HomeMy WebLinkAboutChange Order - 6Kyle Smith 10/30/23
CAG-22-062, CO #6-23
Approved by Cheryl Beyer via 10/24/2023 email
ChangeOrderNo.____6_____
ContractNo.:CAGͲ22Ͳ062
ContractTitle:BronsonWayBridgeͲSeismicRetrofitandPainting
ProjectNo.:TED4004020Page2of3
THECONTRACTISMODIFIEDASFOLLOWS:
DescriptionofChange:
x Revisequantityforthefollowingbiditemsinthecontract:
o BidItemNo.47,PROFILEDPLASTICLINE,RevisedQuantity=542L.F.
x Addthefollowingbiditemstothecontract:
o BidItemNo.6Ͳ47,PROFILEDPLASTICWIDELINE,
Quantity=369L.F.,UnitPrice=$17.25perL.F.
x ModifyDrawingNo.20,StripingPlan,asshownintherevisedplanattachedtothischange
order.
ReasonforChange:
ThisChangeOrderdoesnotincludeasignificantchangeasdefinedinSection1Ͳ04.4sincethe
characteroftheWorkdoesnotdiffermateriallyinkindornaturefromthatinvolvedorincluded
intheoriginalproposedconstruction.Specifically,theapplicationofprofiledplasticlane
markings.
TheoriginalcontractScheduleofPricesincludedBidItemNo.49,ProfiledPlasticLine.Forthis
biditem,paymentisbasedona4Ͳinchwidthofprofiledplasticlineappliedperfoot.Thecontract
plans(DrawingNo.20)requirednewprofiledplasticlanelinestomatchthelongitudinallane
markingpatternsthatexistedonthebridgepriortopavingthenewHMAwearingcourse.Some
oftheexistinglanemarkingswerewidelinesof8Ͳinchwidth.Thiswouldrequiretwopassesof
4Ͳinchwidthprofiledplasticlines.Theplanquantitydidnotaccountforthis.Thischangeorder
addstheWSDOTstandardbiditem,ProfiledPlasticWideLine,toaccountforthelongitudinal
widelanemarkinglinesappliedtothebridgedeck.
AffectsDBEWork:տYes܆NoցN/A(NotFHWAFunded)
Materials:
ProfiledPlasticWideLine
Plans:
Refertodrawingsattachedtothischangeorder.
ChangeOrderNo.____6_____
ContractNo.:CAGͲ22Ͳ062
ContractTitle:BronsonWayBridgeͲSeismicRetrofitandPainting
ProjectNo.:TED4004020Page3of3
EquitableAdjustment:
ThisChangeOrderincludeschangesasdefinedinSection1Ͳ04.4.Specifically,decreasing
quantitiesandalteringspecifications,designsorboth.Thischangeorderincludesanequitable
adjustmentperSection1Ͳ09.4ofthe2022WSDOT/APWAStandardSpecificationsintheunit
price(s)ofthenewbiditem(s).Theunitprice(s)ofthenewbiditem(s)areasfollows:
x BidItemNo.6Ͳ49,PROFILEDPLASTICWIDELINE,UnitPrice=$17.25perL.F.
ExtensionofTime:
TheTimeforCompletionisextended0WorkingDays.
Sections1Ͳ04.4and1Ͳ04.5ofthe2022WSDOT/APWAStandardSpecificationsshallgovern
thisChangeOrder.TheWorkofthereferencedContractismodifiedtoincludethechanges
detailedherein.Thepaymentprovidedforhereinshallconstitutethecompleteandfinal
settlementforallcostsoflabor,equipment,materials,overhead,profit,permitfees,andall
otherclaimsthatmaybemadebytheContractorasaresultofthischange.
AttachmentstothisChangeOrder:
տFieldDirective
տEquitableAdjustmentDetermination
տDeterminationofAdditionalWorkingDays
܈Engineer’sEstimateofChangeOrderCost
տEngineer’sCalculationofAdditionalWorkingDays
տContractor’sQuote
܈Plans
տProjectLaborList
տContractor’sEquipmentListincludingratesperAGCͲWSDOTEquipmentRental
Agreement
տSummaryofinvoicesforrentedequipment
տSummaryofinvoicesformaterials
ProjectNo.:TED4004020ContractNo.:CAGͲ22Ͳ062
BidItemNo. Description Quantity Unit UnitPrice EstimatedCost
Itemdescription
Labor Hours $0.00
LaborMarkup 31%$0.00
EquipmentHours $0.00
EquipmentMarkup 21%$0.00
Materials Estimate $0.00
MaterialsMarkup 21%$0.00
Services Estimate $0.00
ServicesMarkup 21%$0.00
Mobilization Estimate $0.00
SubcontractorWork Estimate $0.00
SubcontractorMarkup 12%,10%,7%$0.00
$0.00
49 PROFILEDPLASTICLINE Ͳ558 L.F. $11.25 Ͳ$6,277.50
6Ͳ49 PROFILEDPLASTICWIDELINE 369 L.F. $17.25 $6,365.25
$87.75
Perattacheddetermination Estimate $0.00
$87.75
$87.75
EstimatedChangeOrderCost ChangeOrderNo.6
ForceAccountTotal
BidItemChangeTotal
CalculatedCost
EstimatedChangeOrderCost
EquitableAdjustment
ForceAccount
BidItemChange
Page1of1
07/$'4$; #224'8+5+10&'5%4+26+10&4#90$;&'5+)0$;%*'%-$;241,/)4(+.'CITY OF RENTONBY:DATE:APPROVED FOR CONSTRUCTION'&4#9+0)01241,'%60156#6'#+&01'5*''601OF5748';'&$4105109#;$4+&)'Ä5'+5/+%4'641(+6#0&2#+06+0)28SIGNING AND STRIPING5+)0+0)#0&564+2+0)6'&,55%#/%#//,5*.2Ä
SCALE: 1" = 10'-0"0 5' 10' 20'7/11/2022WIDE SOLID LANE LINEWIDE DOTTED LANE LINEWIDE SOLID LANE LINEThe measurement for "Profiled Plastic Line" will be based on the total length of each 4-inch wide plastic line installed. No deduction will be made for the unmarked area when the marking includes a broken line such as, center line, dotted extension line, center line with no-pass line, lane line, reversible lane line, or two-way left-turn center line. The measurement for "Profiled Plastic Wide Line" will be based on the total length of each 8-inch wide plastic line installed. No deduction will be made for the unmarked area when the marking includes a broken or dotted line. 11 FT13.5 FT10 FT6 FT8.5 FT13 FT28 FT9.5 FT16 FT28.5 FT28.5 FT16 FT100 FT21 FT10 FTTYP30 FTTYP9 FTTYP3 FTTYP11CHANGE ORDER NO. 6 - ADD PROFILED PLASTIC WIDE LINE 16/30/23