Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Change Order - 03
Kyle Smith 10/30/23 CAG-22-062, CO #3-23 Approved by Cheryl Beyer via 11/24/2023 email ChangeOrderNo.____3_____ ContractNo.:CAGͲ22Ͳ062 ContractTitle:BronsonWayBridgeͲSeismicRetrofitandPainting ProjectNo.:TED4004020Page2of6 THECONTRACTISMODIFIEDASFOLLOWS:DescriptionofChange:x Revisequantityforthefollowingbiditemsinthecontract:o BidItemNo.10,CONSTRUCTIONSIGNSCLASSA,RevisedQuantity=120S.F.x Addthefollowingbiditemsinthecontract: o BidItemNo.3Ͳ10,CONSTRUCTIONSIGNSCLASSB, Quantity=1,828S.F.,UnitPrice=$22.50perS.F. x ModifyDrawingNo.03,GeneralNoteNo.9,asshownintherevisedplanattachedtothis changeorder. x ModifyDrawingNo.10,ShearBlockSection3,noteonverticaldimension,asshowninthe revisedplanattachedtothischangeorder. x ModifyDrawingNo.12,CleaningandPaintingNote6C,asshownintherevisedplanattached tothischangeorder. x ModifySpecialProvision1Ͳ07.23(1)asfollows: 1Ͳ07.23(1)ConstructionUnderTraffic (May2,2017APWAGSP) Revisethethirdsentenceofthesecondparagraphtoread: Accessibilitytoexistingortemporarypedestrianpushbuttonsshallnotbeimpaired;if approvedbytheContractingAgencyactivatingpedestrianrecalltimingorother accommodationmaybeallowedduringconstruction. (******) Section1Ͳ07.23(1)issupplementedwiththefollowing: Duringthesetup,useandremovalofthecontainmentsystemforpaintremoval,cleaning andpaintingoperations,trafficoverthebridgemayberestrictedasfollows: Closetheoutsidetrafficlaneforeachdirectionoftraveloverthebridgeorcloseall trafficlanesoverthebridge. ChangeOrderNo.____3_____ ContractNo.:CAGͲ22Ͳ062 ContractTitle:BronsonWayBridgeͲSeismicRetrofitandPainting ProjectNo.:TED4004020Page3of6 WhenevertheContractor’soperationsrequirelanereductionsrestrictingtheflowoftraffic,theContractorshallfurnish,maintain,andoperationasequentialarrowsign,foreachlaneclosure,asspecifiedintheSpecialProvision1Ͳ10.3(3)BSequentialArrowSigns.BridgesidewalksmaybeclosedtopedestriantrafficaslongasthePedestrianDetourRoutesignsareinplaceasshownintheTrafficControlPlansincludedinVolume2ofthecontractorinTrafficControlPlanssubmittedbytheContractorandapprovedbytheContractingAgency. x ModifySpecialProvision1Ͳ07.23(4)asfollows: 1Ͳ07.23(4)ConstructionandBridgeClosure (******) Section1Ͳ07.23(4)isanaddednewsection: Thisprojectislocatedonaprincipalarterialsurroundedbybusinesses,residences,apark andlibrary.Duetotheproximityoftheprojectsitetotheresidences,nightworkwillnot beallowed.Sincetheprojectincludesreplacementoftheexistingbridgebearingsand bearingreplacementrequiresbridgejackingwithnovehiculartrafficallowedonthe bridgewhilethebridgeiselevated,afullclosureofthebridgeisanticipatedandwillbe allowed.ABridgeClosurePeriodisdefinedasafullclosureofthebridgetovehicularand pedestriantrafficfor24Ͳhoursperday,overconsecutivedays,foranextendedperiodof time.TheContractorwillbeallowedone(1)uptotwo(2)separateBridgeClosurePeriods: thatshallnotexceed28consecutivecalendardays(1)42calendardaysin2022(RES4474) (2)60calendardaysin2023(RES4489). TheAnyBridgeClosurePeriodshallnotcoincidewiththe2022RentonRiverDays, scheduledforSaturday,July23,2022andthe2023RentonRiverDays,anticipatedfor Friday,July21,2023thruSunday,July23,2023. TheEachBridgeClosurePeriodshallbehighlightedintheProgressSchedule.The ContractorshallinformtheEngineerinwritingofthestartdatefortheeachBridge ClosurePeriod,fourteen(14)calendardaysinadvanceoftheactualstartdate.The ContractorshallnotbegintheaBridgeClosurePerioduntiltheContractorreceives authorizationfromtheEngineer. TheContractorshallinstalladvancedconstructionnotificationoftheeachBridgeClosure Period,seven(7)calendardaysinadvanceoftheactualstartdate.RefertotheAdvanced ConstructionNotificationsheetintheContractdrawingsforsignage,PCMSmessaging andplacementlocations.DuringtheeachBridgeClosurePeriod,theContractorshall provideameansforUSPS(dailymaildeliveryandpickup)andRepublicServices ChangeOrderNo.____3_____ ContractNo.:CAGͲ22Ͳ062 ContractTitle:BronsonWayBridgeͲSeismicRetrofitandPainting ProjectNo.:TED4004020Page4of6 (garbage/recycle/yardwastepickuponMondays)toaccesstoN.RiversideDr.fromBronsonWayN.ThefollowingworkactivitiesareanticipatedtooccurduringtheBridgeClosurePeriods:0.Bridgecleaningandpaintingincludinginstallationandremovalofworkplatformandcontainmentsystem.1.Elevatesuperstructuretoremoveexistingbearings,placeshearblockbearing pedestals,installelastomericpadsandlowersuperstructureontothenewbearings. 2.Removeasphaltwearingcoursefrombridgedeck. 3.Removeexistingexpansionjoints. 4.Repairconcretedeckandconcretecurbs. 5.Modifybridgedeckdraingrates. 6.Placeconcreteheadersandinstallcompressionseals. 7.Prepandcleandeck. 8.Installwaterproofmembrane. 9.OverlaybridgedeckwithHMA. 10.Placepermanentlanemarkings. WiththeexceptionoftheBridgeClosurePeriodsdescribedabove,theContractorshall maintainaminimumofthree(3)lanesoftraveloverthebridge,two(2)inthesouth/west bounddirection(towardsdowntown)andone(1)north/eastbounddirection. IftheEngineerdeterminesthatanylaneclosureisnotwarranted(e.g.duetoalackof constructionactivities,etc.),theContractorshallreͲopenthelane(s),asdirectedbythe Engineer. ReasonforChange: ThisChangeOrderdoesnotincludeasignificantchangeasdefinedinSection1Ͳ04.4sincethe characteroftheWorkdoesnotdiffermateriallyinkindornaturefromthatinvolvedorincluded intheoriginalproposedconstruction.Specifically,increasingthenumberofBridgeClosure Periods,thetotalnumberoffullbridgeclosuredays,andchangingConstructionSignsClassAto ConstructionSignsClassB,exceptfortheAdvancedConstructionNotificationsigns. Theprimarypurposeforthischangewastoaccommodatethetimerequiredforprocurementof thebridgebearingpads.OnJuly22,2022,theconstructioncontractwasfullyexecuted.On August17,2022,thefirstsubmittalwasreceivedfortheproject.Thissubmittalwasforthe elastomericbearingpadsandassociatedhardware.OnSept.8,2022,thePreͲConMeetingwas held.Atthattime,theprocurementtimefortheelastomericpadswasestimatedtobea minimumoffour(4)months,uponreviewandapprovalofthesubmittal.Thiswouldplace deliveryofthebearingsintoDecember2022orJanuary2023. ChangeOrderNo.____3_____ ContractNo.:CAGͲ22Ͳ062 ContractTitle:BronsonWayBridgeͲSeismicRetrofitandPainting ProjectNo.:TED4004020Page5of6 ThefocusatthePreͲConwasonthecleaningandpaintingportionofthework.Thesubcontractorwasreadyandavailabletocleanandpaintthebridge.Thesubcontractorrequestedafullbridgeclosuretoprovidesufficientspaceforalltheequipmentrequiredforthework.Afullclosureofthebridgewasnotoriginallyanticipatedforcleaningandpaintingandthiswasreflectedintheconstructioncontract.Giventhetimeofyear,weatherconditionswerebecomingafactorforpaintingthebridge.Thechoicewasbetweenstartingworkinfall2022tocompletethecleaningandpaintingactivitiesandthensuspendingtheremainingworkuntilspring2023;orwaituntil spring2023tostartconstruction,whenfavorableweatherconditionsreturnedafterthewinter. Choosingtheformerresultsinaneedtosetupthetemporarytrafficcontrolsignage,twotimes insteadofone.TheoriginalcontractrequiredalltemporarytrafficcontrolsignstobeClassA. ClassAsignsaretobemountedonposts.Installingandremovingsignspostsinfall2022and againinspring2023wasnotpracticalorcosteffective.ClassBsignsaretobemountedontripods orothertemporarystands. TheCitydecidedtocompletethecleaningandpaintingworkinfall2022andsuspendthe remainingworkuntilspring2023.WiththeexceptionoftheAdvancedConstructionNoticesigns shownonDrawingNo.21,allothertemporarytrafficcontrolsignsdesignatedinthecontractas ClassAwerechangedtoClassB.OnSeptember18,2022,aNoticetoProceedwasissued.On September23,2023thetemporarytrafficcontrolwasplacedandtheBronsonWayBridgewas closed.OnOctober14,2023theBronsonWayBridgewasreopeneduponcompletionofthe cleaningandpaintingactivities,thetemporarytrafficcontrolsignswereremovedandthe contractwassuspended.ThebearingsweredeliveredtothecontractorinFebruary2023.On May15,2023,thetemporarytrafficcontrolwasplacedandtheBronsonWayBridgewasclosed asecondtimetocompletetheremainingcontractwork.OnJuly12,2023,theBronsonWay Bridgewasreopenedandthetemporarytrafficcontrolsignswereremoved. AffectsDBEWork:տYesտNoցN/A(NotFHWAFunded) Materials: N/A Plans: Refertodrawingsattachedtothischangeorder. ChangeOrderNo.____3_____ ContractNo.:CAGͲ22Ͳ062 ContractTitle:BronsonWayBridgeͲSeismicRetrofitandPainting ProjectNo.:TED4004020Page6of6 EquitableAdjustment:ThisChangeorderincludeschangesasdefinedinSection1Ͳ04.4.Specifically,alteringspecifications,designsorboth.ThisChangeOrderincludesanequitableadjustmentperSection1Ͳ09.4ofthe2022WSDOT/APWAStandardSpecificationsintheunitprice(s)ofnewbiditem(s).Theunitprice(s)ofnewbiditem(s)areasfollows:x BidItemNo.3Ͳ10,CONSTRUCTIONSIGNSCLASSB,UnitPrice=$22.50perS.F. ExtensionofTime: TheTimeforCompletionisextended0WorkingDays. Sections1Ͳ04.4and1Ͳ04.5ofthe2022WSDOT/APWAStandardSpecificationsshallgovern thisChangeOrder.TheWorkofthereferencedContractismodifiedtoincludethechanges detailedherein.Thepaymentprovidedforhereinshallconstitutethecompleteandfinal settlementforallcostsoflabor,equipment,materials,overhead,profit,permitfees,andall otherclaimsthatmaybemadebytheContractorasaresultofthischange. AttachmentstothisChangeOrder: տFieldDirective տEquitableAdjustmentDetermination տDeterminationofAdditionalWorkingDays ܈Engineer’sEstimateofChangeOrderCost տEngineer’sCalculationofAdditionalWorkingDays տContractor’sQuote ܈Plans տProjectLaborList տContractor’sEquipmentListincludingratesperAGCͲWSDOTEquipmentRental Agreement տSummaryofinvoicesforrentedequipment տSummaryofinvoicesformaterials ProjectNo.:TED4004020ContractNo.:CAGͲ22Ͳ062BidItemNo. Description Quantity Unit UnitPrice EstimatedCostItemdescription Labor Hours $0.00LaborMarkup 31%$0.00EquipmentHours $0.00EquipmentMarkup 21%$0.00 Materials Estimate $0.00 MaterialsMarkup 21%$0.00 Services Estimate $0.00 ServicesMarkup 21%$0.00 Mobilization Estimate $0.00 SubcontractorWork Estimate $0.00 SubcontractorMarkup 12%,10%,7%$0.00 $0.00 10 CONSTRUCTIONSIGNSCLASSA Ͳ914 S.F. $45.00 Ͳ$41,130.00 3Ͳ10 CONSTRUCTIONSIGNSCLASSB 1,828 S.F. $22.50 $41,130.00 $0.00 Perattacheddetermination Estimate $0.00 $0.00 $0.00 EstimatedChangeOrderCost ChangeOrderNo.3 ForceAccountTotal BidItemChangeTotal CalculatedCost EstimatedChangeOrderCost EquitableAdjustment ForceAccount BidItemChange Page1of1 07/$'4$; #224'8+5+10&'5%4+26+10&4#90$;&'5+)0$;%*'%-$;241,/)4(+.'CITY OF RENTONBY:DATE:APPROVED FOR CONSTRUCTION'&4#9+0)01241,'%60156#6'#+&01'5*''601OF5748';'&$4105109#;$4+&)'Ä5'+5/+%4'641(+6#0&2#+06+0)28)'0'4#.016'56'&,55%#/%#//,5*.2Ä GENERAL NOTES7/11/202211CHANGE ORDER NO. 3 - INCREASE NO. OF BRIDGE CLOSURE DAYS ALLOWED 3/06/23THE ADVANCED CONSTRUCTION NOTICE SIGNSON DRAWING NO. 21 ARE CLASS A. ALL OTHER TEMPORARY TRAFFIC CONTROL SIGNS ARE CLASS B. 07/$'4$; #224'8+5+10&'5%4+26+10&4#90$;&'5+)0$;%*'%-$;241,/)4(+.'CITY OF RENTONBY:DATE:APPROVED FOR CONSTRUCTION'&4#9+0)01241,'%60156#6'#+&01'5*''601OF5748';'&$4105109#;$4+&)'Ä5'+5/+%4'641(+6#0&2#+06+0)28152177621641/4TYP.$'#4+0)4'2.#%'/'066'&,55%#/%#//,5*.2Ä SCALE: 1" = 1'-0"06"1' 2'SCALE: 1 1/2" = 1'-0"0 6" 12" 18"SCALE: 1" = 1'-0"06"1' 2'SCALE: 1" = 1'-0"06"1' 2'SCALE: 1 1/2" = 1'-0"0 6" 12" 18"332881/47/11/202211CHANGE ORDER NO. 3 - INCREASE NO. OF BRIDGE CLOSURE DAYS ALLOWED 3/06/23 07/$'4$; #224'8+5+10&'5%4+26+10&4#90$;&'5+)0$;%*'%-$;241,/)4(+.'CITY OF RENTONBY:DATE:APPROVED FOR CONSTRUCTION'&4#9+0)01241,'%60156#6'#+&01'5*''601OF5748';'&$4105109#;$4+&)'Ä5'+5/+%4'641(+6#0&2#+06+0)28MAXIMUM LOADSCOMPONENT UNIFORM2#+06+0)2.#0 &'6#+.56'&,55%#/%#//,5*.2Ä SCALE: 3" = 1'-0"03"6"9"SCALE: 1" = 10'-0"0 5' 10' 20'7/11/202213/06/23CHANGE ORDER NO. 3 - INCREASE NO. OF BRIDGE CLOSURE DAYS ALLOWED 1THE BRIDGE SHALL BE TEMPORARILY CLOSED TO TRAFFIC OR THE