HomeMy WebLinkAbout Castle Townhomes (C22000675) - Construction Close Out CompleteHello Yvonne,
All construction work associated with the Castle Townhomes has been completed and the City has signed off on the Construction Portion of the Civil Construction Permit on October 26,
2023.
Please note that with the sign off of this permit, your 2-year Maintenance Period begins with your maintenance period ending on October 25, 2025.
If you have any questions, please let us know.
Thank you,
Yong
YONG QI, PHD, P.E., Civil Engineer III
City of Renton | CED | Development Engineering Division
1055 S Grady Way | 6th Floor | Renton, WA 98057
Virtual Permit Center <https://rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=17625638> | Online Applications and Inspections <https://permitting.rentonwa.gov/#/home>
(425) 430-7439 | yqi@rentonwa.gov