Minor Franchise Permit: MFP23005577
IVR Number: 23005577
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:11/02/2023Application Date:7222000173Parcel Number: 2110 SHATTUCK AVE S
Permit Type:11/16/2023Issue Date:Franchise
Permit Work Class:11/15/2024Expiration Date:Minor Utility
Job Number: 101163871Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO PARK IN ROW AND REPLACE BO POLE AT P01 (317106 165918). CREW
TO RELOCATE EXISTING OH SERVICE FROM P02 (317122 165918) TO P01. RESTORATION PER CITY OF
RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
101163871
2110 Shattuck Ave S
Tony Contreras 206-637-3648
MFP23005577
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 11/16/2023
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
SHATTUCK AVE S1111
SHATTUCK AVE S1010S 22ND PL
S 22ND CT
2110 Shattuck Ave S
Renton
WA 98055
USA
P01
W20-1ROADWORKAHEADW20-1ROADWORKAHEADRESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE
PLACE SIGNS
BOTH SIDES OF
WORK AREA
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURC
E
LLC
000
000
000
0 NO PARKINGNO-PARK FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKW20-7AW20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROAD
WORK
AHEAD W20-1STOP
STOP
N
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
Matlock Highbarger
(808) 375-4152
Matlock.Highbarger@PSE.com
1 OF 12110 Shattuck Ave S, Renton, WA
0
514129834
10/24/2023
Notes:
1. All signs and spacing to conform to the
MUTCD and City of RENTON standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 10' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place during approved work hours
as per jurisdictional requirements. (Generally
between 9 a.m. and 4 p.m. on non-arterials and
from 9 a.m. to 3 p.m. on arterials. If night time
work is approved, Night time work to take place between
_____________and ______________.)
MINIMUM TAPER LENGTH=L (FT.)
LANE
WIDTH
10
11
12
20
70
75
80
25
105
115
125
30
150
165
180
35
205
225
245
40
270
295
320
45
475
495
540
POSTED SPEED (MPH)
50
500
550
600
55
550
605
660
60
-
660
720
65
-
-
780
70
-
-
840
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
WORK AREA
CHEVRONARROW BOARD
FLAGGER
UNIFORMED
POLICE OFFICERPOLICE
STOP
POLE
TEMPORARY TRAFFIC CONTROL PLAN
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. ES2 000299Card Exp. 09/30/2027gregory.harwood@pse.com(425)424-6425
MFP23005577
2109
2105
329
335
2103
2110
2120
2130
2202
2111
2117
2115
2125
2135
323
317
2123
300 SHATTUCK AVE SSHATTUCK PL SS 22ND PL
317105-165903
15 kVA 120/240V (C)
SLAP8068
317093-165918 T0/13
25 kVA 120/240V (C)
317087-165918
X81578 (25T)
SLAG7059
317087-165902
37.5 kVA 120/240V (C)
SLAG7060
317106-165918
15 kVA 120/240V (C)
317122-165918 T0/12
15 kVA 120/240V (C)
SLAG7058
317116-165914
#4 CUCN GRA2523'
EOP
40'
ROW
795 MCM ACSRDWY
50'
ROW
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
N
Vicinity Map
47.4607, -122.2124
Owner / Developer Contact Info
officeATTN:
JASON GOODWIN
2110 SHATTUCK AVE S
RENTON, WA 98055
JASON GOODWIN 541-231-4241
OVERHEAD CIRCUIT MAP 2305E076
SCALE: 6" = 1 MILE
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
GRA-25
10/22
315.00 316.00 343.00
0.00 0.00 1.13
315.00 316.00 344.13
OH Service Retire
OH Service
OH Misc
Pole Retirement
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
108147978
101163875514264753
593252188
108147975
CABLE TV
PHONE
GAS
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
SCALE: 1" = 50'101163871THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
101163871514129834
CIRCUIT FEET ADDED: 0'
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
1786 SQ.FT
200 AMPS
GAS
7.7 KW
80A
3.0%
3.7%
JOB SITE
JOB SITE
00 1"2"
00 50'100'
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
T. CONTRERAS 206-637-3648 6/16/23
H. DAY 253-243-5816 6/16/23
H. DAY 253-243-5816 6/16/23
N/A RENTON
SHATTUCK RESIDENCE
B/O POLE & RUN OH SERVICE
2110 SHATTUCK AVE S, RENTON, WA 98055
N/A N/A
N/A 101163871
AS SHOWN 1 OF 1
KING N/A N/A CSPSKEPM
SE 19-23N-05E N/A N/A
2305E076 2305E076 2305E076SW GRA-25
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:TONY CONTRERAS
206-637-3648
TONY.CONTRERAS@PSE.COM
SITE SPECIFIC NOTES
AT P01: 317106-165918
-B/O EXISTING 40' CL-3 1968 DISTRIBUTION POLE
-INSTALL NEW 45' CL-3 DISTRIBUTION POLE W/ GROUNDS AS STAKED PER STD 6010.1000 (PD453)
-INSTALL (1) SINGLE Ø SINGLE ARM PRIMARY NEUTRAL PER STD 6031.3010 (TAP115)
-INSTALL (1) 4" RIGID CLEVIS, NEUTRAL IN COMMON POSITION 6015.1000 (INDNRC)
-EXISTING 15kVA 120/240V TRF TO REMAIN
-STUB POLE AT COMMS LEVEL
-POLE STUB TO BE REMOVED ONCE COMMS ARE TRANSFERRED
AT P02: 317122-165918
-EXISTING 70' CL-1 1963 TRANSMISSION POLE TO REMAIN
AT M01 "2110": NEW METER BASE
-INSTALL 200A METER
AT M02 "2110": EXISTING METER BASE
-EXISTING METER TO BE REMOVED
SPAN SPECIFIC NOTES
SEE SITE PLAN, ONE-LINE DRAWING & TABLES FOR REMOVALS & NEW INSTALLS
3-10
POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS
Wk
Loc
Pole Data Pole
TEL TV FIBER TRAN RMVD ID NUMBER
Grid #Length Class Year TOPPED RMVD
P01 317106-165918 40'CL-3 1968
POLE TABLE (NEW)
Work
Location
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P01 317106-165918 45'CL-3
SECONDARY CABLE REMOVAL TABLE
Work
Location Wire Size Quantity
Length
(per
conductor)
Remarks
From To
P02 M02 1/0 OH TPX 1 90'
UTILITY POLE EROSION CONTROL DETAIL
TOP VIEW
FLOWING DITCH or BODY OF WATER
SLOPE
Secure bottom of fence
with gravel bags
Place straw mulch
on disturbed areaExcavated or
Augered Hole
Pole
SLOPE
Not to scale Adjacent to flowing ditches or bodies of water
Install silt fence around
pole excavation
WIRE STRINGING
PRIMARY & SECONDARY
Location
Usage Wire Size & Type
Quantity
of wires
Length
(per wire)TotalFromTo
P01 M01 SEC 1/0 OH TPX 1 55'45'
Typical overhead service installation
TRANSFORMER
SERVICE LINE(UTILITY OWNED ANDINSTALLED)
SERVICE ENTRANCECONDUCTOR
POWER POLE
SERVICE MAST
METER SERVICE PANEL
WEATHERHEAD
SERVICE MAST GUY
MAST HEIGHT BELOW 26"
METER SURFACE MOUNTED, U-BOLTS SECURE MAST
SERVICE BRACKET
WEATHERHEAD
FLASHING
18" MIN
18" MIN
24" MAX *FLASHING IN COURSESOF SHINGLES
MINIMUM 2" x 6" INSTALLEDSOLIDLY BETWEEN RAFTERS
OR STUDS WITH HOLE
BORED FOR SNUG FIT
2" x 6" INSTALLED
SOLIDLY BETWEENRAFTERS AND AGAINST
ROOF SHEATHING
RIGID STEEL
CONDUIT
STRUCTURAL
FRAMINGAND FINISH
MATERIALS
STUD
GROUND
* ADDITIONAL SUPPORT GUYS REQUIRED FOR ATTACHMENTS GREATER
THAN 24" ABOVE ROOFLINE OR IF SERVICE LINE EXCEEDS 100' IN LENGTH
MAST HEIGHT BELOW 26"
METER SURFACE MOUNTED, GALVANIZED LAG BOLTS SECURE MAST
SERVICE BRACKET
WEATHERHEAD
FLASHING
FRONT VIEW
GALVANIZED LAG-BOLTINTO FRAMING MEMBER
HEAVY-WALLSTRUT-TYPE
CHANNEL HEAVY-WALL
STRUT-TYPECHANNEL
18" MIN24" MAX *
SERVICE DROP
DETAIL
BLOCKING BETWEENMAST AND BUILDING
5/16" U-BOLTS
2" x 6" BACKING
SHIM METER
BASE/SOCKETAND FASTEN WITH
SCREWS
FLUSHMETER
SOCKET
GROUND
RIGID STEEL
STRUCTURAL
FRAMING ANDFINISH MATERIALS
24" MAX *
SERVICE DROP
SERVICE BRACKET
FLASHING
MAST HEIGHT BELOW 26"
METER FLUSH MOUNTED
SERVICE DROP WEATHERHEAD
MINIMUM 2' x 6" BETWEEN
RAFTERS WITH HOLEBORED FOR SNUG FIT
RIGID STEEL CONDUIT
UN-GUYED SERVICE MAST DETAIL
SCALE: NONE
OVERHEAD SERVICE - SIDE VIEW
SCALE: NONE
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER
PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5
BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS.
2-129