Loading...
HomeMy WebLinkAboutChange Order - 7Kyle Smith 10/30/23             CAG-22-062, CO #7-23 Approved by Cheryl Beyer via 10/24/2023 email ChangeOrderNo.____7_____ ContractNo.:CAGͲ22Ͳ062 ContractTitle:BronsonWayBridgeͲSeismicRetrofitandPainting ProjectNo.:TED4004020Page2of3 THECONTRACTISMODIFIEDASFOLLOWS:  DescriptionofChange:  x Revisequantityforthefollowingbiditemsinthecontract: o BidItemNo.15,SEALINGEXISTINGLONGITUDINALANDTRANSVERSEJOINT, RevisedQuantity=105L.F.  x ModifyDrawingNo.15,HMAOverlayPlanandConstructionNotesasshownintherevised planattachedtothischangeorder.  x ModifyDrawingNo.17toincludenewJointSealDetailsasshownintherevisedplanattached tothischangeorder.  ReasonforChange:  ThisChangeOrderdoesnotincludeasignificantchangeasdefinedinSection1Ͳ04.4sincethe characteroftheWorkdoesnotdiffermateriallyinkindornaturefromthatinvolvedorincluded intheoriginalproposedconstruction.Specifically,cleaningandsealingexistingjoints.  TheoriginalcontractScheduleofPricesincludedBidItemNo.15,SealingExistingLongitudinal andTransverseJoint.Theoriginalplanquantitywasbaseduponlocationsandextentsidentified onDrawingNo.15.Existingsidewalkjointsadjacenttothemainpierpylonswerenotshownon DrawingNo.15orincludedintheoriginalplanquantity.ExistingverticaljointsinSpan2deck curbswerenotshownonDrawingNo.15orincludedintheoriginalplanquantity.Thischange ordermodifiestheplanstoincludeadditionallocationsanddetailsforexistingjointstobe cleanedandsealedandadjuststhebiditemquantitytoreflecttheadditionallocations.  AffectsDBEWork:տYes܆NoցN/A(NotFHWAFunded)  Materials:  SingleͲComponentPolyurethaneSealant  Plans:  Refertodrawingsattachedtothischangeorder.           ChangeOrderNo.____7_____ ContractNo.:CAGͲ22Ͳ062 ContractTitle:BronsonWayBridgeͲSeismicRetrofitandPainting ProjectNo.:TED4004020Page3of3 EquitableAdjustment:  ThisChangeOrderincludeschangesasdefinedinSection1Ͳ04.4.Specifically,increasingthe quantityofanexistingbiditem.Thischangeorderdoesnotincludeanequitableadjustmentper Section1Ͳ09.4ofthe2022WSDOT/APWAStandardSpecificationssincetheoriginalbidunitprice isbeingappliedtothequantityincrease.  ExtensionofTime:  TheTimeforCompletionisextended0WorkingDays.  Sections1Ͳ04.4and1Ͳ04.5ofthe2022WSDOT/APWAStandardSpecificationsshallgovern thisChangeOrder.TheWorkofthereferencedContractismodifiedtoincludethechanges detailedherein.Thepaymentprovidedforhereinshallconstitutethecompleteandfinal settlementforallcostsoflabor,equipment,materials,overhead,profit,permitfees,andall otherclaimsthatmaybemadebytheContractorasaresultofthischange.  AttachmentstothisChangeOrder:  տFieldDirective տEquitableAdjustmentDetermination տDeterminationofAdditionalWorkingDays ܈Engineer’sEstimateofChangeOrderCost տEngineer’sCalculationofAdditionalWorkingDays տContractor’sQuote ܈Plans տProjectLaborList տContractor’sEquipmentListincludingratesperAGCͲWSDOTEquipmentRental Agreement տSummaryofinvoicesforrentedequipment տSummaryofinvoicesformaterials           ProjectNo.:TED4004020ContractNo.:CAGͲ22Ͳ062 BidItemNo. Description Quantity Unit UnitPrice EstimatedCost Itemdescription  Labor Hours $0.00 LaborMarkup 31%$0.00 EquipmentHours $0.00 EquipmentMarkup 21%$0.00 Materials Estimate $0.00 MaterialsMarkup 21%$0.00 Services Estimate $0.00 ServicesMarkup 21%$0.00 Mobilization Estimate $0.00 SubcontractorWork Estimate $0.00 SubcontractorMarkup 12%,10%,7%$0.00 $0.00 15 SEALINGEXISTINGLONGITUDINALAND TRANSVERSEJOINT 40 L.F. $35.00 $1,400.00 $1,400.00 Perattacheddetermination Estimate $0.00 $1,400.00 $1,400.00                   EstimatedChangeOrderCost EquitableAdjustment ForceAccount BidItemChange EstimatedChangeOrderCost ChangeOrderNo.7 ForceAccountTotal BidItemChangeTotal CalculatedCost Page1of1          07/$'4$; #224'8+5+10&'5%4+26+10&4#90$;&'5+)0$;%*'%-$;241,/)4(+.'CITY OF RENTONBY:DATE:APPROVED FOR CONSTRUCTION&#6'&4#9+0)01241,'%60156#6'#+&01&#6'5*''601OF5748';'&$4105109#;$4+&)'Ä5'+5/+%4'641(+6#0&2#+06+0)28$4+&)'&'%-18'4.#;6'&,55%#/%#//,5*.2Ä  SCALE: 1" = 10'-0"0 5' 10' 20'SCALE: 1" = 10'-0"0 5' 10' 20'7/11/2022PIER 2 DOWNSTREAM PYLON99PIER 3 DOWNSTREAM PYLON99PIER 2 UPSTREAM PYLONPIER 3 UPSTREAM PYLON9BRIDGE SIDEWALK JOINT SEAL AT MAIN PIER PYLONS. SEE DETAIL 7 ON SHEET 17. 2+60.5128.00' RT2+52.1628.00' LT1CHANGE ORDER NO. 7 - ADD JOINT SEAL LOCATIONS AND DETAILS6/12/2023111111+04.1828.00' RT28.00' RT28.00' LT28.00' LT28.00' LT29.75' LT29.75' LT29.75' LT34.75' LT34.75' LT34.75' LT28.00' LT0+95.8310BRIDGE DECK CURB JOINT SEAL AT FLOOR BEAMS. SEE DETAIL 8 ON SHEET 17. 101010DECK CURB JOINTDECK CURB JOINTDECK CURB JOINT101010DECK CURB JOINTDECK CURB JOINTDECK CURB JOINT11         07/$'4$; #224'8+5+10&'5%4+26+10&4#90$;&'5+)0$;%*'%-$;241,/)4(+.'CITY OF RENTONBY:DATE:APPROVED FOR CONSTRUCTION&#6'&4#9+0)01241,'%60156#6'#+&01&#6'5*''601OF5748';'&$4105109#;$4+&)'Ä5'+5/+%4'641(+6#0&2#+06+0)28,1+065'#.&'6#+.56'&,55%#/%#//,5*.2Ä  SCALE: 3" = 1'-0"03"6"9"SCALE: 3" = 1'-0"03"6"9"SCALE: 3" = 1'-0"03"6"9"7/11/20221CHANGE ORDER NO. 7 - ADD JOINT SEAL LOCATIONS AND DETAILS6/12/2023