1) TRIPLE HELIX ANCHOR 20' EAST PER STD 6012.1000(ANDH3) -INSTALL (2) 7/16" PRIMARY SPAN GUY PER STD 6013.0100 (GYD7SA) -INSTALL GRID# 230' UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CHAU 253-208-9480 02/22/23 R. REYNOLDS 253-262-7409 02/22/23 E. SCHOTT 714-893-2405 02/22/23 N/A RENTON BROTHERTON CADILLAC SCH'L 73 209 SW 12TH ST, RENTON, WA 98055 N/A N/A N/A 101158373 AS NOTED 2 OF 2 KING N/A N/A CSPSKEPM NW 19-23N-05E N/A N/A 2305E074 2305E076 2305E074SE GRA-26 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 101158373CIRCUIT FEET ADDED: 230' PREL I M I N A R Y NOT F O R C O N S T R U C T I O N CUSTOMER APPROVAL I approve the location of the trench, including road crossings, and all electrical equipment as shown on print. ________________________ Customer's Signature ________________________ Print Name/Date 6" to 12" Under Normal Conditions 65" Min for Triple Helix DETAIL FOR TRIPLE HELIX INSTALLATION Not To Scale ANCHOR DETAIL - TRIPLE HELIX CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE GRA-26 06/2020 83.00 86.00 85.00 0.00 0.00 0.00 83.00 86.00 85.00 WIRE REMOVAL TABLE Work Location Wire Size & Type Quantity Length (per conductor) Remarks From To P01 P02 PRI 336 ACSR 3 230' P01 P02 LEGACY - #4 ACSR 1 230' POLE TABLE (NEW) Work Location Pole Data Grid #Height Class Year Remarks / Location Ref. P02A 317441-165730 35 CL-1 P01 317444-165747 45 CL-1 DocuSign Envelope ID: 38C5462B-3449-4BF4-9564-2CB3ED7160E6