HomeMy WebLinkAboutMFP23005547.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP23005547
IVR Number: 23005547
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:11/01/2023Application Date:7231502245Parcel Number: 225 WILLIAMS AVE S
Permit Type:11/17/2023Issue Date:Franchise
Permit Work Class:11/18/2024Expiration Date:Minor Utility
Job Number: 594157073Franchise Type:Electric
Description: Puget Sound Energy Electric. Crew to raise vault by 1" in order to match the final grade of the cities sidewalk. Crew
will brick the vault up 1" to achieve this new grade. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
594157073
Williams Ave S (from S 2nd St to S 3rd St)
11/15/23 11/25/23
Dustin Weller 2063794347
MFP23005547
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 11/17/2023
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
For Corrie Rydberg 11/1/23
BUSSTOPONE WAY
ONE WAY
S 3RD ST (SR-900)BURNETT AVE SWILLIAMS AVE SWILLIAMS AVE S11111111WELLS AVE SWELLS AVE S1111S 2ND ST (SR-900)WILLIAMS AVE S11111111WILLIAMS AVE SS 2ND ST (SR-900)WELLS AVE SONE WAY
11112020
1212
RRWILLIAMS AVE S11
12 1211111111
225
V01FROMTOTOW AWAY AREAPHONE 684-5444NAME OF FIRM XXX-XXX-XXXXNO PARKINGW20-1ROADWORKAHEADW21-5SHOULDERWORKX'≥X'≥S/W
CLOSEDR9-9S/WCLOSEDR9-9CROSS HERES/W CLOSEDAHEADR9-11CROSS HERE
S/W CLOSEDAHEAD
R9-11N
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
Jason Bisenius
425-424-7316
jason.bisenius@pse.com
1 OF 1225 WILLIAMS AVE S, RENTON, WA 98057
0
11916582
10/18/2023
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 10' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place during approved work hours
as per jurisdictional requirements. (Generally
between 9 a.m. and 4 p.m. on non-arterials and
from 9 a.m. to 3 p.m. on arterials. If night time
work is approved, Night time work to take place between
_____________and ______________.)
MINIMUM TAPER LENGTH=L (FT.)
LANE
WIDTH
10
11
12
20
70
75
80
25
105
115
125
30
150
165
180
35
205
225
245
40
270
295
320
45
475
495
540
POSTED SPEED (MPH)
50
500
550
600
55
550
605
660
60
-
660
720
65
-
-
780
70
-
-
840
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
WORK AREA
CHEVRONARROW BOARD
FLAGGER
UNIFORMED
POLICE OFFICERPOLICE
STOP
UG/BOX/VAULTVAULT
TEMPORARY TRAFFIC CONTROL PLAN
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. ES2 000299Card Exp. 09/30/2027gregory.harwood@pse.com(425)424-6425
MFP23005547
201
225 WILLIAMS AVE S
214 WILLIAMS AVE S
WILLIAMS AVE S222 WILLIAMS AVE S
201 WILLIAMS AVE S
201 WELLS AVE S
N
Vicinity Map
Renton, WA
594157073SITE PLAN
SCALE: 1" = 20'
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
No
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
DOWNTOWN CORE
STREETSCAPES - PHASE 2
RAISE VAULT LID
GENERAL SPECIFICATIONS
Scope of Work
PSE project limits: Raise vault lid to match new grade.
General
-All work is to be completed per PSE Standards & Practices. Copies of all PSE
Standards are available upon request.
-Work sites shall be kept clear of debris and all construction materials; equipment
and packing shall be removed daily.
-Return all unused and removed poles, transformers and hardware to PSE,
storeroom. All copper shall be coiled and returned the day it is removed from the
poles. Remove all unused pins and insulators.
-Return all streetlights, area lights and floodlights to Sumner yard.
Preconstruction
- Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by
permitting agency, in advance of starting work in Right-of-way involving a Permit.
- All system switching shall be approved by System Operations (425-882-4652) a
minimum of 48 hours in advance.
- Notify customers of all outages 48 hours in advance.
Work Drawings & Documents
- Field design changes shall be approved by PSE Project Manager or Engineer.
- Mark all field changes, equipment ID numbers and Underground cable information in
red on Foreman's copy of worksketch.
- Return one Foreman's copy of worksketch to Project Manager at completion of job.
- When permits are required, a copy shall be available on work site at all times.
Safety
- Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements.
- Refer to PSE standards 6275.9050 for personal protective grounding requirements.
- Refer to PSE standards 6275.9150 for vehicle grounding and barricading
requirements.
- Proper line clearances shall be taken at the beginning, and released at the end, of
each work day, or as otherwise instructed by the System Operator.
- Provide signs, barricades, and traffic control in conformance with permit regulations.
- Utilize flagging and other vehicle traffic control as necessary and in conformance with
local traffic regulations.
- Maintain traffic flow as required by permitting agency.
Erosion & Sediment Control
- Refer to PSE standards 0150.3200 for minimum requirements.
- Comply with all requirements of permitting agency.
- Installed erosion & sediment devices shall be maintained until vegetation has been
re-established or disturbed soil has been otherwise permanently stabilized.
Joint Facilities
- Coordinate with Communication Companies for transfers.
UNDERGROUND CONSTRUCTION
Excavation
-Trenching outside of the Right-of-way shall be of sufficient depth to provide a
minimum of 36” of cover for primary conductors and 24” of cover for secondary
conductors.
-Road crossings and all trenches within the Right-of-way shall be of sufficient depth
to provide a minimum of 36” of cover for all conductors or as required by the
permitting Agency.
-All conductors/conduits shall have a minimum of 3” of bed and 3” of clean sand
cover.
-No rocks larger than 6” shall be included in backfill.
-Backfill in road crossings and within the Right-of-way shall be compacted to 95%
density or as required by the permitting Agency.
-Restore all excavated areas to original condition.
- If four or more six inch conduits are installed in a trench, fluidized thermal backfill
(FTB) shall be installed around the conduits to a depth of six inches above and to
the sides of the conduit, and two inches underneath, per PSE Standard 6790.0140.
Vaults & Handholes
- Refer to PSE standard 6775.0040 “Vault and Handhole Installation”
- Vaults shall be placed level and 2” above final grade in landscaped areas and flush
with final grade when placed in hard surface areas.
- A minimum 6” bed of 5/8” crushed rock shall be placed under all vaults.
- All conduit entrances shall be grouted.
Conductors & Conduit
- Refer to PSE standard 6800.6000 “PVC Conduit Installation”.
- Unless splices are called for, or otherwise noted or approved, conduit risers shall be
plumbed directly to road crossing conduits.
- Install insulating caps on all unused primary bushings.
- All “spare” conduits shall be capped at each end.
Owner / Developer Contact Info
officeATTN:
CITY OF RENTON
1055 SOUTH GRADY WAY
RENTON, WA 98057
AMANDA ASKREN (425) 430-7369PHONE
CABLE TV
11916582 594157073
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:DUSTIN WELLER
(206) 379-4347
DUSTIN.WELLER@pse.com
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
DUSTIN WELLER (206) 379-4347 10/13/23
DAVID SANTIAGO (425) 738-8705 10/13/23
N/A N/A N/A
ALLY MELIN (360) 402-4754 10/13/23
N/A CITY OF RENTON
DOWNTOWN CORE STREETSCAPES - PHASE 2
RAISE VAULT LID
WILLIAMS AVE S (FROM S 2nd ST TO S 3rd ST)
N/A N/A
N/A 594157073
AS NOTED 1/1
King N/A N/A CSPSKEPI
T23 S17 05E N/A N/A
A2305E067 D2408E124 R2305E067 GRA-17
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
LEGEND
CONDUIT RISER
OVERHEAD TRANSFORMER
JUNCTION VAULT/JUNCTION BOX
NEW CONDUCTOR AND OR TRENCH LINE
DISCONNECT - FUSED
PULL VAULT OR SPLICE VAULT
EXISTING POLE
DOWN GUY
DISCONNECT - UNFUSED
NEW POLE
PADMOUNT TRANSFORMER
SECONDARY HANDHOLE
EXISTING CONDUCTOR TO BE REMOVED
OR ABANDONED
STREET LIGHT
TOTAL UNDERGROUND TRANSFORMER
ENERGY CUSTOMER DEMAND POINT
OR
OR
OR
OVERHEAD JUMPER CONNECTION
Vault & Equipment Table
Site Working Space Grid
Number
Vault Size
& Cover
Type & Size
Equipment
In Vault
Primary Bushings Transformer
ID Numbers
(Company ID)
MATERIAL
INFORMATION
ASBUILT INFORMATION
Foreman-CompleteLBDC
V01 EXISTING 317837
166058 577 VAULT --
SITE NOTES:
V01 (317837-166058) EXISTING
-SET VAULT TO MATCH FINAL GRADE OF WALK USING BRICK, SHIM,
AND GROUT AS NECESSARY (MID 9996191)
JOB SITE
MFP23005547
RESTORATION PER CITY OF RENTON STANDARDS