Loading...
HomeMy WebLinkAboutChange Order - 6Kyle Smith 10/30/23          CAG-22-062, CO #6-23 Approved by Cheryl Beyer via 10/24/2023 email ChangeOrderNo.____6_____ ContractNo.:CAGͲ22Ͳ062 ContractTitle:BronsonWayBridgeͲSeismicRetrofitandPainting ProjectNo.:TED4004020Page2of3 THECONTRACTISMODIFIEDASFOLLOWS:  DescriptionofChange:  x Revisequantityforthefollowingbiditemsinthecontract: o BidItemNo.47,PROFILEDPLASTICLINE,RevisedQuantity=542L.F.  x Addthefollowingbiditemstothecontract: o BidItemNo.6Ͳ47,PROFILEDPLASTICWIDELINE, Quantity=369L.F.,UnitPrice=$17.25perL.F.  x ModifyDrawingNo.20,StripingPlan,asshownintherevisedplanattachedtothischange order.  ReasonforChange:  ThisChangeOrderdoesnotincludeasignificantchangeasdefinedinSection1Ͳ04.4sincethe characteroftheWorkdoesnotdiffermateriallyinkindornaturefromthatinvolvedorincluded intheoriginalproposedconstruction.Specifically,theapplicationofprofiledplasticlane markings.  TheoriginalcontractScheduleofPricesincludedBidItemNo.49,ProfiledPlasticLine.Forthis biditem,paymentisbasedona4Ͳinchwidthofprofiledplasticlineappliedperfoot.Thecontract plans(DrawingNo.20)requirednewprofiledplasticlanelinestomatchthelongitudinallane markingpatternsthatexistedonthebridgepriortopavingthenewHMAwearingcourse.Some oftheexistinglanemarkingswerewidelinesof8Ͳinchwidth.Thiswouldrequiretwopassesof 4Ͳinchwidthprofiledplasticlines.Theplanquantitydidnotaccountforthis.Thischangeorder addstheWSDOTstandardbiditem,ProfiledPlasticWideLine,toaccountforthelongitudinal widelanemarkinglinesappliedtothebridgedeck.  AffectsDBEWork:տYes܆NoցN/A(NotFHWAFunded)   Materials:  ProfiledPlasticWideLine  Plans:  Refertodrawingsattachedtothischangeorder.        ChangeOrderNo.____6_____ ContractNo.:CAGͲ22Ͳ062 ContractTitle:BronsonWayBridgeͲSeismicRetrofitandPainting ProjectNo.:TED4004020Page3of3 EquitableAdjustment:  ThisChangeOrderincludeschangesasdefinedinSection1Ͳ04.4.Specifically,decreasing quantitiesandalteringspecifications,designsorboth.Thischangeorderincludesanequitable adjustmentperSection1Ͳ09.4ofthe2022WSDOT/APWAStandardSpecificationsintheunit price(s)ofthenewbiditem(s).Theunitprice(s)ofthenewbiditem(s)areasfollows:  x BidItemNo.6Ͳ49,PROFILEDPLASTICWIDELINE,UnitPrice=$17.25perL.F.  ExtensionofTime:  TheTimeforCompletionisextended0WorkingDays.  Sections1Ͳ04.4and1Ͳ04.5ofthe2022WSDOT/APWAStandardSpecificationsshallgovern thisChangeOrder.TheWorkofthereferencedContractismodifiedtoincludethechanges detailedherein.Thepaymentprovidedforhereinshallconstitutethecompleteandfinal settlementforallcostsoflabor,equipment,materials,overhead,profit,permitfees,andall otherclaimsthatmaybemadebytheContractorasaresultofthischange.  AttachmentstothisChangeOrder:  տFieldDirective տEquitableAdjustmentDetermination տDeterminationofAdditionalWorkingDays ܈Engineer’sEstimateofChangeOrderCost տEngineer’sCalculationofAdditionalWorkingDays տContractor’sQuote ܈Plans տProjectLaborList տContractor’sEquipmentListincludingratesperAGCͲWSDOTEquipmentRental Agreement տSummaryofinvoicesforrentedequipment տSummaryofinvoicesformaterials        ProjectNo.:TED4004020ContractNo.:CAGͲ22Ͳ062 BidItemNo. Description Quantity Unit UnitPrice EstimatedCost Itemdescription  Labor Hours $0.00 LaborMarkup 31%$0.00 EquipmentHours $0.00 EquipmentMarkup 21%$0.00 Materials Estimate $0.00 MaterialsMarkup 21%$0.00 Services Estimate $0.00 ServicesMarkup 21%$0.00 Mobilization Estimate $0.00 SubcontractorWork Estimate $0.00 SubcontractorMarkup 12%,10%,7%$0.00 $0.00 49 PROFILEDPLASTICLINE Ͳ558 L.F. $11.25 Ͳ$6,277.50 6Ͳ49 PROFILEDPLASTICWIDELINE 369 L.F. $17.25 $6,365.25 $87.75 Perattacheddetermination Estimate $0.00 $87.75 $87.75                   EstimatedChangeOrderCost ChangeOrderNo.6 ForceAccountTotal BidItemChangeTotal CalculatedCost EstimatedChangeOrderCost EquitableAdjustment ForceAccount BidItemChange Page1of1       07/$'4$; #224'8+5+10&'5%4+26+10&4#90$;&'5+)0$;%*'%-$;241,/)4(+.'CITY OF RENTONBY:DATE:APPROVED FOR CONSTRUCTION&#6'&4#9+0)01241,'%60156#6'#+&01&#6'5*''601OF5748';'&$4105109#;$4+&)'Ä5'+5/+%4'641(+6#0&2#+06+0)28SIGNING AND STRIPING5+)0+0)#0&564+2+0)6'&,55%#/%#//,5*.2Ä  SCALE: 1" = 10'-0"0 5' 10' 20'7/11/2022WIDE SOLID LANE LINEWIDE DOTTED LANE LINEWIDE SOLID LANE LINEThe measurement for "Profiled Plastic Line" will be based on the total length of each 4-inch wide plastic line installed. No deduction will be made for the unmarked area when the marking includes a broken line such as, center line, dotted extension line, center line with no-pass line, lane line, reversible lane line, or two-way left-turn center line. The measurement for "Profiled Plastic Wide Line" will be based on the total length of each 8-inch wide plastic line installed. No deduction will be made for the unmarked area when the marking includes a broken or dotted line. 11 FT13.5 FT10 FT6 FT8.5 FT13 FT28 FT9.5 FT16 FT28.5 FT28.5 FT16 FT100 FT21 FT10 FTTYP30 FTTYP9 FTTYP3 FTTYP11CHANGE ORDER NO. 6 - ADD PROFILED PLASTIC WIDE LINE 16/30/23