HomeMy WebLinkAboutP_Plan Set_Sunset Undergrounding_231120_v1.pdfUTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J.CHAU (253) 208-9480 6/20/22 A.PERNELL 253-289-8568 4/1/21 N/A N/A N/A A.PERNELL 253-289-8568 4/1/21 RW-130851 RENTON SUNSET GARDENS PRIMARY OH/UG CONVERSION SCH 73 2900 NE 10TH ST, RENTON, WA 98056 N/A N/A N/A 101137749 AS NOTED 1 OF 6 KING N/A N/A CSPSKEPM NW 9-23N-05E N/A N/A 2305E034 2305E040 2305E034 PRE-11 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NOTE: DEVELOPER TO PROVIDE ALL CIVIL WORK: TO AND INCLUDING EXCAVATION, BACKFILL, SHORING, TRENCH MAINTENANCE, SANDING FOR DUCT, SELECT 5/8" CRUSH FOR UNDER VAULTS, COMPACTION, ALL HARD SURFACE RESTORATION AND RELATED LANDSCAPING RESTORATION. DEVELOPER TO PROVIDE TEMPORARY EXCAVATION PLATING (IF REQUIRED). ALL CROSSING TO BE DONE PARALLEL OR PERPENDICULAR TO ROAD. STRAIGHT CROSSING ONLY. N Vicinity Map 47.5,-122.179 Owner / Developer Contact Info officeATTN: SINSET GARDENS 2900 NE 10TH ST RENTON, WA, 98056 RYAN ARP 206-285-2966 FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 108127699 N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Removal Distribution HP Svc/MSA PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" E-Mail: Cell Phone: Project Manager Contact Information: Manager:JENNY CHAU (253) 208-9480 JENNY.CHAU@PSE.COM 101137749THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Service Stubs 101137749 N/A N/A 510976403 N/A JOBSITE ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. LEGEND EXISTING PROPERTY LINE EXISTING UG RISER NEW UG RISER SVC STUB J-BOXJ NEW TRENCH LINE EXIST. 3Ø WIRE EXISTING CENTER LINE EXISTING CONDUCTOR TO BE REMOVED DISCONNECT - FUSED EXIST. 1Ø WIRE EXISTING RIGHT OF WAY PROPOSED PULL VAULTP EXISTING POLE DOWN GUY EXISTING SECONDARY SERVICE LINE DISCONNECT - UNFUSED EXISTING STREETLIGHT NEW POLE PROPOSED PADMOUNT TRANSFORMER EXISTING PADMOUNT TRANSFORMER PROPOSED TOTAL UNDERGROUND TRANSFORMER EXISTING TOTAL UNDERGROUND TRANSFORMER HANDHOLE PRIMARY METERING POINT PSE GENERAL SPECIFICATIONS General -All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards are available upon request. -Work sites shall be kept clear of debris and all construction materials; equipment and packing shall be removed daily. -Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall be coiled and returned the day it is removed from the poles. Remove all unused pins and insulators. -Return all streetlights, area lights and floodlights to Sumner yard. Pre-Construction -Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by permitting agency, in advance of starting work in Right-of-way involving a Permit. -All system switching shall be approved by System Operations (425-882-4652) a minimum of 48 hours in advance. -Notify customers of all outages 48 hours in advance. Work Drawings & Documents -PSE Project Manager or Engineer shall approve field design changes. -Mark all field changes, equipment ID numbers and Underground cable information in red on Foreman's copy of work sketch. -Return one Foreman's copy of work sketch to Project Manger at completion of job. -When permits are required, a copy of the permits shall be available on work site at all times. Safety - efer to PSE standards 6275.3000 for requirements on System Grounding -Refer to PSE standards 6275.9210, 6275.9230 and 6275.9250 for personal protective grounding requirements. -Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements. -Proper line clearances shall be taken at the beginning, and released at the end, of each workday, or as otherwise instructed by the System Operator. -Provide signs, barricades, and traffic control in conformance with permit regulations. -Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations. -Maintain traffic flow as required by permitting agency. Joint Facilities -Coordinate with Communication Companies for transfers. OVERHEAD CONSTRUCTION Poles & Structures -Poles are to be installed or relocated as staked. Unless otherwise noted, all pole location measurements are from the center of the pole. -All new poles set shall be the class indicated on the sketch, or better. Do not set a lower class pole than specified. -Install ground plate assembly on all new poles. Install Switch Ground Assembly per standard specification 6014.1000 at new gang operated switch locations. -Install grid numbers on all new and existing poles as shown on sketch. -Straighten existing poles as indicated or as necessary. -Treat all field-drilled poles with copper napthenate wood preservative. -Remove old poles after communication companies have transferred off and return to PSE storeroom. Fill and crown pole holes and restore the area similar to adjacent landscaping. Conductors & Equipment -Transfer all overhead and underground primary, secondary and service conductors and guys to new poles set, unless otherwise indicated on this sketch. -Transfer existing transformers to new poles unless otherwise indicated on this sketch. -Use stirrups to connect all overhead and underground primary taps, and all transformers. Install at all sites being worked within the scope of the project where they are currently missing. - For 12vK construction, install avian protection with #4 CU-covered jumpers (MID#9998076) and #4 SD Aluminum covered tie-wire (MID#8309760). For 34vK construction use bare wire primary jumpers with pre-formed helical-grip ties and avian protection devices when required per Std. 6015.2000. Jumpers for poles that are double dead ended with tree wire can be either the same size tree wire conductor or covered CU. -Apply grit inhibitor on all Ampact, stirrup, and dead-end connections. -Connect primary taps and transformers to same phase as existing unless otherwise shown on the drawing. -All neutral connections to be made with solid compression connectors. Connect all pole grounds to common neutral. -Use Load-interrupter cutouts (with arc shields) on all primary overheads and underground taps with fused protection above 40T. -Install Wildlife Protectors on all transformers. -If four or more six inch conduits are installed in a trench, fluidized thermal backfill (FTB) shall be installed around the conduits to a depth of six inches above and to the sides of the conduit, and two inches underneath, per PSE Standard 6790.0140. Materials -The City will provide a schedule of when vault excavation will be ready. All vaults will be delivered by the manufacture to the job site as follows: --575 and smaller with a minimum 3 days advanced notice to PSE storeroom. --5106 and larger with a minimum 5 days advanced notice to PSE storeroom. -If vault excavation is not ready when vaults are delivered, city will provide necessary equipment to install vaults. UNDERGROUND CONSTRUCTION Vault Installation -Vaults shall be installed in accordance with PSE standards 6775.0035 and 6775.0040. -All PSE vaults shall be clean and clear of construction debris with all knockouts and cover adjustments grouted to PSE satisfaction prior to PSE accepting delivery of bare conduit & vault system. Conduit Installation -All PSE conduit installations shall conform to PSE standards 6800.6000, 6800.6050, 6800.8050, and 6825.6505. -All conduits shall be routed and installed per conduit tables, installation diagrams, and details in this work sketch. -A plug shall be installed in all spare conduits. -All conduits entering PSE vaults shall be through the appropriate knockouts to ensure proper cable lay. Vault entries shall not cause cables to cross each other in the vault, or lay in the vault unevenly. -All conduits entries into PSE vault shall be straight and level with a minimum of 6' straight section outside the vault wall and 2” on conduit extending into the vault with bell ends installed. -PSE conduits shall be placed in the trench maintaining a minimum of 1-1/2” of separation. Use conduit spacers (provided by PSE) every10'. -PSE conduit runs shall be placed straight and level. If it becomes necessary to alter conduit alignments, in order to avoid other utilities, the maximum bend radius allowed is 22-1/2 degrees. Bend radius greater than 22-1/2 degrees require prior approval from PSE engineering representatives. -All PSE conduits shall be placed with the minimum separation between other utility facilities as specified in PSE standard 6790.0130. Refer to the typical utility trench cross section detail in this work sketch. -All PSE conduits shall have a minimum of 36” of cover. Cover of less than 36” is permissible on a case by case basis provided that such installations adhere to PSE standard 6790.0130 figure 2. Pre-approved by PSE engineering representatives is required. Cable Tags and Pulling -Primary Underground Cable Identification Tag installation shall conform to PSE standards 6825.6050. -Cable Pulling shall conform to PSE standards 6825.6100 and 6825.6150 RESPONSIBILITIES OF THE CITY Documentation -The city and their contractor shall attend a pre-construction meeting specifically for installation of bare duct and vault system. -Field changes shall be pre-approved by PSE or designated representative prior to construction with proof of acceptance required prior to PSE acceptance of completed duct and vault system. Safety -The city contractor shall not access energized power vaults without the assistance of PSE line workers. -The city contractor shall not expose energized power conductors (direct buried or in conduit) without the assistance of PSE line workers. Trench and Excavation -The city shall provide all trench excavation and backfill for the installation of new or modified PSE underground distribution system within the construction area. -All trench excavation shall conform to PSE standards 6790.0075, 6790.0130, 6790.0140, 6790.0250, and 6790.3050. -PSE plans show general trench alignment. They do not show specific cross sections with existing or proposed other utilities. It is the City's responsibility to install PSE facilities at necessary depths to avoid and provide required clearances to other existing or proposed utilities. -Construct the shared utility trench where the various utilities can transition in and out of the trench line in an orderly fashion without altering duct bank alignments of other utility. Separation of crossing utilities sharing the common utility trench is 6”. -Placement of other utility vaults within the trench line alignment encumbering access to PSE facilities is not allowed. - After the new underground system is installed and energized, additional excavation may be necessary to re-train existing underground cables into the new vaults. This excavation will be provided by the city with 48 hours notice. -City shall provide all surveying necessary to assure all PSE vaults are installed in the alignment location specified in this document. The city shall be responsible for establishing grade elevation for PSE vaults. Adjustment of vault lids to final grade will be the responsibility of the City. -Vault hole excavation shall be prepared level and free of debris with a minimum 6” base of crushed rock to prevent vault settling. -PSE Vaults in planter areas shall be set 2” above final grade. -PSE Conductors and equipment are energized. -PSE line Note: The city contractor will not be allowed to make vault adjustments after PSE conductors and equipment are energized. PSE line crew will perform the adjustments on a change order basis. B.O Pole Removal Misc 108148684 593252668 Fabian Gomez 8/23/23 1000 2804 2900JEFFERSON AVE NEJEFFERSON AVE NEN E 1 0 T H S T ROW 50' PRE 11 318536-166771ROW 60' 318508-166750 318533-166758 318536-166771 318547-166768 225 kVA 208V (ABC)318548-166763318528-166784 75 kVA 120/240 (B) 318505-166760 15 kVA (B) SLAH5030 ROW 50'101137749THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SITE PLAN SCALE: 1" = 50' SITE SPECIFIC NOTES AT P01: 318508-166750 ( EXISTING) -EXISTING 2017 45' CL 3 POLE TO REMAIN AT P02: 318533-166758 (EXISTING) -REMOVE DOWN GUY -REMOVE ANCHOR -REMOVE 3PH PRI NEUT SGL ARM FRAMING -REMOVE EXISTING 150 KVA OH XFMR BANK AND RETURN TO PSE YARD -REMOVE EXISTING 45' CL 3 POLE (1981) AT P03: 318536-166771 (EXISTING) -REMOVE 3PH PRI NEUT SGL ARM FRAMING -REMOVE EXISTING OVERHEAD C/O TERMINIATION -DISCONNECT EXISTING PRIMARY CABLES EHE500, EHE501 & EHE502 -REMOVE (2) 4" PRIMARY RISERS -REMOVE EXISTING 45' CL 1 POLE (1969) AT P04: 318547-166768 (EXISTING) -REMOVE 225kVA OH XFMR BANK & RETURN TO PSE YARD -REMOVE EXISTING DE FRAMING -REMOVE GUY WIRE -REMOVE EXISTING B.O POLE AT J04: 318536-166771(EXISTING) -DISCONNECT EXITING PRIMARY CABLES -REMOVE EXISTING J- BOX AT V02: 318528-166784 (EXISTING) -EXISTING VAULT & 25kVA TRF TO REMAIN POWER GENERAL NOTES - COMMERCIAL PROJECT 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. 1. 2. 3. 4. 5. 6. 7. 9. 11. 10. WIRE REMOVAL TABLE Location Wire Size & Type Quantity Length (per conductor)RemarksFromTo P01 P02 #2ACSR 3 250' P01 P02 #4/0 NEUTRAL 1 250' P02 P03 #2ACSR 3 150' P02 P03 #4/0 NEUTRAL 1 150' P03 P04 #2ACSR 3 100' P03 P04 #4/0 NEUTRAL 1 100' Total Feet #2 ACSR Removed:2250' Total Feet #4 NEUT Removed: 500' POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS SITE # POLE DATA POLE TEL TV FIBER TRAN RMVD ID NUMBER GRID #HEIGHT CLASS YEAR TOPPED RMVD P02 318533-166758 45 3 1981 P03 318548-166763 45 3 1961 Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P02 318533-166758 50kVA CIRCUIT FEET REMOVED: 500' 00 1"2" 00 50'100' UNDERGOUND CIRCUIT MAP: 2305E034 JOBSITE Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P02 318533-166758 50kVA Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P02 318533-166758 50kVA SCALE:NTS OVERHEAD CIRCUIT MAP: 2305E040 SCALE: 6" = 1 MILE JOB SITE UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J.CHAU (253) 208-9480 6/20/22 A.PERNELL 253-289-8568 4/1/21 N/A N/A N/A A.PERNELL 253-289-8568 4/1/21 RW-130851 RENTON SUNSET GARDENS PRIMARY OH/UG CONVERSION SCH 73 2900 NE 10TH ST, RENTON, WA 98056 N/A N/A N/A 101137749 AS NOTED 2 OF 6 KING N/A N/A CSPSKEPM NW 9-23N-05E N/A N/A 2305E034 2305E040 2305E034 PRE-11 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A E 50' R.O.W. CL W NOT TO SCALE CROSS SECTION - INDEX AVE NE LOOKING EAST Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P04 318547-166768 75kVA Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P02 318547-166768 75kVA Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P02 318547-166768 75kVA ABANDONED / REMOVE / REPLACED CABLE SCHEDULE CABLE NO. SAP EQUIP LOCATIONS CABLE (LF) EST EXISTING CABLE MFG. NAME EXISTING CABLE MFG. DATE CABLE REPLACED?FROM TO 3236 123846040 P03 V02 215 TOTAL 215' Fabian Gomez 8/23/23 1000 3030 2804 2900ROW 50' P R E 11 ROW 60'318538-166767ROW 50'FENCE AREA318532-166753318527-166761318548-166768225 kVA 208V (ABC)318528-166784 75 kVA (B) FIELD BEND 318527-166778150 kVA 120/240VWYE/DELTA318508-166750 SW# T90129 318505-166760 15 kVA (B) SLAH5030 318578-167413JJJTHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SITE SPECIFIC NOTES AT P01: 318508-166750 ( EXISTING) -EXISTING 2017 45' CL 3 POLE TO REMAIN -INSTALL (1) STIRRUP, BOLTED & HOT CLAMP #4-4/0 & TAP ABCØ (MID: 2254000 & 2153100) -INSTALL (1) 12kV 200AMP OH/UG TERMINATION PER STD 6043.1000 (TSU3C1F) -INSTALL (3) LB C/O ON NEW FG ARM, FUSE @ 100T (MID: 3412700) -INSTALL (1) 4" PRIMARY RISER ON NEW STANDOFF BRACKETS PER STD 6042.1000 (RIS4CSS) -INSTALL SWITCH #T90129 -INSTALL CABLE TAGS AT J01: 318527-166761 (NEW) -INST NEW 575 JBOX PER STD 6055.1030 (JBOX15L) -INST HH 4'8" X 7' X 5' W/ 2-3' SQ DOORS (MID: 7663200) -INST (3) 4-POS JBOX (MID: 7625900) -INST (8) LB ELBOWS (6041,1000, ELB10J) -INST (8) INSULATED CAPS (MID: 7630600) -INSTALL CABLE TAGS -INST GRID# AT J02: 318538-166767 (NEW) -INST NEW 575 JBOX PER STD 6055.1030 (JBOX15L) -INST HH 4'8" X 7' X 5' W/ 2-3' SQ DOORS (MID: 7663200) -INST (3) 4-POS JBOX (MID: 7625900) -INST (6) LB ELBOWS (6041,1000, ELB10J) -INST (6) INSULATED CAPS (MID: 7630600) -INSTALL CABLE TAGS -INST GRID# AT J03: 318578-167413 (NEW) -INST NEW 575 JBOX PER STD 6055.1030 (JBOX15L) -INST HH 4'8" X 7' X 5' W/ 2-3' SQ DOORS (MID: 7663200) -INST (3) 4-POS JBOX (MID: 7625900) -INST (6) LB ELBOWS (6041.1000, ELB10J) -INST (6) INSULATED CAPS (MID: 7630600) -RECONNECT EXISTING 3PH DB PRIMARY CABLE FROM J04 AT V01: 318527-166778 (NEW) -INSTALL (1) HH 4' 8" X 5' 7" W/ TWO 21" X 26" ACCESS HOLES PER STD 6045.1015 (MINIOYOD5x7) -INSTALL (1) COVER HH 4'8' X 5'6" X 6" W/ 20" X 44" ACCESS (MID 7655200) -INSTALL (1) 150kVA PADMOUNT TRF (MID:6260050) -INSTALL (3) 12KV LB ELBOWS PER STD 6041.1000 (ELB10J) -INSTALL (4) SECONDARY #2- 500KCMIL CONNECTION LUGS (MID:7651002) -INSTALL (16) MOUNTING BOLT KITS (MID:7651008) -INSTALL GRID: SITE PLAN SCALE: 1" = 50' CIRCUIT FEET ADDED: 400' 00 1"2" 00 50'100' CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: CROSSING/BORING. -OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMIT REQUIREMENTS. -CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO CONSTRUCTION. -PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION WORK IN RIGHT OF WAY. -EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY. VAULTS & WORK PITS. -REQUIRED TO PROVIDE 4' X 4' WORK PIT & AT P01,P04,P05, P06, V02 & J04 -REQUIRED TO PROVIDE 11' X 9' WORK PIT 1 CUBIC YARDS OF 6” CRUSHED ROCK AT J01 -REQUIRED TO PROVIDE 25' X 20' WORK PIT 2 CUBIC YARDS OF 6” CRUSHED ROCK AT J02 & J03 -REQUIRED TO PROVIDE 8' X 8' CRUSHED ROCK BED AT V01 GUARD POSTS. -CUSTOMER REQUIRED TO INSTALL GUARD POSTS AS SEEN ON PAGE #5 JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . Vault & Equipment Table Site Grid Number Vault Size & Cover Type & Size Equipment In Vault Primary Bushings Transformer ID Numbers (Company ID) ASBUILT INFORMATION Foreman-Complete LB DC V01 318527 166778 4' 8” X 5' 6” X 6” Matid: 7655200 PM3P15S Matid: 6258050 -- J01 318527 166761 4'8" x 7' x 5' HH Matid: 7663200 200A J-BOX Matid:7625900 3 3 J02 318538 166767 4'8" x 7' x 5' HH Matid: 7663200 200A J-BOX Matid:7625900 3 3 J03 318538 166413 4'8" x 7' x 5' HH Matid: 7663200 200A J-BOX Matid:7625900 -- PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT PRIMARY CABLE ASBUILT INFORMATION SIZE Qty LENGTH Design (ft) BENDS PULL PULL Cable LENGTH Design (ft) Cable Numbers Foreman Please Record Foreman - Complete FROM TO (in)90°45°22°11°(lbs) Rev (lbs)Size A B C Manufacturer Compound Year Actual Amount Installed (Conduit & Cable) P01 J01 4 1 230'1 1 213.58 254 3ØPRI 12KV 1/0 AL SOL 280'EJN496 EJN497 EJN498 J01 V01 4 1 60'105.6 105.6 3ØPRI 12KV 1/0 AL SOL 80'ENJ499 ENJ500 ENJ501 J01 J02 4 1 210'135.4 140.1 3ØPRI 12KV 1/0 AL SOL 220'ENJ502 ENJ503 ENJ504 J02 J03 4 1 30'36.7 36.7 3ØPRI 12KV 1/0 AL SOL 70'ENJ505 ENJ506 ENJ507 J02 P04 4 1 100'50.8 70.3 3ØPRI 12KV 1/0 AL SOL 130'ENJ508 ENJ509 ENJ510 V02 P04 2 1 80'1 75.3 80.2 1Ø 12KV 1/0 AL JKT 270' EXISTING ABH661 P01 P04 4 1 400'SPARE CONDUIT P01 P04 6 1 400'SPARE CONDUIT TOTAL 3Ø 1/0 AL JKT: (X3)860' Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P06 318548-166768 75KVA 6214250 TOTAL 4" CONDUIT: 710' SITE SPECIFIC NOTES AT IP1: DUCT INTERCEPT -INTERCEPT CONDUIT AND EXTEND 1/0 PRIMARY TO P04 AT V02: 318528-166784 (EXISTING) -EXISTING VAULT & 25kVA TRF TO REMAIN AT P04: 318547-166768 (EXISTING) -INSTALL (1) 45' CL-3 POLE W/ GROUNDS AS STAKED (6010.1000 , PD453) -INSTALL (1) 3 PH SLACK SPAN 2ACSR PER STD 6033.5010 (SSD312) -INST 11' DOUBLE CROSSARMS AS CUTOUT ARM (NW) (6011.1010, ARD2S11) -INST 11' DOUBLE CROSSARMS AS CUTOUT ARM (NW) (6011.1010, ARD2S11) -INSTALL (1) UG/OH TERMINATION PER STD 6043.1001 (UTSU3C1) -INSTALL (1) SWITCH C/O 1Ph LD INT (6022.1000) ( DLS115F) -INST STIRRUPS & HOT CLAMPS -INSTALL (1) 4" PRIMARY CONDUIT RISER ON STANDOFF BRACKET (6042.1000, RIS4CSS) -INSTALL (1) 2" PRIMARY CONDUIT RISER ON STANDOFF BRACKET (6042.1000, RIS2CSS) AT P05: 318532-166753 (NEW) -INST NEW 35' CL. 3 POLE W/ GROUNDS AS STAKED (6010.1100, PS353) -INST (1) 3" SECONDARY CONDUIT RISER ON STANDOFF BRACKET (6042.1000, RIS3CSS) -TRANSFER OVERHEAD SERVICES FROM P02 -INST GRID# AT P06: 318548-166768 (NEW) -INST NEW 55' CL-1 POLE DEEPSET 10' W/ GROUNDS AS STAKED. (6010.1000, PD551) -INSTALL (1) 3 PH SLACK SPAN 2ACSR PER STD 6033.5010 (SSD312) -INST 11' DOUBLE CROSSARMS AS CUTOUT ARM (SE) (6011.1010, ARD2S11) -INST 11' DOUBLE CROSSARMS AS CUTOUT ARM (SE) (6011.1010, ARD2S11) -INST (1) 225 kVA 120/208V OH TRF BANK (6025.3000; BNKS4C) -INST (3) L/I CUTOUT & SURGE ARRESTER, FUSE @ 40T -INST STIRRUPS & HOT CLAMPS -TRANSFER OVERHEAD SERVICES FROM P04 -INST NEW GRID# SPAN SPECIFIC NOTES: **REFER TO SITE PLAN, ONE LINE DIAGRAMS AND TABLES FOR INSTALL** POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P05 318532-166753 45 3 PSE Equip # P06 318548-166768 55'1 WIRE STRINGING PRIMARY & SECONDARY Location Pri Sec Wire Size & Type Quantity Length (per conductor) Total ActualFromTo P04 P06 XX #2ACSR 3 80'240' P04 P06 X 4/0 NEUTRAL 1 1 80' UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J.CHAU (253) 208-9480 6/20/22 A.PERNELL 253-289-8568 4/1/21 N/A N/A N/A A.PERNELL 253-289-8568 4/1/21 RW-130851 RENTON SUNSET GARDENS PRIMARY OH/UG CONVERSION SCH 73 2900 NE 10TH ST, RENTON, WA 98056 N/A N/A N/A 101137749 AS NOTED 3 OF 6 KING N/A N/A CSPSKEPM NW 9-23N-05E N/A N/A 2305E034 2305E040 2305E034 PRE-11 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P06 318548-166768 75KVA 6214250 Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P06 318548-166768 75KVA 6214250 Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: V01 318527-166778 150KVA 6260050 SERVICE RELOCATIONS AND CONVERSIONS NAME AND ADDRESS Meter Number Old Point of Delivery New Point of Delivery Service Notes 2804 NE 10TH ST U096045247 318533-166758 318532-166753 EXISTING OH SERVICE TO BE TRANSFERRED TO NEWLY INST. PSE POLE. 2806 NE 10TH ST P149158013 318533-166758 318532-166753 2808 NE 10TH ST X150897809 318533-166758 318532-166753 2809 NE SUNSET BLVD P149158014 318547-166768 318548-166768 SECONDARY CABLE & CONDUIT TABLE LOCATION CABLE CONDUIT VOLTAGE DROP VOLTAGE FLICKER ASBUILT INFORMATION SIZE LENGTH Design (ft) SIZE LENGTH Design (ft) BENDS Foreman - Complete FROM TO (1/0,4/0,350)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable) V01 P05 350 150'3 100'EXISTING SERVICE UG CABLE TO BE TRANSFERRED CABLE Old Point of Delivery New Point of Delivery Service Notes AØABE440 & BØABE441 318536-166771 318532-166753 EXISTING SERVICES @ J04 WILL BE TRANSFERRED TO J03 EXCEPT 1PH CABLE ABH661 WHICH WILL BE RE-ROUTED TO P04. CØEHY669 318536-166771 318532-166753 AØEHY670, BØEHY671 & CØEHY672 318536-166771 318532-166753 BØABH661 318548-166763 318547-166768 Fabian Gomez 8/23/23 90° R=60" 90° R=60" 1-4" SCH'L 80 CONTINUOUS PVC CONDUIT ± 200' PSE PROVIDED & CUST INSTALLED 4' X 4' WORK PIT CUSTOMER SUPPLIED 4' X 4' WORK PIT CUSTOMER SUPPLIED 1-3" SCH'L 80 CONTINUOUS PVC CONDUIT ± 120' PSE PROVIDED & CUST INSTALLED 9' X 11' WORK PIT CUSTOMER SUPPLIED BACKFILL CUSTOMER SUPPLIED 1-4" SCH'L 80 CONTINUOUS PVC CONDUIT ± 210' PSE PROVIDED & CUST INSTALLED 25' x 20' WORK PIT CUSTOMER SUPPLIED BACKFILL CUSTOMER SUPPLIED 4' X 4' WORK PIT CUSTOMER SUPPLIED 1-4" SCH'L 80 CONTINUOUS PVC CONDUIT ± 90' PSE PROVIDED & CUST INSTALLED BACKFILL CUSTOMER SUPPLIED 6' X 6' WORK PIT CUSTOMER SUPPLIED 45° 1-6" SCH'L 80 CONTINUOUS PVC CONDUIT ± 400' PSE PROVIDED & CUST INSTALLED SPARE FIELD BEND 1-4" SCH'L 80 CONTINUOUS PVC CONDUIT ± 400' PSE PROVIDED & CUST INSTALLED SPAR E 1-4" SCH'L 80 CONTINUOUS PVC CONDUIT ± 60' PSE PROVIDED & CUST INSTALLED 5' X 5' WORK PIT CUSTOMER SUPPLIED EXISTING 2" CONDUIT 1-2" SCH'L 80 CONTINUOUS PVC CONDUIT ± 60' PSE PROVIDED & CUST INSTALLED 4' X 4' WORK PIT CUSTOMER SUPPLIED 90° R=60" 90° R=60" PSE INST. 1-RUN 3Ø 1/0 UG JKT CABLE ± 230' PSE INST. 1-RUN 3Ø 1/0 UG JKT CABLE ± 220' PSE INST. 1-RUN 350 UG TPX CABLE ± 150' PSE INST. 1-RUN 3Ø 1/0 UG JKT CABLE ± 70' PSE INST. 1-RUN 3Ø 1/0 UG JKT CABLE ± 130' FIELD BEND PSE INST. 1-RUN 3Ø 1/0 UG JKT CABLE ± 80' AØEJN496 BØEJN497 CØEJN498 AØEJN499 BØEJN500 CØEJN501 AØEJN502 BØEJN503 CØEJN504 AØEJN505 BØEJN506 CØEJN507 AØEJN508 BØEJN509 CØEJN510 PSE INST. 1-RUN 1Ø 1/0 UG JKT CABLE ± 270' BØABH661 90° R=60"101137749THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SCALE: NONE CONDUIT ONE-LINE DIAGRAM SCALE: N/A CABLE ONE-LINE DIAGRAM UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J.CHAU (253) 208-9480 6/20/22 A.PERNELL 253-289-8568 4/1/21 N/A N/A N/A A.PERNELL 253-289-8568 4/1/21 RW-130851 RENTON SUNSET GARDENS PRIMARY OH/UG CONVERSION SCH 73 2900 NE 10TH ST, RENTON, WA 98056 N/A N/A N/A 101137749 AS NOTED 4 OF 6 KING N/A N/A CSPSKEPM NW 9-23N-05E N/A N/A 2305E034 2305E040 2305E034 PRE-11 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Fabian Gomez 8/23/23 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Field Face Quadrant Road Face Quadrant Climbing Space 5" Min CL Direction of Vehicular TrafficCL TOP VIEW Standoff Bracket 15" Min Length Conduit Clamp Conduit CONDUIT RISER PLACEMENT DETAIL (P05) SCALE: NONE 4'x4' Work Pit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LC Direction of Vehicular TrafficTOP VIEW Standoff Bracket 15" Min Length Conduit Clamp Conduit CONDUIT RISER PLACEMENT DETAIL (P01) SCALE: NONE 4'x4' Work Pit Cables should enter the vault so that all of the cables will lay in the same direction. TOP VIEW J- BOX CABLE ENTRY DETAIL Not to scale J-BOX B-FLY DETAIL (J02) SCALE: NONE Prop 4" UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J.CHAU (253) 208-9480 6/20/22 A.PERNELL 253-289-8568 4/1/21 N/A N/A N/A A.PERNELL 253-289-8568 4/1/21 RW-130851 RENTON SUNSET GARDENS PRIMARY OH/UG CONVERSION SCH 73 2900 NE 10TH ST, RENTON, WA 98056 N/A N/A N/A 101137749 AS NOTED 5 OF 6 KING N/A N/A CSPSKEPM NW 9-23N-05E N/A N/A 2305E034 2305E040 2305E034 PRE-11 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Field Face Quadrant Road Face Quadrant Climbing Space 5" Min CL Direction of Vehicular TrafficCL TOP VIEW Standoff Bracket 15" Min Length Conduit Clamp Conduit CONDUIT RISER PLACEMENT DETAIL (P06) SCALE: NONE 4'x4' Work Pit J-BOX B-FLY DETAIL (J03) SCALE: NONE Exist 4" Exist 4" Prop 4" Prop 4" Exist 4" Exist 4" Exist 4" GUARD POST INSTALLATION GUARD POST LOCATIONS 10' MIN. REQUIRED ROAD OR PARKING AREA GUARD POSTS 5' MIN MIN WORK SPACE 5' MAX 5' MAX 6" CONCRETE 5' MAX 5' MIN 5' MIN PAINTED YELLOW MIN 2'-6" 6" 3'-6" 6'-0" CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT The following styles of guard posts are approved for Puget Sound Energy transformers: - 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete. The concrete shall have a minimum compressive strength of 3000 psi after 28 days. The exposed portion of the post shall be painted traffic yellow. - 6 ft x 9 in. diameter precast steel-reinforced concrete post. Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA. The exposed portion of the post shall be painted traffic yellow. PAD & FRONT GUARD XFMR 3' MIN TYPICAL MIN 18"18" MIN MIN 3' LENGTH GUARD POST INSTALLATION Not to scale 0700.1600-02 EXISTING SERVICES J-BOX B-FLY DETAIL (J01) SCALE: NONE Prop 4" Prop 4" Prop 4" Prop 4" Prop 4" Prop 4" Prop 4" Prop 4" Fabian Gomez 8/23/23 COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PADMOUNT TRANSFORMER AND VAULT CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 1.5' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA Not to scale 1.5' MIN 3' MIN 3' MIN 3' MIN 10' MIN 3' MIN TOP VIEW 6'MIN VAULT LID 3'MIN 3'MIN 3'MIN ROAD SIDE (PREFERRED) FIELD SIDE (PREFERRED) TOP VIEW VAULT LID 6775.0035.02Not to scale 4'-0" 1'-0" 5'-8" 8" 7'-0" Tubes for 1" adjustable bolts ( 4) Cover 2,490 lbs Top Section 1,835 lbs Base 4,760 lbs 4'-8" (2) 3' Square Plate Doors NOTE: For Installations in pavement or sidewalks with adjustable cover SIDE VIEW TOP VIEW 9'-0" 11'-0" 2" 6'-0" 6" Crushed Rock 3-piece handhole, increase excavation Depth to 6'-6" and 24 cubic yards. 4'-8" x 7' Handhole ( 575) w/adjustable Cover MID#: 7663206 VAULT & EXCAVATION DETAIL @ J01, JO2 & J03 Not to scale 6055.1030 Excavation - 20 cubic yards CLEAR WORKING SPACE FOR J-BOX NOT TO SCALE FIELD SIDE (PREFERRED) ROAD SIDE (PREFERRED) 6' MIN 3' MIN 3' MIN 3' MIN UTILITY POLE EROSION CONTROL DETAIL TOP VIEW DRY DRAINAGE DITCH or DRY VEGETATED SITE SLOPE Place gravel bags for Sediment Trap Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Drainage ditches or Dry vegetated sites FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS. 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 TOP VIEW Excavation - 10-1/3 cubic yards SIDE VIEW Rock Crushed 6" 4'-4" 2" 8' 8' 4'-8" 3'-6" 4'-8" 6" 20" 4'-8"5'-6" 44" Not to scale 6045.5000-1 3,600 lbs 1,657 lbs VAULT & EXCAVATION DETAIL @V01 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SERVICE LINE (UTILITY OWNED) SERVICE MAST CONNECTION POINT 24' 16-1/2' 12'13' STATE HIGHWAYS STREETS, ALLEYS, COUNTY ROADS, DRIVEWAYS, AND PARKING AREAS RESIDENTIAL PROPERTY OVERHEAD SERVICE CLEARANCE DETAIL SCALE: NONE Communications Primary Power Cables or Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min 12" Min Separation 36" Min Cover 48" Max Backfill (No rocks over 10" diameter) Separation 12" Min Gas 4" Sand Bedding 32" Typical (Power, Gas, and Communications) JOINT TRENCH DETAIL Primary-Mainline Gas & Communications (NTS) Separation 12" Min 6" or 12" Min Sand Shading after Compaction - A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter. UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J.CHAU (253) 208-9480 6/20/22 A.PERNELL 253-289-8568 4/1/21 N/A N/A N/A A.PERNELL 253-289-8568 4/1/21 RW-130851 RENTON SUNSET GARDENS PRIMARY OH/UG CONVERSION SCH 73 2900 NE 10TH ST, RENTON, WA 98056 N/A N/A N/A 101137749 AS NOTED 6 OF 6 KING N/A N/A CSPSKEPM NW 9-23N-05E N/A N/A 2305E034 2305E040 2305E034 PRE-11 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SPLICE PIT DETAIL SCALE: NONE Fabian Gomez 8/23/23