Loading...
HomeMy WebLinkAboutContractDocuSign Envelope ID: 8C291ACB-0678-4C95-9137-EEC3O9A4514A AGREEMENT FOR EMERGENCY RESPONSE TO HAZARDOUS MATERIALS: LAND-BASED WORK AND DISPOSAL, INCINERATION, OR RECYCLING PURUSANT TO WASHINGTON DEPARTMENT OF ENTERPRISE SERVICES MASTER CONTRACT NO. 09321 THIS AGREEMENT, dated for reference purposes only as November 6, 2023, is by and between the City of Renton (the "City"), a Washington municipal corporation, and Clean Harbors Environmental Services, Inc. ("Consultant"), a foreign (Massachusetts) profit corporation. The City and the Consultant are referred to collectively in this Agreement as the "Parties." Once fully executed by the Parties, this Agreement is effective as of the last date signed by both parties. Whereas, the Consultant was awarded Master Contract No. 09321 ("Master Contract") by the Washington State Department of Enterprise Services ("DES") after a competitive bid process; and, Whereas, the City entered in the State Master Contracts Usage Agreement ("MCUA") No. 21725 and is therefore an Eligible Purchaser under the Master Contract; and, Whereas, the City has identified work to which the Master Contract may appropriately be applied. Now therefore, the Parties agree as follows: 1.Terms and conditions. Terms and conditions of the Master Contract at Exhibit A, are incorporated herein. 2.Scope of Work: The City will use the Consultant's expertise for emergency response for hazardous materials land-based cleanup, and related recycling, disposal and incineration as necessary (a "cleanup project"). The City's Project Manager identified in Paragraph 6 will coordinate with the Consultant to delineate the cleanup project as described in Exhibit B, and which will include: Remove all debris from the fifth (5) of ten (10) sites in the Cedar River Natural Area. 3.Prevailing Wage Rates: Contractor must comply with the State of Washington prevailing wage requirements. Contractor must file an Intent To Pay Prevailing Wage at the beginning of the project and an Affidavit of Wages Paid at the end of the project with the Washington State Department of Labor and Industries. The State of Washington prevailing wage rates applicable for this project, which is located in King County, may be found at the following website address of the Department of Labor and Industries: CAG-23-422 DocuSign Envelope ID: 8C291ACB-0678-4C95-9137-EEC3O9A4514A http://www.lni.wa.gov/TradesLicensing/PrevWage/default.asp http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/default.asp Pursuant to WAC 296-127-011, the applicable effective date for prevailing wage rates paid for the duration of this contract shall be the date the contract is executed as reflected in the "Effective Date" identified at the top of the first page of this Agreement. 4.Compensation: Compensation to Consultant for Work provided pursuant to this Agreement shall not exceed $25,000.00 (twenty-five thousand dollars) including any applicable state and local sales taxes, for the cleanup project. Compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in the Master Contract. 5.Notices: Any notice required under this Agreement will be in writing, addressed to the appropriate party at the address which appears below (as modified in writing from time to time by such party), and given personally, by registered or certified mail, return receipt requested, by facsimile or by nationally recognized overnight courier service. Time period for notices shall be deemed to have commenced upon the date of receipt, EXCEPT facsimile delivery will be deemed to have commenced on the first business day following transmission. Email and telephone may be used for purposes of administering the Agreement, but should not be used to give any formal notice required by the Agreement. CITY OF RENTON Cai If n Hunsaker, Parks and Trails Director Renton City Hall - 6th Floor 10550 South Grady Way Renton, WA 98057 Phone: {425) 430-6606 Email: CHunsaker@rentonwa.gov 6.Other Provisions: CONSULTANT Paul Van Der Bosch, VP NW 42 Longwater Drive Norwell, MA 02061 Attn: General Counsel (Urgent Contract Matter) Phone: (503) 477-2614 Email: vanderbosch.paul@vleanharbors.com A.Approval Authority. Each individual executing this Agreement on behalf of the City and Consultant represents and warrants that such individuals are duly authorized to execute and deliver this Agreement on behalf of the City or Consultant. B.General Administration and Management. The City's project manager is: Cailin Hunsaker, Director Parks & Trails. In providing Work, Consultant shall coordinate with the City's contract manager or his/her designee. PAGE20F3 DocuSign Envelope ID: 8C291ACB-0678-4C95-9137-EEC3D9A4514A C.Amendment and Modification. This Agreement may be amended only by an instrument in writing, duly executed by both Parties. D.Counterparts. The Parties may execute this Agreement in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date last signed by the Parties below. CITY OF RENTON iH:;;::yv� �t By: L578322688C8E4E2 ... Maryjane Van Cleave Interim Administrator Parks and Recreation Department 11/22/2023 I 11:19 AM PST Date Approved as to Legal Form By: _________ _ M.Patrice Kent Sr. Assistant City Attorney CONSULTANT By:/� l Paul Van Der Bosch Vice President, North West Date Template Agreement for use with this vendor through December 31, 2023 (File # 2146/NonStandard) Exhibits: A: Master Contract B: Scope of Work for Cleanup Project PAGE30F3 Approved by Patrice Kent via email 7/20/2023