Loading...
HomeMy WebLinkAboutLUA96-034 r„,ee).i Nu,Mr.o)i M/irn5 )]r• .,r r.W i,.�.h.nn•.n, ,,rn, .>t).,,1:/e r....,n•u • Bg 1 \-i I I ‘`1 1. 1 � IILLI •! I Z 8 5 < 2C gg -3 , ) E 4 .. • / / ',� tll ':Ir ill(.1� 1 � D ... Y. ' i 'i'"1.•:, ,jli::)!:ii' i'i!:ii _ ,- 9, c O • ";,i ,: ' , a I :1 I'I o • It ,i i r\'., al{htiy� 1� ,.!:I:IirTi rTa:'!-, , .,•', .I D_ ems' \t, • ' • ,,E. , , c, l I;li:il'li!• 3,,.1:'}•1 iilllT.1:1,:11:14 . 0 \ D CD y .:1—.40•0"•`I:J, . � ‘ ;''` �\-c, ap it I)1 LI _, kos ..:‘,,,,\ ,; :, 't �., : t . •r° N, I l "S : I - -0�,I . • ' v ' i't 'i '(I dilj I ill i iIPA kiii:7iiiii Cai{ifi ei i •;; k � , � ' ` ' � fl . ;. , ? ' \ ,t tr !• I,i�l •1 fi.al!i!aG! :•� i,,,1lit � iilll i•r�c'r' I,.lI Z 1 IIdI j I • s 1 9 a 1111 o _ • 1 5 L ;! !; - .• . 1aa a m 1 ! v_-, GHaV TITLE: LOCATION: a it Z P� 4, 18215 72ND AVENUE SOUTH _ NENi WA 98032 F s E C2-- 2 IOC YEAR FLOODPLAIN COMPENSATION PLAN GROUP HEALTH iA Y O 4 (206)251-6222 x �; (206)251-87821-A% RENTON, WASHINGTON 4 0 CM.ENCITmw C.LVN PWIrMIG, 'A a : Tw .. :uIVEYIN4 CZtai TU 5[TNrt6 B.C.E. JOB NO,5687 15o. SW 16TH STREET ��J�f��(y�� RELOCATE IXSTC F.H. TIPICLL LANDSCAPE L ems+ w �chBg® 11 --RELOCATE EST'C F.H. PROPOSED NEW REMOVE EXST'C MIN SETBACK n L PROPOSED NEW CURB C5? CURB CUT PROPOSED NEW REMOVE E%S'C Ge.c fda a6Acay.mYOA70ao2a CURB CUT N B9'26.29°C 1JJB NEW 6'CONC SIDEWALK _CURB CUT CURB CUT 9�'0®TWA.M�ma:.w mmARID�� toeml F4 m - I JO/I_ —_ rywnor-iAvnst RAAR saes( 30' NEW CeNC SIDEWALK mssT�r d4.GYSQ ( ) T^./. • J.w'f sly` s4: --er..r. _'� .:.�.s.�w,,,,, �. r - - _ H�RI:m•0__'I --RELOCATE E%ST'C F.H. } + RELOCATE a T'C a�0 S=3: 2!03C — RE N B9-26.29'E j , -.t.. (�-�Ft`� f P] m 011" 54.9T 1 _a`'/ � NEW LANDSCAPING TYP Itrtrt>>,,��9 fi TYPIWL PARKING 1F pex 1 e ', 15 m• NEW AC PAVING Y"s� a P'i thwB'-t12' A'I td+:•= =n^�(- _ STALL 9'%20' v —W„di CO.OUTSIDE ww.-ro -_ FAPNG AREA I• •''64' m • J I CONC OUTSIDE J — ° i •— EATING AREA 1 EISPC SIDEWALK 1'�u"]I / — o EXISTING BUILDING /V _ . 3 1- 1 85,000 SF _ ` - Il u\:),.\\. /IFj s REMOVE IXST'C FH • __ L_ \ REMOVE IXST•G 1—V V l5' "Z5" m Ipp — • — D CURB CUT 5320; 42'9;2. 0' re.a BUILDING A �� .-_ --_ _ CND 126,000 SF — r1 'J'\ tv 100' CT u •, DEMO �'BtDGS —\m / -------\ CURB C OPAfSDALE DEDICATION TO CITY -��JJ / CURB CUT LINE FOR NO BLOC ZONE Pam'£' - -e- _ REMOVE EKSFG PAN. L- ? —'Y Ec CO o A• (_ - X • Z Si, (---- _ _ ▪ z /y\//,//��/,��\��/�/ SITE PLAN £ 1. 6 BUILDING 0 ':I I V V y, 208.000 SF ' 11/ � \ Ti„,,,,,„II' tt] (�NEW LEGAL DESCRIPTION: C. cuRe CUT a L24: CAMPSTER ECYCLE AREA L W/6'FEN E&GATE —— ALL OF VACATED BLOCKS 32.33 AND 34 OF C.D.HILLMAN'S EARLINGTON GARDENS '�\ p — RECORDED N TO THE CITY OF SEATLE,ON.1,ACCORDING TO THE PLAT THEREOF. y�� `� \'I PROPOSED G�LgnyiJ a^+y . RECORDED IN VOLUME 17 OF PLATS,PAGE(5)ld,IN KING COUNTY,WASHINGTON: �S� 'I I i_ TOGETHER WITH VACATED KENNY AVENUE(82ND AVENUE SOUTH)AUG VACATED L�8%\ a _� 72:9,63• �f( TL 11F(�� EVANS AVENUE(83RD AVENUE SOUTH)ADJOINING, , DV 75TER�REC :AREA • _ E EXCEPTING FROM ALL OF THE FOREGOING ANY PORTION THEREOF LYING EASTERLY OF A la Wig FEN E& —— UNE 40 FEET WEST OF AND PARALLEL WITH THE FAST UNE OF SECTION 24,TOWNSHIP arcu Lam) .23 NORTH,RANGE 4 FAST,WILWAETTE MERIDIAN,IN KING COUNTY,WASHINGTON:AND �`20°,38. \ C EXCEPT THAT PORTION THEREOF CONVEYED TO THE CIN OF RENTON FOR STREET BY N]9'28.11 %jy !ll;;; r- DEED RECORDED UNDER RECORDING NUMBER 1812060683;AND <'� EXCEPT THAT PORTION THEREOF CONVEYED TO THE CRY OF RENTON BY DEED \e a ! — "' RECORDED UNDER RECORDING NUMBER 8911030809. SEE ELEVAPONS DWGS FOR EXTERIOR UGHRNC m— uv 41 / erc STATISTICS: \\ =l ) IR-STrat,We. ZONE: CO ", I I -20' SITE AREA 22.4 ACRES • _ \° — _ um t IXST'S F.N. IMPERVIOUS ARE% 18.0 ACRES CITY OF RENTON PERVIOUS AREA: 4.4 ACRES RECEIVED \ A/ , S11 SF LOT COVERAGE: 43S L`~- 000UPANCY: S-1,B CONSTRUCTION TYPE: V-N SPRINKLEREO ' BUILDING AREA: \ 1]R9'=IOR' Al11R9'=99' ITrR9'=RO' BUILDING A: 126,000 5F \ I NEW IIIJIiIUI II�IIIfIIIiIi�IIUIIIIi GDRB°°' BUILDING B: 29},D00 SF J((� Q /1\RM. 2/WO4 TOTAL BUILDING ED: 419,000 SF • MAY 0 8 1996 \ r) I RYE PUN TURMRYTL 1/13/96 PARKING REQUIRED: 7 WAREHOCTURING 1/1000 2\\A V 6100 REVISION 4/17/96 WAREHOUSE: 1/1500 • sPR r;O6RpttK/OVSIuIE REwtwRar REV s/]/96 OFFCE: 3/1000 - MANUFACTURING 111.000 50.FT.: 111 STALLS b UP\ j.\ - r-- 1 WAREHOUSE 00 SO. T.:FT.: 393 STALLS BUILDING DIVISION `-•�\ [�1 OFFlCE 131,000 S0.FT.: }g3 STALLS TOTAL PARKING REQUIRED: 622 STALLS t I £ ,' PARKING PROVIDED: a!a" it MANUIIOUSE NG 111.000 SO FT.: 112 STALLS E WAREHOUSE 177,000 SO.FT.: 119 STALLS .-OFFICE 131.000 SO.FT.: 393 STALLS —6 TOTAL PARKING PROVIDED: 624 STALLS _ WILD LIFE LANDSCAPE REO'D. 915,144•.02=19,515 SF / �--.->__�� - x• M PROVIDED: 60,000 SF {1 ` PARKING AREA lo: bFtro: PARKING LANDSCAPE AREA REO'D: }51,J68•.05=1],568 SF _ PARKING LANDSCAPE AREA PROVIDED: 3],200 SF ) V SW 19TH STREET VICINITY MAC: (NOT OPEN) / 8,�,�: A a 1 de. 2 e,5ss . . • \... • . • - . • ' •. •. . - . • . . . . ••••- i e- •_ . . • . • . . . : • I ' i. , • _ . . . . .-.7 ,. • . • . ..,... , , -.,--„,,„ . ,.._.,_...„.„......,,,a roinittact s- • • . ' . :: i,..__C4H.- 7 zi•-::i ''' . . `:f...‘,',: nnarac...on tanawn.ftr.",...• • , . ; ,4 siii. 1311i clawaicar rave.n awn.200 -.--w..- ..----a: ' , ' I • " . ; ; , , 11111 -, ---- : / / • • 0 . • , i i , 1 1 ! % ...- r.AINii. waft...,wa aeloa(100328.6-4,64 . :•/--.0- r , , ,,,,_ -..,.. .. . ,..,,,. .0,,, ,..,.....,..., ),rids `r-{:Aar• •72 jALEXr.rtr.4-*.cli_....--., .. k). .Mikh,_ / • • V.•,.--.-.7. :,__r! ,7.;:7,7r-2:-.1.:1-frt‘Vr.a.j1.r.."..L...=^4. ,„ - ( .-.- •-• - - • . ."-.1,"4*-`3.7-t,17,17.-":":::';Ziltrl : Z / rt."... • . ..: 5'.........: - ../ ,. . •_..!: --_-._ GA. - • ••• . _••• •• ..•.: _ , ----.. I-•,..-t. . . . _ -v---.-•, e :•• ,....\_„, , ;----, . CgEE.(.)r.,..• . • • ii ''..1- "..7/ ',/.:•:• ,-7-:i";--TZ7.E"'• - 1 • ..,-.--_----,-....y.•--- 0" .: . • -- consultants _ 7---- --\ e ,.:, • 1 :Ff;',._.;::'....:...l.:::':.-',-l': l ' irrt:LoNer ' ;•-)€79" •• -(— . • r .----.-0.- .. ...I:S."-- 7-4: . •• " R. - ,----1=d=:..'1 T'' . .„ 1 - I- " I . — 1,--.• . ...r.z7,,, 10 - --4:1 r I , .....ratT, li, -- ----* ! --E• AilfRit• • 1.--_- ---- •• . . . r, ,..,......,..-___ :.-.;_7:06...-i_e !' • .c.___ --- li.. i `-'?, ---- . "-: :',1:*•• ' ' . ' (0 •--ta 1 rn: -i I ' 2 ...* - .......„,, 6- :-.. ,,,,... e,J ga-- -r-Am . - .• 1' '77 7' 4.....-_,. ;. ---,-.... •ft:,7 li , 7. r ••,..1 -... , . . •. • • •..Lc....1.) ---- I.:i 4114 ! ,: 1,..N.- ..-1-•-•i '-.---;-' . : ' ' C . • . 1. .'-- ; •-Z7Ct-O',. . i&M,- 4' --''• ' ' . .-- - • - , project title: . : l iik:, , .:•, . . .... *13-C122:1 "u- ,- .— 1 Ait4E1- , •,-., ne •• • • ..-C) . .. •: Isk.:6. , . i gIgor• - MI , . , . : . 1 ' •-1! . • 9..7_,., . . A • 1---4,r--1 :1• ,,1 .• ...4 i L_...... ' ,;- I•r-1 ..."' " : i ; l • ! la 1 'r , -.; .- ;.e..: : ; ; • ' • 1 ' ' • I I 1 I ; .4- . 1-1, ' I 1 I ; 1 r 1 ; ; " e i • •I 1'; .•I I, • -7-• •i• .,•:,-1 • , , ' . ' ' '. ' • ' • 4.i•s-0 1 !. ' .: " • __.' :la I 1 I " i ' ' Itt,' I -' 11%. AA au: ;4=161;106.**--14it-- dit.,,.. itkf., 7(.-ii•, i iso ot; -z---71:-.rW(M. -‘4`.4v 4)' .'..;:t.;•4 ..; • i — _ Ath.ntrAL12"..attetir_.11-dite..a.,.*"- . ' ( `--- =. 1 s 'La.-. 1 •:,-. •• 1 CREEK(CHaal) - . ‘,...., , / SIEWOR,WA , ' NEW CONC SIDEWALK ------ - ________._._. ,•_ -----•--- • --- ---- sheet title: . :;;;;,*q„igr'1;ld 4.9- P.a.'1,',01\ID .A VEN Li= S.W. "i.11).!.1.,"etei • - Li.F.D",..C.S.PE ft:x.5i • (84.-H A VEi:IJE SOUTH) I I ,. •4- :s,-n.. F4-.4 SW9."..,.- .,,,•1., . . . : 1 . - . n.,reVieleit,' lob nc. eneel no -.-% \s,LANDSCAPE PLAN'. /I-----7 . • -ci•WZ.,---.;,-;,/,...,--,----- • - • • \--,'--"' . . • . . _ - • ' • . . � Il / • CITY OF RENON - IM `�: CO T . t ZONING MAP �-� °;1-- INI\\4.. C) N C. v LEGEND ,I > n Resource Coneerrallon VC7 . P-1 - 09 >�� • ¢ 14¢ IM EaSingle Family Low Density N CO O n Single Famll) IMD S C`\ n Trailer(Slagle Family) n Mixed RealdeoUal / n Planned Neighborhood Residential. \ e/ K-I Multi-Family:Mill _ i 111\11 `,i K-U MuIU-Family Urban Center l n Multi-Family Community Center , v sw �- •+�' �'0 K-N )(WU-Famil)CommNeighborhood Cealdr lio7 -„„le. 7 . • n Industrial - Light nIndustrial - Medium '/yO l (,J Iaduslrlal - Ata7 -- 7 '///�I�S�MOO ' ~ n ''411111111111) �ij l� n Wised Commercial` y i 1 n Commercial Office � 10 10. • � n MaJor Educational Inetitutlon / �r/j�,/�/�� � '1- n Major Medical Inalllutloa / - •./!/ys�' . z r n ArL.rl.t t:emmerel+l iff . �i _J f C■ Community Commercial Neighborhood Commercial nConvenience Commercial 1(110 vet i Planned Office/Reaidrnllal ■� CO I J • n Public Us r . Renton City Limits a/ 0 600 1200 r tit) I 1:7200 j • '.t, LONG RANGE PLANNING i + s _+ P/li/PW TECHNICAL SERVICES 1I PAGE � I � � 09/30/93 �� i I - 1. 0 4324 4325 ' 1 ��96 DE�/ELO I�i�id r r3LkNNliqG CiTYOF RENTOiy '. . . . . . • . . . . . ' . • 4. • • • ' . . '. . . . .... • r,---N--•\ - • . . It l'.i aue• ir....--•G 0 architects • 7 2,1j.3.1"2.. 2.1. I- 36' , _.6._ •, 36' ';16. sa' ...4• ._ .8' . <a' 4_ 49' .4.. 443. 4_ ...B. .4_ .NS• ! <X i .,.e., ;--- <6. — 48' •71' .,•,-.............n.......,..ardslincle ---.--- 4.. -- 1310 dnatnr mve.n mune 200 ! . [ —Fr- ' - • . oe..me.WA.2.02(2.3)263-47.4 1 NI ---- - ' . . , . : . !. : • I i ; p 7,• P 0 F- P . • F..2:: .-..:.-..-...,,.,..,,rr...-..,....-,,.t 7,,-:T.:-.....;, LI , OFFIFE . , . , • .....................n............er.....Z..........2....,:4 ,1 . . . . • , •, , ,T. , .,..;.,--,„--..:.,-..,..........--.... n 1 . • . . . 1 I I . - . .. . ... .. 7- . 7 _ 7 - -i--+- --1-t---- t— : . — — • . . . . : - • : I --.....\--1,—... • • • , F•4 _.... .. . _._ _._. ._. .. _ ...• _ . ._ 1 -- .,.., ..c.__:_.,__1....... 1 i • , -• • •. , ,. Na.EhOUSE . i .., •I ; ' _ .--. — . -. - consultants ,__. L i - L I • r• • • • i . , _ • : 1 . . .t , . 71 ;1 1 OM.CE . •--I i 1 - 1.-•, :- , 1 , . . VANUFAC7UR NG I ....i I 1. •-•-,i 1,1 . I 4.4f-• •;:1?.11 I i , , ! • , I Ii .,,.i 41 .: ' •• . ! , . . . : I . I .• • I I ' i i 1 _ __. . , . 1 ---t-1- T— ------- . . . . • • -I -, •.• • , • I I : b: in l -, r i .',1: • • , 1. . • • : . . : • . ; ,.' i , r Li . ! El, : projecttile CFFICE .. . . . I i i i __ , • . • I . i L i I ne-ne.t.,"si.a.ceta KA: i I 4; i • .,,0•,:.••iirvci:71.81-leT,Tm 1 1 , , . 1 . • . • 'i 1 • _ .. ._ . . , • i t— • - Tte. :,4.10,2E,770,1 FOA ZISFARaff.CO,APAio^f • .'7, I I , i • • • ' 1 : , i 1.I I ' I . . . , • 1 .`3'li 1 ' . 1---1 •- i. 1 ' { I. , 0 : : . ,,, .1-1 . hm — -- ---- • --- ---- ----1 -L-1- . I ! . . i I •I 1-----1:10..i57.,Er.,ALDNG i, . I I . . I I , • 1 70?•1 Wit • -----.— • I i aheet title: H? .1._ ±..._+_- 16B• I ..,_.1 I._ ' . 376. • i-- i 18' : ___ ,32• , i i • . . 'z...,s_pa..•..2_41-_••.?.a...L___- - . t • . . - . G_ _l_______________.•r____FLOOR PLAN BUILDING B --J— SCALE 1/ ..1. no,1 revid.on, pftta, }Ob ra 3.0160 • . . • . •. —7 A.- d•te• ,-).-44 . . . 7 !(11j1,rt'rf.,':/) "r$,' V6v� '`/,.,' ,// V �/• � • /. JJ•_ I1: (_,— i -\i; •I _ ,.;(1 1 -i 1. , - )••,,,,:i i: !1i i :I. ' im l' '• / lj 1 I! t • a,,,,1, �'.J 1 1 eF ,.fir ,_ /,: _ jo i•-. ,1 pp _� , DJ - // _ --. I -pp , � ...' o D -') . - >�_ m �H( - e 1, i II o g VI,,I1111, • " " x,. • ,` I . Z �111 ;IIIII�• -A4 11 '' k II •� '! ll --u9 f 1 � �� �• ' I 1...� llr rI'• • :,r.. 1 _c, III yi - ��., '�'I6 I ,, ...._'�►='a.l'"�1 ' I ; i,;i ,.;; j ' Jll �l (T,i 1' p i ,:,.V. j-r-r 1... .I.; 1 I , I I qv, I-I' • I l 1lr •i •. 1 a- I I I toI ILE I-.. - :_. 7'' Jti 1 v _- LI I .. - .. ,,, I .—may__SD`_: .=i.- '9'- .. _ss— s'�_�—: • —IS,: �___e___. y _�_ __RANCE4 EAST___..•'sn]c:��;___.� i __.—__.____._.___.__ire._ _.x._ T__ C ,.,o•. a ',u 'k•,-,:.a,'rl„._T,'::.:;_..__N 0 I N,Y `tat. - i k IS ? i cm _ a HA TITLE: LOCATION: 2 p Z �G V0 18215 72ND AVENUE SOUIN P N,ty KElT,WA 98032 PRELIMINARY GRADING AND UTILITY PLAN w i o m (206)2m-6222 GROUP HEALTH a u (206)251-8782 FAX • RENTON, -WASHINGTON A G• i 1 ><rc`qt., 0, SUNN.Y0,C.EFIMRONYL`(VL SER/CES ' B.C.E. JOB N .5687 '' ' . . . . .. . • • 111, •• - . t • • , • •• • .. . •• • • i s i .., t - , • - f :. ..1 z.L.. ;. ' •• ' '''''' ' .111 L. ' ••• "• 1T...I.-.---..-iY-•,.;, f...:4 . , . ,- ... .: r---1-.- , -.1,:i.• !. .1:., 1 ....,:!•1.1-::k ; ' • 1 ' -‘,- .. •I • 0 •!•;. : ..3....• '.'.1.----.••• ,'I P•: r, . .:.'1 -;,:.:i•' 1--,••••7,1 i B i4 1 I '" 1.,•1'.• .1••`' :;•'-'-'41 . 10. 7 ,. ._ L •j•e•..••''f•v, 'II. t I - •---1.''----l••'.4f_•-',..•••;•;1 ,C-I 1,1 •'-ir;ii • ' . \ i ' i i'••' .'• •• 4 ?i ••:if r, 11-,,Q,, ••.i 1 .• . . , i• :';''-: •.•i).•..:.! -. ---• ••f 'I::: ::','-'i/.:1 • -:- ...I'll', •. 1 . , ..,.....: )•,-, .: . ',:l1r":?••'. ' ' ; i ' :::4 'i. '.,.:112'•,.,' '1 .;,Q 4..,ziji,./ ., ., ..., t,, ( I v er', .,,i•. • . g 1.‘, ,,,,,yi4; .„ ... _ (.,..;:: % .,I.' '. 7 Li I G,...,..• , n !: I. §I.;:'I • .;li. - T .. ;.- 12..4 - ' ':' !::'. .F 1'•."•;:•.1,:: • • :':';;:vi '; :• ,. :1 I.. :': ,ii ,. . '• :-•: ' .1 :I ir-- •• :-..,::AT,i ;; ,- -,rli r.;-'• ,•- •'''?(.1;•1 4 6 ' .. ;•:.•,1 1 , i , y. 1) i : --:1 Z • , '1 •V"; I ' • 0 I: 1 I . I, .• , . .. ' •:,:: .: _-- 4, 4 a: . I : I .1A' 1! 1 ...•! .1 i . . .......--,-,:•• '!• 1 .' , • ••'! •1 1 •.1 I a) ,, ,4 1 • Pi.. I• -?.',Tr:. i- •i I "-41 • , : •-,,, :•.•.1 1 E) II -< •1-?•ic4,- .. .4;:•••''• Y . n•,..:2 -,,, ••" 0 • 1 j \ " • •• 4 ' •• ;I i:, .; ,•- • . 4,•P ---: - 4.1 ' ; •._...0 • ik: 1.; ..,j,•• ' ..';I.-. I I. '1 I DO t I! I. •I: • f',' !: •2 ' 1 :2'. •11 -11 '1'1 1 I > ,..-i3E: 1 t ,., t t , • 2:••••••.:4;! ,-. ' ,- , i i! .•,. ''.- - -:!! /' 1;'k! " ' T • , ::11 .4 . ,!tA,..t.... ..),: ,„ ; 1 i'.. i !,...,,..1.,,- , . !ill 1 ..,';',..: :\..:,),.;.:, •.,.':.:,. i,..,L-c.i I -.1.,. z 4,1, . , .: ........b .. :t.,,, i ....,"..• ..Ii,. ...... ,.. . ,2 1* I ,.i. .. 0 . .. ..-i:7, !. .: . : !F % ....4 .2!, : .1...,..::.!v. il -. r 11-11 „ .. ,-•., 1, . . . 1 ,. . ›. gi f;•-.... ,\ i4,-, '1 . !::: ..; ..: .' l'•\•::- ••,•:',.': i Ell.--• • 1 ,. Z .4.-; ... -1-- 4-,t- •--;',..- \,.:•--1 ...• ' . 1 • -'-"1.--i• t: I •.:-• Cil ill-'''''''4."."). ,_. .....----t • 1 1.\ -/1..-!;;I:, - , •,:t.f.:•:..-.• .'• • - -I ...1' .; ;I.V.I ,..,/,,,,;.•-r : 1 -'-' 1'I' / g'• - ' ,:Elc;;.•1.r..;.' ' .1 t; . C , -, •,....,,..1,, _,..--,--, ,_ !„,• „ .,•, ,/,.• jf!..62:14.41.:!..101,,,•41-(0,I1,,,o._i ii.1,• ,1 •1.$-•IA I-I::,f 1,:,,1-,!,, ., /, ,.r..,..".4 i.-i--/!A,.,. ,..v....I-I.-FT:4,, Fli...i! \:.,•!,.1 II i -h 1.. .,1 LI !`'t_,-:(:.t,:f ..\:,1 4111.1 r- _4— ‘,,..1 . 1 I ; 4;A:-.. L.; r ,s, .,, , i .4 •I 1 .6, - ,4 .,,,, 14„,,,,, , I • I • , : •,.. •, i ,,.. •' ;,. I 41 -.1',-I- • —•.-I--'"......"7".''----t- :1------•••••—•7-'... .r:-.,...,,i ,'1, ; r4 . • .-. ...) • • • ';,.... . it:.-.-1•7 1 .°1.: 1 , i ,• . ,•1 9 ";, ' ,t '\ • . '-•-. ". •. 1.':,,., ; t; • ,.1...,-1,..7 ..... . c., .3,1::1. ,,. ,i -1.-. ''.: '' . ' "..' Pj:" 11 TI l `j'''.1-.1_j ti 111;11 1. 1:.'' I l'r • "i• ''''' !"''''''' '' •'—':"-- '0 \ '" ,"'•I "I ', ; ! L.7,';.1.1, —,i .._L 1:41 1 ' i• z. r— . ,,4_;,-&--...,.../4 i.__...---,i L.: -.f..v • • -:_-____.. , • ..,i i ::,-,,..,1 1 I . .,,ii.5... • ,,,: . :--..i .. q.',.....t...,....0..,_6.4.-...,,,t,..._..,:•--.-----. - • • • . - • ' . :I' :'-, v ..- :•F-.3.'-'----------:1---i;.•-_- :447.-_-•- •.-0------_:••.--:=T- ,,.....i-.-. ..:-:-:--,_-• ;-, -S-7e-:'i-s-i—';E----4--7--L.--'"- -L4L'4::4;:ir.-.i.; L - • -- Z g----..'' .1 ,L-14..., '\. •17----T-'-- 4,- - , T-- ...._,:_._-_,E-..=:Ns-.==.;',.*—,,,s----..,-7,4.- 7;1----(:) —is--f---.,--- --.:.,-,--T--.-...14-._,,,-----7—.ss . .....------7----7' . 'I'. '-.. '.,.. ''y,,; , . + ---,,-;aci•958'..e---118-2--t---r -------1-,]... n :.:..;.,.,•••: • • ... ,' • .1...,----•r'"-• .•, ''. c'.---,---.0i - , 1 29•': 1:2 s ' ...•V ;1,1'. '.;.::''',1';....:K.: . ,12 I': 1. ! 141.'41:1::1. .r4 ....•:':•' 11 !:••:'. :'''.' • , 1 1 11i1.-11,1, 1 • 1 • • . .. . .. . . . .. e .• 11111 ' . • . • • 1 1 ti -, ...: 0, j 4.,,, 4°,•,- i • ,s,..,-1 ,01440.., TITLE: LOCATION: f . a- .- ..1, 18215 72ND AVENUE SOUD1 N (206)251-6222 g 1 z r „t‘,, KENT WA 98032 PREUMINARY GRADING AND LfT1LITY PLAN £ £2- - 2 GROUP HEALTH 0 ..,.• •. .. (206)251-8782 FAX • RENTON, WASHINGTON 4:.• I • i : .t?. NGINCERING,WM IONNING, 'Oto pne,•••„ Cr.Cr.SUMING,DIVINONVENTN.SMICLS B.C.E. JOB NO.5687 • • • . .... . • . , . . • . . . . .• • . P',J1)1, iq rig Lr . . .. .. . . . . . ... Co q7.1 i., AY 11.2. .1!,,, , :,... ,,,.-.•,.,--„:i.•,------_•.f-_.A:-r.,_,.•.,-::,-o--••....--------tq...,,,.l. i . ... ,,- ----:,,,-....,,,,;,,,,,,.,-----77.----,-..,•-_,-,...-_,,4v, , -..-. .,...k-_,........,,,-,7-.:-.„..--;-7••••.`-i'....:3•'<••=,....,'....• ;'l't.'-• I • . . 17:. cs*,..1•91,":`•.-;.•..'•'';',•,;-•:----• ,;V. *...._:°c9.ala.:.g1-°t.....". • ::',..:";,I If iit , cl, F',c):,',..4.,:::.••••'' /... ,. ....,•,..•--NJ._,...= .. 1;4 .. '!'..!;!..:!'l i';;''-'1,' •-.' :',i :.• rt,• ...- --,e, : ;4-•. .:!! '..:•! -i—<;' ,--- . • "4'I 1. C'' '.....' . .K,- ..-.;;;<..• -(---(-\----- : . •,,,._._ , ••• ..,. 1- - :,,,-.), . - . DO . •1 ,..,,---)-'1'1,1:1-1.°7•,',1, . :, ,•1:-.'•••ki.. ... ., i, . 7,7:------. __.,..., ..---, ..1".. ,,e,.•..,,',' •: .. I • .1.- r_M E i je j.,1);''' ..,.,-'•-• j kj 1 ' , ji I 1 If-,1 . 1:',, i • ; H 111 I 1;,:i I III I .1•••1.1 I I . :,,• • I" ; .• '-!!!( P ' (, !..' ! •• I ..- >:'i.• ,, .. • vo •• .•• , 1.'...',1' !?: ! I 1 _ Ri .1, %, ---.--•..:-.`,..,;- cr . Z IS'O' ,':":"..•:" ." --" , .r ' ..., ----4''= •—•—,.... - ''''--• ' •,'7.;r- :I—g-11 '. • ; 1,1 •- • I > i .> •;'.';, ,•,, ,- _, ,-- e * ,,,,,,---..,,,,,_,.,„ d F. ., i C!!; • •-.-. • 'h ; .-- % :!! '! \':. :: I ' ' • '1,' •,-- :: !,! DJ —.< i ,1-77:- :---•,!! Z., 9 / --•X•cp . , .4 . •„,- . „/. , . •sq,; ! . -! li. ' ,1: 1 i ‘,,'„e'e''./:-4'7 ! : ! .4; !3..;•H(1 ! jr, il .4s; ' • : \1.Q...-:, i F! i i N 0 I ,f.•?..;>0,,,-..;;., .......,.., i.4.,._.__:. . ._, ... , • . .. . .., ,,.. • .. . . , . . , • ( ...c..- ,.,... ;.4,i. ,. . X r.a, 0:--• .-- .--,-,,....._•••• . • - : pl. _.•-f-,0 tt. , 1 > , • .. -.' • ; 0 il• •!. , . . • • %! Ef;1.. ii ! A 1 0 :.?,-.1-%/A •.-:,:.:,:: —---i------,-----nv------ - ..7 .. ,1 I .: ..1 ! I Z ..__..., . • ''-; -''.1- ' i J ; • . .1• ,K -,•'• . :. . Ri .: , .-. ki-4.. ,.•411 ..: i. I • - -.1•I . , • ,' , 1 - -., • --- -,- .- --- --- ---'---- - •, . ---;1 1,'P. i.. I. .!;.: z ,., f... , --1 11' I i.iii c) i . ..._.1...._;.. -„,..„ ji • . '. .." — I 1- • : i jj I. ; I I' 1 . ! • ' ••'‘ •i 7 .1 I -"' . i (.7, ....:-, •1 Iil . , ---! . .t; t; •ig-: i I Itf: •., 1 I .- .' / : , 1,--•1- -•:-• L•I ;. '1. I r— .-41 '• ------.\ \ • ••• .•:... .-I I,t, '',. .111 '.• '. ? . \ • ... , . 1- ;• . ‘-•.k• :' l• .,j; ..-- .-•• • •: •'..•- : '... . • i It I: I . . ,i , u. .. , ''‘, -••'S•••1-• . ' P...„__I I ..r. , • '..,,p, .. i .."1! li IN7TIPIP'rill'i ' ' 1.11' 11 i • 111 ,. Z1 i iVI.r..--\i) 61711 Tr I I!I I , • ; 't' ' U..I .''.j 14 I • I I 1 i I I I 1.1 .., .., 12 .\t,[...zi :i I,.; 1 Z --- -- ---1 ; ';''t. k‹. a.?,.1fiir--__A_,...j A N .^ '4• E 4< -------;k3q-A. T„ Or;1 i,,,., 1,,, I , ...- i, •,,..••• / !''. 71" ,71._i_ : --1......0r. -,...-!--Iltr..,,,•4-t,./..,,I;' ck•K',.-;,' ...-I.\%. .,I'''' 1 .. ... .......-,- . ''.."-,--':"--- .,..1i..-1_-, ..., .. , .i.,....,:lk: p f• 1.tifi i i LH li ir-1-1--' 1-,:r.„—'-.Lpi r.'"'l!Pf'ql--1.!. ! : I 1'H;1'ill '-------z-s- •!t'i!'!•i! 1;-!,-', .1.!!. ;1' , . . . . . . i i :1-c!!"/• ::• ! ! L., tk• •; '..''''' • ' I 4 I , I -- h .1. -.r.1-0.1.4 .. i.-, I 1.1 .,,,....,---- •`..,.0 1 , ,.:..,,,,•• 1.-., ,...-";,.:',...j 1 7 --- /7'16'TTrij.,:,,47.-I--ra,q • ._ , 1•1 ,,,,,,-,: 1,, !,• •••1 ',I c.I I 1 ',' • 1 ill ..•-• f:- ':•••I-• rd if-',;-'''',.:1- .7 ,...101.,1 i 1 1••3..,i-?-..& 2 ,21,14.,•.2? t.:11,1 .!,;.! l.I I , .., ........... . ....,.., , ,..... 4,1,a ._ T'S.-- t':-yc'':N ‘t,.,)".',---•':',1• iC,' I ii, t•.....t !6.•;-.Ll-ir...T Al.;1••.!:.,. ..-1..r.,...,..'''.. ' ii.,c,,' V : .,.?,,\ • "',. ''5,.1. •100.. i : i ../ ,44' ; I'er,.. 00,1.0.1••,,, ,..,: •'.. 7,\,•:. . . . . .. ! '' ,1 l '-' MT-1.1 1 rt' !.P I ilj i i ":1/111"'..i'-i i i l'.g.F,HVfil t.1 : i. IA 1 ! W i I I:/''.,1 1 .1 1\''... '-2/..0;4!. r''' I j ...:. ... J .... . , ..,...,,,.‘.., ,.:.,.4,, ! i : • , • • • ‘, ., 1 '' =`, i J: ',..• • '• ' ', J4, J. : ',,,•' " . FF-19.8 - '1--11; : I 1 , ) . • 3 . 1111 • . . 7' 9. [11, ,-.7.i,•• •,_,,?,,, • N . ,2 TITLE: LOCATION: '1;°z .:2•04 4 US, 10215 72ND AVENUE SOUTH V. ,Is.z. KENT,WA 98E132 PRELIMINARY GRADING AND I.R1U1Y PLAN 0r1 -11 ft- (206)251-6222 GROUP HEALTH i:. v.,,. ,:,-. (206)251-87a2 FAX RENTON, WASHINGTON g , ° k„,. Pe'0.: Mk CHCISEER1110..0 P.M% • i' e.,„„0, stmemc.FOIROMILION.MINUS ! I B.C.E. JOB No 5687 • • . . • •- - -•- . • LDG.th-ohite.t. • 0,0.0•..r-ohnoot.; tale cbstter rs out.;200 goat..WA.09100 C204,021.--4704 • +.` • 7÷. W.• • r•iL7c Fer " • 4 - - ' •• - - - • -.•••••- II I n , .• SOUTH ELEVATION 70. W9 consuitants MTT t .1,11111111,L=E1 6111115;'ffiTff,=.1A , DJ NEM Op weed gr445.- EAST ELEVATION • • SCALE 1/32. 1.--0" . • • rririrrini. .pg15,'EftfaifEm.,• =1111E8 M'Elfff ; • VEST ELEVATION SCALE 1 Or s•-o- • • project trtle irnm • RACLRCe.=,3tilL,..4.743ROP.: ZeITH NORTH ELEVATION r;SVIIEM SCALE I/57 • FOR liE-FAROYA • sheet title: • . ' • • rTo7 re—Yr;i•c {00 r;c;• shoot no WeE;d: • • • dlecked • • • . . • • • n/ . LL..,`. architects O . o�o«P..re• . c wc. i s E• 1 .e. ..WA.oosoo(208)25u-•7e< <8' <8• 8e• <8' 48• 38' _«._.. 48' " _. _-3P___..I 8 . m , . • - { j1. U CJ if - - "I t i \ � bi. . I; P'�, i consultants II OFFICE/YANUPPrUPAc . 1 I i 'hi • I 1`l ^i ' -4 hi j I h' II Project title riF FLOOR PLAN BUILDING A tva> s 'E t=o: E£AMYkCCX. i34V --YEi COPING CONC TILT-UP PANEL(PAINT)--- " ' . WALL PACK TY➢ 1•NW_TINTED YET CANOPY CLASS IN ANOD ALUM TRAM . \ N.N.DOOR- • 1 536531403!,WA :.1,'' P.i•.I'PV, „nl,,,, „l ''1 qo tt.,m. „•1 ? I �. .-.-L_._--.--__-._ _ i _-7 I _ I .'_ sheet tilts, ®i®®i® i i®�� ®M yam ' �In�®;®'� ^L �I®I'Jnl�;®;�nj�®®�� ELrf,DM k WEST ELEVATION NORTH ELEVATION • —. _ r —I— II • • • :'•l'i. ,P '°4 4 ).,'y 4'..n r:.••1.'91)°) ,,,.i,....miq.;...-': . . . -•.- . .a„'...?I i-r.!,I ..-r,I l l I I't I I I f -- ---'I---t-'--- j - -- ---__�"--_--+---- - ------------ 1 h' ®®,®�! ®®'®I� ®;®� ;., ®�®®1® t i 11 lit Do�T.YLyDti .a.+e --u' t� 1 I I G I u I u, __._it _ ;n_,.;®®i - n�1®1®Ind®� w�ro Most no. — draw EAST ELEVATION SOUTH ELEVATION ' SCALE 1/3r.1.-0• - •. SCALE. 1/3T_I._p— - - e2kld A-4 • de A a c< . . . . ' • . • . . • : • . • • - • • • . . . • .._ . . . -,---, . • ._,_-_-,:•,....,.architacts nnarctIc cle.Pon OrCIPP•w'ciPPPet•• i311Ig cheater-nye.n eaelle.200 moan..WA.00100(200)283-47041 PLANT LIST - -1.--);"Jr . -.................... ......-,....-.- - .•.:•- •">•:.-,.7. •..... •\ ...f.- :-..1.-.2:•-•.;‘,..' --,-. r ,,,,,,,,,,,,,, ( '.....:r.Z.'•'-'"---1•1- '''..,,,i•''''. ..- -....... r-r. _ ,,,,„,z-,^__,-,..7,-,,,,f 4,,,,-;....;,-,-;_:.-: ,1.6r,7-, + "...-7.-;..4-.1/4... 7..-0/, . .:',1:e..--77-,...,_-= : _4.• '*---f."--..?... . - __ ,_ • - . , ''"' ,----.,.•_ler,',.....n., ....e -,- --.:',..,•,-,,;,-;. ,...,": z-47;•-?•••i." 1— if 9C10124_000VER_V.A.C.1.22 12ETALL_ --.'-0 "...I"---ll.,:-.....-VP ..i..e.,77...47.- , ....-1,,,,dil .."-a- .E:V.-e-T :-/!,.-9 !I 1.-". ,...'f,--r,f:::: Thzng.g.tgahn, , 11, e•,..,,,,Salo__ 0 -„,.... ......,_,,, ,-,„..„...-...-.„- :,-.„.„,. .C.'1,9 L7.'" —It it ji . ',:."— 0 ..,..:".-.....---,,,,,,,. ,z.6_, ...,,,, , -....E.,:-.f///d., .9/.9 • • -'u..--L' ..— . .. '."."". 4 ".--;:';'..::' r":".:...: .; ..r.../2,:-/' .P1'az/ -3 f.3 "4 X,,_i.___:•=4,_,E• l--,--"7.7 --,-rrr, =76'4••.,:c.77 .7.4*/17.15"-/ even,.. 4 • 2 nA7 •t-',1 __ . ...- 4,1,f-7 4.4•••.:::::::'.• •• ', ..- ...-5 .5.-.'"'", ../-•,•••"•, . r.--44.-"•-,C'-'74/-.2,1,••••2.744:247' ,72.,74'•:".•4• consultants ,.. —•.... : . .-.--;,..., i,.../J.:V.,7 .".''.1.,‘lefd,/.....-."; 4.7,r-c".1 Z.,- di-WI . IEEE PLANTING L,Ei611........__ •.1 1,:t-." V.,CC FE41,3. • .'.-..:., e,-,,,,,,,,i.a•,..?-..'•7 . f,..,.?.-.--,-,-/Prg,d wove. KEN — KEN LONEY • • SKEWS PLANTING DETAIL 7;1 I • .-,..-1,--,...n . •=7-=,.....,-----...; ,...n.v.,'. ,..1,-,4.7-4,r P7:-....,-„!///-a, - .•,.,,/..-:-.....-1...,,, —f...../..a".7.-- -reee..,/,,-e.e;,,, ,___`:-,tnX,6,,7.44.7, —:. ..,•-er.:7 Fr..-- ye.-.s.7,-•.•C V.OE.,,?-vh.2,-,J2 . • • •rit'f.A.' id:.-:-\":..?..--,..P-..Z •,41-(4.-,(1 . /.,..7.,:etgf. ,'-c S .e."--,..1-.. • sy,roe.er7 CCD CW"X ar.-+. . 1 ...-..-,...-..,,-..xzk.•Cree&.,(///range _,---1 2-.•:,e,\ , WOR r.,...•-• ..;-eu, •ca-,-. ..v.,:e.r *.e.L' . ..-4,77:.e.-- •,. .,,„ye;,7 ,,,,,,,,:,„e.,... .4..747M7ped ..-.\ ,\ .-.' ••••":., .-:-,!,•-g-, .:a v-,7 -r----s 7:3-e :::W,-.0.:3 7,-.."r.".•IA- e-e-nY,e•5:.If,rrreer ,'")ez.s/r4.•-c„.'afsev/zere„ 1 1 @ NTIN ;.,dv BED€ ---7-:.. I M3100 • LAWN i PLAG DETAIL :I!. .A.F.A.I.641.•.ra,,,,, . i 41.vent.....r. NOTES - —..„..--• --_,.,..-.; ,.&.-- 1 1• N---- --• ' .1._,_„1.-_,..-' „.....---- —-—••; ; •• .--"----:. --/ '--•' ---- ---- .-.--..--,-* •'7v.,• .• 1 .1.: I C. 4.31:::!....:i!IlUdigrberTs;stethin.1/11n.foot provided . • .-4./ ./..i....-•••• ..._..--'-- ;,,--.: 1 -.:(,:• i '''7.••97 , , -- 2. subgrade ehall te...rifled or rototIlled if condition. !':-.:•;;;''''.'C.?:•4•1-- .. • ( require. ' -' - 1''-'- - I. 4.depth gepsoll In all planting • "'. 4. 2.depth finegrade berk eul.in ell planting bade. __?- .N7--- .-- . , All plant aaaaa ial stall to healthy:fall anO confer..to USA • ...- ' .7 . standard for nursery erock.lateen editIon. ' •1°,:=:;':,L,•"•.:T.°p;ro','',:l r.';':,',:,;I:',.;°.7-2K,t:. ..• ovnar. ing drainage. 00' III .4. : : ! . , .......... , _ . I C-....:Caai:4.•).t 9. Pusitive drainage shall be saintainad. Mount plant areas ' I loin.=la•. Z . Ie. shrubs end trees minimum 42.from cure for car overheng . :•• "•: 1 project titre, unleea vheelmtope noted. • -...4 2.. a.vide bark hewing a...',era iwA' Pdl..."P... / AZ 4••„J. building. • .1,4. •,.14..s,t,.... i.... .,.:00,---A'.4.i. i. I:. Lane:neap*cOntractor shall CC intain site until final • Inspection and acceptance by owner. .4" . '..... ..a .P•I 1 -7 a- I eCira•riFEZT'''.$'4•Fl . • . ' ' • ; . : : .•• ••'.. . Z ' . ... a: . . ; , 0 : : : , : (3, , . • : ,. • , „ ..1A ....., • . ' .061k,..11 ;Mir_saapine• . '_iross:gi-ses-potillopiteue2;)irsitfi.at4.s..iair.riewit,;_19.1r1.. 0•Pw_le...N. ; !I:F., -- - • 7,74:,r7e7-a 7---•1 i !4 —• . L - ‘1.1,7,2 C4-18.r ioil, • • t . : .. e°5446- 011iPgE------' ; te .. 44,' iri.: le / . . ie. . • '.4. --- hit i REIM.WA . --- ,itS7-..-,EC-,Li."AWA ----"- ----: - ol,W - d-i--,E....a A Gta / , .. LAS-71741'..C......E Fl.„4-RE ,,A- .q.,i • ry.,.:_gilsyizc., I . 1) i' • - I. 4 -..-.-i It:" i . , --_•:-.1•,•--;re.--r....:4 -7 ( ""-.•-&,i... 1 11 s • • c r ! • .4.1 _ . • •,.1 ell) --.. 1 • •414 --- .1 1 -- • --P' •.• ; . • ‘'i ..."1-_-_: -i •,-..0,-7.4. :1:, ,z„„1 • -Ci . I ••• •-1-,f,---,, ;g ,..,,- A 7 r41„.. .4 It.-,, __ ._._. I (-1'•, LANDSCAPE PLAN . , -...sil efi mil e.o..4,....m...or.,....ia,.....50.,..,.Q.,.....,,,..c1/4.,Gyi- i . oth, r.i......wmoi...C.3s!■.......iti! . . , , , -.. ,-, ., .451,-; -; 1i-I i 1 ! i 1 . i ' f 7N F — r.I reoisono ,—••-- ----•---- •-•-•---- , • ! ' ! : ' ' ! : , : , ! : 1 ! ii ! : ! : i sm . 1 : : 111 , 1 ! ! iii ,.,.___•.=__,__,, -:... g job no. shoe os ., •• .-... `---•-•-.lz:i / : .,....._. , „ , , , ----•••----- , iT'll • , 1,1 • , f -* , • 1 •iliii .. I 1 ...kr -.7541-C-.?. / ,' .7.-ic!, P'. ;•. ; Nit ; ; ' , ; . • ' ' 'OL ' i•, 1 '; ; iWiCylill ' i ! I . ; — (Pili ! II ! ! ; l• ' Iiill . . 111 • ; II , l : • . ,qt); NEW bANDSCAF444g TyP---: --.. -- , . 1 . 1 , 1 , , Itl . , . 1 •11Illt .. l ' i g '''...C''''... ". 7,r-7e • • . •••-•-•• -• -• • ••• - • • ••- . . . . .. .-..__ . . e4 4 - • / 06/11/96 07:18 FAX 206 236 "0 O'KEEFE DEVELOP 1m002 S`Pc O'KEEFE DEVELOPMENT CORPORATION June 10, 1996 Attn.: Jana Huerter,Assistant Planning Director City of Renton 200 Mill Avenue South Renton,WA. 9S055 RE: S.W. 16th R&D Technical Center-Hearing Examiner Report Dated June 3, 1996 Dear Jana The following is our understanding of the conditions placed by the Hearing Examiner: 1) We are required to comply with our S.E.P.A. Determination. 2) We are required to provide a storm detention system that complies with the City of Renton standards. —N Because we are deeding 55 feet to the City for the widening of Spriugbrook Creek,the City will assume responsibility for providing compensatory storage for our project within the creek(either along our property or somewhere else in the creek). 3) Based on our letter from Greg Zimmerman dated April 30, 1996, we were given approval to participate in the wetland mitigation bank;therefore, once we have paid our compensation to the wetland bank, our obligation to provide wetlands becomes the City's. 4) Acceptable-No questions. 5) We would only be required to provide raptor poles in areas east of the 55 feet given to the City. If the poles would be required within the 55 feet from the creek, this would become the City's responsibility_ 7900 S.E. 2t5th Street. Suite 400 Mercer Island. Washington 98040 (208) 236-8200 Fax (206] 236-6160 06/11/96 07:18 FAX 206 236 "'0 O'KEEFE DEVELOP 141003 6) Acceptable No questions. 7) Acceptable-No questions. 8) It is our understanding that the Fill and Grade Permit is considered a Building Permit and that a letter from.Surface Water confirming that once we deed the 55 feet to the City they are responsible for providing compensatory within the widening or elsewhere in the creek. Jana,please sign below acknowledging that the Planning and Building Departments understanding of the conditions imposed by the Hearing Examiner is the same as ours. ( / iIJ %lel Ackuowled e d Agree With The Above Statements Dat Sincerely, O'KEEFE DEVELOPMENT CORPORATION Thomas M_ e Vice President ML:lmk ;y t CIT'i_ OF RENTON "l Planning/Building/Public Works Department Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator June 18, 1996 Tom Lee O'Keefe Development Corporation 7900 SE 28th Street, Suite 400 Mercer Island,WA 98040 SUBJECT: GROUP HEALTH SITE,LUA-96-034,ECF, SA Dear Tom: As a result of the transfer of property to the City for the purpose of widening Springbrook Creek, the proposed building will be setback approximately 25 feet from the newly created property line. The property deeded to the City for the Springbrook widening will be considered right-of-way, therefore no additional building setbacks will be required. Sincerely, ana Huerter Land Use Review Supervisor cc: Craig Burnell H:\W W6ODOT\LETTER.DOTBH • 200 Mill Avenue South - Renton, Washington 98055 [Y7 Thla r.a..or r....minc SAW-rnrvrlart matnrinl 95%nnet rnneumnr 7i SA- -967 -o3 f RECEIVED THIS DAY WHEN RECORDED RETURN TO: g_"Jr s/o C]ittfA Rt t r t Office of the City Clerk n OF Project Reference: ' i4T FQ-Sbflo P2O+Ji� Renton Municipal Building 200 Mill Avenue South • Jul. � I� 2 d'16 i&ATION Parcel Tax Account/Ps 33°"0/U -5300 Renton,WA 98055 Grantor(s)Name gFNARriY A BY 1 ..ri;� C 1';9ufCii OF STR: 2'/-23-y m RECORD'i. , Et E ,NS CTIO ''`'`' Street Intersection: Id / .Yr K I -., f:;',J I Ty oc'Ictso-.. AUK Svc CAG-96-092 Grantor, BENAROYA CAPITAL COMPANY, T,_T,_C_ , for and in consideration of mutual benefits conveys, quit claims, dedicates and donates to the City of Renton, a Municipal Corporation, Grantee herein,the following described real estate situated in the County of King, State of Washington. See Attached Exhibit"A" SUBJECT TO: Easements, restrictions, reservations; covenants, conditions and agreements. Cr IN WITNESS WHEREOF, said corporation has caused this instrument to be executed this /Vdt4, day of . , 19 r4 . tN2 _ CApproved and Accepted By: 7X/AA-97.-- / City of Renton BY: Its:', Mayor City Clerk _ o i...X G Q1 o it H:DOCS:96-96-300D.DOC:SW:ps Deed of Dedication Sheet 1 of 6 /�� PROPERTY SERVICES (7� -QC1 Ei49E 94 07/PP/96 . "� STATE OF WASHINGTON ) ) SS COUNTY OF KING ) I certify that I know or have satisfactory evidence that 1flf-,/ l--/9/4" signed this instrument, on oath stated that he/she/fhey was/were authorized to execute the instrument and acknowledged it as the /`1A74-'/Gam— of C/4-j I77-i L CO, lL -• to be the free and voluntary act of such party/parties for the uses and purposes mentioned in the instrument. Dated 7- 114421/ t1 —`36 N ry blic in and for the St LHADEfF of Washington residing at JOSEPH S. A Notary(pint): kv i Lh.I F—FF-- STA1E OF WASHINGSON My appointment expires: 3 —I —9? NOTARY- --PUBLIC 1tY COMMISSION EXPIRES 3-01-99 � I i I Cit) • at ct 6 H:DOCS:96-96-300D.DOC:SW:ps Deed of Dedication Wry' Sheet 2 of 6 PROP Y SERVICES i . Project:LJ f •Tfig.51-147.0 Pgapr EXHIBIT A Work Order# (,5130 LEGAL DESCRIPTION PID_33`/d°lo - 53 cs Grantor: 7A Ie.o 1 A ' STR: 2-41—L3- �f Street Intersection: SW. I(;tt, sr; g oAkt.5.0ALE That portion of the parcel described in Exhibit B, said portion being located in the northeast quarter of the southeast quarter of Section 24, Township 23 North, Range 4 East, W.M., in King County, Washington, and lying westerly of the following described line: Beginning at the southwest corner of said parcel, the true point of beginning of said line; thence S 87°34'06" E along said line and the south boundary of said parcel a distance of 76.63 feet; thence leaving aforesaid south boundary and continuing along said line the following courses: N22 31'11"W 57.49 feet, N23 19'29"W 142.12 feet, N32 18'48"W 761.27 feet, N32 12'16"W 33.99 feet, N49 43'11"W 44.11 feet, N37 07'24"W 52.42 feet, N49 57'10"W 55.07 feet, N45 03'27"W 27.93 feet,N57 36'56"W 49.70 feet,N66 5429"W 56.14 feet, S89 25'18"W 118.36 feet,N69 45'41"W 18195 feet, N49 31'59"W 73.38 feet, N44 59'49"W 15.27 feet, N42 12'27"W 60.50 feet, N42 19'15"W 20.27 feet, N37 32'08"W 73.40 feet, N33 24'23"W 18.77 feet,N31 19'23"W 39.61 feet, N32 22'46"W 19.31 feet, N32 22'46"W 231.20 feet, N31 05'11"W 78.10 feet, N30 41'07"W 67.33 feet, N33 33'14"W 42.30 feet, N24 46'34"W 55.48 feet, N18 09'37"W 50.76 feet,NO3 22'42"E 134.83 feet to the north line of said parcel and the end of said line. O © I r H:DOCS:96-96-300D.DOC:SW:ps Deed of Dedication Sheet 3 of 6 F r.A PROPERTY SERVICES 6Aasr S/d•£ G/' ..J kivewt Project:toi A? 7S4 P114.3 EXHIBIT A CONTINUED Work Order# 61230 MAP EXHIBIT PID;__334'aYO- S3a , Grantor: 6 td i'`2n-1 A STR: 2y'�3-Y Street Intersection:5.--) 14M 1r; Northwest Corner of Said Vacated i, 0A14‘504•L.4 ,taut. s;,d Block 34 DeIscribed in Exhibit B 29 i Line# Bearing Dist.(ft) ''''- Parcel Conveyed to City of 1 S 87 34'06"E 76.63 Renton by Deed 2 N 22 31'1 I"W 57.49 28 Recording No. 8911030809 3 N 23 19'29"W 142.12 4 N 32 18'48"W 76.27 30 5 N 32 12'16"W 33.99 6 N4943'11"W 44.11 7 N 37 07'24"W 52.42 27 8 N 49 57'10"W 55.07 1 I 9 N 45 03'27"W 27.93 26 10 N 57 36'56"W 49.70 • c+ ; 11 N 66 54'29"W 56.14 12 S 89 25'18"W 118.36 25 v4 13 N6945''41"W 18.95 14 N 49 31'59"W 73.38 24 15 N 44 59'49"W 15.27 31 16 N 42 12'27"W 60.50 O 17 N4219'15"W 20.27 tiO 18 N 37 32'08"W 73.40 23 a) 19 N 33 24'23"W 18.77 20 N 31 19'23"W 39.61 22 21 N 32 22'46"W 19.31 21 22 N 32 22'46"W 23.20 23 N 31 05'11"W 78.10 20 24 N 30 41'07"W li 67.33 19 25 N 33 33'14"W ' 42.30 26 N 24 46'34"W ' 55.48 ! 18 27 N 18 09'37"W 50.76 28 N 03 22'42"E 134.83 3 17 29 S 89 26'29"W 71.72 30 S 07 46'31"E 186.50 11 31 S 26 15'01"E 278.69 p 1"-100' 100 Z 32 S 37 17'31"E 228.53 ., V 33 S 49 13'31"E 175.73 ( IN FEET ) E` Q 34 S 79 28'11"E 204.36 35 S 40 37'21"E 221.83 1 36 S2301'41"E 185.15 -' H:DOCS:96-96-300D.DOC:SW:ps Deed of Dedication ���� Sheet 4 of 6. A f7LENAME: v 4100750NlSrwwtESw7:DitG/PLT IIDO 5-8-96 I PROPERTY SERVICES r r S 1. ICJASr Sin.c GRAck) 41-vL,f Project: I^46162514 9 Pf Jrf.4 EXHIBIT A CONTINUED Work Order# Ia5-2-30 19 MAP EXHIBIT PIDL 33N6110 — 5300 Grantor: 4 4,1A£.&'IA 18 STR: 2 f L3' t • Street Intersection:5i.' /01, 5f; ti 0,zwerscoAa ,Av4 sp. 17 16 Z 15 U ~ 14 Q 13 12 11 / 33 10 9 8 34 7 See Line Table on Previous Sheet 6 5 35 4 Gm 3 ;16 .0 � 36 1 100' too 2 ( IN FEET ) 1 Southwest Corner of Parcel Described in Exhibit B H:DOCS:96-96-300D.DOC:SW:ps Deed of Dedication Sheet 5 of 6 HIE N WE: U:11100TSCWISTOR//1£S M.DIZ PLT UDD 5-8-96 PROPERTY SERVICES £Asr S/01 &PA .) /114/4 Project:w rt....5J/ O mega— ' EXHIBIT B Work Order# 675 23o LEGAL DESCRIPTION PID;_ 3 3''oyv- sax Grantor: IV...LA/ 1 A STR: 2 y-�3"I Street Intersection: 14,441 "7 e,t,WSW lit Awd scJ All of vacated blocks 32, 33, and 34 of C.D. Hillman's Earlington Gardens Addition to the City of Seattle, Div. 1, according to the plat threof, recorded in Volume 17 of Plats, page(s) 74, in King County, Washington; together with vacated Kenny Avenue (82nd Avenue South)and vacated Evans Avenue(83rd Avenue South) adjoining. Except that portion thereof conveyed to the City of Rentonby deed recorded under recording number 8911030809. 0 • 0 H:DOCS:96-96-300D.DOC:SW:ps Deed of Dedication W� j Sheet6of6 /-1/ • SERVICES 06/11/96 07:18 FAX 206 6160 O'KEEFE DEVELOPIII 94-0 SA 0002 O'KEEFE DEVELOPMENT CORPORATION • June 10, 1996 • RECEIVED JUN 1996 Attn.: Jana Huerter, Assistant Planning Director DEVELOPMENT PLANNING City of Renton CITY OF RENTON 200 Mill Avenue South Renton, WA. 9S055 RE: S.W. 16th R&D Technical Center- Hearing Examiner Report Dated June 3, 1996 Dear Jana, The following is our understanding of the conditions placed by the Hearing Examiner: 1) We are required to comply with our S.E.P.A. Determination. 2) We are required to provide a storm detention system that complies with the City of Renton standards. Because we are deeding 55 feet to the City for the widening of Springbrook Creek, the City will assume responsibility for providing compensatory storage for our project within the creek(either along our property or somewhere else in the creek). 3) Based on our letter from Greg Zimmerman dated April 30, 1996, we were given approval to participate in the wetland mitigation bank;therefore, once we have paid our compensation to the wetland bank, our obligation to provide wetlands becomes the City's. 4) Acceptable -No questions. 5) We would only be required to provide raptor poles in areas east of the 55 feet given to the City. If the poles would be required within the 55 feet from the creek, this would become the City's responsibility_ 7900 S.E. 2121th Street. Suite 400 Mercer Island. Washington 98040 (206) 236-6200 Fax (206) 236-6160 06/11/96 07:18 FAX 206 2 6160 O'KEEFE DEVELOP t1 003 6) Acceptable-No questions. 7) Acceptable-No questions. 8) It is our understanding that the Fill and Grade Permit is considered a Building Permit and that a letter from Surface Water confirming that once we deed the 55 feet to the City they are responsible for providing compensatory within the widening or elsewhere in the creek. Jana,please sign below acknowledging that the Planning and Building Departments understanding of the conditions imposed by the Hearing Examiner is the same as ours. • Acknnowled,;e :nd Agree With The Above Statements Dat Sincerely, O'KEEFE DEVELOPMENT CORPORATION Thomas M ee Vice President TML:lmk ® CITY -23F RENTON "LL Hearing Examiner Jesse Tanner,Mayor Fred J.Kaufman June 20, 1996 Mr. Edi Linardic LDG Architects 1319 Dexter Avenue North, #260 Seattle, WA 98109 Re: R&D FACILITY- SW 16TH TECHNICAL CENTER FILE No. LUA-96-034,SA,SM,V,ECF Dear Mr. Linardic: The Examiner's Report and Decision on the above referenced matter,which was issued on June 3, 1996;was not appealed within the 14-day period established by ordinance. Therefore,this matter is considered final by this office and the file on your application is being transmitted to the City Clerk as of this date. Please feel free to contact this office if further assistance or information is required. Sincerely, • Fred J. Ka an Hearing Examiner FJK/mm cc: Jennifer Toth Henning • . Sandi Seeger, Development Services • - Renton,Washington - 2 2 - 200 Mill Avenue South W gt 98055 ( 06) 35 2593 Thic nanar rnntainc Ffl%rarvrlari malarial 9F%nod rind mar 1996 Renton City Council Minutes Page 220 City staff is to work with WorldCom to find a satisfactory route along SR 169 beginning at the Cedar River undercrossing of SR 169 adjacent to the City golf course. Use of the Maple Valley Pedestrian trail is specifically restricted from use. The Committee concurred with the staff recommendation to approve the WorldCom Network Services, Inc. Master Street Use Permit application in accordance with the condition stated above. The Committee recommended that the Mayor and City Clerk be authorized to execute the Master Street Use Permit as presented. MOVED BY SCHLITZER, SECONDED BY PARKER, COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED. Utilities Committee Utilities Committee Chair Corman presented a report Public Works Springbrook recommending concurrence in the Planning/Building/Public Creek Widening, SW 16th Works Department's recommendation that the Mayor and St Acquisition for ROW City Clerk be authorized to execute an agreement regarding from Benaroya Capital Co, right-of-way acquisition for drainage channel with Benaroya CAG-96- Capital Company LLC for the dedication of 2.2 acres of right-of-way along the east side of Springbrook Creek between SW 16th St. and SW 19th St. The area to be dedicated is needed for the future widening of the creek, as proposed in the City of Renton Surface Water Utility's East Side Green River Watershed Project (File No. LUA-95- 205). There are currently no funds budgeted for obtaining the right-of-way. Therefore, to compensate Benaroya in exchange for the deed of dedication, the Utilities Committee recommends concurrence in the Planning/Building/Public Works Department's recommendation to: a. Waive OFFSET 100% of the Grantor's Surface Water Utility system development charge that may become due for the SW 16th Technical Center proposal (File No. SA-96-034); b. Provide and construct any compensatory storage volume required for filling in the floodplain by the SW 16th Technical Center proposal; c. Waive OFFSET 50% of the Grantor's Wastewater Utility and Water Utility system development charges that may become due for the said SW 16th Technical Center proposal as calculated excluding any redevelopment credit. However, the amount to be waived is not to exceed that which will become due after subtracting all redevelopment credit from the total charges. The Surface Water Utility will reimburse the water and sanitary sewer utilities any water and sewer system development charges for the SW 16th Technical Center that are waived OFFSET in exchange for the right-of-way. The funds for reimbursement will be transferred from the Surface Water Utility carry forward balances through the year end budget adjustment process or funds will be allocated for the transfer in the 1997 Surface Water Utility capital improvement budget; ( HEARING EXAMINER'S REPORT AFFIDAVIT OF SERVICE BY MAILING STATE OF WASHINGTON ) ss. County of King ) MARILYN MOSES , being first duly sworn, upon oath, deposes and states: That on the 3rd day of June ,1996, affiant deposited in the mail of the United States a sealed envelope(s) containing a decision or recommendation with postage prepaid, addressed to the parties of record in the below entitled application or petition. Signature: ' 1 <-7/06„, SUBSCRIBED AND SWORN to before me this `'viL. day of , 1996. I:tl No ub ' ' and f the State of Washington, residing at therein. Application, Petition, or Case No.: SW 16th Center R&D Technical Center LUA-096-034,SA,SM The Decision or Recommendation contains a complete list of the Parties of Record. June 3, 1996 OFFICE OF THE HEARING EXAMINER CITY OF RENTON REPORT AND DECISION APPLICANT: Edi Linardic/LDG Architects SW 16th Center R&D Technical Center File No.: LUA-96-034,SA,SM LOCATION: 801 SW 16th Street SUMMARY OF REQUEST: To construct 126,000 square foot building(Building A)and 208,000 square foot addition to existing structure(Building B). Site is located adjacent to Springbrook Creek and requires Shoreline Substantial Development Permit as well as Site Plan Approval. SUMMARY OF ACTION: Development Services Recommendation: Approve with conditions DEVELOPMENT SERVICES REPORT: The Development Services Report was received by the Examiner on May 8, 1996. PUBLIC HEARING: After reviewing the Development Services Report, examining available information on file with the application, field checking the property and surrounding area;the Examiner conducted a public hearing on the subject as follows: MINUTES The following minutes are a summary of the May 14, 1996 hearing. The legal record is recorded on tape. The hearing opened on Tuesday,May 14, 1996, at 9:07 a.m. in the Council Chambers on the second floor of the Renton Municipal Building. Parties wishing to testify were affirmed by the Examiner. The following exhibits were entered into the record: Exhibit No. 1: Yellow file containing the original Exhibit No.2: Proposed site plan application, proof of posting, proof of publication and other documentation pertinent to this request. Exhibit No.3: Landscape drawing(western half) Exhibit No. 4: Landscape drawing(eastern half) Exhibit No. 5: Building elevations(Building A) Exhibit No. 6: Building elevations (Building B) Exhibit No. 7: Existing site development ,Edi Linardic/LDG Architects SW 16th Center R&D Technical Center File No.: LUA-96-034,SA,SM June 3, 1996 1 Page 2 The hearing opened with a presentation of the staff report by JENNIFER TOTH HENNING,Project Manager, !Development Services, City of Renton,200 Mill Avenue South, Renton, Washington 98055. The original applicant for this Site Plan Approval, Shoreline Permit and environmental review was Group Health Cooperative. There has been a change of ownership and now it is owned by the Benaroya Corporation. This is a 22.5 acre site in the Green River Valley portion of the City. The surrounding streets are SW 16th on the north and Raymond Avenue SW on the east. The western boundary is defined by Springbrook Creek. The southern boundary would be defined by SW 19th if it went through. The applicant is requesting Site Plan Approval for the redevelopment of the site. The site is currently being used by Group Health Cooperative for the purposes of warehousing, offices,medical laboratories and a distribution center. There is existing site development that is located in the northeast corner. Currently there is 93,000 square feet of development in one building plus two smaller metal buildings, for a total of about 97,000 square feet. The two metal buildings and 8,000 square feet of the existing building(Building B)will be removed. An addition of 208,000 square feet to Building B is 1 then proposed. A second building(Building A)would be 126,000 square feet. The addition to Building B would extend it to the west and south, and the new Building A would be located on the western portion of the triangular shaped parcel. The storm water facilities would be located in the very southern portion of the site and would include facilities for both treatment and detention of storm water. This particular project is speculative. The buildings are being proposed for high tech office research and development and no tenants have been identified, although the applicant has been in negotiations with at least one tenant. While it is 'speculative, staff feels confident that the applicant is going to go forth with this project. The total site development in terms of built area would be about 419,000 square feet and would be leasable area. There would be dock high loading doors on the western facade of Building A and the new construction would also feature a building that consists of tilt-up concrete construction with wood roofing. The building would have stepbacks on each facade to try and diminish the bulk of the building. There would be parking for 624 vehicles which meets the City's requirement. The parking lots would be located on the perimeter of the buildings and between the two buildings. There would be new access driveways on SW 16th and on Raymond Avenue SW. Currently there are two driveways on each side. The project site is involved in a Comprehensive Plan amendment and rezone. If it went through it would change this particular designation to a manufacturing designation. However,this proposal would meet the requirements of either zone based on the way it is being designed right now. To develop this site,the applicant needs to import up to 75,000 cubic yards of material. This fill would be used as preload to elevate the building above the flood plain. The applicant has indicated they would like to begin preloading this summer if they are able to obtain all necessary permits and approvals. The surrounding sites that have been developed or have been proposed are office and light industrial land uses. The bank of Springbrook Creek on the western edge of this property is very steep and the vegetation along the creek is currently dense brush. The proposed buildings for this project would be set back a minimum of 50 feet from the ordinary high water line. There would be no clearing,no grading or other disturbance as part of this project that would occur within 25 feet of the mean high water mark for the creek. Since this project is within 200 feet of the creek, it does require a Shoreline Substantial Development Permit. That is not part of this hearing today, but is an administrative action, and ultimately is approved by the State Department of Ecology. There is a small unregulated stream called Rolling Hills Creek at the southern portion of the site, and that is not subject to any kind of shoreline permits or other regulation. Edi Linardic/LDG Architects SW 16th Center R&D Technical Center ;File No.: LUA-96-034,SA,SM June 3, 1996 Page 3 This site is within the Valley Planning Area. The Soil Conservation Service has an agreement with the City that requires the applicant retain at least 2 percent of the site as natural landscaping. The applicant has retained approximately 6 percent of the site, so they have more than three times met the minimum requirement. The proposal is also located within the Pacific Flyway and has been identified as an area where raptors sometimes perch. The applicant has proposed to temporarily locate perch poles in areas on the site where any clearing might impact vegetation that is currently used for raptor perching. When proposed vegetation is established enough that it is suitable for perching habitat,those perch poles would be removed. There are three wetlands on the southeastern edge of the site. Wetland C is regulated by the City wetlands ordinance and is almost 17,000 square feet in size. The two smaller wetlands are less than 5,000 square feet in size. All of these wetlands are considered to be Category 3. Because wetlands A and B are less than 5,000 square feet in size,they are not regulated, and the applicant is able to fill those and has planned to do so. The applicant has proposed a building to go in the location where wetland C is located. In order to do that they need to participate in the wetlands mitigation bank, and the Public Works Administrator has approved participation in the bank. The largest wetland is going to be recreated on the site of the wetlands mitigation bank, but in an j area that is not regulated by the Corps of Army Engineers. SCOTT WOODBURY, Project Manager, Surface Water Utility, City of Renton, 200 Mill Avenue South, Renton, Washington 98055, addressed several issues. He explained that with regard to the flood plain,the City is working with the applicant to acquire some additional right-of-way along the creek for the future widening of Springbrook Creek. One of the agreements reached in exchange for that right-of-way is the City will provide the compensatory storage for this proposed project. The City completed a channel widening project just downstream of the site in 1995. As part of that project approximately half of the applicant's compensatory storage requirement was created. The balance of the compensatory storage would be compensated as part of the future project. The widening of Springbrook Creek from 16th Street to 23rd Street is identified in a current proposal,the East Side Green River Watershed Project. An application was submitted in December 1995 for this comprehensive surface water drainage project which includes a channel improvement along this reach from 16th to 23rd Street. So,the storage that is temporarily lost on this site in no way would increase flows to the stream in a way that 16th Street to Grady did not mitigate for. The Examiner asked why this applicant achieved a variance from the additional wetland compensation--if a wetland of 16,000 square feet were to be removed, 24,000 square feet of new wetland would normally be required. Mr. Woodbury explained that the wetlands ordinance has provisions for reducing the mitigation ratios provided certain criteria are met. One of the criteria is if wetland fills are mitigated so that the separate wetland fills are consolidated into a single wetland mitigation,then a lower mitigation ratio is allowed. 1 Ms.Henning explained that the southern half of this particular subject parcel is located within the 100 year flood plain and the project must have compensatory storage or provide it if not. The applicant's proposal does 'result in displacement of flood waters. There is sufficient compensatory storage in Springbrook Creek and that has occurred as part of recent projects. The City is asking for 55 feet on either side of the creek. They need a total width of 140 feet. The channel width is currently 40 feet,then they need another 50 feet on either side of the creek. The applicant has revised the size of Building A slightly and agreed to set an area in reserve on the northwestern corner to accommodate the widening of Springbrook Creek and also to accommodate the possible future extension of Oakesdale Avenue SW. Edi Linardic/LDG Architects SW 16th Center R&D Technical Center File No.: LUA-96-034,SA,SM June 3, 1996 Page 4 This project has gone through environmental review and received a Determination of Non-Significance- Mitigated. The first mitigation measure required applicant file a final wetland management plan that was acceptable to the City and that would mitigate for the filling of the large wetland C. The applicant submitted their plan to fill the wetland and have the site recreated in an off-site area. They proposed paying the City$3.00 per square foot of replaced wetland to participate in the wetland mitigation bank. It has been accepted by the City. The second mitigation measure requires payment of the appropriate fire mitigation fee. That fee for industrial and commercial structures is$.52 per square foot of new construction and credit can be given for areas that are demolished of existing structures. Those fees are payable prior to the issuance of the building permit. The third mitigation measure requires payment of the traffic mitigation fee. That is assigned at a rate of$75 per each new average daily trip that is attributable to the project. There can be credit given for existing trips on the site that might be eliminated with the new proposal. Finally,the applicant is going to be required to limit construction traffic on adjacent arterials during their preloading activities to the hours of 8:30 a.m. to 3:30 p.m. In terms of a site plan criteria,the applicant's proposal does meet the requirements of the policies that secondary uses in the category include a mix of commercial and light industrial activities. Since this site would be used for office,manufacturing,warehousing, research and development facilities, it would be consistent with allowed primary and secondary uses in the zone and the land use designation. Policies and objectives also call for quality development in this area, and this particular proposal would develop the site with additional buildings. There would be parking circulation and landscaping. It would complement existing office and warehouse development in the area. The setback,heights and lot coverage requirements are within the standards in this zone. An environmental policy that applies to the project is the location of developments in the 100 year flood plain. Roads and finished floors of structures must be located above the existing 100 year flood level, and new development must provide compensation for existing flood storage capacity due to filling. The applicant is going to set their floor elevations to meet City regulations. There is compensatory storage that is being provided. It is being accommodated by the City and part of this is in negotiation with the applicant for giving over area that can be used for the widening of Springbrook Creek. The applicant has proposed 20 feet of landscaping along SW 16th and also Raymond. The project also meets the required 2%of natural landscaping for the Soil Conservation Service agreement with the City. In fact,the applicant is providing nearly 60,000 square feet of natural landscaping where the requirement would be about 19,500. Primarily this is going to be located along Springbrook Creek. The CO zone requires there be a pedestrian connection between public entrances to streets unless the Hearing Examiner determines that this requirement unduly endangers pedestrians. The applicant's plan has not indicated striped crossings or other suitable pedestrian connections from the buildings out to the streets, but staff recommends that this be required as a condition of approval. The Examiner inquired about the timing on the wetland compensation and whether the wetland bank would be opened for withdrawal when this wetland is filled. Mr. Woodbury explained that the City is in the process of completing a wetland mitigation banking program,but the net result might be a temporary loss of two to three years of certain wetlands. Ms. Henning stated that this particular redevelopment of the site would conserve and enhance property values by providing a project that has office,research and development, and manufacturing, and includes sufficient Edi Linardic/LDG Architects - SW 16th Center R&D Technical Center File No.: LUA-96-034,SA,SM June 3, 1996 Page 5 perimeter and interior site landscaping with extensive buffering. The proposed development would be similar in scale and character to existing Valley development. 1 The applicant is going to be providing site lighting that provides for security in the parking lots during evening hours. They are proposing shielded lights so that there is no spill-over impacts to areas where raptors would be nesting or to the creek areas and such. There is water, sewer, and storm service available to applicant. There may be a number of people working on the site who might be seeking some sort of recreation during their breaks and applicant has provided outdoor eating areas. Staff is asking for active recreation for the site such as a basketball hoop, and believes there is sufficient area to accommodate that. The architecture proposed and the installation and maintenance of landscaped areas would prevent neighborhood deterioration and blight. There would be areas held in reserve for the widening of Springbrook Creek and the Oakesdale extension. Those would need to be maintained by the applicant, owner or the tenant of the development. Staff is recommending approval of the site plan with conditions attached. The first would be compliance with the ERC mitigation measures. The second would be appropriate pedestrian connections between the two proposed buildings and also out to the sidewalks on SW 16th Street. These would be tied to the building permits and must be submitted as part of the building package drawing. In addition, staff is recommending that the site plan be revised to indicate the number and location of the raptor perch poles prior to the issuance of any construction permits. Staff is asking submittal of a lighting plan which would indicate where the lights would be located,the type of lighting used, and demonstrate that there would be appropriate shields on the lights to prevent spill-over lighting, especially in regard to Springbrook Creek. The final condition is for the provision of on-site recreation areas. The Examiner asked where the entrances to the buildings were located as a focal point, and Ms. Henning responded that typically the offices would be located at the corners where the extensions of the building were, and that is where a few small raised walkways have been proposed by the applicant. TOM LEE, O'Keefe Development, 7900 SE 28th Street, #400,Mercer Island, Washington 98040, spoke on behalf of the applicant. He stated that they had worked closely with the City and the neighbors of the project site to comply with not only the Oakesdale extension, but the Springbrook Creek widening as well. He indicated that although currently this is a speculative research and development center, applicant was talking with several possible tenants and hoped by the middle of summer to come to resolution on that. With regard to the major focal point for the office area of the larger building, it would be to the north end which is where the main entry to the Group Health facility is located at this time. The Examiner called for further testimony regarding this project. There was no one else wishing to speak, and no further comments from staff. The hearing closed at 10:15 a.m. FINDINGS, CONCLUSIONS &DECISION Having reviewed the record in this matter,the Examiner now makes and enters the following: FINDINGS: Edi Linardic/LDG Architects SW 16th Center R&D Technical Center File No.: LUA-96-034,SA,SM June 3, 1996 Page 6 1. The applicant, Edi Linardic(LDG Architects), filed a request for approval of a Site Plan Approval and a Shoreline Substantial Development permit for office/warehouse buildings. 2. The yellow file containing the staff report,the State Environmental Policy Act(SEPA)documentation and other pertinent materials was entered into the record as Exhibit#1. 3. The Environmental Review Committee(ERC),the City's responsible official, issued a Determination of Non-Significance-Mitigated(DNS-M)for the subject proposal. 4. The subject proposal was reviewed by all departments with an interest in the matter. 5. The subject site is located at 801 SW 16th Street. The subject site is on the southwest corner of the intersection of 16th and Raymond Avenue SW. The existing building on the site was used as the Group Health Distribution Warehouse. That building will be incorporated into a larger building and a second building will be added to the west. 6. The subject site was annexed to the City with the adoption of Ordinances 1745 and 1764 enacted in April and May, 1959 as amended by Ordinances 1928 and 4040 enacted in December 1966 and February 1987. 7. The subject site received its CO(Commercial Office)designation with the adoption of Ordinance 4404 enacted in June 1993. 8. The map element of the Comprehensive Plan designates the area in which the subject site is located as suitable for the development of commercial,employment generating uses,but does not mandate such development without consideration of other policies of the Plan. 9. The subject site is an approximately 22.4 acre,triangular shaped parcel. Its southeast to northwest angling western property line is defined by Springbrook Creek. 10. The applicant proposes expanding portions of the existing building,Building B, from 85,000 square feet to approximately 208,000 square feet. A portion of the existing building and an out-building would be demolished. The addition would be added to the southern side of the current structure. The building would have articulated facades. It would be approximately 850 feet long(north to south)by approximately 400 feet wide. It would be approximately 31 feet tall. 11. Proposed Building A would be approximately 126,000 square feet. It would also have an articulated facade. It would be 31 feet tall. It would be approximately 520 feet long(north to south)by approximately 250 feet wide. 12. The buildings will each be of tilt-up concrete construction,with bay delivery doors. The buildings will have some modulations concentrated near their respective corners. There will be horizontal accent trim and metal trimmed window and door panels. The applicant proposes outside eating patios near the northwest corner of each building. 13. Parking for 624 vehicles will be provided around the buildings. There will be parking along the west, north and east property lines as well as parking between the buildings. The parking areas will be landscaped. Edi Linardic/LDG Architects SW 16th Center R&D Technical Center File No.: LUA-96-034,SA,SM June 3, 1996 Page 7 14. Both buildings will observe approximately 90 foot setbacks from SW 16th Street. Building B will be setback approximately 115 feet from Raymond. 14. The applicant proposes three driveways along Raymond and an additional three driveways along 16th to serve the site. 15. Three small wetlands on the site will be filled with approval of the City. The wetlands are concentrated along the eastern boundary of the site with one immediately south of the existing building. The other two are located near the southeast corner of the site. The applicant will be partaking of the City's wetland bank to provide compensatory wetlands and with variance approval from Public Works it will be on a one to one level. 16. The site is within the Pacific Flyway for migrating birds and raptors are known to perch in the area. The applicant will be providing raptor poles subject to both City and State review. 17. The site is located in the 100 year flood plain. The applicant proposes flood proofing the site by raising the building elevations above the flood plain by filling the site. This fill material would displace flood waters from the site potentially creating additional flood problems for other sites. Staff notes that there should be sufficient capacity for storm water in the proposed widened Springbrook Creek but that project is in the planning stage. Staff also notes that the existing channel probably has sufficient capacity. There is nothing that entitles this applicant to use that City resource and the applicant is required to accommodate its storm water. 18. The applicant has provided an area in reserve that may be used to accommodate the eventual widening of Springbrook Creek and the construction of Oakesdale Avenue. The area in reserve is located in the northwest corner of the site. 19. Staff recommended that the applicant provide active recreational amenities on the subject site in the form of a basketball hoop. CONCLUSIONS: 1. The site plan ordinance provides a number of specific criteria for reviewing a site plan. Those criteria are generally represented in part by the following enumeration: a. Conformance with the Comprehensive Plan; b. Conformance with the Building and Zoning Codes; c. Mitigation of impacts on surrounding properties and uses; d. Mitigation of the impacts of the proposal on the subject site itself; e. Conservation of property values; f. Provision for safe and efficient vehicle and pedestrian circulation; g. Provision of adequate light and air; h. Adequacy of public services to accommodate the proposed use; Edi Linardic/LDG Architects SW 16th Center R&D Technical Center File No.: LUA-96-034,SA,SM June 3, 1996 Page 8 The proposed use satisfies these and other particulars of the ordinance. 2. In the main,the proposed site plan appears appropriate and should be approved. 3. The mixed office/manufacturing/warehouse use is compatible with the Comprehensive Plan's designation of commercial and employment generating uses, although warehousing is space consumptive without providing a large employment base. 4. The proposed buildings comply with the height, setback, lot area coverage and use limitations of the Zoning Code. Building Code compliance will be established when the applicant submits its plans for a building permit. 5. The generally low-rise nature of the buildings will not create any adverse shadow impacts on surrounding property. The large mass of the buildings should be relieved somewhat by the exterior treatment, landscaping and the articulations found near the corners of the buildings. 6. What needs to be addressed is the impact on the flood plain and the loss of wetlands. More specifically,the timing of the improvements and proposed compensation_needs to be reviewed. It would seem inappropriate to fill wetlands if the compensating wetlands were not provided in a timely fashion. While the filling of the small wetlands areas has been approved,the loss of habitat should not have to wait years as the wetlands'bank issues are fine tuned. The loss of habitat will force migratory species elsewhere or cause their loss if appropriate habitat is not established in a simultaneous fashion. The nesting of raptors may be associated with the wetlands and the loss of these small wetlands might- alter the raptors' hunting habits. The recreation of nesting poles will help but their prey might be less frequent. Therefore,the applicant shall be required to provide compensation as near as possible in time to the filling. 7. In a similar fashion,the filling of the site requires compensating storage of flood waters or they could be displaced onto adjoining parcels that would not normally be affected by flooding. The site is in the 100 year flood plain and any filling must be accompanied by compensatory storage. While there supposedly is excess capacity in the Springbrook Creek system, it does not appear that the applicant is entitled to its long term use. Since staff was not sure that potential projects to widen Springbrook Creek are certain,the applicant shall be required to demonstrate that it can fully accommodate its storm drainage requirements,that is, a full design for compensation, its location and suitability is necessary. 8. Again,the proposed site plan appears to be generally well-laid out. The buildings,particularly the larger Building B,will be quite large,but as noted,the landscaping, including the additional required for habitat mitigation, will soften the impact on the site. 9. The redevelopment of the existing building and the addition of a new building should not adversely affect property values. 10. The applicant will need to clearly delineate pedestrian crossings of the parking areas. This should be done with a change of pavement materials so that it is more permanent than painted markings. The six driveways should accommodate the traffic flow and staff indicated that impacts on the corridors should not be adverse. 11. There are adequate public services to serve the site. • 1 Edi Linardic/LDG Architects • 1 SW 16th Center R&D Technical Center File No.: LUA-96-034,SA,SM June 3, 1996 Page 9 12. In conclusion,the overall project is appropriate although more office space would probably create additional jobs, but warehousing of products is an essential aspect of business and commerce. DECISION: The proposed Site Plan is approved subject to the following conditions: 1. The applicant shall comply with the conditions imposed by the ERC. 2. The applicant shall be required to demonstrate that it can fully accommodate its storm drainage requirements,that is, a full design for compensation, its location and suitability is necessary. 3. The applicant shall be required to provide compensation wetland as near as possible in time to the filling. 4. The applicant shall provide pedestrian paths that delineate crossing of the driveways/parking aisles by using a different paving material. 5. The applicant shall provide raptor poles subject to both City and State review. 6. The applicant shall provide an active recreation area that is shared by both buildings. 7. The applicant shall provide a lighting plan for the site. 8. There shall be no preloading of the site until the applicant has been granted a building permit. The applicant shall post a bond to assure that either the preload material is removed from the site or compensatory storage can be provided if development as approved does not occur. ORDERED THIS 3rd day of June, 1996. it FRED J. KAU HEARING EXAMINER TRANSMITTED THIS 3rd day of June, 1996 to the parties of record: Jennifer Toth Henning Scott Woodbury Tom Lee 200 Mill Avenue S 200 Mill Avenue S 7900 SE 28th Street,#400 Renton, WA 98055 Renton, WA 98055 Mercer Island, WA 98040 Edi Linardic/LDG Architects SW 16th Center R&D Technical Center File No.: LUA-96-034,SA,SM June 3, 1996 Page 10 TRANSMITTED THIS 3rd day of June, 1996 to the following: Mayor Jesse Tanner Gregg Zimmerman,P1anBldg/PW Administrator Members,Renton Planning Commission Jim Hanson, Development Services Director Art Larson, Fire Marshal Mike Kattermann, Technical Services Director Lawrence J. Warren, City Attorney James Chandler, Building Official Transportation Systems Division Jay Covington, Mayor's Executive Assistant Utilities System Division Councilperson Kathy Keolker-Wheeler Valley Daily News Pursuant to Title IV, Chapter 8, Section 15 of the City's Code, request for reconsideration must be filed in writing on or before 5:00 p.m., June 17, 1996. Any aggrieved person feeling that the decision of the Examiner is ambiguous or based on erroneous procedure, errors of law or fact, error in judgment, or the discovery of new evidence which could not be reasonably available at the prior hearing may make a written request for a review by the Examiner within fourteen (14) days from the date of the Examiner's decision. This request shall set forth the specific ambiguities or errors discovered by such appellant, and the Examiner may, after review of the record,take further action as he deems proper. Appeal of the Examiner's decision is governed by Title IV, Chapter 8, Section 11, which requires that such appeal be filed with the Superior Court of Washington for King County within twenty (20) days from the date of the decision. The Appearance of Fairness Doctrine provides that no ex parte(private one-on-one)communications may occur concerning pending land use decisions. This means that parties to a land use decision may not communicate in private with any decision-maker concerning the proposal. Decision-makers in the land use process include both the Hearing Examiner and members of the City Council. All communications concerning the proposal must be made in public. This public communication permits all interested parties to know the contents of the communication and would allow them to openly rebut the evidence. Any violation of this doctrine would result in the invalidation of the request by the Court. The Doctrine applies not only to the initial public hearing but to all Requests for Reconsideration as well as Appeals to the City Council. ,:;,. SW 16TH STREET Loa; a ,,,. isi 1 r�•-PELOCA1L C.SI.O I,1 �[U4BDCY0 Kg/__.-. -: p 1 Sf 00 CH - -.PAOPOS[D NC. - REY C SI'C�E n _ -_ _ �u�124150��tt„qt ''D•- L 1- YRCs05[0 NC. J{ pp • -NCr 6 CpK A____ CUNe CUf _ CUP kS..._--..____I-- .. .._. j CURB CVO-..._._.._ .__.t:uro::.wr NAI 1� (,�.'i[.•� )ND _ _._- _ -PCLOGIE C.IG fN -ND.C S.CYAUt . G t 09'2 IG`1 .. ._2._ _. • , ri P iv N 89.7E19•- c" ./'//! `11 i 1 1 6,9r`. ./i. /; ;I;i • I I I I I !I Iy1� I �^e� I _ -.. _IrPrx vAPNiNc / ii. _ n[Sr lN+DSGJv.c rrP-- I1. `_.__;9r__153P-i u' v,^_bona 13T_ .rJ»-f �a--i.- sr c•t 70• °x.',i's•'. Y t�,,�y} '• ! ✓,, !/•t- 6�5 NE.f K P.tItNG .._ 4<.,�V�y'•'4 i` ! /i 1 �/ W 1• a• p 11 x� • P(r '1i'��.�.';:. , �' 1:. •_ COK WNILOE I �•> _ a . I � I - . • uNYO V I 14 6,•- • i. �. � I. --q 1.--CDbC cult..[ - �b _- .'• n\--�--1 v/i�'/v% l [ 1 - I _ ----usrc voEweut ; EXISTING BUILDING i ,, i Rtuo t lasrc Al --I _ r //.it� i' =i .. _.1 I - S '- �-• NRe cur ii,,141.2.• '..-.1,; :.:. • 11111I �4j14.\ ' ue.ow y I - t: r ,Dluo 1 • v .\.. :'I I'"• + I .-..t5:r.PE n0WD0L H0C.ry '\\. , ..... PEl1pf[all'G PAN NC -.---. - t' ' I : ,,,7„.`•NCYOYC laSlC M [-` -- r; '.1\ H. �:I 1j9. ,: C la~ ---- !J D En :-f .._ ' J ._ to I. A`t \ P ._ BUILDING B • .__ 1.:: i Cr 23.-• =HUM?-50.1 .,rI Ii 1t 1 II li\ -._ -r,cr -y�� • r•lr. ..l:Ot'zlli�1•. F _ r-, GYPS CUT COE 0 i c3Ae_ - �: .. +..+al •lurtl as\�••�`�... • 1I! \ /•� _ prcF(( ♦L'l...ITC 3.".'!S 12.:1.h4:a r CO ,•a,t.n'S lAP1✓W!4,.•:.0P.S 9 \ \\_ _ • �� '_'i,•ON 14•.l C^r Cr Y••,1[,a. 1,.CCOP:.NO•0 lel Pt,NQRICY. . > �'r� �J 1 _- A'Ka.h.w.,a ..D.P.A.S.P1GC '.n.IN(S T.) I•Av...ED '[ / ° - _ - 12DOJF'.l -l.8ttav 'VA'Ka n•+'.•:ofD•:f P..CNLC Ce:•,D a•.iv.1 SCAT.)1,..1V C.10, _ --_ •.ShUC re:•,1..,.1 SOL.,w:cn.w:: ��^�_� le9'n I. -4-DUYPSICR RCC'l ltlu - _ a IL THEtiE N..G ni:A Y,Gr•..t n,RCGDh:wr VPi•O,InCR(GI t*wG 0.51(Ru Cr• �• .OI I I I I .A w/[•I[ C t [ - . ,0 rU,•Is1 cr u.0 P1Ph:rL•41.4 I,..U51 1s(d!WK.,.N•IGrm9eP �, -' -- ;R ,W.:E.LW.•..Uv(n(40..D•x,. 11.i..G COLun.•ayuNG1CN.•M) .I�1 ' �„104,b. \ _- .1 ITMI LF..'J.,•.!•E04 C01..[+ED IJ 1.4 on 05 PLI.10h I./SIP1.0 Br N t97e'11.� .6:: - .CIO RECORDED ENDER PICCRD.,G•..:..BU 76120406e1•MC. .jam.:- .17 (KW,Ir.!P4R:.c..1•.f.(O,CON,VID 10 I.(r.rr Or RCH10N Br Duo 2P la_.fuo• �_ -" 4t CORLI4,Of..RCCDPD..G htv6ER e9110XIB09. SIC CLCVADONS ONGS COP CIOCP.M UCHING� -' . did a r.. STA'iIS'fiS_ . .. \�% T' _ L{.2 [tsxtodwA r.0.l.A ta,,EKES CI OF RENTON ..,,((11 -v.t..00:.PV' IRO.CPCSu'[F ---(--CaSrc FM. �� .5P.m..P1, „AC...0 RECEIVED .5. 4'� s ..., MAN 1 C:.r PA.:C ,la Ilr„P.14r. 5-1,B V.C:•PU;Iov I r LI v-Ir SPR.M LPOO 6.40.4.4 r--1109=1GIV_ •-_UD'L-9'L'_-5' 3C09•r90•- 4 .-NCW 6.tOhG• 126.440 Sr CURB cur \ I 1111IIlII� 1014 0 B 991.4M Sr MAY 0 8 1996 --- ,41µ fi.,0:W.ICI ,191A0 5f .\ _ _. I /l a(�(+ L.ca Rw..Rm \ -T----T--s ..Use... un.IK'W.,0.n.0. 1 In•.I' :\\ p�Tl f•,V Jw/:a.,✓.I f FA RIM''` 100 50 ,+ a r.115 BUILDING DIVISION -1aq\��-'EpI}1�f ____.r._.-rrr-_ nd, UI,CAO•q rt :vl 5W,1 , ^-1.J=-.GI .-_--1-. nn4u• •I..Py...r.S RCD:'E: ttt SI."S • •-� r,cltPn,4 II 444 50 r1 112 S•NIS • ..FC.4.:1 11r,:0O,0 I5 I19 SIUI5 OII.0'SI,UI):G II :91 51.05 /7'.'`•V-- 1 ••.U.•I.A•MWY°IVD .H.:u.Ut•ro ,S'd ` - •••.+.1N✓5C•H 1NIA•14D r,e.s4e.OS.1r•St6 Sr '� W.GK•('4••V P•r,,,4E1). Il,tUp V 1 . SW 19TH STREET .aOwlVIC:NOY MAP: (NOT OPEN) Sj �,6,0 /•' • b. I.... ' . • . • • • • • • • • • • (--.f.,...:—..n..L.--%r":t......archlterstf. •••••.......................erarnanno Senn dn.."S .n ann.SOO •; anon..Wn no.caosvawa-4,••• la • : • • . . . . .a:.__... ...1.----- ":-. .1-'-. - !8:. .....- '.. 1... ' 4e• Or .11. I Mr • Li.......Y.ra..LI•..:P.a......V:.....i.....r::.....==....I . • . . .. 1...... -- — -;--r-T- -•-•:!-.7.--a--•-•=r--• -i.---• ••• • ' 1‘ F.,:....vi•_;.•,-...-.Z......r.-."-:..........=.. -.... 1-------- ----I- - 1 -.1 I------1 I '. I I . . t..r.....Mon. • % ............ I r , •''S.:::::.==4 ; 1 41 --- 4-- --.• -- I' t., . conallantv. - '' • orr.cc/vonqnr.....: %.• ! • . 2 1.0 • !::.i • 'n•/ •• ...: I.7... h, : •• i, •" . • . • „.././s, • • I • 11. 11 11 • . L i....._ r-r • . . • zr . • — • • protect ItI • 1110•0113 POW=MN 77".. • 1:-.::,..Tr:KEST 1 Frd FLQQR PLAN BUILD!NG A. . . MOH CINTEA,.....17.7 s.-.41t •I/3r..1.-0. PO N 11134APIOTA CCIIPANY ' • r7 cotr.c 111.7-UP D.M.(PAP.1)-•-.. / I=-PaLL Pa:Y4 MP) • I FWD'CANOPY cuss IN.00 ALUM fll.WCS. \ • ; 1 J • • , ', ,• .L..--;---....i.--.1—.. I • I El ITEITIIIII3gg ,IgE1;111:13!ElfIT1411. igITITITKEEdill •MII 23:13.112:1:1 giI13: iii.litIREIIHITITE1 "1 gg:011:1:15:11,13TAIM:12:1i02:alitEggnIMIMIEME13 EITIMilflfpg sheet Mr 1 KOLCOn A FLOOR PLAK 71.111111)0101 WEST ELEVATION____- NORTH ELEVATION scAtE tin-.,...i.; —sc.LE •..).: .••i• .4.1._:37...._t4t7s..._.__. 11-1, . II F•• . . . •1 . • • •I!I)1111,4,7'• ',',r' ,r1 •,• ,l,.,-.,.,-,) : • • • I ;am t • t •••••— mum,EalmiRa EgiErniFEED;Erglil IIIIIMIleralligiQ CRECE50225.11M'il glIttErVI:teig]iir•MIPEO gpikflgRaitopittl. _ nrgulammiammingTaitmom azg 7,-.-1,--,.....-- ...._ job ro rhnOI no • —.-- . EAST ELEVATION . SOUTH ELEVATION & ;cmc ina77. war .1, -4 - ----—- _ __------- --——--— --- -------- - :-. ------- ----- - ... • • • -• • • " -" • • • LDGarctect. Wwon prew.A. nit...Igor ne.9t $00 owalne.WA.IMIO•t200/20:0-4744 r " It%" • . . • n SOUTH ELEVATION SCAE I/3r. •••• ••••3. •0-10 -•aa A.AS &LW M.00 COnnitanis WO. mmL ,TTmITTrg:11,1E1 jigP310113•=0 6/1[1111,0115:1= 1P25:EEEEI:EECEIgl CilEP:1!=!en:13:ti 61[111, Er INN EAST ELEVATION SCA.E 1/37. ii [--- m=geTrugli• m=1,- =J.= E3 =um I - - II EST ELEVATION provect trtseF 77.Vecetr,2..111...VPI FOP: N 0 P.T H ELEVATION .." F.--Xvi se...ac v/37 P '.ATA=OAK/ 570.77a..WA veel - • -- - • •-• - • • .. . _ --- • . _ . . . . . p30 it steel It -...... EFILA •— • CITY OF ON D IVI I 'N CURRENT PLANNING I S 0 DAVOF'SERVICE BY MAILING On the 1l day of UV�..�. , 1996, I deposited in the mails of the United States, a sealed envelope containing gLov-el L tke eeMA t1 documents. This information was sent to: Name Representing Q aF ec'010 3s MtaM-e,-i evNevo..1L entiv.r tic aka Ec U vw�td« R clrVv 4 lAc Lam sn (Signature of Sender) SJAA.Ki.k Sc cnCX- STATE OF WASHINGTON ) ) SS COUNTY OF KING ) I certify that I know or have satisfactory evidence that �ib 2 signed this instrument and acknowledged it to be his/her/their free and voluntary act for the uses and purposes mentioned in the instrument. a\ M Dated: cI i 7/ y ri' •' , _. ti •' w � • Notary P c in and f?r e State of Wasb rfgto•g� y Notary ( nt) X _ My appointment expires: -' Project Name: su3 klo" ' Ce.Kter g vNCe‘ Project Number: 04) • 04, ,S�n ,� NOTARY.DOC AFFIDAVIT OF PUBLICATION Jessica Folkerts , being first duly sworn on oath states that he/she is the Legal Clerk of the NOTICE OF ENVIRONMENTAL DETERMINATION (ERC) has issued a Determination of Non- ENVIRONMENTAL REVIEW COMMITTEE Significance - Mitigated for the following VALLEY DAILY NEWS RENTON, WASHINGTON project under the authority of the Renton The Environmental Review Committee Municipal Code. 600 S. Washington Kent, WA. 98032 R&D FACILITY/SW 16TH TECHNICAL CENTER a daily newspaper published six (6) times week. Said newspaper is a legal LUA-96-034,SA,SM,ECF newspaper of general circulation and is now and has been for more than six The applicant proposes to develop a new months prior to the date of publication referred to, printed and published in the tione-story structure(Building A)and an addi- En English language continuallyas a dailynewspaper in Kent, KingCounty, Wash- aop rto anlexisting structure (Building l nog g partially developed 22-acre site. Building ington. The Valley Daily News has been approved as a legal newspaper by order A would be 129,000 sq. ft. in size, while of the Superior Court of the State of Washington for King County. Building B would result in the addition of 5,000 The notice in the exact form attached, was published in the Valley Daily News sq. ft. building.0 squaretotalot, to an existingark 8spac- sq. ft. A of s18 parking spac- (and not in supplement form) which was regularly distributed to the subscribers es would serve the site. These would be during the below stated period. The annexed notice, a speculative buildings, with office, and high tech manufacturing uses anticipated. Three wetlands are present on the site. Two small Not.i r-P of Env Dot wetlands are not regulated and would be filled.A third wetland(approximately 16,000 square feet) is subject to the requirements of the Wetlands Management Ordinance. The site is located adjacent to Springbrook Creek, although no development is was published on 4-22-96 pro- posed within 25 feet of the mean high water The full amount of the fee charged for said foregoing publication is the sum of mark. The project requires nw,Site Plan Approval,anddvirShmental Reviee a Shoreline Substantial Development Permit. Location: 72 . 99 801 SW 16th Street. $ The 15 day comment/14 day appeal peri- ods for this project will run concurrently and end at 5:00 p.m. on May 07, 1996. Appeal eg I Cle , Valley Da y News procedures and the mitigation measures imposed by the City of Renton's Environ- mental Review Committee are available at _ the Development Services Division, Third Floor,Municipal Building, Renton,Washing- Subscribed and sworn before me this day of 19 ton 98055.Phone:235-2550.You should be (aLljtili-r‘Th / prepared to make specific factual objec-,��,,, ` [ "�'^ e lions. e,00 �wA/434 A Public Hearing will be held by the N M FE, , 7' Renton Hearing Examiner at his regular f1 a�•••g1ON F••. / N./y , meeting in the Council Chambers on the 4 A C:..•�� -riz •Q N. Notary Public or the State of Wa hln� second floor of City Hall, Renton, Wash- 4 4 •N ington, on May G • -C A R . Z residing at M g 14, 1996 at 9:00 AM to '= J0 y N; ` consider the Site Approval. If the Environ-. s`' ___ S is f King County, Washington i, mental Determination is appealed, the °U i3�\C ��_ '$ appeal will be heard as part of this public i hearing. V�► a 1,11., .jsed 7/92,1p�:�O��+ Published in the Valley Daily News April a4 1) 31 • G 2: 1996. 1474 RECEIVED 1 1 0 1996 DEVELui-w NT PLANNING CITY OF RENTON O'KEEFE DEVELOPMENT CORPORATION May 7, 1996 MAY 13 I996 0 CITY OF RENTON Attn.: Jennifer Henning HEARING M N R City of Renton 200 Mill Ave. South Renton, WA. 98055 RE: Wetland Mitigation Plan- S.W. 16th Tech Center(Group Health Site, LUA-96-034) Dear Jennifer, The April 18th letter from the City to LDG Architects references four mitigation measures, the first is the Wetland Mitigation Plan. Based on the wetland determination of the Army Corps dated April 4th, our request to participate in the Wetland Bank dated April 12 and Greg Zimmerman's approval of our request to participate in the Wetland Bank should preclude us from having to prepare a Mitigation Plan for relocating our wetland since we will be participating in the Wetland Bank. Please let me know if this letter is not acceptable and call me if you have any questions. Sincerely, O'KEEFE DEVELOPMENT CORPORATION omas M. ee Vice Presi ent TML:Imk Enc. cc: Joe Alhadeff 7900 S.E. 28th Street, Suite 400 Mercer Island, Washington 98040 (206) 236-6200 Fax (206) 236-6160 WAli Washington State Northwest Region Department of Transportation 15700 Dayton Avenue North Sid Morrison P.O. Box 330310 Secretary of Transportation Seattle,WA 98133-9710 (206)440-4000 C / /et) DATE: May 6,199611 MAY 13 lac? 1 u 1996 9 V EVELoh TO: Jennifer00 Mill Avenue South CITY OF RENTON CflYOF ReNoNNING Renton WA 98055 HEARING EXAMINER Subject: SR 405 MP 2.06 CS 1743 Mitigated Determination of Nonsignificance-R& D Facility/SW 16th Technical Center 4114" File No. LUA-96-034,SA,SM,ECF i 4 FROM: Robert A. Josephson, PE, Manager of Planning & Local Coordination Washington State Department of Transportation Northwest Region 15700 Dayton Avenue North, MS 122 P. O. Box 330310 Seattle, WA 98133-9710 Thank you for giving us the opportunity to review this project which, is located at 801 SW 16th Street. Our response is checked below: We have reviewed the subject document and have no further comments. The project will have no significant impact on the state highway system. X The State recommends that a traffic study be prepared to analyze the state intersections that are impacted by ten or more of the project's generated peak hour trips and also determine what mitigation measures, if any would be required. If you have any questions, please contact Don Hurter at 440-4664 or Vickie Erickson at 440-4915 of my Developer Services section VEE:vee File Name GITYOF RENTON . DAVIT F: ERVICE• BY MAIUN On the I day of , 1996, I deposited in the mails of the United States, a sealed envelope containing t�cav trn F xn vtt vta r e pc k documents. This information was sent to: Name Representing ed i Lt Aatt(tc. LOG letvchts tteati4n Lavvy Ca?eakaw 1�t v Co tava tv Tits-tvtc • *` I 1 uv Parer "toct tv.3 -ktclnaAd MCC h Perkk uts Cot e (Signature of Sender) SiIJ4 k- per STATE OF WASHINGTON ) ) SS COUNTY OF KING ) I certify that I know or have satisfactory evidence that 5 DRi. l‹. SGC 6 R signed this instrument and acknowledged it to be his/her/their free and voluntary act for the uses and purposes mentioned in the instrument. Dated: q/q 6o (-t3 ��� [/• • I Notaryin anState o P. Iic f r the f Notary rint) f�09 - `. • ^' My appointment expires: '.. a c 1 Project Name:m "La ra_cA% sw klotN-TGciAtAtcsl C�JIn Project Number: 96 034 ,Sft , sm 'tcr NOTARY.DOC OM • (,i • CIT'c OF RENTON Planning/Building/Public Works Department Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator May 17, 1996 State Department of Ecology Northwest Regional Office 3190 160th Ave. SE • Bellevue, WA 98008-5452 SUBJECT: Shoreline Management Substantial Development Permit for R&D Facility/SW 16th Technical Center File No. LUA-96-034;SA,SM,ECF • Dear Shoreline Permit Coordinator: Enclosed is the Shoreline Substantial Development Permit for the above referenced project. The permit was issued by the City of Renton on May 17, 1996. We are filing this action with the Department of Ecology and the Attorney General per WAC 173-14-090. Please review this permit and attachments and call me at (206) 277-6186 if you have any questions or need additional information. ith Sincerely, ftenvtiv-ap Jennifer Toth Henning Project Manager Enclosures: Copy of Original Application Affidavit of Public Notice/Publication Site Plan, Vicinity Map Wetland Study (Parametrix, Inc) -Attachment "A" Legal Description -Attachment"B" SEPA Determination -Attachment"C" cc: Office of Attorney General City of Renton, Transportation Systems City of Renton, Utility Systems City of Renton, Code Compliance Inspector Applicant SHLTR.DOC 200 Mill Avenue South - Renton, Washington 98055 CITY OF RENTON SHORELINE MANAGEMENT ACT OF 1971 PERMIT FOR SHORELINE MANAGEMENT SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT APPLICATION NO.: LUA-96-034,SA,SM,ECF DATE RECEIVED: March 15, 1996 DATE OF PUBLICATION: April 22, 1996 DATE APPROVED: May 17, 1996 DATE DENIED: N/A TYPE OF ACTION(S): X Substantial Development Permit [ ] Conditional Use Permit [ ] Variance Permit Pursuant to Chapter 90.58 RCW, the City of Renton has granted a permit: This action was taken on the following application: APPLICANT: Edi Linardic/LDG Architects PROJECT: R&D Facility/SW 16th Technical Center DEVELOPMENT DESCRIPTION: The applicant proposes to develop speculative buildings on a partially developed 22-acre site. A new one-story structure (Building "A") and an addition to an existing structure (Building "B") and parking for 624 vehicles would be provided. Building "A"would be 126,000 square feet in size, while Building "B" would result in the addition of 208,000 square feet to an existing 85,000 square foot building. Total size of both buildings would be 419,000 square feet. Anticipated use of the structures is office, research and development, manufacturing and warehouse. Landscaping would be provided on the perimeter of the site, around the buildings and within the parking areas. Existing natural landscaping would remain along the western boundary of the site which is adjacent to Springbrook Creek. On-site employee outdoor recreation/seating areas would be provided. Buildings would be setback a minimum of 65 feet from the Ordinary High Water Mark for Springbrook Creek, and no disturbance would occur as a result of the project within 25 feet of the mean high water mark of the creek. The proposal would not preclude access to Springbrook Creek. Visual access would be available from SW 16th Street on the north side of parcel. Physical access would be possible from SW 16th Street. In addition, future City of Renton public works projects (as discussed below)would accommodate public access to and along the Creek. The Site Plan indicates an area in the northwest corner of the property that would be set aside as a reserve to be dedicated to the City of Renton for the future extension of Oakesdale Avenue SW through the site. In addition, a 55-foot wide area from the western 5-foot contour of Springbrook Creek would be granted as an easement or dedicated by the property owner to the City of Renton for the widening of Springbrook Creek. The City would need to obtain a separate Shoreline Substantial Development Permit for either the Oakesdale extension or the SHSBDV.DOC • • " City of Renton P/B/PW Department Shoreline Substantial Development Permit Page 2 of 4 widening of Springbrook Creek. A shelf would be created along the Creek as part of the widening project and could be used for visual and physical public access to and along Springbrook Creek. Three wetlands are present on the site. Two small Category III wetlands are not regulated and would be filled. A third Category III wetland (approximately 16,000 square feet in size) would be filled and recreated off-site. The site is located adjacent to Springbrook Creek and Rolling Hills Creek. Springbrook Creek is considered to be a "Shoreline of the City" and is regulated under the Shoreline Master Program. The Shoreline Boundary Map for Springbrook Creek shows that "Urban" and "Conservancy" designations apply to the site. (The Shoreline Boundary Map was developed based on a Department of Ecology windshield survey of the area.) "Urban" environment designations are intended for high-intensity land uses including residential, commercial, and industrial development. "Conservancy" environments are intended for passive uses and were intended to account for the presence of Category I or II wetlands. Wetland studies conducted by a qualified wetlands biologist included delineation of three wetlands on the subject parcel. Each of these three wetlands was determined to be classified as a Category III wetland, according to the Renton Wetlands Ordinance. Based on the wetland studies conducted for the subject site (Attachment "A") the "Conservancy" designation is not an appropriate designation for any portion of the property. For this reason, the Shoreline Substantial Development Permit considers only the "Urban" designation as applying to the site, and will seek to amend the Shoreline Boundary Map for Springbrook Creek. LEGAL DESCRIPTION: See Attachment "B" SEC-TWNP-R: Section 24, Township 23 North, Range 4 East WITHIN SHORELINES OF: Springbrook Creek, Rolling Hills Creek APPLICABLE MASTER PROGRAM: City of Renton Shoreline Master Program The following section/page of the Master Program is applicable to the development: Section Description Page 5.04 Urban Environment page 22 6.04 Public Access page 24 6.06 Landscaping page 24 7.05 Commercial Developments page 28 7.07 Industrial Development page 30 7.11.02 Private Parking page 32 Development of this project shall be undertaken pursuant to the following terms and conditions: 1. The applicant shall comply with the mitigation measures established by the City of Renton's Environmental Review Committee (See Attachment"C"). This permit is granted pursuant to the Shoreline Management Action of 1971 and pursuant to the following: 1. The issuance of a license under the Shoreline Management Act of 1971 shall not release the applicant from compliance with federal, state, and other permit requirements. 2. This permit may be rescinded pursuant to Section 14(7) of the Shoreline Management Act of 1971 in the event the permittee fails to comply with any condition hereof. SHSBDV.DOC • - ' City of Renton P/B/PW Department Shoreline Substantial Development Permit Page 3 of 4 3. A construction permit shall not be issued until thirty (30) days after approval by the City of Renton Development Services Division or until any review proceedings initiated within this thirty (30) day review period have been completed. /Ogg 4 5//?/%1( Planning ildin ublic Works Administrator ate SHSBDV.DOC City of Renton P/B/PW Department Shoreline Substantial Development Permit Page 4 of 4 THIS SECTION FOR DEPARTMENT USE ONLY IN REGARD TO A CONDITIONAL USE OR VARIANCE PERMIT DATE RECEIVED: APPROVED: DENIED: If Conditional Use, Section of the City's Shoreline Master Program authorizing the use: If Variance, Section(s) of the City's Shoreline Master Program being varied: This Conditional Use/Variance permit is approved/denied by the Department pursuant to Chapter 90.58 RCW. Development shall be undertaken pursuant to the following additional terms and conditions: Date Signature of Authorized Department Official cc: Attorney General's Office City of Renton, Plan Review(Neil Watts) City of Renton, Surface Water Utility(Ron Straka) Applicant SHSBDV.DOC „ ' S CIT'F RENTON ail 4 (S-- Planning/Building/Public Works Department Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator May 16, 1996 • Mr. Edi Linardic LDG Architects 1319 Dexter Avenue North, Suite#260 Seattle, WA 98109 SUBJECT: R&D Facility/SW 16th Technical Center Project No. LUA-96-034,SA,V,SM,ECF Dear Mr. Linardic: This letter is to inform you that the comment and/or appeal periods have ended for the Environmental Review Committee's (ERC) Determination of Non-Significance - Mitigated for the above-referenced project. No appeals were filed on the ERC determination. The Hearing Examiner's decision on the Site Approval will be forthcoming approximately May 28, 1996. If you have any questions, please feel free to contact me at 277-6186. For the Environmental Review Committee, fOt t WV/VA:in h Henning Project Manager cc: Group Health Cooperative/Owner Ms. Lori Pitzer/Boeing Mr. Tom Lee/O'Keefe Development FINAL.DOC 200 Mill Avenue South - Renton, Washington 98055 ®This paper contains 50%recycled material,25%post consumer 0 King County MAY 10 1996 Metro Transit Division Design and Construction Section, CITY OF HEN U i ON Environmental Planning and Real Estate PUBLIC WORKS ADMIN. Department of-Transportation 821 Second Avenue M.S.122 Seattle,WA 98104-1598 (206)684-1418 (206) 684-1900 FAX May 7, 1996 City of Renton Gregg Zimmerman, Administrator Department of Planning/Building/Public Works 200 Mill Avenue South Renton, WA. 98055 Mitigated DNS, R&D Facility/SW 16th Technical Center, LUA-96-034,SA,SM,ECF Dear Mr. Zimmerman: King County Transit Division staff have reviewed this proposal and have the following comments. Route 153 operates on SW 16th St. Metro has a bus zone on SW 16th St.just west of Raymond Ave. SW. As it appears that the developer will be installing new curb, gutter and sidewalk in this area, staff request that the developer coordinate with King County Transit to maintain the current location of the zone both during and after construction. Please consult with Paul Alexander, Facilities Planner, at 684-1599 to discuss maintaining the zone as these improvements are made. In addition to the improvements discussed above, the project proponent should be required to provide pedestrian access from Building A and the existing building to SW 16th St. to facilitate the use of transit. Please note that Commute Trip Reduction requirements are likely to apply, at some point, to this project. If you have any questions or comments, please contact Ann Martin, Transit Planner, at 296-6509. Thank you for the opportunity to review and comment. Sin rely, 2(4, Gary K iedt, Environmental Planner g:\oap154.doc sk- %= d31- CITY OF RENTON PLANNINGBUILDING/PUBLIC WORKS MEMORANDUM DATE: December 17, 1997 TO: Linda Honeycutt s VIA: Priscilla Pie,11/Sam Star FROM: Ron Straka Lin Wilson/6>y SUBJECT: Interfund Transfer for: Benaroya Wetland Mitigation Springbrook Creek Channel Widening Design Reimbursement Please process the two interfund transfers from the Surface Water Utility to the Transportation Division as discussed below. USE OF PORTION OF OAKESDALE WETLAND AREA TO SATISFY BENAROYA MITIGATION OBLIGATION The City is obligated to provide 16,700 square feet (0.38 acres) of wetland mitigation for the Benaroya's SW 16th Street Technical Center project (LUA-96-034). In exchange Benaroya paid the City$50,100 in lieu of having to construct the mitigation on their development site. The intent of the City was to use the money to construct the mitigation as part of the City's mitigation bank construction project. Under current design plans, the Oakesdale Phase lA project (LUA-95-024) will create about 2 acres of wetland. This is about 1.5 acres in excess of what is required for the Phase 1A wetland impact. The excess 1.5 acres was intended to be reserved in partial satisfaction of the approximately 3 acres of mitigation needed for Phase 2, with the remaining 1.5 acres of Phase 2 mitigation being accomplished on a separate site at the time Phase 2 is implemented. However, it was agreed that the Benaroya mitigation money should be transferred to the Oakesdale project in 1997 in exchange for use of 0.38 acres of the excess wetland to be created under Phase 1A. Thus the Benaroya mitigation requirement is satisfied and the cost of the Oakesdale project is reduced by $50,100. The Benaroya mitigation would also be completed 2 years earlier than if the mitigation was accomplished under the City's mitigation bank construction project, currently scheduled in the SWU Capital Improvement Program for the year 2000. The $50,100 also covers all monitoring, maintenance, and other post-construction activities that may be necessary to ensure that the wetland mitigation is successful. Post-construction activities will be conducted by the Transportation Division in accordance with the Wetland Mitigation Plan approved for the Oakesdale Extension Project. Linda Honeycutt Interfund Transfers Page 2 The total transfer is$50,100 and is to be transferred in 1997 between the following accounts: DEBIT: 421.000600.018.5960.0038.65.065119/25105/5100 $50,100 Surface Water Utility account/WO/function CREDIT: 317.000022.016.5950.0011.67.000000/25 1 05/5 1 60 $50,100 Transportation account/WO/function SPRINGBROOK CREEK CHANNEL WIDENING DESIGN REIMBURSEMENT The Springbrook Creek channel from SW 16th Street to the proposed Oakesdale bridge crossing will be widening as part of the Oakesdale Avenue SW Extension Project. In addition to designing the roadway, the engineering consultant team for the Oakesdale project, lead by Kato & Warren, also prepared the design plans and specifications for the channel widening work under their contract (CAG-97-061)with the Transportation Division. The Surface Water Utility(SWU)will reimburse the Transportation Division for the SWU's share of the costs of the channel widening design work. The total cost has not yet been determined. However, the SWU wishes to make an initial $25,000 payment this year to reimburse a portion of the cost. Therefore,please process a transfer for$25,000 between the following accounts: DEBIT: 421.000600.018.5960.0038.65.065285/25105/5160 $25,000 Surface Water Utility account/WO/function CREDIT: 317.000022.016.5950.0011.67.000000/25105/5160 $25,000 Transportation account/WO/function We request that the transfer be made before the end of the year so it is paid out of 1997 funds. Thank you. If you have any questions,please contact Ron Straka at X-5548 or Lin Wilson at X-6223. H:DOCS:97-1148:SW attachment cc: City File LUA-96-034 City File LUA-95-024 Ron Olsen Sandra Meyer Joe Armstrong Tom Boyns Scott Woodbury CITY OF RENTON PLANNINGBUILDING/PUBLIC WORKS MEMORANDUM DATE: December 23, 1997 TO: File LUA-96-034 t5Pt FROM: Scott Woodburycl,t) SUBJECT: COMPENSATORY FLOODPLAIN STORAGE FOR THE SW 16TH STREET TECHNICAL CENTER PROJECT(LUA-96-034) The purpose of this memo is to confirm for the file that an adequate amount of compensatory floodplain storage has been provided for the floodplain storage lost due to the SW 16th Street Technical Center project. The final calculation for the floodplain storage filled by the Technical Center project is attached. The calculation shows that 213,246 cubic feet of floodplain was filled by the project, which is less than originally expected. A net volume of 61,544 cubic feet of storage was created by the project, excluding the volume of storage needed to satisfy the project's detention requirement. This results in a net fill of 213,246-61,544=151,702 cubic feet. As a condition of obtaining property along Springbrook Creek from the Technical Center site, the City agreed to provide compensatory storage for the Technical Center project's floodplain fill (see Hearing Examiner's report for site plan approval dated June 3, 1996, and CAG-96-092). A total of 175,000 cubic feet of floodplain storage was created in 1995 just downstream of the Technical Center site as part of the Springbrook Creek widening project from SW Grady Way to SW 16th Street. Thus,the compensatory storage created exceeds that filled by 23,298 cubic feet. The excess 23,298 cubic feet may be used to offset floodplain fill impacts of other projects for which the City is obligated to provide compensatory storage. U:1997:97-039:SW attachment cc: Ron Straka Jennifer Henning 10/03/96 10:00 FAX 2062518782 BARGHAUSEN ENG 0001 ,.::....:. r� TO: RN7 lotAINO Fax No: (_ ,2 gel55 OF RENTON OCT 0 3 1996 • CC: Fax No. ( • Fax No. ( FaX No. • FROM: Kot, �- Ka4.‘ BARGHAUSEN CONSULTING ENGINEERS, INC. 18215 72nd Avenue South, Kent, WA 98032 (206) 251-6222, FAX (206) 251-8782 Comments: PiliniVii441Vvry ./‘.9.41,e9-1(-/5.19-rt.. .. .. ..... �. ...... --- number of Indicated pages. Nate. Please call(206) 251-6222 if you de not receive the A 9 AF.167 . '10/03/96 10:01 FAX 2062518782 BARGHAUSEN ENG LL/�j E1002 117 Soft. H Street Suite 210 r• Eacalcci Inc. Aberdeel, WA 98520 ✓ +r (360) 533-2007 rJ yg� FAX (`LSO) 533-1618 • � October 1 , 1996 /4)6- Karl Lundberg C '• Barg%atasen 'Engineers. Inc. ' 18215 72nd Avenue South „ Ken+., WA 98832 RE; ;W 16th Tech Center De,a x' Karl, Em,losed please find grid elevation cutlfill graphics and volumes for this project, which was calculated using the average end area method with a cross-section created approximately every .73' The site was not adjusted to reflect stripping or design subg}-ades in order to reflect exact changes in volume as related to the flood study. The design grades in the area of the flood stu4y which were higher than elevation 16 were lowered to elevation 16. Those lower were lett as designed. By , comparing this, adjusted terrain model to the existing terrain model, the amo�" t of flood storage volume displaced by the fill can be calculated. The, cut volume which would create or open up more f1or'd storage capacity was calculated from the unadjusted design. TOTAL RAW VOLUMES IN PLACE CUT FILL AREA VOLUME VOLUME m i.. —. n CHANGE TO FLOOD STORAGE AREA 285542 6737 7898 V m a M Please call after you have reviewed the information if you have any cl►yestions_ '10/03/96 10::01 FAX 2062518782 BARGHAUSEN ENG 1QJ003 • /1" Y 4l2 r. ruag rA C c rcdn/ • VOWME- d►- 5e0.4v,477vA) S Lflf✓ G7- _ 16 0 — ‘731 cY /e 019cF cdv itak.sa PLO S S cJ u YIum I— I.., W W\11 W W.C\II • I S in Ml in u1 0 1�l w n eopPl. ud = fol, <44 r glr nci�ti N Cl • wopPL-4-f4.1 Dis.R.A-o 0-Air • v'Lu,we of ru_ g at / O 7$9 e. c•V • • " I • • 1 w , December 15, 1997 Renton City Council Minute: Page 415 Citizen Comment: Tilton - David Tilton, 3511 NE 6th St., Renton, 98056, submitted a petition containing NE 6th St Stop Signs & 41 signatures requesting that the City install stop signs and traffic circles Traffic Circles Request along NE 6th Street from Monroe to Union Avenues NE, to deter speeders. (Petition) Mr. Tilton explained that NE 6th Street is the only through street between Monroe and Union that does not have stop signs. He added that the problem with speeding vehicles along this street has been recently exacerbated by increased housing development in this area, which has worsened what is already a dangerous situation for residents and their pets. Councilmember Nelson agreed this was a problem, particularly since NE 6th Street is narrow and not intended for use as a thoroughfare. CONSENT AGENDA Items on the consent agenda are adopted by one motion which follows the listing. Appointment: Municipal Mayor Tanner appointed the following individuals to serve one-year terms Court Judge Pro Tems expiring 12/31/98 as Municipal Court Judge Pro Tern: Jerry J. Belur, Frank Davidson, Charles Delaurenti, Gary Faull, Michael J. Finkle, Patrick Hardy, Susan Irwin, Timothy Jenkins, David R. Kirshenbaum, John D. Lawson, Roger I. Lewis, Terence Lynch, Denise C. Marti, Robert. McBeth, Stephen L. Rochon, Robert Sewell, Georgina D. Sierra and Howard S. Stein. Council concur. CAG: 97-174, New City City Clerk reported bid opening on 12/04/97 for CAG-97-174, new City Hall Hall Carpet, Allied Floors carpet (supply only); four bids; engineer's estimate $266,000; and submitted & Acoustics staff recommendation to award the contract to the lowest responsive bidder, Allied Floors & Acoustics, Inc., in the total amount of $246,181. Council concur. Parks: New City Hall Community Services Department requested waiver of permit fees in the Construction Permit Fee estimated amount of $45,000 for construction of the new City Hall. Refer to Waiver Finance Committee. Municipal Court:, Municipal Court Division recommended approval of an interlocal agreement Computer Upgrades, with the Office of the Administrator for the Courts to reimburse the State for Reimbursement to State personal computer upgrades at a cost of $1,116. Council concur. (See page 416 for resolution.) Transportation: Oakesdale Planning & Technical Services Division submitted request from the Benaroya Ave SW Extension, Capital Company to release a restrictive covenant reserving rights for the Benaroya Co Release of Oakesdale Ave. SW extension project, since the City has acquired the Restrictive Covenant necessary rights for.this project. Council concur. gb -03L S'Pcs Transportation: Oakesdale Planning & Technical Services Division recommended granting an easement to Ave SW Extension, Seattle Seattle City Light to relocate an electrical transmission line to accommodate City Light Power Line the Oakesdale Ave. SW extension project. Council concur. Relocation (Easement) Utility: Annual Consultant Utility Systems Division requested a two-year extension of the annual Roster, Two-Year consultant roster for General Utility Engineering, Geohydrology, Extension Hydraulics/Hydrology, Soils/Geotechnical Engineering, and Corrosion Control services. Council concur. Utility: Skyway Water & Water Utility Division submitted proposed agreement establishing a water Sewer District Water service area boundary with the Skyway Water and Sewer District. Refer to Service Area Boundary Utilities Committee. C11 Jr. OF RENTON COUNCIL AGENDA I • AI#: (0.e. . Submitting Data: Planning/Building/Public Works For Agenda of: DeptiDiviBoard.. Planning&Technical Services December 15, 1997 Staff Contact Tom Boyns, X 6209 Agenda Status Consent X Subject: Public Hearing... Release of Restrictive Covenant; Benaroya; Oakesdale Correspondence.. Extension Project Ordinance Resolution Old Business Exhibits: New Business Issue Paper Study Sessions Information Recommended Action: Approvals: Council Concur Legal Dept Finance Dept Other Fiscal Impact: Expenditure Required... Transfer/Amendment Amount Budgeted Revenue Generated Total Project Budget City Share Total Project.. Summary of Action: The necessary rights have been acquired to extend Oakesdale Avenue SW through the Benaroya property at SW 16th Street. During the redevelopment of this property in 1996 the City required a reservation of an area of the property for the Oakesdale Extension Project which was larger than what was ultimately needed in the form of a Restrictive Covenant which was recorded. The negotiations for the area needed included a request from the Benaroya company to release the Restrictive Covenant as it is no longer needed. STAFF RECOMMENDATION: The Planning/Building/Public Works Department requests the City Council approve the release of the Restrictive Covenant. CITY OF RENTON PLANNINGBUILDING/PUBLIC WORKS MEMORANDUM DATE: December 5, 1997 TO: Kathy Keolker-Wheeler, President City Council Members VIA: (vteff Mayor Jesse Tanner FROM: Gregg Zimmerman, Administrator 6- Planning/Building/Public Works Department STAFF CONTACT: Tom Boyns, 6209 SUBJECT: Release of Restrictive Covenant; Benaroya; Oakesdale Extension Project ISSUE: The Benaroya Capital Company has requested the City release a restrictive covenant reserving rights for the Oakesdale Extension Project because the City has acquired the necessary rights for this project from their property. RECOMMENDATION: The Planning/Building/Public Works Department requests the City Council to approve the release of the restrictive covenant BACKGROUND SUMMARY: During the redevelopment of this property in 1996 the City required a reservation of an area of the property for the Oakesdale Extension Project which was larger than what was ultimately needed in the form of a Restrictive Covenant which was recorded. The necessary rights have been acquired to extend Oakesdale Avenue SW through the Benaroya property at SW 16th Street. The negotiations for the area needed included a request from the Benaroya company to release the Restrictive Covenant as it is no longer needed. The request was circulated within the Planning lBuilding\Public Works Department verbally. The response was uniformly unconditional approval with the comments that the Benaroya Company was very cooperative during negotiations and dealt fairly with the City, since the property rights held in the restrictive covenant are no longer needed the request should be granted and the restrictive covenant released. I - 1001 Fourth Avenue, Suite 4700 Seattle, Washington 98154 (206) 343-4750 Fax: (206) 447-9384 • Benaroya Capital Company December 5, 1997 Mr. Thomas G. Boyns Property Services Supervisor City of Renton - 200 Mill Avenue South Renton, WA 98055 Subject: Oakesdale Avenue SW Extension Project . Dear Mr. Boyns: Enclosed are executed Deed of Dedication together with its' exhibits and Real Estate Excise Tax Affidavit. Also enclosed is a form of Release to be executed by the City of Renton in order to removed the restrictive covenant currently on the property. You are hereby authorized to record the Deed of Dedication, only and so long as concurrently you execute and record the Release and submit a check in good U.S. funds the sum of$90,000 payable to Benaroya Capital Company, LLC. If you have any questions, please do not hesitate to call. Yours very truk , T Ji- 4 I ( • Joseph EUdef cc: David . Lombard, Jameson Babbitt Stites & Lombard • After Recording Return to: David N. Lombard Jameson Babbitt Stites & Lombard, P.L.L.C. 999 Third Avenue, Suite 1900 Seattle, WA 98104-4001 Document Title or Titles : 4' Release Reference Nos. of Documents Assigned or Released: 96.07180097 v ! � Name of Grantor: City of Renton Name of Grantee: j Benaroya Capital Company, L.L.C.' Pages referencing additional navies: None Abbreviated Legal Description: Portion of Blocks 32, 33 and a34, C.D. Hillman' s Earlington Gardens Addition, Div. 1, Volume 17, page 74 Additional Legal Description Found On: Page 3 Assessor's Property Tax Parcel Number or Account Number: 334040-5300-01 • II ' I iI • • RELEASE This Release (this "Release) is made this day of December, 1997, by CITY OF RENTON, a Washington municipal corporation. Benaroya Capital Company, L.L.C. , has previously executed and . rec.orded ,that . certain Declaration of .Restrictive Covenant executed by Benaroya Capital Company, L.L.C. recorded in King County, Washington on July 18, 1996, under King County Recording No. 9607180097 (the "Restrictive Covenant")., which Restrictive - • Covenant was to run with the, property described therein (the "Reserved Property") for a period of ten (10.) years. The undersigned is concurrently herewith . acquiring a portion of the Reserved Property for roadway and related purposes and the remaining portion of the Reserved Property should no longer be reserved. Now, therefore, the undersigned hereby releases all of its right, title and interest in, to and under the Restrictive Covenant and agrees that said restrictive covenant should be released from the Reserved .Property. , Approved as to Legal Form CITY OF RENTON • By: By: Lawrence J. Warren Jesse Tanner • • City Attorney Mayor • Attest : • By: ' City Clerk . • II • (JBSL1/50376/01617/DNL/172440.1) 2 LEGAL DESCRIPTION OF PROPERTY That portion of the below described Tract X in the northeast quarter of the southeast quarter of Section 24, Township 23 North, Range 4 East, W.M., in King County, Washington, described as follows: Beginning at the northwest corner of said Tract X; Thence N 89 26'29"E a distance of 71.72 feet along the north line of said Tract X to the True Point of Beginning; Thence continuing N 89 26'29"E along the north line of said Tract X, a distance of 94.50 feet Thence S 00°32'04"E a distance of 341.92 feet; Thence N 3 l°05'11"W a distance of 17.09 feet; Thence N 30°41'07"W a distance of 67.33 feet; Thence N 33°33'14"W a distance of 4230 fret; Thence N 24°46'34"W a distance of 55.48 feet; Thence N 18°0913T'W a distance of 50.76 feet; Thence N 03°22'42"E a distance of 134.83 feet to the True Point of Beginning; Tr t X: All of vacated Blocks 32, 33, and 34 of C.D. Hillman's Earlington Gardens Addition to the City of Seattle,Div. I,according to the plat thereof,recorded in Volume 17 of Plats,page(s)74, in King County,Washington; together with vacated Kenny Avenue (82nd Avenue South)and vacated Evans Avenue(83rd Avenue South)adjoining. (J8SL1/50376/01617/DNL/172440.1) 3 t ( 1 • ` ,• Project: Onkes1a1 Reservatleo� WHEN RLCORDfiD RETURN TOt . ' Wee of the City Clerk Work Order M • Renton building DECLARATION OF PID;�34Q4o•S]Oc 200 Mill Avenue South Grantor: neilarove • w Renton.WA 98035 RESTRICTIVE COVENANT STR: 24.23.4 • a Street Intersection: W I i h s Q -, 0 _ . Oakc dale Ave SW: 'n .71 The undersigned, Benaroya Capital Company, L.L.C., a Washington limited liability company (the r. "Declarant"), is the owner of the real property described in Exhibit A attached hereto and by this reference incorporated herein (the "Property"). The City of Renton (the"City")has requested that 1 Declarant not construct any buildings upon the portion of the Property described in said Exhibit A • , attached hereto and by this reference incorporated herein(the"Reserved Property")for a period of ten Al e • (10)years from the date of the recording of this Declaration because of the possible future sale of the a Reserved Property to the City for roadway purposes. r 3. NOW THEREFORE, Declarant hereby establishes, grants and imposes, in favor of the City, the y •; 66 following restrictions and covenants running with the Property,subject to the terms and conditions set :. 0)• forth below with respect to the use of the Reserved Property by the undersigned,its successors,heirs O C and assigns: t. Declarant hereby agrees for the benefit of the City that Declarant shall not construct any ; permanent buildings within the Reserved Property for a period or ten(10)ye ars from the date 0 this Declaration is recorded with the King County Division of Records and Elections. •;�; CD 2. Notwithstanding the restriction contained in paragraph 1 above,Declarant shall have the full right to use the Reserved Property, including, but not limited to, the right to install parking and landscaping on the Reserved Property for the use and benefit of the remainder of the Property. 1 3. At any time during the period commencing on the date of the recording of this Declaration .. and ending on the date ten (10) years after the date of the recording of this Declaration, Declarant hereby agrees to sell the Recc•rved Property to the City for the fair market value of the Reserved Property, without giving consi icration to any improvements placed on the Reserved Property by Declarant, including, but not limited to, any parking or landscaping '{ placed thereon. 4. The covenants contained herein shall run with the Property and shall expire on the date which . is ten (10) years from the date of the recording of this Declaration with the King County Division of Records and Elections. Any violation or breach of the covenants contained herein may be enforced by proper legal procedures in the Superior Court of King County by the City. IN WITNESS WHEREOF,the undersigned has executed this Declaration as of the day and year set forth in the notarial acknowledgment set forth below. S. t 61 . BENAROYA CAPITAL COMPANY, L.L.C. �0 r a Wsshing{on limited liability c •zany J I.arryicnaroya,Manager' 1 00 SIHI 03h1303y t • • a, • I Project: Deictsdeis ReservtiL'Cn Work Order II PID• 314040-3300 • I. Grantor: fl n rovn • j STR: 24.23.4 • j Street Intersection: SW 16'h Si..Ct t • Oakesdale Ave SW 1 1 .. i • STATE OF;WASHINGTON ) SS COUNTY OF KING ) `` • • • I • I certify that I know or have satisfactory evidence that Larry R. Benar a signed this instrument, on oath • A stated that he was authorized to execute the instrument and acknowledged it as the Manager of BENAROYA . CAPITAL COMPANY, L.L.C. to be the free and voluntary act of such party/parties for the uses and A . qi purposes mentioned in thg instrument. Date e 1I.(a" • x• CIAO-. .. Notary Public in a d fe:the S S' • ` '• of Washington reJiplat .. it :: . �' Notary(print): 1V/JJl5� ,;•-- comb,' My appointment expires: N Q ,M 0, , ':h 1s 1- • I4 .,-. ai • :it0 . 1 1I•DOCS:96.344.S W:ps -Dcclerstion of Restrlctive Covenant • Pars I of 4 _ . i • . --tom. ' .. '. L _ - 1 e • I , i 1 i Project: Oakesdale Reservation . I. EXHIBIT A Work order� 3: LEGAL DESCRIPTION Plo; 334119-5304 ?i Crantor:_9sa•_Axe • • h SIR: _ 24.23.4 Sheet lnterscc ion: SW 16th St& • 4 Qakesdale Ave SW.: i . i That portion of the below described Tract X in the northeast quarter of the southeast quarter of I Section 24, Township 23 North, Range 4 East, W.M., in King County, Washington, described asii 3 follows: Beginning at the northwest corner of said Tract X; Thence N 89 26'29"E a distance of 71.72 feet along the north line of said Tract X to the True Point of f Beginning; Thence continuing N 89 26'29"E along the north line of said Tract X,a distance of 94.50 feet; i I• Thence S 00Di. °32'04"E a distance of 341.92 feet; 0 ; 0 Thence N 3l°05'11"W a distance of 17.09 feet; • I GO I P. Thence N 30°4l'07"W a distance of 67.33 feet; . • IP 'i . � 0 s 1 a•�D�y Thence IN,> >J'l4'W a distance of42.30,acy �-�: • VIA Thence N 24°46'34"W a distance of 55.48 feet; Thence N 18°09'37"W a distance of 50.76 feet; A. i v. Thegce N 03°22'42"E a distance of 134.83 feet to the True Point of Beginning; 4. '• Tract X; All of vacated Blocks 32,33,and 34 of C.D.Hillman's Earlington Gardens Addition :� to the City of Seattle,Div. I,according to the plat thereof,recorded in Volume 17 of T Plats,page(s)74,in King County,Washington;together with vacated Kenny Avenue • 1 (82nd Avenue South)and vacated Evans Avenue(83rd Avenue South)adjoining. ts v. :i • • • .2 1 • 1 II'IYXS 96.314:SW:p1 Ikclunion of Restrictive Covenu:t Page 3 or1 1 . -- t I M. Project: Oakcsdalc Rstrmtion ' EXHIBIT A CONTINUED Work Order It ; MAP EXHIBIT PID�13a40.5300 • • '• Grantor:_clCDttroya . STR: 24-23.4 •• Street Intersection: SW 16th St R Qalresdale Ave SW.; Northwest CornerII of Tract X iI 1 2 9 1 j i 3 V 8 1 Line M Rearing Diu.(R) ., • • 1 N 89 2629"E 71.72 7 • II Cr) 2 N 89 2629"E 9430 _ I S00'J204"E 341.92 6 •IN, 4 N 31'05'117 W 17.09 t ' 5 N 30'41'07_ W 67.33 \ !A a N33.33'14";W 1 42.30 i I ?; I v) 7 I N'24'46341 iV 55.48 5\ 8 N I8.0937i%V I 50.76 j 4" � 9 N 03'22'42 j EI 134.83 t . .� ^• llII i .:, 0 l-!100' It* 7 ( IN FEET ) I. • , K ti• L.� 4 • n.e"4 (• W:��r Dec:melon of Restrictive Covenant, Pipe 4 of 4 i I . I 1 1 Marilyn J. Petersen From: Thomas G. Boyns To: Marilyn J. Petersen Subject: Benaroya Release of Restrictive Covenant Date: Tuesday, December.09, 1997 4:31 PM We have confirmed that the Restrictive Covenant was not imposed, but was negotiated and freely given, approved and accepted by the City Council. Therefore the proper procedure for release is for the City Council to approve the release as presented. Thank you for your question this morning. I feel better about what we know regarding this issue. • Page 1 . .... .I HEAR::::>::>:::::::> • .:::.::::.:;:;.•••••;:.::.••••:.;:;:.>:.::.::.:;;:.:::<.;::::;.::•••••:.:.:;.:••••;;:;:.;::.::.::.::.::.::.:.;:. • G UNCIL CHAMBERS, SECOND FLOOR# RENTON MUNICIPAL BUILDING Tfie ►caf.an. ..>Elsted.are..in..order..of a .rcatron...number..;Only ana..not.:necessan.. :.the.O.rder..in which.. t. : ATE. :: ::::::�.��.�::::::::..�::::::::::::::.:�::::.::�::::::::::::.171�.:.�:::::::.�:::::::::::::::::::.�:::::::::.Y.:::.:::.:�:.::::.::::::.:�.:_:::._::::::�:::.�:::::::::.:�::.: .:.:�::::::::::::::.. .hearct::;ltemsw.11..be.caled.�'orl0arrn PROJECT NAME: CHEVRON/MCDONALD'S ON FOURTH PROJECT NUMBER: LUA-96-037,SA,ECF PROJECT DESCRIPTION: The applicant requests Site Plan Approval for the re-development of a site located at NE 4th Street and Monroe Avenue NE. The site is presently occupied by Alexander's Auction Storage. Existing buildings would be demolished to accommodate the new development. The project would consist of a Chevron gas station with a 38-foot by 83-foot convenience store that includes a McDonald's quick-serve restaurant. The McDonald's would feature seating for 52 to 60 persons and drive-through window service. The Chevron station and convenience store would operate 24 hours each day,while the McDonald's would be open from 6:00 am to 10:00 pm. Location: 3209 NE 4th Street. PROJECT NAME: R&D FACILITY/SW 16TH CENTER PROJECT NUMBER: LUA-96-034,SA,SM,ECF PROJECT DESCRIPTION: The applicant requests Site Plan Approval (SA) for the development of a new one-story structure (Building A) and an addition to an existing structure (Building B) on a partially �. developed 22-acre site. Building A would be 129,000 sq. ft. in size, while Building B would result in the addition of 202,000 square feet to an existing 85,000 sq. ft. building. A total of 618 parking spaces would serve the site. These would be speculative buildings, with office, and high-tech manufacturing uses anticipated. Three wetlands are present on the site. Two small wetlands are not regulated and would be filled. A third wetland (approximately 16,000 square feet) is subject to the requirements of the City's Wetlands Management Ordinance. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires Environmental Review, Site Plan Approval, and a Shoreline Substantial Development Permit. 801 SW 16th Street. HEXAGNDA.DOC City of Renton P/B/PW Department ? Preliminary Report to the Heating Examiner SW 16th STREET R&D TECHNICAL CENTER LUA-96-034, SA, SM,ECF PUBLIC HEARING DATE: May 14, 1996 Page 1 of 11 City of Renton PUBLIC Department of Planning/Building/Public Works HEARING PRELIMINARY REPORT TO THE HEARING,EXAMINER A. SUMMARY AND PURPOSE OF REQUEST: Public HearingDate May14, 1996 Project Name SW 16th Center R& D Technical Center Applicant Edi Linardic(LDG Architects) File,Number LUA-096-034,SA,SM,ECF Project Manager Jennifer Toth Henning Project Description The applicant proposes to develop a new one-story structure (Building "A") and an addition to an existing structure (Building "B") on a partially developed 22-acre site. Building "A" would be 129,000 square feet in size, while Building "B" would result in the addition of 202,000 square feet to and existing building (net 85,000 square feet). The buildings would be set back 90 feet from the north property line (SW 16th Street) and 115 feet from the east boundary (Raymond Avenue SW). A total of 627 parking spaces would serve the proposed uses. The project is considered to be speculative development, with office and high-tech manufacturing uses anticipated. The site is located adjacent to and east of Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires environmental review, Site Plan Approval and a Shoreline Substantial Development Permit. Project Location 801 SW 16th Street B. GENERAL INFORMATION: 1. Owner of Record Group Health Cooperative 2. Zoning Designation Commercial Office (CO) 3. Comprehensive Plan Employment Area - Office Land Use Designation '4. Existing Site Use Distribution Center for Group Health Cooperative HEXRPT.DOC City of Renton P/B/PW Department Preliminary Report to the Hearing Examiner CIN Afh C.713 L7_.D2L1_TCGL1Al1!`_Al_1`SAISLO Sono cu City of Renton P/B/PW Department Preliminary Report to the Hearing Examiner SW 16th STREET R&D TECHNICAL CENTER LUA-96-034, SA, SM,ECF PUBLIC HEARING DATE: May 14, 1996 Page 2 of 11 5. Neighborhood Characteristics North Offices (Austin Company) East Offices (Wizards of the Coast) South Vacant (approved for light industrial/office - Raymond Ave Center) West Springbrook Creek, vacant Boeing Longacres property 6. Access via SW 16th Street and Raymond Avenue SW 7. Site Area 22.4 acres 8. Project Data: area comments Existing Building Area 97,200 sq. ft 12,200 to be demolished or removed New Building Area 329,000 sq. ft 126,000 in Bldg. A; 208,000 in Bldg. B Total Building Area 419,000 sq. ft • C. HISTORICAL/BACKGROUND: Action Land Use File No. Ordinance No. Date Annexation N/A 1745 4-14-59 Annexation N/A 1764 5-19-59 Annexation N/A 1928 12-19-66 Annexation N/A 4040 2-9-87 Comprehensive Plan N/A 4498 2-20-95 Zoning Code N/A 4404 6-7-93 D. PUBLIC SERVICES: 1. Utilities Water Existing 12-inch line in SW 16th Street and Raymond Avenue SW; existing 8-inch loop on the project site Sewer Existing 8-inch main in Raymond Avenue SW; existing 24- inch main in SW 16th Street Surface Water/Storm Water Existing storm drainage facilities in SW 16th Street and Raymond Avenue SW 2. Fire Protection Provided as per City Code 3. Transit Metro Transit provides service on SW 16th Street (Route 153). A bus zone is located on SW 16th just west of Raymond Avenue SW. 4. Schools Not Applicable HEXRPT.DOC City of Renton P/B/PW Department Preliminary Report to the Hearing Examiner SW 16th STREET R&D TECHNICAL CENTER LUA-96-034, SA, SM, ECF PUBLIC HEARING DATE: May 14, 1996 Page 5 of 11 2. ENVIRONMENTAL REVIEW Pursuant to the City of Renton's Environmental Ordinance and SEPA (RCW 43.21C, 1971 as amended), on April 16, 1995 the Environmental Review Committee issued a Determination of Non-Significance - Mitigated for the Proposal. The combined comment/appeal period ends at 5:00 pm on Tuesday, May 7, 1996. At the time of preparation of this report no substantive comments nor appeals had been filed. 3. COMPLIANCE WITH ERC MITIGATION MEASURES 1. The applicant shall submit a.final wetland management plan subject to the review and satisfaction of the Development Services Division for the filling of Wetland C on the project site. The final wetland mitigation plan must be submitted prior to the public hearing for Site Plan Review. The applicant applied to the City to participate in the Wetlands Mitigation Bank and to pay for the replacement of a wetland in an off-site area. A decision was rendered on April 30, 1996 by the Administrator of the Planning/Building/Public Works Department that would allow for the applicant's participation in a Cooperative Wetlands Mitigation Bank per City Code Section 4-32- 6. In addition, the applicant requested that a waiver be granted to allow a wetlands replacement ratio of 1:1 rather than the required 1.5:1 replacement ratio, and that the replacement occur after the subject wetland has been filled. The requests were granted subject to the following conditions: 9. There shall be compensation payment in the amount of$3.00 per square foot of replaced wetland for participation in the in the wetland mitigation bank prior to the issuance of a Building Permit. 2. There shall be a one year period from this approval where full or partial refunds could be made to the applicant if the City substantially alters the Wetland Management Ordinance in such a way that minimizes or deletes the need for compensation for filling of the subject wetland during this time period. The decision has a reconsideration/appeal period connected to it that ends on Tuesday, May 14, 1996 at 5:00 pm. 2. The applicant shall pay the appropriate Fire Mitigation Fee at a rate of $0.52 per square foot of new construction. (Credit may be given for area of demolished structures.) This fee is payable prior to the issuance of the Building Permit. The applicant will need to comply with this requirement prior to the issuance of a Building Permit. 3. The applicant shall pay the applicable Traffic Mitigation Fee at a rate of$75 per each new average daily trip attributable to the project. Credit may be given for existing trips on the site that would be eliminated under the proposal. The fee will be estimated based on the ITE Manual and the applicant's traffic study, and is payable prior to the issuance of a Building Permit. The applicant will need to comply with this requirement prior to the issuance of a Building Permit. HEXRPT.DOC City of Renton P/B/PW Department Preliminary Report to the Hearing Examiner SW 16th STREET R&D TECHNICAL CENTER LUA-96-034, SA, SM,ECF PUBLIC HEARING DATE: May 14, 1996 Page 6 of 11 4. The applicant shall limit construction traffic on the adjacent arterials during pre-loading activity to the hours between 8:30 am and 3:30 pm. The applicant will need to comply with this mitigation measure during the construction of the project. 4. STAFF REVIEW COMMENTS Representatives from various city departments have reviewed the application materials to identify and address site plan issues from the proposed development. These comments are contained in the official file, and the essence of the comments has been incorporated into the Departmental Recommendation at the end of the report. 5. CONSISTENCY WITH SITE PLAN APPROVAL CRITERIA Section 4-31-33 (D.) "The Hearing Examiner and City staff shall review and act upon site plans based upon comprehensive planning considerations and the following criteria. These criteria are objectives of good site plans to be aimed for in development within the City of Renton. However, strict compliance with any one or more particular criterion may not be necessary or reasonable. These criteria also provide a frame of reference for the applicant in developing a site, but are not intended to be inflexible standards or to discourage creativity and innovation. The site plan Review criteria include, but are not limited to, the following:" GENERAL CRITERIA: A. CONFORMANCE WITH THE COMPREHENSIVE PLAN, ITS ELEMENTS & POLICIES Policy LU-184. Secondary uses in the category should include a mix of commercial and light industrial activities. The proposal would result in the development of the site for office, manufacturing and warehouse uses, consistent with allowed primary and secondary uses in the Commercial Office Zone and Employment Area- Office land use designation. Objective LU-DD: Ensure quality development in the Employment Area-Office areas. The applicant would develop the site with buildings, parking, circulation and landscaping that would complement existing development in the area. Policy LU-190. Parking should be provided on-site, in parking structures, and buffered from adjacent uses. On-site parking for 624 vehicles would be provided. Landscaping would be provided in minimum 20-foot wide beds along SW 16th Street and Raymond Avenue SW. Landscaped planter areas would be located along building facades and within parking areas. The proposed landscaping would consist of ornamental trees, shrubs, groundcover and sod lawns and would effectively buffer the site from adjacent uses. Policy LU-192. Vehicular access to the site should be the major street with the access points minimized but designed to ease entrance and exit. Three access drives would be provided from SW 16th Street, and three access drives would serve the site from Raymond Avenue SW. The driveways would be redesigned from the current configuration replacing the two existing curb cuts on SW 16th Street. Two new curb cuts would be installed along Raymond Avenue SW, and one existing curb cut would continue to access the site. Another existing curb cut would be eliminated on Raymond Ave SW. HEXRPT.DOC • City of Renton P/B/PW Department — . Preliminary Report to the Hearing Examiner SW 16th STREET R&D TECHNICAL CENTER LUA-96-034, SA, SM, ECF PUBLIC HEARING DATE: May 14, 1996 Page 7 of 11 Policy EN-13. When development may impact wetlands the following hierarchy should be followed in deciding the appropriate course of action: a. avoid the impacts to the wetland, b. minimize impacts to the wetland, c. restore the wetland when impacted, d. recreate the wetland at a ratio which will provide for its assured viabilityand success. The applicant applied for and received approval to participate in the City's Wetlands Mitigation Bank for the recreation of the wetland at a 1:1 ratio in an off-site location. The applicant's responsibility is to provide financial compensation for the wetland area to be filled. The amount has been determined to be $3.00 per square foot of replaced wetland. The wetland area affected by this determination is one (approximate) 16,700 square foot wetland located at the southeast portion of the subject parcel. Policy EN-19I. Limit development within the 100-year floodplain to that which is not harmed by flooding. Roads and finished floors of structures should be located above the 100-year flood level and new development should provide compensation for existing flood storage capacity due to filling. The applicant will set floor elevations to meet City regulations to be above the flood plain. Compensatory storage would be accommodated through the City's Springbrook Creek widening project. Should the widening of Springbrook Creek not occur, the applicant would need to provide compensatory flood storage on the project site. B. CONFORMANCE WITH EXISTING LAND USE REGULATIONS The following requirements and development standards contained in Section 4-31-16 Commercial Office Zone (CO) of the Interim Zoning Code [adopted June 1993) are applicable to this proposal. 1. SETBACKS Buildings in the CO Zone must be setback a minimum of 15 feet from the front yard, while minimum street setbacks are based on building height. Proposed buildings would be approximately 31 feet in height. For structures that are from 25 to 80 feet in height, the minimum setback from the street is 20 feet. Buildings proposed on the subject parcel comply with the minimum setback as they would be set back a minimum of 90 feet from the surrounding streets. Maximum setbacks in the CO Zone have recently been eliminated from the Code under Ordinance No. 4593 (April 1, 1996). 2. HEIGHT Allowed heights in the CO Zone are 250 feet. The proposal would include building heights of approximately 31 feet, and would comply with the development standards. 3. LOT COVERAGE The CO Zone allows 65% lot coverage. The proposal would result in 43% lot coverage and could comply with the development standard. 4. PARKING REQUIREMENTS: Chapter 14, Title IV The developer has indicated that the 419,000 square foot development would include 131,000 square feet of office, 111,000 square feet of manufacturing use, and 177,000 HEXRPT.DOC City of Renton P/B/PW Department Preliminary Report to the Hearing Examiner SW 16th STREET R&D TECHNICAL CENTER LUA-96-034, SA, SM, ECF PUBLIC HEARING DATE: May 14, 1996 Page 8 of 11 square feet of warehouse. The Parking and Loading Ordinance requires a minimum of three parking spaces per each 1,000 feet of gross floor area, and not more than 4.5 parking spaces per each 1,000 square feet of gross floor area. Manufacturing, research and testing uses are requires to provide a minimum of 1 parking space for each 1,000 square feet of gross floor area, and not more than a maximum of 1.5 spaces per 1,000 square feet of gross floor area. Warehouse use must provide a parking space for each 1,500 square feet of gross floor area. Based on these requirements, the applicant would need to provide a minimum of 393 and a maximum of 590 parking spaces for the office use; a minimum of 111 and a maximum of 167 parking spaces for the manufacturing use, and 118 parking spaces for the warehouse use. Therefore, the total required parking for the proposal is a minimum of 622 parking spaces and a maximum of 875 parking spaces. The applicant has proposed 627 parking spaces, thus meeting the minimum required by the Code. 5. LANDSCAPING/IMPROVEMENTS Ordinance 4593 reduced the minimum amount of required landscaping along street frontages in the CO Zone from 15 feet to 10 feet. The applicant has proposed 20 feet of landscaping along the SW 16th Street and Raymond Avenue SW street frontages. Since the project is located within the Green River Valley, an additional two percent (2%) of natural landscaping shall be required for developed sites as per the Soil Conservation Service Environmental Mitigation Agreement. These areas should not be dispersed throughout a site, but should be aggregated in one portion of the property. Where possible, the required two percent landscaping for adjacent properties would be contiguous. The proposal is required to have a minimum natural landscaping of 19,515 square feet, and has provided approximately 60,000 square feet of natural landscaping, primarily along Springbrook Creek and within the creek setback area. The CO Zone also requires a pedestrian connection from a public entrance to the street unless the Hearing Examiner determines that the requirement would unduly endanger., the pedestrian. The applicant would need to provide striped crossings or another suitable type of pedestrian connection from each of the two proposed buildings to the sidewalks on SW 16th Street and Raymond Avenue SW.. This would need to be shown on a revised site plan that would be submitted and approved by the Development Services Division prior to the issuance of Building Permits. 6. ROOF-TOP EQUIPMENT The CO Zone requires that all operating equipment located on the roof of any building be enclosed so as to be shielded from view. The applicant would be required to meet this Code condition and to demonstrate to the satisfaction of the Development Services Division that it has been met prior to the issuance of a Building Permit. 7. REFUSE AND RECYCLABLES COLLECTION &STORAGE The CO Zone requires that all garbage, refuse or dumpsters contained within specified areas shall be screened, except for access points, by a sight-obscuring fence or landscaping or some combination thereof. The applicant's Landscape Plans indicate areas where dumpsters would be located. These areas would be enclosed with a 6-foot high fence with a gate serving as an access point. The proposal would comply with this requirement. C. MITIGATION OF IMPACTS TO SURROUNDING PROPERTIES AND USES; The project site is located adjacent to and east of Springbrook Creek and the Boeing Longacres site. Office development is located across SW 16th to the north, and across Raymond Avenue HEXRPT.DOC City of Renton P/B/PW Department Preliminary Report to the Hearing Examiner SW 16th STREET R&D TECHNICAL CENTER LUA-96-034, SA, SM, ECF PUBLIC HEARING DATE: May 14, 1996 Page 9 of 11 SW to the east. The vacant parcel to the south have been approved for light industrial/office uses. Proposed buildings would be setback from Springbrook Creek to retain natural vegetation and buffering. Minimum 800 foot setbacks from SW 16th Street and Raymond Avenue South would allow for minimum 20 foot wide landscaped buffers along street frontages. The applicant has reached agreement with the City for the accommodation of future proposed City projects on the site including the widening of Springbrook Creek and the extension of Oakesdale Avenue SW. An area in the northwest corner would not be developed with structures and would be reserved by the applicant for the eventual development of these City projects. By reserving this area, surrounding properties owners can predict how the City projects would impact their sites. D. MITIGATION OF IMPACTS OF THE PROPOSED SITE PLAN TO THE SITE; The proposal would result in the development of a 22.4 acre site. Two small Category 3 wetlands on the southwest portion of the site would be filled as allowed under City Code, a third large Category 3 wetland would also be filled and recreated in an off-site location. The applicant has applied for and received approval from the City to participate in the Wetlands Mitigation Bank for the creation of off-site wetlands. Raptor perching areas have been identified on this parcel as part of site studies for another project proposal. The applicant has proposed to install temporary raptor perch poles in affected areas, until such time that planted vegetation has established or matured to provide adequate perching habitat. The Site Plan would need to be revised to indicate the number and location of these perch poles. This would be a condition of approval and would need to occur prior to the issuance of Construction or Building Permits. The Landscape Plan identifies Platanus acerfolia (London Plane) trees for use in perimeter landscape beds. Staff has concerns about the selection of this tree type as the root system is invasive and can heave pavement when used in street right-of-ways. The applicant has agreed to find a suitable substitute street tree. E. CONSERVATION OF AREA-WIDE PROPERTY VALUES; The proposal would redevelop a partially developed site presently used as a distribution center for the Group Health Cooperative. Construction of the site would conserve and enhance property values by providing a project with office, research and development, manufacturing uses. Site improvements would include perimeter and interior site landscaping that would provide buffering for the two large buildings. The proposed development would be similar in scale and architectural character to existing Valley development and as such would be expected to conserve and enhance area-wide property values. F. SAFETY AND EFFICIENCY OF VEHICLE AND PEDESTRIAN CIRCULATION; The project would include three new access driveways along SW 16th Street, replacing the two existing curb cuts. Two new curb cuts would be installed along Raymond Avenue SW, and one existing curb cut would continue to access the site. Another existing curb cut would be eliminated on Raymond Ave SW. Internal site circulation would allow for access around all sides of the two proposed structures. Parking for 624 vehicles would be distributed in lots on the east, north and west sides of both structures. Limited additional parking would be provided adjacent to the south building facades. HEXRPT.DOC City of Renton P/B/PW Department Preliminary Report to the Hearing Examiner SW 16th STREET R&D TECHNICAL CENTER LUA-96-034, SA, SM, ECF PUBLIC HEARING DATE: May 14, 1996 Page 10 of 11 Raised walkways would be provided at building corners where entrances to offices would be located. However, the site plan lacks clear pedestrian connections between the two buildings and also from Building "A" to SW 16th Street, and from Building "B" to either SW 16th Street or Raymond Avenue SW. As a condition of approval staff will recommend that the applicant be required to provide pedestrian connections in the form of striped walkways or other suitable delineation to facilitate pedestrian safety. G. PROVISION OF ADEQUATE LIGHT AND AIR; The proposal would result in the construction of one new building and a large addition to an existing structure. The structures would be separated on the site by a distance of approximately 100 feet. Buildings would be set back from surrounding streets by a minimum of 80 feet. Lot coverage would be approximately 43%, and structures would be approximately 31 feet in height (depending on future tenant needs, the building height could increase by 6 feet for a total of 37 feet in height). Lighting would be provided in the parking lot during evening hours. Shielded lights have been proposed to minimize or eliminate spill over light to off-site properties. The development does not appeal to have any adverse impacts to the provision of light or air on or off of the site. Staff will recommend that the applicant submit a lighting plan to the Development Services Division for review and approval prior to the issuance of Building Permits. H. MITIGATION OF NOISE, ODORS AND OTHER HARMFUL OR UNHEALTHY CONDITIONS; Construction of the proposed project site would result in short term noise impacts during construction activity. Operation of the development would not be expected to produce odors or other harmful or unhealthy conditions. The development of these structures is speculative in nature, but the potential tenants being marketed for the site do not use toxic or hazardous materials. Any future tenant would need to adhere to all required codes in order to minimize any environmental health hazards, and to provide a plan to control such an event, if it occurred. AVAILABILITY OF PUBLIC SERVICES AND FACILITIES TO ACCOMMODATE THE PROPOSED USE;AND Public services are already available to serve the project site. The applicant would need to provide any Code-required connections or improvements, unless otherwise waived by the City. In addition, staff will recommend that the applicant provide additional on-site recreational opportunities for employees. This recreation should be in the form of active recreation (for example, a basketball hoop). J. PREVENTION OF NEIGHBORHOOD DETERIORATION AND BLIGHT. The proposal, including the architecture of the buildings and installation and maintenance of landscaped areas should prevent neighborhood deterioration and blight. Areas held in reserve for future widening of Springbrook Creek and the Oakesdale Avenue extension would need to be maintained by the applicant, owner or tenant of the development. HEXRPT.DOC • City of Renton P/B/PW Department Preliminary Report to the Hearing Examiner SW 16th STREET R&D TECHNICAL CENTER LUA-96-034, SA, SM, ECF PUBLIC HEARING DATE: May 14, 1996 Page 11 of 11 H. RECOMMENDATIONS: Staff recommend approval of the SW 16th R&D Technical Center, file no. LUA-96-034, SA, SM, ECF subject to the following conditions: 1. Compliance with ERC Mitigation Measures: The applicant is required to comply with the Mitigation Measures which were required by the Environmental Review Committee's April 16, 1996 Threshold Determination, prior to the issuance of a Building Permit: 2. Pedestrian Connection: The applicant would need to provide striped crossings or another suitable type of pedestrian connection from each of the two proposed buildings to the sidewalks on SW 16th Street (Buildings "A" and "B") and Raymond Avenue SW (Building "B"). In addition, suitable pedestrian connections must be provided between the two buildings. These pedestrian connections would need to be shown on a revised site plan that would be submitted and approved by the Development Services Division prior to the issuance of Building Permits. 3. Raptor Perch Poles. The Site Plan would need to be revised to indicate the number and location of raptor perch poles. This would need to be submitted subject to the satisfaction of the Development Services Divisions prior to the issuance of Construction Permits. 4. Lighting Plan: The applicant will be required to submit a lighting plan to the satisfaction of the Development Services Division prior to the issuance of Building Permits. The lighting plan must show the location and type of site lighting and demonstrate that spill-over lighting would not impact off-site areas. 5. On-Site Recreation: On-site recreation areas for the use and enjoyment of employees shall be provided in at least one additional area on the site in order to supplement the two proposed outside eating areas. It is recommended this additional recreation area be active, such as a basketball hoop. EXPIRATION PERIODS: Site Plan Approvals (SA): Two (2) years from the final approval date. (Extensions may be requested.) HEXRPT.DOC CI TY OF RENT ON DETERMINATION OF NON-SIGNIFICANCE (MITIGATED) APPLICATION NO(S): LUA-96-034,SA,SM,ECF APPLICANT: Edi Linardic/LDG Architects PROJECT NAME: R&D Facility/SW 16th Technical Center DESCRIPTION OF PROPOSAL: The applicant proposes to develop a new one-story structure (Building A);and an addition to an existing structure (Building B) on a partially developed 22-acre site. Building A would be 129,000 sq. ft. in size, while Building B would result in the addition of 202,000 square feet. to an existing 85,000 sq.,ft. building. A total of 618 parking spaces would serve the site. These would be speculative buildings, with office, and high-tech manufacturing uses anticipated. Three wetlands are present on the site. Three wetlands are present on the site. Two small wetlands are not regulated and would be filled. A third wetland (approximately 16,000 square feet) is subject to the requirements of the Wetlands Management Ordinance. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires Environmental Review, Site Plan Approval, and a Shoreline Substantial Development Permit. LOCATION OF PROPOSAL: 801 SW 16th Street LEAD AGENCY: City of Renton Department of Planning/Building/Public Works Development Planning Section The City of Renton Environmental Review Committee has determined that it does not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21 C.030(2)(c). Conditions were imposed as mitigation measures by the Environmental Review Committee under their authority of Section 4-6-6 Renton Municipal Code. These conditions are necessary to mitigate environmental impacts identified during the environmental review process. The 15 day comment period and the 14 day appeal period for this project will run concurrently. The comment/appeal periods for this project will end at 5:00 p.m. on May 07, 1996. Appeal procedures and the mitigation measures imposed by the City of Renton's Environmental Review Committee are available at the Development Services Division, Third Floor, Municipal Building, Renton, Washington 98055. Phone: 235-2550. You should be prepared to make specific factual objections. PUBLICATION DATE: April 22, 1996 DATE OF DECISION: April 16, 1996 SIGNATURES: Gregmm , Administrator DAT �� Depa lent of Planning/Building/Public Works r(q .6- /Sam Chastain,Admi trator DATE Community Service epartment Pr6 Lee)Nh ler, ire hief DATE Renton Fire Department DNSMSIG.DOC • • CITY OF RENTON DETERMINATION OF NON-SIGNIFICANCE (MITIGATED) MITIGATION MEASURES APPLICATION NO(S): LUA-96-034,SA,SM,ECF APPLICANT: Edi Linardic/LDG Architects PROJECT NAME: R&D Facility/SW 16th Technical Center DESCRIPTION OF PROPOSAL: The applicant proposes to develop a new one-story structure (Building A) and an addition to an existing structure (Building B) on a partially developed 22-acre site. Building A would be 129,000 sq. ft. in size, while Building B would result in the addition of 202,000 square feet. to an existing 85,000 sq. ft. building. A total of 618 parking spaces would serve the site. These would be speculative buildings, with office, and high-tech manufacturing uses anticipated. Three wetlands are present on the site. Three ' wetlands are present on the site. Two small wetlands are not regulated and would be filled. A third wetland (approximately 16,000 square feet) is subject to the requirements of the Wetlands Management Ordinance. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires Environmental Review, Site Plan Approval, and a Shoreline Substantial Development Permit. LOCATION OF PROPOSAL: 801 SW 16th Street MITIGATION MEASURES: 1. The applicant shall submit a final wetland management plan subject to the review and satisfaction of the Development Services Division for the filling of Wetland C on the project site. • The final wetland mitigation plan must be submitted prior to th'e public hearing for Site Plan Review. 2. The applicant shall pay the appropriate Fire Mitigation Fee at a rate of $0.52 per square foot of new construction. (Credit may be given for area of demolished structures.) This fee is payable prior to the issuance of the Building Permit. 3. The applicant shall pay the applicable Traffic Mitigation Fee at a rate of $75 per each new average daily trip attributable to the project. Credit may be given for existing trips on the site that would be eliminated under the proposal. The fee will be estimated based on the ITE Manual and the applicant's traffic study, and is payable prior to the issuance of a Building Permit. 4. The applicant shall limit construction traffic on the adjacent arterials during pre-loading activity to the hours between 8:30 am and 3:30 pm. MITMEAS.DOG • CITY OF RENTON DETERMINATION OF NON-SIGNIFICANCE (MITIGATED) ADVISORY NOTES APPLICATION NO(S): LUA-96-034 SA SM NO ,ECF APPLICANT: Edi Linardic/LDG Architects PROJECT NAME: R&D Facility/SW 16th Technical Center DESCRIPTION OF PROPOSAL: The applicant proposes to develop a new one-story structure (Building A) and an addition to an existing structure (Building B) on a partially developed 22-acre site. Building A would be 129,000 sq. ft. in size, while Building B would result in the addition of 202,000 square feet. to an existing 85,000 sq. ft. building. A total of 618 parking spaces would serve the site. These would be speculative buildings, with office, and high-tech manufacturing uses anticipated. Three wetlands are present on the site. Three wetlands are present on the site. Two small wetlands are not regulated and would be filled. A third wetland (approximately 16,000 square feet) is subject to the requirements of the Wetlands Management Ordinance. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires Environmental Review, Site Plan Approval, and a Shoreline Substantial Development Permit. LOCATION OF PROPOSAL: 801 SW 16th Street Advisory Notes to Applicant: The following notes are supplemental information provided in conjunction with the environmental determination. Because these notes are provided as information only,they are not subject to the appeal process for environmental determinations. General 1. The applicant shall apply with all applicable City, state, federal and other jurisdictional regulations, codes and policies governing the project and site. 2. All required utility, drainage and street improvements will require separate submittals prepared by a registered Civil Engineer, according to City of Renton drafting standards. Permit application must include an itemized cost estimate for these improvements. The fee for review and inspection of these improvements is 5% of the first $100,000, 4% of anything over$100,000 but less than $200,000; and 3% of anything over$200,000. One-half of the fee must be paid upon application for building and construction permits, and the remainder when the permits are issued. 3. The applicant is required to obtain a Construction Permit in order to accomplish site work and installation of site improvements. 4. The applicant will need to submit construction drawings for street lighting and each utility. These drawings will need to be on individual sheets. 5. Construction plans must comply with the City's Drafting Standards. Transportation 6. A traffic report will be required which shows the existing trip ends and new trip ends generated by the proposed project. If significant, the report needs to indicate what impacts the new generated traffic volume will have on SW 16th Street and any local intersections. ICY , R&D Facility/SW 16th Technical Center LUA-96-034,SA,SM,ECF Page 2 7. The City's Transportation Impact Fee will apply to the project as discussed in the mitigation measures above. Credit may be given for existing trips that would be eliminated under the proposal. The applicable fee is$75 per each new average daily trip. 8. Curb, gutter, sidewalk and street lighting will be required on SW 16th Street. A street lighting plan is required per City standards and is to extend the full length of the property frontage to the roadway. 9. The applicant will need to coordinate with the City's Transportation Systems Division for the road improvement project on SW 16th Street. Roadway grades and elevations of the proposal and the City will need to coincide. Storm Drainage 10. A System Development Charge (SDC) for storm water is applicable to the project and would be assessed at the rate of$0.129 for new impervious surface area. 11. The applicant shall provide a drainage report which addresses the King County Surface Water Manual core and special requirements. 12. The applicant may be required to provide a FEMA Elevation Certificate due to the location of the project within the flood plain. Wastewater 13. The applicant will be required to provide an appropriate removal system for fats, oils, or grease if the project includes any uses that would generate the same. 14. The side sewers will be required to have a 2% grade to the right-of-way. One sewer clean-out shall be located within five feet of the building and one clean-out is required every 100 feet. 15. The applicant is required to provide a plan and profile for the sewer. These drawings will need to show the finish floor elevations of the buildings and slopes of the wastewater pipes. 16. . The minimum pipe cover required for wastewater pipes is two (2) feet. 17. The applicable System Development Connection charge is $0.078 per square foot of site area. Credits may be given if partial charges have been previously paid for the site. 18. If the floor elevation is below 22 feet as shown on the applicant's submittals, then a backflow prevention device will be required on the sewer system. Water 19. A 12-inch water line is located in both SW 16th Street and Raymond Avenue SW. Available fire flow is 5,600 gpm. Preliminary fire flow required by the Fire Department is 4,500 gpm. A sufficiently sized loop system is required. 20. The proposed project is located in the Downtown 196 mapped water zone. 21. The relocation in the water loop system will require a new 15-foot utility easement. 22. Construction plans and profile drawings are required for water drawing submittals. ADVNOTES.DOC/ R&D Facility/SW 16th Technical Center LUA-96-03 4,S A,SM,ECF Page 3 23. The applicant is required to pay a water System Development Charge of$0.113 per square foot of site area. Credit may be given if connection charges have been previously paid for the site. Fire 24. The preliminary fire flow requirement for Building A is 4,500 gpm. A total.of five hydrants are required. The primary hydrant is to be located within 150-feet of the building, and four additional hydrants are required within 300-feet of the building. A looped fire main is required for Building A. 25. The preliminary file flow requirement for Building B is 4,500 gpm. A total of five fire hydrants are required. The primary hydrant is to be located within 150-feet of the building, and four additional hydrants within 300-feet of the building. A looped fire main is required for Building B. 26. The applicant is required to pay the applicable Fire Mitigation Fee as discussed in the Mitigation Measures above. The fee is assessed at a rate of $0.52 per square foot of new building area. Credit may be given for the area of existing structures that are demolished for the proposal. Building A would be 129,000 sf in size, therefore the estimated Fire Mitigation Fee would be $67,080. Building B would be 202,000 sf in size, therefore the estimate Fire Mitigation Fee would be $105,040. The fee is payable at the time of the issuance of the building permit. 27. The applicant shall provide fire sprinklers and fire alarm systems for both of the proposed new buildings. Separate plans and permits are required for each system. 28. Since the building is speculative in nature, and no tenant has been identified, additional fire and • building requirements will be based on the use of the building and the type of operation to be conducted. The applicant shall provide information regarding the storage and use of any flammable, combustible liquids or gases, or any hazardous materials. 29. The applicant's plans shall reflect Code requirements for a minimum 20-foot wide paved roadway with an inside turning radius of 25-feet and an outside turning radius of 45 feet. Parks and Recreation • 30. The owner/tenant shall maintain landscaped areas outside of the property line but within the street right-of-ways. Police Services 31. The applicant is advised to coordinate with Renton Police Crime Prevention for recommendations to reduce possibility of crime during construction and operation of the facility. Building Construction 32. The applicant will need to provide a current soils report which addresses the potential for liquefaction and proposed mitigation. Wetlands&Creeks 33. The applicant will need to meet the requirements of the City's Wetland Ordinance with regard to the regulated wetland (Wetland C). 34. A Shoreline Substantial Development Permit is needed to allow development within 200 feet of Springbrook Creek. ADVNOTES.DOC/ R&D Facility/SW 16th Technical Center LUA-96-034,SA,SM,ECF Page 4 35. The applicant shall meet requirements for public access as part of the Shoreline Substantial Development Permit. Solid Waste 36. Garbage and recyclable deposit areas and collection points shall be easily and safely accessible to hauling trucks. ADVNOTES.DOC/ J Development Services EIS REVIEW COMMENTS DEVELOPMENT SERVICES R & D Technical Center / SW 16th St. March 27, 1996 By Clinton Morgan TRANSPORTATION: 1. A traffic report will be needed which shows the existing trip ends and new trip ends generated by the proposed project. If significant, the report needs to indicate what impacts the new generated traffic volume will have on SW 16th Street and any local intersections. 2. There is a Transportation fee for new trips generated at $75 per trip. 3. Curb, gutters, sidewalks and street lighting will be required on SW 16th Street. A street lighting plan is required per City Standards and to extend the full length of the property frontage to the roadway. The open drainage ditch fronting on SW 16th Street would need to be tight line. Note: The City has a road improvement project for SW 16th Street that the above improvements will need to be coordinated with. Roadway grades and elevations need to coincide. 4. Construction drawings for street lighting and each utility drawings are to be on individual sheets. 5. Driveways to SW 16th Street to be kept to a minimum. 6. The Detention pond and parking lot to the west of Building "A" is located in the alignment of the Oakesdale Ave SW extension. The project needs to show an overlay from City drawings which shows the Oakesdale Ave SW extension. nl o f Coordination with the City's Transportation plans will be necessary. A second route alternative would go through the south end of building "A". 7. The right-of-way near the Spring Brook Creek bridge abutment does not seem to match what is on City's Oakesdale Ave, SW extension drawing. The bridge abutment should be shown and tied at the existing Oakesdale intersection. 96CM068 City c_.centon Department of Planning/Building/Put,,.- v forks ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET REVIEWING DEPARTMENT-7 --II.ai l COMMENTS DUE: MARCH 25, 1996 APPLICATION NO: LUA-96-034,SA,V,SM,ECF DATE CIRCULATED: MARCH 19, 1996 APPLICANT: EDI LINARDIC(LOG ARCHITECTS) PROJECT MANAGER: JENNIFER If4TkijdENNING PROJECT TITLE: R&D-SW 16TH TECHNICAL CENTER WORK ORDER NO: 78072 �?E[;p DOM LOCATION: 801 SW 16TH STREET SITE AREA 22.24 ACRES BUILDING AREA(gross): 80 S.Q.FT. BUILDING AREA(new expanse`s fitrbs"s),', 'l 1 p ,SQ.FT. nt-CIOSUMMARY OF PROPOSAL: The applicant proposes to develop a new on-story structure(Building A)and an addition town existing structure(Building B)on a partially developed 22 acre sate. Building A would be 129,000 sq. ft. in size,while the Building B would result in the addition of 202,000 sq.ft.to an existing 85,000 sq. ft. building. A total of 608 parking spaces would serve the site. These would be speculative buildings,with potential office, high-tech manufacturing and warehousing uses anticipated. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires environmental review, site plan review, shoreline substantial development permit and a variance to exceed the maximum 40 foot building setback in the Commercial Office Zone. A setback of 90 feet from the north property line and 115 feet from the east boundary is proposed to accommodate proposed landscaping, parking and circulation. A. ENVIRONMENTAL IMPACT(e.g.Non-Code) COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major information Environment Minor Major Information Impacts Impacts Necessary impacts Impacts Necessary Earth Housing Air Aesthetics Water light/Glare Plants Recreation Land/Shoreline Use Utilities Animals Transportation Environmental Health Public Services Energy/ Historic/Cultural Natural Resources Preservation B. POLICY-RELATED COMMENTS C. CODE-RELATED COMMENTS 5e,e {ter We have reviewed this application with particular attention to those areas In which we have expertise and have Identified areas of probable Impact or areas where additional Information Is needed to properly assess this proposal. ?96 Signature of Director or Authorized Represen ive Date DEVAPP.DOC Rev.1tY93 City ca. ",nton Department of Planning/Building/Pub,.._-Sorks ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET REVIEWING DEPARTMENT:St act (.)114 -tom COMMENTS DUE: MARCH 25, 1996 APPLICATION NO: LUA-96-034,SA,V,SM, CF DATE CIRCULATED: MARCH 19, 1996 t.:I ry�F R • Er�Oh9 APPLICANT: EDI LINARDIC(LDG ARCHITECTS) PROJECT MANAGER: JENNIFER TOTH HEI ,ING PROJECT TITLE: R&D-SW 16TH TECHNICAL CENTER WORK ORDER NO: 78072 , ' r, 1996 LOCATION: 801 SW 16TH STREET '�'tfi-+ba 't 3`.�.ja` kjd.3 SITE AREA 22.24 ACRES BUILDING AREA(gross): 85,000 SQ.FT. BUILDING AREA(new expansion gross): 416,000 SQ.FT. SUMMARY OF PROPOSAL: The applicant proposes to develop a new on-story structure(Building A)and an addition to an existing structure(Building B)on a partially developed 22 acre site. Building A would be 129,000 sq.ft. in size,while the Building B would result in the addition of 202,000 sq.ft.to an existing 85,000 sq. ft. building. A total of 608 parking spaces would serve the site. These would be speculative buildings,with potential office, high-tech manufacturing and warehousing uses anticipated. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires environmental review, site plan review, shoreline substantial development permit and a variance to exceed the maximum 40 foot building setback in the Commercial Office Zone. A setback of 90 feet from the north property line and 115 feet from the east boundary is proposed to accommodate proposed landscaping, parking and circulation. A. ENVIRONMENTAL IMPACT(e.g.Non-Code) COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major Information Environment Minor Major Information Impacts Impacts Necessary impacts Impacts Necessary Earth Housing Air Aesthetics Water -, Light/Glare Plants Recreation Land/Shoreline Use Utilities S;•f, V'/47 // Animals Transportation Environmental Health Public Services Energy/ Historic./Cultural Natural Resources Preservation • B. POUCY-RELATED COMMENTS • C. CODE-RELATED COMMENTS �I ��;G, `a-t"l a.Gil v-1r-)Byt+-Pr YGti)e J (�>y„),A;,z-Li We have reviewed this application with particular attention to those areas in which we have expertise and have Identified areas of probable impact or areas where additional in rmation Is needed to property assess this proposal. t____fA 4..,..V.,,,,,z, Signature of Director or Authorized Representative 7 Date DEVAPP.DOC Rev.10/93 Development Services Review Comments • R & D Technical Center / SW 16th St. March 27, 1996 By Clinton Morgan STORM DRAINAGE: 1. Spring Brook Creek actual location may not be within the Drainage District #1 legally described boundary. If not, Drainage District #1 may claim adverse possession of property. This has happened in the past. If true this could change the location from where the off-set to the Building is measured. The right-of-way near the Spring Brook Creek bridge abutment does not seem.to match what is on City's Oakesdale Avenue SW extension drawing. The bridge abutment should be shown and a tie-in at the existing Oakesdale intersection. A current title report needs to be provided and the developer's consultant needs to confirm the present location of Spring Brook Creek. 2. The City's Comprehensive Plan for Storm Drainage calls for widening of the Spring Brook Creek Channel which may have a major impact to the building set back. The City's Storm Drainage Division is working to determine what will be needed for the channel widening at this site. Coordination with the City's Storm Drainage Division will be needed. 3. , The detention pond and parking lot to the west of Building "A" is located in the alignment of the Oakesdale Avenue SW extension. The project needs to show an overlay from City drawings which shows the Oakesdale Ave SW extension. Agreements with the Transportation Division will need to be coordinated. 4. The preliminary drainage calculation may have to be revised after the above • comments have been resolved. 5. There is a surface water System Development Connection charge of $0.129 for new impervious surface area. This would best be calculated when the above comments have been addressed. The new impervious surface area may be impacted. 6. Drainage report to address King County Surface Water Manual Core and Special requirements. 7. Elevation Certificate will be require due to the flood plan impact. WASTE WATER (Sewer): 1. If the project produces fats, oils, or grease then an appropriate removal system will be required. 2. Side sewers to have a 2% grade to the right-of-way. A clean-out shall be located within five feet of the building and one clean-out every 100-feet. 3. Provide plan and profile. Show finish floor elevation and slopes of pipes. 4. Minimum pipe cover is two feet. 5. The System Development Connection charge is $0.078 per square of site. Calculation of the System Development Connection charge would best be done after resolution of storm drainage and transportation review comments which may have an impact on the area for calculating the charge. 6. Construction plans must comply with the City of Renton Drafting Standards. 7. If floor elevation is below 22-feet as shown than a back flow prevention device will be require on the sewer system. 96CM067 . ` 4 CITY OF RENTON City olwenton Department of Planning/Building/Public Works ENVIRONMENTAL & DEVELOPMENT APPLICATION RE iIEWi NtEET REVIEWING DEPARTMENT: 1eVtt•w— Uia- COMMENTS DUE: MARCH 25 9 c2 ntvisI,pN APPLICATION NO: LUA-96-034,SA,V,SM,ECF DATE CIRCULATED: MARCH 19, 1996 APPLICANT: EDI LINARDIC(LDG ARCHITECTS) PROJECT MANAGER: JENNIFER TOTH HENNING PROJECT TITLE: R&D-SW 16TH TECHNICAL CENTER WORK ORDER NO: 78072 LOCATION: 801 SW 16TH STREET SITE AREA: 22.24 ACRES BUILDING AREA(gross): 85,000 SQ.FT. BUILDING AREA(new expansion gross): 416,000 SQ.FT. SUMMARY OF PROPOSAL: The applicant proposes to develop a new on-story structure(Building A)and an addition to an existing structure(Building B)on a partially developed 22 acre site. Building A would be 129,000 sq. ft. in size,while the Building B would result in the addition of 202,000 sq.ft.to an existing 85,000 sq. ft. building. A total of 608 parking spaces would serve the site. These would be speculative buildings,with potential office, high-tech manufacturing and warehousing uses anticipated. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires environmental review, site plan review, shoreline substantial development permit and a variance to exceed the maximum 40 foot building setback in the Commercial Office Zone. A setback of 90 feet from the north property line and 115 feet from the east boundary is proposed to accommodate proposed landscaping, parking and circulation. A. ENVIRONMENTAL IMPACT(e.g.Non-Code) COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major Information Environment Minor Major Information Impacts Impacts Necessary impacts Impacts Necessary Earth Housing Air _ Aesthetics Water Light/Glare Plants Recreation Land/Shoreline Use Utilities Animals Transportation Environmental Health Public Services Energy/ Historic/Cultural Natural Resources Preservation •b\ c\,)Y vest': z, B. POLICY-RELATED COMMENTS C.: CODE-RELATED COMMENTS We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas where add— a information is needed to properly assess this proposal. Signature of Director or Authorized Representative Date DEVAPP.DOC vvv Rev.10r93 Development Services EIS REVIEW COMMENTS DEVELOPMENT SERVICES R & D Technical Center / SW 16th St. March 27, 1996 By Clinton Morgan WATER: 1. A 12-inch water line is located on SW 16th St. and also Raymond Avenue SW. Fire flow available is 5,600 gpm. The preliminary fire flow required per Fire.Department is 4,500 gpm. A sufficiently sized loop system is require. 2. The proposed project is located in the SE 24-23-4 quarter section map. 3. The proposed project is located in the Downtown 196 mapped water zone. 4. The site is not located in Aquifer Protection Area. 5. No water improvements shown for the area on the City's Comprehensive proposed P Y p Plan. 6. One fire hydrant will be required for each 1000 gallons of fire flow required. The first fire hydrant must be within 150 feet of the building, but not closer than 50- feet. The secondary hydrants must be within 300 feet of the building. 7. The relocation in the water loop system will require a new 15-foot utility easement. 8. A construction plan and profile drawing will be required for water. 9. A System Development Connection Charge is $0.113 per square feet of site. This will be calculated after issues have been resolved which may impact the area figure used in the calculation. 96CM069 City of,.anton Department of Planning/Building/Puo►u;Works ENVIRONMENTAL & DEVELOPMENT APPLICATIONLREVIEW SHEET REVIEWING DEPARTMENT: F1Ye- ' -e\eh..1l v COMMENTS DUE: MARCH 25, 1996 APPLICATION NO: LUA-96-034,SA,V,SM,ECF DATE CIRCULATED: MARCH 19,_1996 APPLICANT: EDI LINARDIC(LDG ARCHITECTS) PROJECT MANAGER: JENNIFER'TOTH HENNING PROJECT TITLE: R&D-SW 16TH TECHNICAL CENTER WORK ORDER NO: 78072 LOCATION: 801 SW 16TH STREET SITE AREA: 22.24 ACRES BUILDING AREA(gross): 85,000 SQ.FT. BUILDING AREA(new expansion gross): 416,000 SQ.FT. SUMMARY OF PROPOSAL: The applicant proposes to develop a new on-story structure(Building A)and an addition to an existing structure(Building B)on a partially developed 22 acre site. Building A would be 129,000 sq. ft. in size,while the Building B would result in the addition of 202,000 sq.ft.to an existing 85,000 sq. ft. building. A total of 608 parking spaces would serve the site. These would be speculative buildings,with potential office, high-tech manufacturing and warehousing uses anticipated. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires environmental review, site plan review, shoreline substantial development permit and a variance to exceed the maximum 40 foot building setback in the Commercial Office Zone. A setback of 90 feet from the north property line and 115 feet from the east boundary is proposed to accommodate proposed landscaping, parking and circulation. A. ' ENVIRONMENTAL IMPACT(e.g.Non-Code) COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major Information Environment Minor Major Information Impacts impacts Necessary Impacts impacts Necessary Earth • Housing Air, Aesthetics Water Light/Glare Plants Recreation Land/Shoreline Use Utilities Animals ___ Transportation Environmental Health Public Services Energy/ Historic/Cultural Natural Resources Preservation N B d 1 o f- J!J{c�3 Id eta.�f B. POLICY-RELATED COMMENTS AM • C. CODE-RELATED COMMENTS / /� 5GC 4tocJ 0.0-r''- 4t/5 We have revs wed this application with particular attention to those areas In which we have expertise and have Identified areas of probable Impact or areas where addrtio al information s=eded to properly assess this proposal. c 9 Signatu e f Director or Authorized R_4 esentative Date DEVAPP. I ROe.10193 oti`oc O� CITY OF RENTON FIRE PREVENTION BUREAU MEMORANDUM �.Nrro� DATE: March 19, 1996 TO: Jennifer Toth-Henning, Senior Planner FROM: Jim Gray, Assistant Fire Marshal , SUBJECT: Southwest 16th Tech Center, Southwest 16th and Raymond Avenue Southwest FIRE COMMENTS: 1 . The preliminary fire flow requirement for Building A is 4,500 gpm. A total of five fire hydrants are required. The primary hydrant is to be located within 150-feet of the building, and four additional hydrants within 300-feet of the building. A looped fire main is required for Building A. 2. The preliminary fire flow requirement for Building B is 4,500 gpm. A total of five fire hydrants are required. The primary hydrant is to be located within 150-feet of the building, and four additional hydrants within 300-feet of the building. A looped fire main is required for Building B. 3. A fire mitigation fee is required for all new structures at $0.52 per square foot. The mitigation fees are as follows: Building A: 129,000 square feet x $0.52 = $ 67,080.00 Building B: 202,000 square feet x $0.52 = $105,040.00 The fire mitigation fee is required at the time of building permit issuance. 4. Sprinkler and fire alarm systems are required for both buildings. Separate plans and permits are required for each system. 5. Additional fire and building requirements will be based on the use of the building and type of operation to be conducted. The applicant shall provide information regarding the storage and use of any flammable, combustible liquids or gases, or any hazardous materials. 6. The fire access roadways requirements are a minimum 20-foot wide paved roadway with an inside turning.radius of 25-feet and an outside turning radius of 45-feet. If you have any questions please call me. JEG:js TechCtr City of Renton Department of Planning/Building/Pubn,, Works ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET 2EVIEWING DEPARTMENT: PosVs COMMENTS DUE: MARCH 25, 1996 APPLICATION NO: LUA-96-034,SA,V,SM,ECF DATE CIRCULATED: MARCH 19, 1996 APPLICANT: EDI LINARDIC(LDG ARCHITECTS) PROJECT MANAGER: JENNIFER TOTH HENNING PROJECT TITLE: R&D-SW 16TH TECHNICAL CENTER WORK ORDER NO: 78072 LOCATION: 801 SW 16TH STREET SITE AREA 22.24 ACRES BUILDING AREA(gross): 85,000 SQ.FT. BUILDING AREA(new expansion gross): 416,000 SQ.FT. SUMMARY OF PROPOSAL: The applicant proposes to develop a new on-story structure(Building A)and an addition to an existing structure(Building B)on a partially developed 22 acre site. Building A would be 129,000 sq. ft. in size,while the Building B would result in the addition of 202,000 sq.ft.to an existing 85,000 sq. ft. building. A total of 608 parking spaces would serve the site. These would be speculative buildings,with potential office, high-tech manufacturing and warehousing uses anticipated. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires environmental review, site plan review, shoreline substantial development permit and a variance to exceed the maximum 40 foot building setback in the Commercial Office Zone. A setback of 90 feet from the north property line and 115 feet from the east boundary is proposed to accommodate proposed landscaping, parking and circulation. A. ENVIRONMENTAL IMPACT(e.g.Non-Code) COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major Information Environment Minor Major Information Impacts Impacts Necessary Impacts Impacts Necessary Earth • Housing Air Aesthetics Water Light/Glare Plants Recreation Land/Shoreline Use Utilities Animals Transportation Environmental Health Public Services Energy/ Historic/Cultural Natural Resources Preservation ee'� B4 ,RO CIY-RELATED COMMENTS , /�O� 5fr°eT . -� i /fIU �� '. z3, y/) 5 :7`-&a c7S )C1 �7z 6� �� � V�' xeet 71n ' G097Sh � . 4/ �. sib/i' 7/2e a 2 0-a C. CODE-RELATED COMMENTS �c 7- n We have reviewed this application with particular attention to those areas In which we have expertise and have identified areas of probable Impact or areas where additional information Is needed to properly assess this proposal. Signature of Dir or Authorized Representative Date DEVAPP.DOC Rev.10/93 • City of...nton Department of Planning/Building I Pub,...-Works ENVIRONMENTAL & DEVELOPMENT 'APPLICATION REVIEW SHEET REVIEWING DEPARTMENT: pbktce COMMENTS DUE: MARCH 25, 1996 I APPLICATION NO: LUA-96-034,SA,V,SM,ECF DATE CIRCULATED: MARCH 19, 1996 APPLICANT: EDI LINARDIC(LDG ARCHITECTS) PROJECT MANAGER: JENNIFER TOTH HENNING PROJECT TITLE: R&D-SW 16TH TECHNICAL CENTER WORK ORDER NO: 78072 LOCATION: 801 SW 16TH STREET SITE AREA 22.24 ACRES BUILDING AREA(gross): 85,000 SQ.FT. BUILDING AREA(new expansion gross): 416,000 SQ.FT. • SUMMARY OF PROPOSAL The applicant proposes to develop a new on-story structure(Building A)and an addition to an existing structure(Building B)on a partially developed 22 acre site. Building A would be 129,000 sq. ft. in size,while the Building B would result in the addition of 202,000 sq.ft.to an existing 85,000 sq. ft. building. A total of 608 parking spaces would serve the site. These would be speculative buildings,with potential office, high-tech manufacturing and warehousing uses anticipated. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires environmental review; site plan review, shoreline substantial development permit and a variance to exceed the maximum 40 foot building setback in the Commercial Office Zone. A setback of 90 feet from the north property line and 115 feet from the east boundary is proposed to accommodate proposed landscaping, parking and circulation. p A. ENVIRONMENTAL IMPACT(e.g.Non-Code) COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major information Environment Minor Major Information Impacts Impacts Necessary Impacts Impacts Necessary Earth Housing Air Aesthetics _ Water Ught/Glare Plants Recreation Land/Shoreline Use Animals Transportation vJ Environmental Health Public Services Energy/ Historic/Cultural Natural Resources Preservation Estimate 171 . 15 police calls for service annually , based on the size of the buildings . Most of these calls will occur during the construction phase , when thefts of building materials , tools , vandalism of property and burglary will occur This area of Renton has sustained a high number of property related crimes over the past year , due to the new construction. Recommend that the builders secure all of their materials and tools when the items are not in use , and that the site be well lit at night to help deter thieves . If the builders plan on using a portable construction trailer as a temporary office site , they should realize tha B. ; POLICY-RELATED COMMENTS these have been particularly targeted by thieves . Recommend that any unit of this type have heavy-duty dead-bolt locks , auxiliary locking devices , and bars over any windows to help prevent entry to the building. All office machinery and toolE need to have the serial , model numbers and descriptions of property recorded in the event they are stolen ; to help aid in locating the items . Recommend the use of .a private security patrol to monitor the site during the hours of darkness and when employees are not at work. Once the site has been completed , common crimes in this area are thefts from employees ' vehicles , and an occasional burglary. The buildings all need auxiliary lighting on all exterior doors , and all doors nec C. CODE-RELATED COMMENTS dead-bolt locks with at least a 1 1/2" bolt . The site plans show that the site will be well lit , which will help to deter criminal activity. We have reviewed this application with particular attention to those areas/n which we have expertise and have identified areas of probable impact or areas where additional information is needed to properly assess this proposal.ASifiature of Direct A orized Representative Date DEVAPP.DOC Rev.10193 City of Renton Department of Planning/Building/Pubi,.. ,✓orks ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET REVIEWING DEPARTMENT:GoA Acv\ S.2.1NtcEo COMMENTS DUE: MARCH 25, 1996 APPLICATION NO: LUA-96-034,SA,V,SM,ECF DATE CIRCULATED: MARCH 19, 1996 APPLICANT: EDI LINARDIC(LDG ARCHITECTS) PROJECT MANAGER: JENNIFER TOTH HENNING PROJECT TITLE: R&D-SW 16TH TECHNICAL CENTER WORK ORDER NO: 78072 Ci, (OF RENTON PiLCEPVEt LOCATION: 801 SW 16TH STREET SITE AREA 22.24 ACRES BUILDING AREA(gross): 85,000 (]FT: % 1996 BUILDING AREA(new expansion gross): 416j Q,000 SQ.FT. gn LUH\ ' Did Aa SUMMARY OF PROPOSAL The applicant proposes to develop a new on-story structure(Building A)and an a itio o n existing structure(Building B)on a partially developed 22 acre site. Building A would be 129,000 sq. ft. in size,while the Building B would result in the addition of 202,000 sq.ft.to an existing 85,000 sq. ft building. A total of 608 parking spaces would serve the site. These would be speculative buildings,with potential office, high-tech manufacturing and warehousing uses anticipated. The site,is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires environmental review, site plan review, shoreline substantial development permit and a variance to exceed the maximum 40 foot building setback in the Commercial Office Zone. A setback of 90 feet from the north property line and 115 feet from the east boundary is proposed to accommodate proposed landscaping, parking and circulation. A. ENVIRONMENTAL IMPACT(e.g.Non-Code) COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major Information Environment Minor Major Information impacts Impacts Necessary Impacts impacts Necessary Earth Housing Air. Aesthetics Water Light/Glare Plants Recreation Land/Shoreline Use Utilities Animals Transportation Environmental Health Public Services Energy/ Historic./Cultural Natural Resources Preservation • B. POLICY-RELATED COMMENTS C. CODE-RELATED COMMENTS 11e (a / O Q RL VJT ) l/ s R(Po n r i (� aif Ii) I L r is ko5 it‘, liU1l'/IV I'll/ f Ot l c(L/LY fUV` PRc11l(OIU t t1t U 111l)k. Pos1��UIJJ (I Ir 1111(Wf l 1 /Okla, We have = '=w=:„ 's appficatio 'r' parti•ular attention to those areas In which we have expertise and have Identified areas of probable Impact or areas where a •i• a/ l ''on •1 top ped),assess this proposal. A 3 --ZO-& Signatu iff Director or Authorized Representative Date DEVAPP.•• Rev.10/43 • __ 1_a_•__ SW 16TH STREET �� �j(�)�[�r.� --Ir--RELOCATE ExST'G PA ttRCµ,IµpSWpC L=1L/ °2t7t�i�T.+i'� S PROPOSED NEW CURB C EKSnG REI S BACK -RELOCATE EASI•G FH CUPB CUi 7 CURB Ur _ In 4'ts l.6la dfa!3:L a;ss;.��.+.:^ !I- //(- PROPoCOT Kw REMOVE _.- f---.PROPOSED NEw I J -NEW 6'CONE SIDEWALK CURB Ur CUf1B CUT ,_ ___ 939E a'siM a nvs-,r,.:'::a j CURB CUT me9'2839'j-. I]!§. -NEW C C SIDEWALK -" -- _�SD� -PELOWiE s,.i'C iH. .> Str.MI.A.COt CC(10l:iIS4A - .-_ r.__-_-.__.— -� f ` �T� - RELOCATE E%S1'G F.N.:LA - - T (� !_.._ __ _ .- r_=____-_ K. }1 1 f� 1.::L'1'- K.S S 99'.176' ii,,.,'"TA 1 ' /,•-- --,LE._ -ems»'-ayssx- ,..W.ta.- \ Fr E� ° . .. . i -�_ . N 8976'29'EVE i 1 , T1 I - f' 5.93' ` Y j I I i Y i I i 1 I I III, I I I1 1 - •5 }y 1I _ 1 NEW ANDSWRNG ttR- ISNy ^ 9', LION-117• ,V'1�-L1LB'sll2L r-,,24.-1, _LO_..-b:.. -STALL 1WIWIW9PIM1NC ��'`{ �� o / "�J'- 1 I 1 1 0 I I L 1 1 11-+ I. 1 ( '3, : x, j ,n, imEW i � 1LI}°titt')li•.Llr'4 4 . 'rrr Ill�lll� xg.. 1 0.... /�, i ;. r \ .G,xC WTSDE -- f a u f 4 / Ji f -,D_ EAnxa u+u t�: a+•�._ 1 Ii1( {II(?:, E //L 1 '�--r i ,- l-GOING UiS10E I I _ I G - -_ I \ l'j I _ I D FALLING MFA _b -- --E%SPG SIDEWALK e— _ 1'_-" EXISTING BUILDING // /Ir, -.. P[40VE EASr•G M --/� --I ___ s BSOM SF �` _-` • 111 } I I E0. ---\-„____:-- , // ;P -_ 1_! I ,-I 'R— - ill-7- �� -RENOVE EAST.G (�j/Z :.' I Z:' _WO.,_. - I _-. - -- / CO CUT V • / BUILDING -� - — 'I • -- is z(—TIN �\\\ ./-L'r. 126,000 SF \ -II v - r, _�-- I _-_-_-_ - _ �_ - --�- �--___ J \ I -_i;fl'.-.._ C -1a p'_'1_ i �DC OERSll4 ELO \m__- / .-_-----\_'-CURB NUT C<KSCA:E DEOIWnON TO GTY -�4=' - 1p - L ;,NE FOR N0 BLOC ZONE 1.1(\ - 1.-- r' - REN01£[6010 PANNE �__ \ L .1^ '- -1- REMOVE EKSi'C M - -� I. 4� t -1 ouu tr• 1 '� '- =- i'l - -�--= C=7 C=M C== J"_5_,';2F . • \ 7 -i I. ___ s p— 3 \ � I/1s \ s "r D TO Gi - \ - -' ------------------- - — 1.1._ ?' -?LAN \ \ � 1 x"° °' °— BUILDING B ------ ------ - _- �•\�'l ; - 208,000 SC -- Ig a 0 y{�I I13 i I Jil Pll.,II 1I NfW p • LEGAL CSSG' .\: \_ 1 ;� __—_ C008 cut py}rAr�.: � __._.. _. _ __._ .__._ 0/u>Sr7R(RECYCLF AREA-- \ w'6'FEv-E&GATE `\ 3-2�+y. ^ \ / 't_ --"- - A.L 4r vAU.1C0 3EUCK5 32.J!.A0•w OF C.O nILLIMn'S GRuxGi411 GARDENS 1' .1111 \J A;p,r,CY 10 THE 0C•Tr00 Cr Y+TLE,DN. 1,AGCGRGIII 10 ir.E PUT THEREOF, ]SyJ I ""- RDID IN vOLuuE 17 CF RATS.PAWS)]A,IN K91G COUrm.WASNINCTOS, .J„ ' -� - !P ?RT R IDTH v.Oc,ED•ENNf/.VENUE(82ND AVENI,E SOUTH)ANO AAWTED b �,__- _2agy53• n _ AEvuE(BIRO A.?nuE SOUfx)cWON.NG; '���c_- I �4-WNPSiER RECSE AREA - 1_- �7' 's IG rxvY AL GF THE iURECA.NG AN!PORTION THEREOF LYRIC EASTCRtf Ci A , I .. W/6'FFNEC tr' -' '- .-- rEEI wEST Or w.0 PARALLEL Y01H THE EAST uNE OF SECLON 24,10wASHIP ' 1 R'_- -- 23 WAN,RAGE 4 EAST.WILAAETTE NERID'AN.LE KING COUNT,.'WASACIOICN,410 ' _201.00. 4 _ r EACCPT i1MT FARTIGN THEREOF CONVEYED TO THE CItt OF RENTON FOR STREET BY N 79'8'11 W: \ -� �- PEED REGORGED LNGER RECORDING YUNBER 7812040683.AND - _p _ __ _ ZI WIa DICCPT THAT PORTION THEREOF CGN]EYED TO THE CITY OF RENTON El/OCED �-I° .• - _ 00004 ED UNDER RECORD NG NU46ER 8911030809. SEE ELEVATIONS DOGS FOR EKTCNCR UGN1ING� \ - r- - -. -- -'- STATISTICS:-__" -------------- ----- \\ . T'2 Az- a RV ION,WA IU.0 CO , '+-- - --IO' AREA ARu: ie ACRES CI OF RENTON +\' � N"t, --T--EAsr•c F.H. RECEIVED ' TN PER CloS AREA . ACRES 1 Gf.uPERROUS GE.AR Aix m MAN CGM1STRUCi7O'7 TYPE. V-el SPR.NKLLAED 4.NONG MCA 1]ao•.,:• 1109'.9L' R. ICOL•_9IL_ BAKO:NG A 126,400 SF \ / I I I I I I I I I CURB CUT BUAG.NG B. 293.000 Sr I TOTAL BUILDING.REA 419.000 SF MAY 0 8 1996 I xc.RSn PARKING REGuIRED _ /� uANWA[TUPING '/TOM -- �--ram /zV S m.11A. RANL,AcTu /5M -�-1I 1 nC hAN st GTµ,CE !/10M - \6 \ - 1-� 1- S>Tum:lYroOR CRLf+RL.•.SU u FKTUWNG 111.0.0 SO rT 111 STALLS L•.U\ u \ -'f- sPPn9tl+OM/,JASCIF cL.0*0.R.v OAREMeSC 177.000 50 R. 11B STALLS BUILDING DIVISION -y--r- Gf FIEF 131.400 50 FT, 393 STALLS \ �_ TOIA PARKING REGLIPED 522 Si.S ` ''1\ PARK.IIG PRO.CED' - _ -- uAALFACTLRING 111.000 50 IT 112 STALLS • AARCNOUSE 177,000 SO IT' 119 STALLS -TL GTFI(E 131.000 SC.el 393 51U LS 62•fSE W----' ._- ._ 1 --. II, L PARKING PRONG.0 4/.51N15 aBfi� MI non*. --• &LE)INE LADaCAA'E HE01. __ __9>1,11...`2-19.515 5f .,-.- -�--� - _ 5. a a rHmaaD ED.an 5 \ - -- 1 __ _ P.R.,AxFw =_- ___ ---- WON:IN i.C.-E AREA HEO'D- 3:1,368.05.11.&68 SF -'-�- SW 19TH STREET a" PART r1G UhDSCAPE AREA PROADED, 37.200 SF 1 VICiN(TY MAP: (NOT OPEN) rWra A„ *EN 7el An . - . .- - . - ..... -. ••• . . .. . . _ . • - --- • . • . ............. ..r... ..... . 1,......, "'4.' ..I.P 'WW1 3••P111. . ' ' I ' : I ' i . • : • ' ' ' ' • • • ---.- •.-- - —oll OltdrJSONTI RIP • . . • , I 1 1 • • e • • 1. 1 'e . I i I I • 1 ..1 _ ._._.4.1.0A i'''• : Ai V! Igi ' 1 ! 1 i ; ; : '. •• . . 1 •, : ; . ! , to. i ••, ...,i_ , . .4„0/•liasi, • . ,..,.—. al pap .....901 ' ' -..-••• • /2 .'s• „ e - 3: : Lt_: H i 1 ._ i .. ..0. ; • , i • ,.. W , : • , : • . • ; •rp,.. __ _ 4 I -...:. --. • • ; .0 1 E 4 1 NYld 3dVOSONY1 ..._ .• • •-- Irdi L•t,.•...:r.,.,/.)Q.W..,•0:.__ ''''11;,..13?,4N,- *:•T.:'. • ..___._ . • ! 0 - t,...:.•,.:.: • , ...„....„„ : 1--.--).: • 1 -40 . „......., 0_.. I I--- • • • •. .._ 1...., V Es..:41C-.1:::-.1 Octet 34V07=1,11 I Ci... _ ildg L.1 ___/•.,Iirt.132. -:•:' F -... , VA I 4 tt0.1.1.3k1 .41,101 ',It, 1.3 4 0 ,p?' ri ; . ..> • / •• .,10' :iie7-: 0 -••- 70..r.o ono, •.'". '• • iltfl.,....2,i).) /I : 71.1•Imen'w2tusIt'ttos.rstiert,....umers:Nr_iEceaminiguniquimutirikulasafp.s.clirmil .. • 116.41" 10 VP' /.." Y.:.S',..1.ZiVf2.1.1::::f.•, 1 • V•--. a- i OA) ,,,' •,...Aq oqq.qa•qq.ppw poppood.ut op a a C e DUI;MOT•,•ilIvrAine/lays JOU 000000 oll.aspeort •CT (:-'..'".....f ' i o • ,,' • • 7 .6u1P11.0 AIM 13*3id ' - , . • •C•aote...I aaaaa go mt.. Buotga•oo lilia lej poop.11..lic./U,.aaaaa pule eq.. 'DI 1 ...1...7.e.. .• .• Z ••el./11.11• .....9.73.Id C...11 •9.........••tt.te..6.....0......... •• ••••.,..,•z•Gozol..anstil op 94.23oclOY,tot Item.ald pm TT. •Il ...C....:PriliC41 • • 4-1 co . - Ow ,..----z ...,..d.zwtobp.t.•....1 IMO...14o0t4....tTV -T. ...IMMO zo panto...4.aspowt zo Tyzezdel•opt.Alpo p•inatz•on. • .4 A..,•1,1.1,VAV pop pm ace....JO......WM,J.t.,, '9 ..',-A)—. . op',op wow.po.11.1'A.S....4 It...........4..1.1t. •T ) .. . .1 .- - -. .•' --.1...- N. ••••••.' •.P..1 OotPoot.II•PT 51.t.......P•TO.P13 trade..g •• Pollo•IO tie ut tta.doZ P1O.P.0 't ' .10-H• ......"•10.1.:5 1,,,.9 V.-••• ... ... roollIP.oa 11 P.TITtopoa ao Wilt....4 MP.•P....1.1 't P.I.,...,.... ) -•''''' ...";C7'..: IP.4.o..0063.ppo aWyn 3.2V2SUO,ieJOVOI5 AP .C.' :Zr,... popp.ozd ,.. ... .._: .....' jj--- -...'' --7---f- ...„,..,.....,:= --........4 1 .!I. .., "ill_____.„..,..„....-4, ... -iii—--- ....- Sal.C)N •;,-••,•••-•,-) •,' _ , ..<:-. •3•1=So..apnr• ..i )-V.'"..-,:._ • '. - --- . '''''.•-.7;1...--- 4 a•Z;;;.;;;;- . . '''''';;;A.Z.: • ....,A,112,1yV AV..+Jdoet, ../".•,.4.,r a''50'...e,:c....;...V:.,:e.....--.,.0/,... •1:•-•••e,' :•,,,,,,:" z. ,?t"..- •,.....-. \... AvG.."2.ast 0' ! •Is,-,4:: Le2Npri,. _....,L,L07.-• 7,4, in.1,0'...,..*:), i-•-•- : (012//1/,71..12,,-,,,....;;,,,...% .. , ,7,44,1 ;.. ,Jr- ". '..A ii...e...A.1..7,.r. ,-.77: ......-..,...., i .f.,..!,..:,_.,-,5.,-... ...f.:.::•.fa-—, .A,•...,...,-c•pi'.' -.60,/n.,17, -,,Z.1,..-t, .134..t.e.....- .r.e2,404....7,.• ......,.....,=-,- • 3,-,-...44.•:- • ; L ...Lau CINILMV-1.1[mum( . . A3A01 A311 L 24,c2.:” L:• •*-;e4*.,•-"•,.4 7",•.-:,i.of,2•,'”?..;."....•••••,••:.,....„........ ..- ..._....1..1.,.-..:./it,.,.s.,..,.„.;.:,-.'..• ;.':,,,,:'•.-,.- .^ "'••":;]•.,...'...'r•-: .r47 .....,,....—..“1•.517r7.3•iD O.N:1- ILW Ild 3311 J 07 4417fi ... y _ . , A14 ' r4 , Z.",:t .. , o 4 , _ .._ . , '_-,, - : - . , / • . -• ,r. efq•I/..,...,:'. ;.•:•ti•-••• :/• -4,--•.".....:•.,.--..7--r 0 i • ,I P.oeneettao., ce.......o.L.1........ *••R 0,...,.' , .ertr.:'..,-Z:er...1-,.:.: ,f5Y.V:"...../ oe,.•:-.. ..,:',.... 0 ...F....,‘,.... 4h I; .•••”•n"...", PoorClo oc..5.1...c. .....o....opt..t.., •!,.__1, I;6•.;‘-; .,,...• - -,...i r"•••7,: ' "374,...p.,. rx-s-.7....z.,-.7_, a , -Vicaci-iTui51.16-112-11155a-Hillitid E•A•.4,.2 .....--, ii.,..,...:-. ' .L.ald),::, ...!..A..,..,,;".',...,:., ,. .•1 .CT,. :::‘-e--..V."li-.iv CAOr1;:: .1 )4_.,.'..•..-',.4.7atF:.-4,-0S-;:t*X-_,... -1•.4.• .',..... O.7.-7.-WO .4:;-.....'_....t,,,-,...: ."--...7.e-,.1.-...., ...,...,....,,:, _...:.-... '-?- „..,__.,.._. , .. -,-ctosg, =......-7:-,e'r_...4"-•Criet.,,...e,T.1....-.,....,2 •a•Zi..... I, 7 .7.".-..:.: .04,.., .k.a t••••- Ava_tte",v•.w:-..f..•-..- -i- .•.".:-..^::-...---zr.s'.t.",--,.....-..g:....'::-.T..v. . .. -:• ' ......,!-• '"'...!----1•17.:7...":„.:.•'..,7-;,...:.:,;:-24.41.,...:;.' " • -•--- • .V.'”,1',.' r...0...,-....V.:%. --,,,r,,..-:--f-L-4--- _..L-::' - ...,••••-••,,, , ',..,A..'•.,?-- ..•poem&ay.0- • ..o.',...3..'.. ------- -atr7.11,TV1.7 ....‘,-........COL11021'WA 1.11..... OIPL..10•••to•.m.o.w J•11..r.MCI. . •KimilLIIMIS•dna..1.00041141....WI .•'•-•;;;...:;---;.'---' • • . ...... . • - • . . • . • �J i j .. _ .. .. .. - - •A 1 ,,-, _architects / , : ._ 1 f�trnrca'f-rrnra'. !•.1 ts'G1:nf.-4-. �Yrrti n,r041rY.,-wlk,t`l.3'� rill#-1-,.rt+^E�. ,..F�J Y — --- .- -'. - - _'--- +la.:.•_ ;lit';."1 j cmr.3itaMa , •-'4I `-�— re ' I d a • - ..:-40 j II- '•-- ._ i ik.�( s,...-..,AI>.LAZO'\Al,A*ivaa7+uti yL. <411.I•.1;1•,-,,J.,u,.v.3)•. . , - _ :,!-1 1 Iy �A+�l�L Lii2y - _ _ '+f� �j], �-. i C ._ .- l -0;: Preen rile .•'I,„.- - 7 •. :'. `--I• :1', . it. .,,. ,i:...,. 4.-.",-._ ---- -c....,n,--:--_: 6-...-..;:-...0-4+.,, i : • • - . : , .0 ,. •., , , - - : • , 4o' , - ....-,40. ,.... ... , 461.-in.v. .,r,,: " aryl► uib -, ; - ..�..�` ... --ROAG MIS RrJSPJP,KA • NESIDEWALKW- ^..7'L. wen" i sheet title �:vr ifnan Uyv"•.�,N� .._r:;;� S.W.S71 �.7.iarT�<e:iwr•=^oir j • ;S- H \- SOU rri) 1 LA?D8CJ►L SJ.ii • I 5.'L GVY wsnnn� :7•1'4. tm eD rmei ne T • t_1 �_WJDSCAPEPLAN'. ei•:.:cw 2 • . !% L..`V•'�.=architects • ....x e..o,,vow.an:Ho ns TOTS d..,.r an.n Nunn 200 I ' ' s,e' . Neam..WA.*MOO L]O.Ylao-a)M ., b• a• Cr -a or AS' • it $ Ae• L • -- -- 1_ U _II4 J1' J 1 7 i -i 1 OFACE/YANLfA.:Ui'.G I hi L • ' :I • 1' 11 U j } _ • r-g • !c•'-s• 'ce•-T Project title• MOOSE • (%L' •"•c''1.7:K IST 1aril FLOOR PLAN BUILDING .4 \\�--]SALE ,i]� ,•-J _.. TECH P 9a�.: Fdl>/B48MYA COMPANY -MET COPNO CONC TILT-UP PANEL(PALM--' r -•vALL PACK(TTP) , I51)L IHIED—'--- '. UV'CANOPY CLASS asmooAO ALUM FRAMES: ,N.Y.DOOR • � ®i®i . ate;®;®;®�•�:®®® u��:®PM: _:®I®litIg 1 tom(®IfITAnl�®i�ni�;®OT®� afoot tiller t!(iSDW 2 A FLOOR PLAN,ELEYATIMS WEST ELEVATION NORTH__ELEVATION--_ i....�..., ^.- ...! T....np.lnu..T.,L.,,„•, ... 7 .,...... ', .,,..•. 'rTrn = t -_ L q Fri F17� _ • :—.._ q _-t.._ q �TTTTT®i�Ej®�®;®; g ®®i®"t7i ®�®�:•ZAy ®1®j®I® ^yyl-- fiii•niii' i iii n� -r— Lam" '�t� i0D O. dlePi no chs EAST ELEVATION SOUTH ELEVATION___ • 'SCALE 1/sY••,•-O• --- dtr s ,.]r-Y-O' drC11.J A-4 __ -_ bt• 3-S M_-_ _ _- - • _ . . . .. .. . . . . . • LDG architects .• ▪ *Won-a-.•rengeeto *WS alangtar floe.n nee] ▪flit*.WA-*MOO C.203/0/0-476.41 - - •- fl .. ; • : n SOUTH ELEVATIQN consittents • ' • • • , • fgrIVEMilTITIp upflflilf=1:=i111 tAITI:ElfERETIM.[11 i:11_1_;I 1:05T171tIM OTTI:EITEItIME10 ;,,p1:1(:IvimmsiOn Rifi-11-71 EAST ELEVATION SCG.E1/32" 1.-0• ' :-; r—r---11===r3=Fr=91-11--lia- .Mm:EtTE,EEM• M 1.• ' , =1:LL_LI EfM VEST ELEVATION 5CtIor-i•-cr • • • 1 '' ' protect "' ".••.!I ItAi 1117-1117111 I-1E-11-1 ET,1 r—Inir""11 71,103•C•SIE?WALT.S.31POet NORTH E.LEVATIO_N • SE4.1.FrJYA CMiff •leet tit1e: . ._ . - --- -- • - -- no, rcnimcns dole rebel n. doe &ay _ _ • • • "+, �r CITY )F RENTON Not, Planning/Building/Public Works Department Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator• • May 7, 1996 ' Ms. Elizabeth Warman Local Government Affairs Manager,Puget Sound The Boeing Company - , P.O. Box 3707,MS 14-49 Seattle,WA 98124-2207 ' SUBJECT: RESERVATION FOR IMPROVEMENTS ON GROUP HEALTH SITE LUA 96-034, SA, SM,ECF Dear Liz: The City has received a revised site plan and project description from the applicant for the redevelopment of the Group Health site. The revised site plan and project description illustrate and describe the area reserved for the future widening of Springbrook Creek and the extension of Oaksdale. City Transportation and Surface Water staff have reviewed the plans and concur that the area in reservation will accommodate the aforementioned improvements. ' The project owners have committed to recording a restrictive covenant against the property. The covenant shall reserve area for the future improvements of the Oaksdale extension and Springbrook Creek widening. Recording of this covenant will be required prior to the expiration of the appeal period of the Hearing Examiner's decision on this project. The City will address the company's additional concerns in a future letter. Sincerely, Gregg Zimmerman. E.,Administrator Planning/Building/Public Works Department h:ghsite/mp H:\DIVISION.S\DEVELOP.SER\DEV&PLAN.INGUH\GHSITE.DOC/MP • 200 Mill Avenue South - Renton,Washington 98055 ®This paper contains 50%recycled material,25%post consumer At kitti /996 O'KEEFE DEVELOI,FMENT CORPORATION cl oy"`r P61 At iledv_pt May 7, 1996 Attn.: Jennifer Henning City of Renton 200 Mill Ave. South Renton, WA. 98055 RE: Wetland Mitigation Plan- S.W. 16th Tech Center(Group Health Site, LUA-96-034) Dear Jennifer, The April 18th letter from the City to LDG Architects references four mitigation measures, the first is the Wetland Mitigation Plan. Based on the wetland determination of the Army Corps dated April 4th, our request to participate in the Wetland Bank dated April 12 and Greg Zimmerman's approval of our request to participate in the Wetland Bank should preclude us from having to prepare a Mitigation Plan for relocating our wetland since we will be participating in the Wetland Bank. Please let me know if this letter is not acceptable and call me if you have any questions. Sincerely, O'KEEFE DEVELOPMENT CORPORATION omas M. ee Vice Presi ent TML:lmk Enc. cc: Joe Alhadeff 7900 S.E. 28th Street, Suite 400 Mercer Island, Washington 98040 (206) 236-6200 Fax (206) 236-6160 I R " CITY -if' RENTON "LL Planning/Building/Public Works Department Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator April 30, 1996 Mr. Jim Kelley Parametrix,Inc. 5808 Lake Washington Blvd NE Kirkland,WA 98033-7350 SUBJECT: GROUP HEALTH SITE (LUA-96-034,SA,SM,ECF) WETLAND MITIGATION BANK REQUEST Dear Mr. Kelley: We are in receipt of your letter dated April 12, 1996, requesting 1) participation in.a cooperative wetlands mitigation bank project with the City of Renton, and 2) an Administrative Waiver to allow a wetland replacement ratio of 1:-1 instead of 1:1.5 in order to allow the filling of a Category.3 wetland on the property. I have reviewed your submittal information,and also the City of Renton staff report dated April 16, 1996. BACKGROUND: The proposed development project involves the construction of a 129,000 square foot new building and a 202,000 square foot addition to an existing structure on a partially developed 22-acre site at SW 16th Street and Raymond Avenue SW. The applicant,has obtained an Environmental Determination of Nonsignificance-Mitigated (DNSM), and has submitted for Site Plan Review and a Shoreline Substantial Development Permit. The subject property is bounded on the west side by Springbrook Creek. Based on a delineation of wetlands performed by Parametrix„Inc. there are three small wetlands on the site. These three wetlands were determined to be exempt from the Corps of Engineer's jurisdiction under Section 404 of the Clean Water Act. The total area of two of the three wetlands is under 5,000 square feet and therefore exempt from the City of Renton's Wetland Ordinance. The third wetland is a Category 3 wetland, approximately 16,700 square feet in size and is regulated under the City's Wetland Ordinance. Based on the size of the proposed development, it would be impossible to avoid the Category 3 wetland. Replacing the wetland elsewhere on-site would not be a desirable option as it would greatly reduce the size of the proposed development. The applicant has requested to participate in the City's wetland mitigation bank which is a .permitted option under Section 4-32-6 G. of the Wetland.. Ordinance. The applicant also requests an Administrative Waiver, as provided by Section 4-32=5.D.1.' This waiver is needed to allow a wetlands replacement ratio of 1:1 (Section 4-32-6.C.3 calls for a replacement ratio of 1.5:1), and to allow the wetland to be replaced after the subject wetlands have been filled (Section 4-32-6.C.5 states that the City may decrease the ratios for Category 3 emergent wetlands to 1.0 times the area, provided the applicant has successfully replaced the wetland prior to its filling). • 200 Mill Avenue South—Renton, Washington 98055 Group Health Site • Wetland Mitigation Administrative Decision 4/30/96 Page 2 FINDINGS: 1. The Category 3 wetland in question is located in the southern portion of the site where the applicant has proposed to develop storm water facilities and compensatory storage. 2. The Category 3 wetland was identified as a perched wetland on fill material. It appears that the wetland has limited biological and physical functions which could be more effectively replaced in a mitigation bank. DECISION: The request for Administrative approval to participate in a Cooperative Wetlands Mitigation Bank per section 4-32-6.G., and the request for Administrative Waiver, as provided by section 4-32-5.D., of section 4-32-6.C.3 to allow a wetlands replacement ratio of 1:1 rather than the required 1.5:1 replacement ratio, and of the requirement of section 4-32-6.C.5 in order to allow the wetland to be replaced after the subject wetland has been filled, are hereby granted subject to the following conditions: 1. There shall be compensation payment in the amount of$3.00 per square foot of replaced wetland for participation in the wetland mitigation bank prior to the issuance of a Building Permit. 2. There shall be a one year period from this approval where full or partial refunds could be made to the applicant if the City substantially alters the Wetland Management Ordinance in such a way that minimizes or deletes the need for compensation for filling of the subject wetland during this time period. • Sincerely, mgee(~,,_, Gregg Z. erman, Administrator Planning/Building/Public Works Department cc: Tom Lee, O'Keefe Development • Jim Hanson, Development Services Director - Jennifer Toth Henning, Project Manager Request for reconsideration must be filed in writing on or before 5:00 p.m., Tuesday, May 14 1996. Any aggrieved person feeling that the decision of the Administrator is ambiguous or based on erroneous procedure, errors of law or fact, error in judgment, or the discovery of new evidence which. could not be reasonably available at the time this determination was made may make a written request for a review by the Administrator within fourteen(14) days from the date of the Administrator's decision. This request shall set forth the specific ambiguities or errors discovered by such appellant, and the Administrator may, after review of the record,take further action as he deems proper. An appeal to the Hearing Examiner requires that such appeal be filed with the office of the Hearing Examiner, accompanying a filing fee of$75.00 and meeting other specified requirements. • H:\DIVISION.S\DEVELOP.SER\DE V&PLAN.INGUH\1724MM.DOC/MP CITY OF RENTON PLANNINGBUILDING/PUBLIC WORKS MEMORANDUM DATE: April 29, 1996 TO: Project File FROM: Jennifer Toth Henning P SUBJECT: SW 16th R&D Technical Center—Schedule(File No. LUA-96-034, SA, SM, ECF) The schedule for the project is noted below and reflects actions to date as well as anticipated action dates (provided that the applicant does not ask that the clock be stopped, and that appeals, or actions related to the Comp Plan Amendment and Rezone slow the process). Application Accepted March.18, 1996 STAFF REVIEW/ENVIRONMENTAL REVIEW 1st Environmental Review Committee Meeting April 9, 1996 2nd Environmental Review Committee Meeting &Environmental Threshold Determination April 16, 1996 Publication of Threshold Environmental Determination Start of Combined 15-day Comment/Appeal Period April 22, 996 Combined Comment/Appeal Period Ends May 7, 1996 SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT Shoreline Substantial Development Permit Issued by City May 8, 1996 Shoreline Permit sent to State Department of Ecology(DOE) May 9, 1996 Receipt/Log-In Date at DOE May 13, 1996 End of DOE 21-day Review/Appeal Period June 3, 1996 SITE PLAN REVIEW Preliminary Report to the Hearing Examiner Mailed to Parties of Record May 7, 1996 Hearing Examiner Public Hearing May 14, 1996 Hearing Examiner Decision Issued May 28, 1996 End of 14-day Appeal Period for Hearing Examiner Decision June 11, 1996 April 26, 1996 Page 2 COMPREHENSIVE PLAN AMENDMENT/REZONE (all dates shown are tentative)*** Planning Commission Public Hearing Comprehensive Plan Amendment Rezone May 15, 1996 Planning Commission Decision/Recommendation to Council May 15, OR June 5, 1996 Environmental Review for Comp Plan Amendment/Rezone June 11, 1996 City Council Planning and Development Committee (P&DC)Meeting . June 12, OR.June 26, 1996 Anticipated City Council Action on P&DC Recommendation June 17, OR July 1, 1996 City Council-1st Reading of Adopting Ordinance June 17, OR July 1, 1996 Publication of ERC Decision Start of 15-day Combined Comment/Appeal Period June 17, 1996 End of 15-day Combined Comment/Appeal Period July 2, 1996 City Council-2nd Reading of Adopting Ordinance July 8, 1996 Effective Date of Rezone/Comp Plan Amendment July 13, 1996 ***The Comprehensive Plan Amendment and Rezone are being processed by Long Range Planning. All dates shown are tentative and subject to change. For further information regarding the status of these applications, the applicant should contact Rebecca Lind at 277-6188. SCHED.DOC/ 04/25/96 08:50 FAX 206 236 6160 O'KEEFE DEVELOP Id1002 1)PR7.25 96 THU 07:57 AN PARA SIX-KIRKLAND FAX NO, 206 3808 P. 01/02 Parametrix, Inc. _ 5808 Lake Washington Blvd. N.E., Suite 200, Kirkland,WA98033-7350 206-822-8880 FAX TRANSMISSION COVER PAGE FAX #206-889-8808 To: ...... _',... Le_' Company Name: 01 icsetfr_ . e Fax#: g-5 CP (( 6,0 PMX Project #: From: ../4—("e O Sent By: Date: g 2 5/Number of Pages (Total): 2 _ Comments/Message: 21//fie /at r r- ‘ 741111‘ Backup Copy Will C] Will Not ❑ Be Sent Via Thls facsimile is confidential and may also be attorney-privileged. if you are not the intended recipient,or the person responsible for its distribution,please call us collect immediately at(206) 822-8880 and return the original to us via the U.S. Postal Service_Thank you. 04/25/96 08:50 FAX 206 236 6160 O'KEEFE DEVELOP 003 APR-25.796 THU 07:58 AM PARAf__ IX-KIRKLAND FAX NO. 206-- 18O8 P, 02/02 Parametrix, Inc. _ — Consult9nts in Engineering and Environmental SCience5 5808 Lake Washington Blvd.N-C Kirkland,WA 98033-7350 206-8Z2.8880-Fax:206-889-8808 P Greg Zimmerman April 12, 1996 City of Renton 55-2942-01 Development Services Division 200 Mill Avenue South Renton, Washington 98055 Re: O'Keefe Development Corporation - Group Health Site • Wetland Mitigation Banking Request for 'Group Health Distribution Center Site" Dear Mr. Zimmerman: Parametrix has completed a delineation of wetlands on the Group Health Distribution Center site (S.W. 16th Street and Raymond Avenue S.W.). On behalf of the purchaser of the property, we request participation in a cooperative wetlands mitigation bank project with the City of Renton, as provided by Code 432-6G. We also request an Administrative Waiver (as provided by Code Section 6-32-6.G) to allow a wetland replacement ratio of 1 to 1 instead of 1 to 1.5 and to allow wetland mitigation to occur following the filing of wetlands on the property. Parametrix identified and delineated three small wetlands on the site. These three areas were determined to be exempt from Corps of Engineer jurisdiction under Section 404 of the Clean Water Act (see attached letter). Two of these areas were determined to be less than 5,000 square feet in size, and they are thus exempt from the City of Renton Wetland Management Ordinance. The remaining wetland is a Category 3 wetland and about 16,700 square feet in size. The Category 3 wetland cannot be avoided by the proposed wharehouse facilities because it is located near Raymond Avenue, interfering with site access and internal circulation. Because the wetland has recently developed on poorly drained fill material, it provides limited biological and physical functions typically attributed to wetlands. These functions can be effectively replaced and enhanced in a mitigation bank where they can be integrated into a more complex wetland system. Please do not hesitate to call me (822-8880) or Tom Lee (236-6200) if you have any questions or require additional information. Sincerely, PARAMETRIX INC. • im Kelley. Ph.D. Senior Ecologist cc: Tom Lee, O'Keefe Development F,1co:t .abakytke.r.der.ir .. - . ..................... ... . ..... .................<.. `lGIYO F:R EN.: .:.;;:::: ,< ::::: : : liim ` '' ` >` ` ::::: ....:.....:....;: �.. . . ....>::::>:.. : :::. .....:::::::» »G RR=NT •. ANN NG.DJVION ' << i < { < '<< ` . . .. ... .. ... . .. •L .... ....... . ......itilCE.BY.M:A<:;.:„:<N:.;:iiiI >`€€`ESI >> <<<M><'E><» >RS:>:::::>:>::»::::><:>:><:>:::: ::::>::::>::»::><.»>::»::>::>::::::>::<>::::::»»::»<::::::»»::>::>:::<:>::;> FF[DA\1:.:::� �< ER. .1�1=..BY.MAIL[N. ............................................................ IBE On the_ l9 day of /Pvntt , 1996, I deposited in the mails of the United States, a sealed envelope containing '1i;1C. de1ev mtInc tw documents. This information was sent to: Name Representing QI.Ia6c4tctliVt C.o CovrA bt "`1 I[V1gv3 izr..f-t- of w ikaki•R_. ` ' i ,,51nex- rt" cf Ai slnev► 1aav id lii.t "zu,na v, . t of L..PC..Sal cem 'L tck tAvOcki.soteN i 4 -TituAsPo-17--taAttryn Su.e, —Qwnne. e f Sea-t4._ 1::uwamtsL 1wdtan-Tv%be. Malcom , �t evves 6u.cklesLot 1vkato,v‘ —Cv-;Le_. "--Prka., i)e vs^tac. ' 4 --?b (Signature of Sender) < ►-k- STATE OF WASHINGTON ) SS COUNTY OF KING ) I certify that I know or have satisfactory evidence that )D12A K or' X- signed this instrument and acknowledged it to be his/her/their free and voluntary act for the uses,'" d purposes mentioned in the instrument. .,���L,;4IA d Dated: '7//`l /gdo %-J/...1�V Notary P, is in and; the State of W sbillgtonp.•r . , Notary nnt) /v./1-' L'T.J J°. �►�' My appointment expires: 9 7 9X � . .'••::•••• Project Name a'Yrj► Fac.,i,A 5W u(l1^ -redw,tte t, Ce-V`t-. Project Number. q(P -o341 %Pt k%M:1 e& NOTARY.DOC dt - • CITY )F RENTON - Nu. Planning/Building/Public Works Department Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator April 18, 1996 Washington State Department of Ecology . Environmental Review Section PO Box 47703 Olympia, WA 98504-7703 . SUBJECT: Environmental Determinations . Transmitted herewith is a copy of the Environmental Determination and Environmental Checklist for the following project reviewed by the Environmental Review Committee on April 16, 1996: DETERMINATION OF NON-SIGNIFICANCE-MITIGATED - - - R&D FACILITY/SW 16TH TECHNICAL CENTER - LUA.96-034,SA,SM,ECF . - .. The applicant proposes to develop a new one-story structure (Building A) and an addition to an existing structure (Building B) on a partially developed 22-acre site. Building A would be 129,000 sq. ft. in size, while Building B would result in the addition of 202,000 square feet. to an existing 85,000 sq. ft. building. A total of 618 parking spaces would serve the site. These would be speculative buildings, with office, and high-tech manufacturing uses anticipated. Three wetlands are present on the site. Two small wetlands are not regulated and would be filled. A third wetland (approximately 16,000 square feet) is subject to the requirements of the Wetlands. Management Ordinance.. The site is located adjacent to Springbrook Creek, although no development is proposed within.25 feet of the mean high water mark. The project requires:.Environmental Review, Site Plan Approval, and a Shoreline Substantial Development Permit. Location: Got sw Uot" Sire' The 15 day comment period and the 14 day appeal period for this project will run concurrently. The comment/appeal period will end at 5:00 PM on May 07, 1996. Following the end of the comment/appeal period, the City will finalize its Determination unless comments received require a reevaluation. Appeal procedures and the mitigation measures imposed by the City of Renton's Environmental Review Committee are available at the Development Services Division, Third Floor, Municipal Building, Renton, Washington 98055. Phone: 235-2550. If you have questions, please call me at (206) 277-6186. For the Environment eview Committee, . ott. k-eAmAA/3 • nnifer enning Project Manager cc: King County Water Pollution Control Division, Metro Department of Wildlife Larry Fisher, Department of Fisheries David F. Dietzman, Department of Natural Resources Don Hurter, Department of Transportation Sue Rumery, City of Seattle Duwamish Tribal Office Rod Malcom, Fisheries, Muckleshoot Indian Tribe (Ordinance) Rita Perstac, Puget Power AGNCYLTR.DOC 200 Mill Avenue South - Renton, Washington 98055 ®This paper contains 50%recycled material,25%post consumer c: =` CITY iF RENTON Planning/Building/Public Works Department Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator April 18, 1996 Mr. Edi Linardic LDG Architects 1319 Dexter Avenue North, Suite#260 Seattle, WA 98109 SUBJECT: R&D Facility/SW 16th Technical Center Project No. LUA-96-034,SA,SM,ECF Dear Mr. Linardic: This letter is written on behalf of the Environmental Review Committee and is to inform you that they have completed their review of the environmental impacts of the above-referenced project. The Committee, on April 16, 1996, decided that your project may be issued a threshold Determination of Non-Significance-Mitigated with the following conditions: See enclosed Mitigation Measures document. Because the Environmental Review Committee imposed specific mitigation measures rather than issue a Determination of Significance, there is a required 15 day comment period during which comments are solicited from various agencies, jurisdictions or individuals (including the applicant)who may have an interest in the Committee's decision. The required 14 day appeal period will run concurrently with the comment period. The comment/appeal period will end at 5:00 PM on May 07, 1996. • Following the end of the comment/appeal period, the City will finalize its Determination, unless comments received require a reevaluation. WAC 197-11-660 states that the responsibility for implementation measures may be imposed upon an applicant only to the extent attributable to the identified adverse impacts of the imposed action. Since an environmental impact statement has not been prepared for this project, any mitigation measure established by the ERC not directly attributable to an identified adverse impact is deemed to be voluntarily accepted by the applicant. Staff urges you to contact the various City representatives, as appropriate, (e.g., the Public Works Division) as soon as possible, to obtain more.information concerning specific mitigation elements recommended for this project, if you have specific questions. This information will assist you in planning for implementation of your project and will enable'you to exercise your appeal rights more fully, if you choose to do so. - Appeal procedures and mitigation measures imposed by the City of Renton's Environmental Review Committee are available at the Development Services Division, Third Floor, Municipal Building, Renton, Washington 98055. Phone: 235-2550. You should be prepared to make specific factual objections. A Public Hearing will be held by the Renton Hearing Examiner at his regular meeting in the Council Chambers on the second floor of City Hall, Renton, Washington, on May 14, 1996 at 9:00 AM to consider the Site Approval (SA). If the Environmental Determination is appealed, the appeal will be heard as part of this public hearing. If you have any questions or desire clarification of the above, please call me at 277-6186. For the Environment eview Committee, vVN Jen fe Toth H ning` roject Ma r cc: Ms. Lori Pitzer/Boeing DNSMLTR.DOC 200 Mill Avenue South-.Renton, Washington 98055 SSA --._ . _. ,.,„, CITY OF RENTON DETERMINATION OF NON-SIGNIFICANCE (MITIGATED) MITIGATION MEASURES APPLICATION NO(S): LUA-96-034,SA,SM,ECF APPLICANT: Edi Linardic/LDG Architects PROJECT NAME: R&D Facility/SW 16th Technical Center _ ' I DESCRIPTION OF PROPOSAL: The applicant proposes to develop a new one-story structure (Building A) and an addition to an existing structure (Building B) on a partially developed 22-acre site. Building A would be 129,0,00 sq. ft. in size, while Building B would result in the addition of 202,000 square feet. to an- existing 85,000 sq. ft. building. A total of 618 parking spaces would serve the site. These would be speculative buildings, with office, and high-tech manufacturing uses anticipated. Three wetlands are present on the site. Three wetlands are present on the site. Two small wetlands are not regulated and would be filled. A third wetland (approximately 16,000 square feet) is subject to the requirements of the Wetlands Management. Ordinance. .The site is located adjacent to Springbrook Creek, .although no development is proposed within 25 feet of the mean high water mark. The project requires Environmental Review, Site Plan Approval,and a Shoreline Substantial Development Permit. LOCATION OF PROPOSAL: 801 SW 16th Street I - i MITIGATION MEASURES: 1. The applicant shall submit a final wetland management plan subject to the review and satisfaction of the Development Services Division for the filling of Wetland C on the project site. The final wetland mitigation plan must be submitted prior to the public hearing for Site Plan Review. 2. The applicant shall pay the appropriate Fire Mitigation Fee at a rate of$0.52 per square foot of new construction. (Credit may be given for area of demolished structures.) This fee is payable prior to the issuance of the Building Permit. 3. The applicant shall pay the applicable Traffic Mitigation Fee at a rate of $75 per each new average daily trip attributable to the project. Credit may be given for existing trips on the site that would be eliminated under the proposal. The fee will be estimated based on the ITE Manual and the applicant's traffic study, and is payable prior to the issuance of a Building Permit 4. The applicant shall limit construction traffic on the adjacent arterials during pre-loading activity to the hours between 8:30 am and 3:30 pm. MITMEAS.DOC/. CITY OF RENTON DETERMINATION OF NON-SIGNIFICANCE (MITIGATED) ADVISORY NOTES APPLICATION NO(S): LUA-96-034,SA,SM,ECF APPLICANT: Edi Linardic/LDG Architects PROJECT NAME: R&D Facility/SW 16th Technical Center DESCRIPTION OF PROPOSAL: The applicant proposes to develop a new one-story structure (Building A) and an addition to an existing structure (Building B) on a partially developed 22-acre site. Building A would be 129,000 sq. ft. in size, while Building B would result in the addition of 202,000 square feet. to an existing 85,000 sq. ft. building. A total of 618 parking spaces would serve the site. These would be speculative buildings, with office,and high-tech manufacturing uses anticipated. Three wetlands are present on the site. Three wetlands are present on the site. Two small wetlands are not regulated and would be filled. A third wetland (approximately 16,000 square feet) is subject to the requirements of the Wetlands Management Ordinance. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires Environmental Review, Site Plan Approval, and a Shoreline Substantial Development Permit. LOCATION OF PROPOSAL: 801 SW 16th Street Advisory Notes to Applicant: The following notes are supplemental information provided In conjunction with the environmental determination. Because these notes are provided as information only,they are not subject to the appeal process for environmental determinations. General 1. The applicant shall apply with all applicable City, state, federal and other jurisdictional regulations, codes and policies governing the project and site. 2. All required utility, drainage and street improvements will require separate submittals prepared by a registered Civil Engineer, according to City of Renton drafting standards. Permit application must include an itemized cost estimate for these improvements. The fee for review and inspection of these improvements is 5% of the first $100,000, 4% of anything over$100,000 but less than $200,000; and 3% of anything over$200,000. One-half of the fee must be paid upon application for building and construction permits, and the remainder when the permits are issued. 3. The applicant is required to obtain a Construction Permit in order to accomplish site work and installation of site improvements. 4. The applicant will need to submit construction drawings for street lighting and each utility. These drawings will need to be on individual sheets. - 5. Construction plans must comply with the City's Drafting Standards. Transportation - 6. A traffic report will be required which shows the existing trip ends and new trip ends generated by , -the proposed project. If significant, the report needs to indicate what impacts the new generated traffic volume will have on SW 16th Street and any local intersections. R&D Facility/SW 16th Technical Center LUA-96-034,SA,SM,ECF Page 2 7. The City's Transportation Impact Fee will apply to the project as discussed in the mitigation measures above. Credit may be given for existing trips that would be eliminated under the proposal' The applicable fee is$75 per each, new average daily trip. 8. Curb, gutter, sidewalk and street lighting will be required on SW 16th Street. A street lighting plan is required per City standards and is to extend the full length of the property frontage to the roadway: 9. The applicant will need to coordinate with the City's Transportation Systems Division for the road improvement project on SW 16th Street. . Roadway grades and elevations of the proposal and the City will need to coincide. Storm Drainage 10. A System Development Charge (SDC) for storm water is applicable to the project and would be assessed at the rate of$0.129 for new impervious surface area. 11. The applicant shall provide a drainage report which addresses the King County Surface Water Manual core and special requirements. _ 12. The applicant may be required to provide a I EMA Elevation Certificate due to the location of the project within the flood plain. Wastewater 13. The applicant will be required toprovide an appropriate removal s stem for fats, oils, or grease PP q Y 9 if the project includes any uses that would generate the same. 14. The side sewers will be required to have a12% grade to the right-of-way. One sewer clean-out shall be located within five feet of the building and one clean-out is required every 100 feet. 15. The applicant is required to provide a plan and profile for the sewer. These drawings will need to show the finish floor elevations of the buildings and slopes of the wastewater pipes. 16. The minimum pipe cover required for wastewater pipes is two (2) feet. 17. The applicable System Development Connection charge is $0.078 per square foot of site area. Credits may be given if partial charges have been previously paid for the site. 18. If the floor elevation is below 22 feet as shown on the applicant's submittals, then a backflow prevention device will be required on the sewer system: Water 19. A 12-inch water line is located in both SW 16th Street and Raymond Avenue SW. Available fire flow is 5,600 gpm. Preliminary fire flow required by the Fire Department is 4,500 gpm. A sufficiently sized loop system is required. 20. The proposed project is located in the Downtown 196 mapped water zone. 21. The relocation in the water loop system will require a new 15-foot utility easement. 22. Construction plans and profile drawings are required for water drawing submittals. ADVNOTES.DOC/ . - R&D Facility/SW 16th Technical Center LUA-96-034,SA,SM,ECF Page 3 23. The applicant is required to pay a water System Development Charge of$0.113 per square foot of site area. Credit may be given.if connection charges have been previously paid for the site. Fire 24. The preliminary fire flow requirement for Building A is 4,500 gpm. A total of five hydrants are required. The primary hydrant is to be located within 150-feet of the building, and four additional hydrants are required within 300-feet of the building. A looped fire main is required for Building A. 25. The preliminary file flow requirement for Building B is 4,500 gpm. A total of five fire hydrants are required. The primary hydrant is to be located within 150-feet of the building, and four additional hydrants within 300-feet of the building. A looped fire main is required for Building B. 26. The applicant is required to pay the applicable Fire Mitigation Fee as discussed in the Mitigation Measures above. The fee is assessed at a rate of $0.52 per square foot of new building area. Credit may be given for the area of existing structures that are demolished for the proposal. Building A would be 129,000 sf in size, therefore the estimated Fire Mitigation Fee would be $67,080. Building B would be 202,000 sf in size, therefore the estimate Fire Mitigation Fee would be $105,040. The fee is payable at the time of the issuance of the building permit. 27. The applicant shall provide fire sprinklers and fire alarm systems for both of the proposed new _ buildings. Separate plans and permits are required for each system. 28. Since the building is speculative in nature, and no tenant has been identified, additional fire and building requirements will be based on the use of the building and the type of operation to be conducted. The applicant shall provide information regarding the storage and use of any flammable, combustible liquids or gases, or any hazardous materials. 29. The applicant's plans shall reflect Code requirements for a minimum 20-foot wide paved roadway with an inside turning radius of 25-feet and an outside turning radius of 45 feet. Parks and Recreation • 30. The owner/tenant shall maintain landscaped areas outside of the property line but within the ' street right-of-ways. Police Services 31. The applicant is advised to coordinate with Renton Police Crime Prevention for recommendations to reduce possibility of crime during construction and operation of the facility. Building Construction 32. The applicant will need to provide a current soils report which addresses the potential for -liquefaction and proposed mitigation. Wetlands &Creeks 33. The applicant will need to meet the requirements of the City's Wetland Ordinance with regard to the regulated wetland (Wetland C). ' 34. A Shoreline Substantial Development Permit is needed to,allow development within 200 feet of - Springbrook Creek. ADVNOTES.DOC/ R&D Facility/SW 16th Technical Center LUA-96-034,5 A,SM,ECF _ Page 4 35. The applicant shall meet requirements for public access as part of the Shoreline Substantial Development Permit. Solid Waste j I 36. Garbage and recyclable deposit areas and(collection points shall be easily and safely accessible to hauling trucks. I i ADVNOTES.DOC/ I I NOTICE OF ENVIRONMENTAL DETERMINATION ENVIRONMENTAL REVIEW COMMITTEE RENTON, WASHINGTON The Environmental Review Committee (ERC) has issued a Determination of Non-Significance - Mitigated for the following project under the authority of the Renton Municipal Code. R&D FACILITY/SW 16TH TECHNICAL CENTER LUA-96-034,SA,SM,ECF The applicant proposes to develop a new,one-story structure (Building A) and an addition to an existing structure (Building B) on a partially developed 22-acre site. Building A would be 129,000 sq. ft. in size, while Building B would result in the addition of 202,000 square feet. to an existing 85,000 sq. ft. building. A total of 618 parking spaces would serve the site. These would be speculative buildings, with office, and high-tech manufacturing uses anticipated. Three wetlands are present on the site. Two small wetlands are not regulated and would be filled. A third wetland (approximately 16,000 square feet) is subject to the requirements of the Wetlands Management Ordinance. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires Environmental Review, Site Plan Approval, and a Shoreline Substantial Development Permit. Location: 801 SW 16th Street. The 15 day comment/14 day appeal periods for this project will run concurrently and end at 5:00 p.m. on May 07, 1996. Appeal procedures and the mitigation measures imposed by the City of Renton's Environmental Review Committee are available at the Development Services Division, Third Floor, Municipal Building, Renton, Washington 98055. Phone: 235-2550. You should be prepared to make specific factual objections. A Public Hearing will be held by the Renton Hearing Examiner at his regular meeting in the Council Chambers on the second floor of City Hall, Renton, Washington, on May 14, 1996 at 9:00 AM to consider the Site Approval. If the Environmental Determination is appealed, the appeal will be heard as part of this public hearing. Publication Date: APRIL 22, 1996 Account No. 51067 dnsmpub.dot _, _ _ . NoncE . , , _ • : . ENVIRONMENTAL DETERMINATION POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION R&D FACIUTYISW 10TH TECHNICAL CENTER LUA-98.024,9A,SM,ECF • The applicant proposes to develop a new one-story sWcture(Building A)and an addition to an existing • structure(Building B)on■partially developed 22-acre site. Building A would be 129,000 sq.ft.In size, while Building B would result In the addition of 202,000 sq.A.to an existing 85,000 sq.ft.building. A total o1818 parking spaces would serve the site.These would be speculative buildings.with office,and high-tech manufacturing uses antidpaled.Three wetlands are present on the site. Two small wetlands are not regulated and would be filled. A third wetland(approximately 18,000 sq.ft.)Is subject to the requirements of the Wetlands Management Ordinance. The site Is located adjacent to Spdngbrook Creek,although no development Is proposed within 25 feel of the mean high water mark. The project requires Environmental Review,Site Plan Approval,and a Shoreline Substantial Development Permit. Location:801 SW 111111 Street. THE CITY OF RENTON ENVIRONMENTAL REVIEW COMMITTEE(ERC) HAS DETERMINED THAT THE PROPOSED ACTION DOES NOT HAVE A SIGNIFICANT ADVERSE IMPACT ON THE ENVIRONMENT. AN ENVIRONMENTAL IMPACT STATEMENT WILL NOT BE REQUIRED. ' nYOU MAY COMMENT ON THIS DETERMINATION BY 5:00 PM ON MAY 07.1996 OR APPEAL THIS DETERMINATION BY 5:00 PM,MAY 07.1996. THE COMMENT AND APPEAL PERIODS WILL RUN CONCURRENTLY. A PUBLIC HEARING WILL BE HELD BY THE RENTON HEARING EXAMINER AT HIS REGULAR • MEETING IN THE COUNCIL CHAMBERS ON THE SECOND FLOOR OF CITY HALL,RENTON, WASHINGTON,ON MAY 14,1996 AT 9:00 AM TO CONSIDER THE SITE APPROVAL. IF THE ENVIRONMENTAL DETERMINATION IS APPEALED,THE APPEAL WILL BE HEARD AS PART OF THIS PUBLIC HEARING. ! • --r liM_ t . — b ,. ./ < 1,1 w IM i . , 1141_ P_t � l u..L'. j\ 4..„„ • , yl. .mi ,, � ' I (4t.•••• ..1,:: 0. . • -/,-- _T_.-5 mi- ft te.\dill . • • ! "el CO II /• r ,. FOR FURTHER INFORMATION;PLEASE CONTACT THE CITY OF RENTON,DEVELOPMENT_ ' SERVICES DIVISION AT 235-2550. • DO NOT REMOVE THIS NOTICE WITHOUT PROPER AUTHORIZATION 'Pleas°Includeahe project NUMBER when calling for properflleddentltication;•,;.,, 1 CERTIFICATION • • i, SfJ_ 4LCkS0/1 , hereby certify that 3 copies of the above document were posted,My me in conspicuous places on or nearby the described property on .4pri 119 I qc (o Signed: 1L_,,�,_ STATE OF WASHINGTON ) 0/ • ' ,�+Sv'M )• SS• ,^ fie ..,.. -• COUNTY OF KING ) a �:/%s-6,' 7d14 Ry I certify that I know or have satisfactory evidence that �'41Vb`1 J " kSc - signed this instrument and acknowledged it to be his/her/their free and volunt�a��da4bIvtIQ�et uses and purposes mentioned in the instrume t. .-> +� 4 c ss . Dated: L /% Q ,,f ,t�I��� 17"' / / Notaryblic in an or the State of Washington 9 Notary (Print) • My appointment expires: NOTARY,DOC - r\talfli10E . ENVIRONMENTAL DETERMINATION POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION R&D FACILITY/SW 16TH TECHNICAL CENTER LUA-96-034,SA,SM,ECF The applicant proposes to develop a new one-story structure (Building A) and an addition to an existing structure(Building B)on a partially developed 22-acre site. Building A would be 129,000 sq. ft. in size, while Building B would result in the addition of 202,000 sq. ft. to an existing 85,000 sq. ft. building. A total of 618 parking spaces would serve the site. These would be speculative buildings,with office,and high-tech manufacturing uses anticipated. Three wetlands are present on the site. Two small wetlands are not regulated and would be filled. A third wetland (approximately 16,000 sq. ft.) is subject to the requirements of the Wetlands Management Ordinance. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires Environmental Review, Site Plan Approval, and a Shoreline Substantial Development Permit. Location:801 SW 16th Street. THE CITY OF RENTON ENVIRONMENTAL REVIEW COMMITTEE (ERC) HAS DETERMINED THAT THE PROPOSED ACTION DOES NOT HAVE A SIGNIFICANT ADVERSE IMPACT ON THE ENVIRONMENT. AN ENVIRONMENTAL IMPACT STATEMENT WILL NOT BE REQUIRED. XXX YOU MAY COMMENT ON THIS DETERMINATION BY 5:00 PM ON MAY 07. 1996 OR APPEAL THIS DETERMINATION BY 5:00 PM, MAY 07. 1996. THE COMMENT AND APPEAL PERIODS WILL RUN CONCURRENTLY. A PUBLIC HEARING WILL BE HELD BY THE RENTON HEARING EXAMINER AT HIS REGULAR MEETING IN THE COUNCIL CHAMBERS ON THE SECOND FLOOR OF CITY HALL, RENTON, WASHINGTON, ON MAY 14, 1996 AT 9:00 AM TO CONSIDER THE SITE APPROVAL. IF THE ENVIRONMENTAL DETERMINATION IS APPEALED, THE APPEAL WILL BE HEARD AS PART OF THIS PUBLIC HEARING. •• IM =-�► `�MI .CO • aN....._ --`1 ' itm - o '9�CO ail IMiim 1111110—.00 L.,— .— I \\\ . 15floti 1 \ ) 1011°4°414 ole P-1 • 9 IMF � ca � �Dr05 I, Mtn II"�T 0 . . 411111r 7 ii..... 0•1 • • V /7 , ' 51'rr- I, . , , „„,,,, 01,4 , i, kg /..; co II I - , F. cra I . ,.. FOR FURTHER INFORMATION, PLEASE CONTACT THE CITY OF RENTON, DEVELOPMENT SERVICES DIVISION AT 235-2550. DO NOT REMOVE THIS NOTICE WITHOUT PROPER AUTHORIZATION :.;:::::; :E•Pleas.01hclude:t �: ::::.::. .. ..... . ...:..... .:.he ro ectNUMBER when.calln for:: ro er:file:: ::,.>::><>: >: ::....: ::.:.:..... :..:::::::..:p...:j..;:::::.:::.....::..:... :: . :..:.::...9::. ..::p... p.:.:::..:.:.:.identifcanon: ::: > ::»_ .>: I CITY OF RENTON DETERMINATION OF NON-SIGNIFICANCE (MITIGATED) APPLICATION NO(S): LUA-96-034,SA,SM,ECF APPLICANT: Edi Linardic/LDG Architects PROJECT NAME: R&D Facility/SW 16th Technical Center DESCRIPTION OF PROPOSAL: The applicant proposes to develop a new one-story structure (Building A) and an addition to an existing structure (Building B) on a partially developed 22-acre site. Building A would be 129,000 sq. ft. in size, while Building B would result in the addition of 202,000 square feet. to an existing 85,000 sq. ft. building. A total of 618 parking spaces would serve the site. These would be speculative buildings, with office, and high-tech manufacturing uses anticipated. Three wetlands are present on the site. Three wetlands are present on the site. Two small wetlands are not regulated and would be filled. A third wetland (approximately 16,000 square feet) is subject to the requirements of the Wetlands Management Ordinance. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires Environmental Review, Site Plan Approval, and a Shoreline Substantial Development Permit. LOCATION OF PROPOSAL: 801 SW 16th Street LEAD AGENCY: City of Renton Department of Planning/Building/Public Works Development Planning Section The City of Renton Environmental Review Committee has determined that it does•not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21 C.030(2)(c). Conditions were imposed as mitigation measures by the Environmental Review Committee under their authority of Section 4-6-6 Renton Municipal Code. These conditions are necessary to mitigate environmental impacts identified during the environmental review process. The 15 day comment period and the 14 day appeal period for this project will run concurrently. The comment/appeal periods for this project will end at 5:00 p.m. on May 07, 1996. Appeal procedures and the mitigation measures imposed by the City of Renton's Environmental Review Committee are available at the Development Services Division, Third Floor, Municipal Building, Renton, Washington 98055. Phone: 235-2550. You should be prepared to make specific factual objections. PUBLICATION DATE: April 22, 1996 DATE OF DECISION: April 16, 1996 SIGNATURES: 51/V76 Greg mm ,Administrator DAT a P De 1 lent of Planning/Building/Public Works �' 4./( , Sam Chastain,Admi. rator DATE Community Service epartment Lee h ler, ire hief DATE Renton Fire Department DNSMSIG.DOC CITY OF RENTON DETERMINATION OF NON-SIGNIFICANCE (MITIGATED) MITIGATION MEASURES APPLICATION NO(S): LUA-96-034,SA,SM,ECF APPLICANT: Edi Linardic/LDG Architects PROJECT NAME: R&D Facility/SW 16th Technical Center DESCRIPTION OF PROPOSAL: The applicant proposes to develop a new one-story structure (Building A) and an addition to an existing structure (Building B) on a partially developed 22-acre site. Building A would be 129,000 sq. ft. in size, while Building B would result in the addition of 202,000 square feet. to an existing 85,000 sq. ft. building. A total of 618 parking spaces would serve the site. These would be speculative buildings, with office, and high-tech manufacturing uses anticipated. Three wetlands are present on the site. Three wetlands are present on the site. Two small wetlands are not regulated and would be filled. A third wetland (approximately 16,000 square feet) is subject to the requirements of the Wetlands Management Ordinance. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires Environmental Review, Site Plan Approval, and a Shoreline-Substantial Development Permit. LOCATION OF PROPOSAL: 801 SW 16th Street MITIGATION MEASURES: 1. The applicant shall submit a final wetland management plan subject to the review and satisfaction of the Development Services Division for the filling of Wetland C on the project site. The final wetland mitigation plan must be submitted prior to the public hearing for Site Plan Review. 2. The applicant shall pay the appropriate Fire Mitigation Fee at a rate of $0.52 per square foot of new construction. (Credit may be given for area of demolished structures.) This fee is payable prior to the issuance of the Building Permit. 3. The applicant shall pay the applicable Traffic Mitigation Fee at a rate of. $75 per each new. average daily trip attributable to the project. Credit may be given for existing trips on the site that would be eliminated under the proposal. The fee will be estimated based on the ITE Manual and the applicant's traffic study, and is payable prior to the issuance of a Building Permit. 4. The applicant shall limit construction traffic on the adjacent arterials during pre-loading activity to the hours between 8:30 am and 3:30 pm. MITMEAS.DOC/ CITY OF RENTON DETERMINATION OF NON-SIGNIFICANCE (MITIGATED) ADVISORY NOTES APPLICATION NO(S): LUA-96-034,SA,SM,ECF APPLICANT: Edi Linardic/LDG Architects PROJECT NAME: R&D Facility/SW 16th Technical Center DESCRIPTION OF PROPOSAL: The applicant proposes to develop a new one-story structure (Building A) and an addition to an existing structure (Building B) on a partially developed 22-acre site. Building A would be 129,000 sq. ft. in size, while Building B would result in the addition of 202,000 square feet. to an existing 85,000 sq. ft. building. A total of 618 parking spaces would serve the site. These would be speculative buildings, with office, and high-tech manufacturing uses anticipated. Three wetlands are present on the site. Three wetlands are present on the site. Two small wetlands are not regulated and would be filled. A third wetland (approximately 16,000 square feet) is subject to the requirements of the Wetlands Management Ordinance. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires Environmental Review, Site Plan Approval, and a Shoreline Substantial Development Permit. LOCATION OF PROPOSAL: 801 SW 16th Street Advisory Notes to Applicant: The following notes are supplemental information provided in conjunction with the environmental determination. Because these notes are provided as information only,they are not subject to the appeal process for environmental determinations. General 1. The applicant shall apply with all applicable City, state, federal and other jurisdictional regulations, codes and policies governing the project and site. 2. All required utility, drainage and street improvements will require separate submittals prepared by a registered Civil Engineer, according to City of Renton drafting standards. Permit application must include an itemized cost estimate for these improvements. The fee for review and inspection of these improvements is 5% of the first $100,000, 4% of anything over$100,000 but less than $200,000; and 3% of anything over$200,000. One-half of the fee must be paid upon application for building and construction permits, and the remainder when the permits are issued. 3. The applicant is required to obtain a Construction Permit in order to accomplish site work and installation of site improvements. 4. The applicant will need to submit construction drawings for street lighting and each Utility. These drawings will need to be on individual sheets. 5. Construction plans must comply with the City's Drafting Standards. Transportation 6. A traffic report will be required which shows the existing trip ends and new trip ends generated by the proposed project. If significant, the report needs to indicate what impacts the new generated traffic volume will have on SW 16th Street and any local intersections. R&D Facility/SW 16th Technical Center LUA-96-0 3 4,S A,SM,E CF Page 2 7. The City's Transportation Impact Fee will apply to the project as discussed in the mitigation measures above. Credit may be given for existing trips that would be eliminated under the proposal. The applicable fee is$75 per each new average daily trip. 8. Curb, gutter, sidewalk and street lighting will be required on SW 16th Street. A street lighting plan is required per City standards and is to extend the full length of the property frontage to the roadway. 9. The applicant will need to coordinate with the City's Transportation Systems Division for the road improvement project on SW 16th Street. Roadway grades and elevations of the proposal and the City will need to coincide. Storm Drainage 10. A System Development Charge (SDC) for storm water is applicable to the project and would be assessed at the rate of$0.129 for new impervious surface area. 11. The applicant shall provide a drainage report which addresses the King County Surface Water Manual core and special requirements. 12. The applicant may be required to provide a FEMA Elevation Certificate due to the location of the project within the flood plain. Wastewater 13. The applicant will be required to provide an appropriate removal system for fats, oils, or grease if the project includes any uses that would generate the same. 14. The side sewers will be required to have a 2% grade to the right-of-way. One sewer clean-out shall be located within five feet of the building and one clean-out is required every 100 feet. 15. The applicant is required to provide a plan and profile for the sewer. These drawings will need to show the finish floor elevations of the buildings and slopes of the wastewater pipes. 16. The minimum pipe cover required for wastewater pipes is two (2) feet. 17. The applicable System Development Connection charge is $0.078 per square foot of site area. Credits may be given if partial charges have been previously paid for the site. 18. If the floor elevation is below 22 feet as shown on the applicant's submittals, then a backflow prevention device will be required on the sewer system. Water 19. A 12-inch water line is located in both SW 16th Street and Raymond Avenue SW. Available fire flow is 5,600 gpm. Preliminary fire flow required by the Fire Department is 4,500 gpm. A sufficiently sized loop system is required. 20. The proposed project is located in the Downtown 196 mapped water zone. 21. The relocation in the water loop system will require a new 15-foot utility easement. 22. Construction plans and profile drawings are required for water drawing submittals. ADVNOTES.DOC/ R&D Facility/SW 16th Technical Center LUA-96-034,SA,SM,ECF Page 3 23. The applicant is required to pay a water System Development Charge of$0.113 per square foot of site area. Credit may be given if connection charges have been previously paid for the site. Fire 24. The preliminary fire flow requirement for Building A is 4,500 gpm. A total of five hydrants are required. The primary hydrant is to be located within 150-feet of the building, and four additional hydrants are required within 300-feet of the building. A.looped fire main is required for Building A. 25. The preliminary file flow requirement for Building B is 4,500 gpm. A total of five fire hydrants are required. The primary hydrant is to be located within 150-feet of the building, and four additional hydrants within 300-feet of the building. A looped fire main is required for Building B. 26. The applicant is required to pay the applicable Fire Mitigation Fee as discussed in the Mitigation Measures above. The fee is assessed at a rate of $0.52 per square foot of new building area. Credit may be given for the area of existing structures that are demolished for the proposal. Building A would be 129,000 sf in size, therefore the estimated Fire Mitigation Fee would be $67,080. Building B would be 202,000 sf in size, therefore the estimate Fire Mitigation Fee would be $105,040. The fee is payable at the time of the issuance of the building permit. 27.. ..The applicant shall.provide .fire.sprinklers.and fire alarm systems for both of the proposed new buildings. .Separate plans and permits are<required for each system. 28. . :Since the building is speculative in nature, and no tenant has been identified, additional fire and building requirements will be.based on the use of the building and the type of operation to be conducted. The applicant shall provide information regarding the storage _and use.of any - flammable, combustible liquids or gases, or any hazardous materials.:... 29. The applicant's plans shall reflect Code requirements for a minimum 20-foot wide paved roadway with an inside turning radius of 25-feet and an outside turning radius of 45 feet. Parks and Recreation 30. The owner/tenant shall maintain landscaped areas outside of the property line but within the street right-of-ways. Police Services 31. The applicant is advised to coordinate with Renton Police . Crime Prevention for recommendations to reduce possibility of crime during construction and operation of the facility. Building Construction 32. The applicant will need to provide a current soils report which addresses the potential.for liquefaction and proposed mitigation. Wetlands&Creeks 33. The applicant will need to meet the requirements of the City's Wetland Ordinance with regard to the regulated wetland (Wetland C). 34. A Shoreline Substantial Development Permit is needed to allow development within 200 feet of Springbrook Creek. ADVNOTES.DOC/ R&D Facility/SW 16th Technical Center LUA-96-034,SA,SM,ECF Page 4 35. The applicant shall meet requirements for public access as part of the Shoreline Substantial Development Permit. Solid Waste 36. Garbage and recyclable deposit areas and collection points shall be easily and safely accessible to hauling trucks. ADVNOTES.DOC/ CITY OF RENTON Staff DEPARTMENT OF PLANNING/BUILDING/PUBLIC WORKS Report ENVIRONMENTAL REVIEW COMMITTEE DECISION DATE April 16, 1996 Project Name R&D Facility/SW 16th Technical Center Applicant Edi Linardic/LDG Architects File Number LUA-096-034,SA,SM,ECF Project Manager Jennifer Toth Henning Project Description Applicant proposes to develop a new one-story structure (Building A) and an addition to an existing structure (Building B) on a partially developed 22-acre site. Building A would be 129,000 square feet (sf) in size, while the Building B would result in the addition of 202,000 square feet to 85,000 square feet of an existing building. A setback of 90 feet from the north property line and 115 feet from the east boundary is proposed to accommodate proposed landscaping, parking and circulation. A total of 618 parking spaces would serve the site. These would be speculative buildings, with office, and high-tech manufacturing uses anticipated. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires environmental review, Site Plan Approval, and a Shoreline Substantial Development Permit. Project Location 801 SW 16th Street Exist. Bldg. Area sf 97,200 square feet Proposed New Bldg. Area sf 329,000 sf (12,200 to be demolished) _ _ - Site Area 22.4 acres Total Building Area sf 416,000 sf i _ -_ — . — -I • -_. -- < 1 • I co 1 9 IMa .S`� P-1 c x I 1 1 ! * \ � � VI j 1it4 tt.guirlIMICIIIIIE . 1 Alf ., co _ 0 1 Project Location Map -_ SITEER City of Renton PB/PW Departmeu Environmental Determination& _'nistrative Land Use Action R&D Southwest 16th Tech Center LUA-96-034, SA, SM,ECF REPORT AND DECISION OF APRIL 16,1996 Page 2 of 9 Part One: PROJECT DESCRIPTION/BACKGROUND The applicant is proposing to construct a one-story building of 129,000 square feet and add a 202,000 square foot addition to an existing structure on a partially developed 22-acre site at SW 16th Street and Raymond Avenue SW. The buildings would be speculative, and no tenants have been identified by the applicant. Currently the site is used for warehouse, offices and medical laboratories. An existing metal building 4,200 square feet in size and approximately 8,000 square feet of the existing structure would be demolished to accommodate the proposal. Existing site development is concentrated in the northeast corner of the property and consists of a 93,000 square foot structure and associated parking lots. Proposed development would consist of an 202,000 sf addition to the existing structure (85,000 sf after demolition) resulting in a structure that is 287,000 sf, and a new 129,000 sf building. The addition would extend to the west and south, while the new building would be located on the western portion of the triangular-shaped parcel. Stormwater treatment and detention facilities would occupy the southern portion of the property. The total size of the Research and Development (R&D) facility would be 416,000 square feet. The new construction would feature concrete tilt-up walls and wood roofing. The building would step back on each facade. According to the City's Parking and Loading Ordinance, a minimum of 608 parking spaces and a maximum of 849 parking spaces would be required. A total of 618 parking spaces are proposed in parking lots located on the perimeter of the buildings. Three new access driveways would be provided along SW 16th Street, replacing the two existing curb cuts. Two new curb cuts would be installed along Raymond.Avenue SW, and one existing_curb cut would continue to,access the site.: Another existing curb cut would be eliminated on Raymond Ave SW. In order to develop the site as proposed, the applicant would need-to import up to 75,000 cubic yards of material. The fill would be used for preloading and to elevate-the building above the flood plain. Once the building pad has settled, the remaining material would be distributed by means of spreading, across the site. The applicant proposed to begin preloading in early summer if approvals have been obtained. The project is located in the Valley Planning Area and is required to include an additional two percent (2%) of the site area as natural landscaping. The site proposal includes approximately three times the,required area as natural landscaping. Three wetland areas have been identified on the site. However, the US Army Corps of Engineers has determined that no jurisdictional wetlands occur on the property (letter of April 4, 1996). Two of the wetlands (A and B) are less than 5,000 square feet in size and are hydrologically isolated, and therefore would not be regulated by the City's Wetland Ordinance. Wetland C is 16,718 square feet in size and meets the criteria as a Category 3 wetland under the City's Wetland Ordinance. Wetland C is located west of Raymond Avenue SW and generally on the southern portion of the site. A minimum 25-foot buffer is required around wetlands of this size. Since the applicant proposes to fill the wetland, other suitable restoration or compensation at a ratio of 1.5 times the area altered is required. The applicant is coordinating with the City as part of a separate effort to participate in the City's Wetlands Mitigation Bank, or, as an alternative, move the wetland to a location elsewhere on the site that would allow the development as envisioned. The south and west boundaries of the project site are located adjacent to Springbrook Creek. The bank of Springbrook Creek has a steep slope of approximately 1:1. Vegetation consists of dense brush. The City's Shoreline Master Program states that commercial buildings should be located no closer than 50 feet to the water's edge (unless reduced by the Hearing Examiner for good reason for SITEERC.DOC City of Renton PB/PW Departmer__• Environmental Determination&.=_..Lristralive Land Use Action R&D Southwest 16th Tech Center LUA-96-034, SA, SM,ECF REPORT AND DECISION OF APRIL 16,1996 Page 3 of 9 those structures that allow public access to and along the water's edge). Industrial structures should be setback 25 feet from the water's edge, as long as public access is provided to and along the water's edge. (Public access is interpreted by the State and City to include visual and physical access.) The proposed buildings would be setback a minimum of 50 feet from the Ordinary High Water Line (OHWL). No clearing, grading or other disturbance would occur within 25 feet of the mean high water mark for the creek. Since the project is within 200 feet of the creek, it is subject to requirements of the City's Shoreline Master Program and requires a Shoreline Substantial Development Permit. Another small stream, Rolling Hills Creek is located just south of the property boundary in a ditch about 10 feet deep. Portions of the project site (southern one-half) are located within the 100-year flood plain. The applicant has provided a compensatory flood storage plan as part of their submittal. The 100-Year Floodplain Compensation Plan indicated that 340,000 cubic feet of flood volume would be displaced by the project. Compensatory volume from the removal of material below elevation 16.0 in ponds and with parking lot ponding would allow for the storage of 345,000 cubic feet of water. Part Two: ENVIRONMENTAL REVIEW A. Environmental Impacts The Proposal was circulated and reviewed by various City Departments and Divisions to determine whether the applicant has adequately identified and addressed environmental impacts anticipated to occur in conjunction with the proposed development. Staff reviewers have identified that the proposal is likely to have the following probable impacts: 1) Earth Impacts: Construction and site preparation activities (import of up to 75,000 cubic yards of fill) could result in erosion and sedimentation. City Codes require the applicant provide a Construction Mitigation Plan and a Temporary Erosion and Sedimentation Control Plan (TESCP) prior to the issuance of a Construction Permit. Mitigation Measures: No further mitigation required. Policy Nexus: N/A 2) Air Impacts: Construction activity would result in increased levels of airborne particulate (especially dust) potentially impacting air quality in the area of the project site. Emissions from construction equipment would have a minor impact on local air quality.. Construction impacts would be short term in nature and would be regulated through best management practices of the required TESCP. Vehicular emission are regulated by the State of Washington. Mitigation Measures:-No further mitigation required. . Policy Nexus: N/A 3) Wetlands Impacts: Three wetlands have been identified on the subject parcel. Wetland A is a small depression occurring on fill and is 1,437 square feet in size. Wetland B is well-defined (up to 3 feet in depth) and occurs on fill material. The wetland covers 1,111 square feet. Wetland C occurs in a shall depression and covers 16,718 square feet. Wetland C is considered to meet the criteria for Category 3 wetlands and is regulated by the City's Wetlands Ordinance. Since Wetlands A and B SITEERC.DOC City of Renton P/B/PW Departmei _ Environmental Determination&'_ istrative Land Use Action R&D Southwest 16th Tech Center LUA-96-034, SA, SM,ECF REPORT AND DECISION OF APRIL 16,1996 Page 4 of 9 are hydrologically isolated and less than 5,000 square feet in size, they are exempt from requirements of the Wetland Ordinance and may be filled. The applicant is negotiating with the City in order to participate in the Wetlands Mitigation Bank to enable filling of the Wetland C to occur. The City has identified an area of sufficient size for wetland creation on the City-owned Wetlands Mitigation Bank site that is not subject to Army Corps of Engineers jurisdiction. As an option to participation in the wetlands bank, the applicant would relocate the wetland on-site with the required compensation areas and buffers. In any event, the applicant will need to provide the City with a final plan as to how they intend to mitigate for the filling of Wetland C. Since the final resolution could affect the way in which the site plan is configured, the wetland mitigation plan would need to be submitted and approved prior to the public hearing for Site Plan Review. Mitigation Measures: The applicant shall submit a final wetland management plan subject to the review and satisfaction of the Development Services Division for the filling of Wetland C on the project site. The final wetland mitigation plan must be submitted prior to the public hearing for Site Plan Review. Policy Nexus: SEPA Ordinance, Wetlands Ordinance 4) Fire Protection Impacts: The proposal would add new construction to the-City which would potentially impact the City's Fire Department. A Fire Mitigation Fee would apply to all new construction, less the area of demolished structures (as applicable). The fee has been estimated at a rate of$0.52 per square foot of new construction. For Building 'A"the fee is tentatively estimated at $67,080.00 (129,000 square feet X $0.52). For Building B"the fee is tentatively estimated to be $105,040.00 (202,000 square feet X$0.52). The Fire Mitigation Fee is payable at the time that the Building Permits are issued. Mitigation Measures: The applicant shall pay the appropriate Fire Mitigation Fee at a rate of $0.52 per square foot of new construction. (Credit may be given for area of demolished structures.) This fee is payable prior to the issuance of the Building Permit. Policy Nexus: Fire Mitigation Fee Resolution and adopting Ordinance; SEPA Ordinance. 5) Transportation --New Traffic Impacts The proposal would result in increased vehicular trips that would impact the City's road system. The applicant has not identified a tenant for the R & D building and has not estimated the total number of new trips that would be associated with the development. Staff is requiring a traffic report which shows the existing trip ends and new trip ends generated by the proposed project. The report must also address any impacts that the newly generated traffic volumes could have on SW 16th Street and any local intersections. Any new trips would be subject to the City's Traffic Mitigation Fee. This fee is assessed at a rate of $75 per each new average daily trip. The fee would be applied to the project based on estimates from the ITE manual, unless the applicant's traffic study yields different results and the City concurs with the report. Credit may be given based on the number of existing trips generated by the existing use that would be eliminated under the proposal. The Traffic Mitigation Fee is payable prior to the issuance of a Building Permit. Mitigation Measures: The applicant shall pay the applicable Traffic Mitigation Fee at a rate of $75 per each new average daily trip attributable to the project. Credit may be given for existing trips on the site that would be eliminated under the proposal. The fee will be estimated based on the ITE Manual and the applicant's traffic study, and is payable prior to the issuance of a Building Permit. SITEERC.DOC City of Renton PB/PW Departme!. Environmental Determination&__T_inistrative Land Use Action R&D Southwest 16th Tech Center LUA-96-034, SA, SM,ECF REPORT AND DECISION OF APRIL 16,1996 Page 5 of 9 Policy Nexus Traffic Mitigation Fee Resolution and adopting Ordinance; SEPA Ordinance. 6) Transportation -- Construction Trips Impacts: The applicant would need to import approximately 75,000 cubic yards of fill in order to prepare the site for development. This would require approximately 3,750 truck trips. Although this would be a substantial number of truck trips, it should not have a significant impact on the area roadways as they are already designed for heavy truck traffic in the surrounding office and industrial area. If the truck trips were to occur during the AM or PM peak traffic flows, they would impact the flow of traffic. No construction-related traffic should be permitted during pre-loading activities except between 8:30 am and 3:30 pm. Mitigation Measures: The applicant shall limit construction traffic on the adjacent arterials during pre-loading activities to the hours between 8:30 am and 3:30 pm. Policy Nexus: SEPA Ordinance 7) 100-Year Flood Plain Impacts: The project is located within the 100-year flood plain. Compensatory storage is required for flood waters displaced by proposed project development. The applicant has provided a compensatory storage plan indicating that 345,000 cubic yards of water could be accommodated in ponds and with parking lot ponding. This amount exceeds the amount (340,000 cubic yards) displaced by project development. Mitigation Measures:. None required beyond that proposed by the applicant Policy Nexus: N/A B. Recommendation Based on analysis of probable impacts from the proposal, staff recommend that the Responsible Officials make the following Environmental Determination: DETERMINATION OF X DETERMINATION OF NON-SIGNIFICANCE NON-SIGNIFICANCE-MITIGATED. Issue DNS with 14 day Appeal Period. X Issue DNS-M with 15 day Comment Period with Concurrent 14 day Appeal Period. Issue DNS with 15 day Comment Period with Issue DNS-M with 15 day Comment Period Concurrent 14 day Appeal Period. followed by a 14 day Appeal Period. C. MITIGATION MEASURES: 1. The applicant shall submit a final wetland management plan subject to the review and satisfaction of the Development Services Division for the filling of Wetland C on the project site. The final wetland mitigation plan must be submitted prior to the public hearing for Site Plan Review. SITEERC.DOC • City of Renton PB/PW Departure _ Environmental Determination&__—_lnistrative Land Use Action R&D Southwest 16th Tech Center LUA-96-034, SA, SM,ECF REPORT AND DECISION OF APRIL 16,1996 Page 6 of 9 2. The applicant shall pay the appropriate Fire Mitigation Fee at a rate of$0.52 per square foot of new construction. (Credit may be given for area of demolished structures.) This fee is payable prior to the issuance of the Building Permit. 3. The applicant shall pay the applicable Traffic Mitigation Fee at a rate of $75 per each new average daily trip attributable to the project. Credit may be given for existing trips on the site that would be eliminated under the proposal. The fee will be estimated based on the ITE Manual and the applicant's traffic study, and is payable prior to the issuance of a Building Permit. 4. The applicant shall limit construction traffic on the adjacent arterials during pre-loading activity to the hours between 8:30 am and 3:30 pm. Advisory Notes to Applicant: The following notes are supplemental information provided In conjunction with the environmental determination. Because these notes are provided as information only,they are not subject to the appeal process for environmental determinations. General 1. The applicant shall apply with all applicable City, state, federal and other jurisdictional regulations, codes and policies governing the project and site. 2. All required utility, drainage and street improvements will require separate submittals prepared by a registered Civil Engineer, according to City of Renton drafting standards. Permit application must include an itemized cost estimate for these improvements. The fee for review and inspection of these improvements is 5% of the first $100,000, 4% of anything over $100,000 but less than $200,000; and 3% of anything over $200,000. One-half of the fee must be paid upon application for building and construction permits, and the remainder when the permits are issued. 3. The applicant is required to obtain a Construction Permit in order to accomplish site work and installation of site improvements. 4. The applicant will need to submit construction drawings for street lighting and each utility. These drawings will need to be on individual sheets. 5. Construction plans must comply with the City's Drafting Standards. Transportation 6. A traffic report will be required which shows the existing trip ends and new trip ends generated by the proposed project. If significant, the report needs to indicate what impacts the new generated traffic volume will have on SW 16th Street and any local intersections. 7. The City's Transportation Impact Fee will apply to the project as discussed in the mitigation measures above. Credit may be given for existing trips that would be eliminated under the proposal. The applicable fee is$75 per each new average daily trip. 8. Curb, gutter, sidewalk and street lighting will be required on SW 16th Street. A street lighting plan is required per City standards and is to extend the full length of the property frontage to the roadway. SITEERC.DOC • City of Renton PB/PW Departure__ Environmental Determination& :, =inistrative Land Use Action R&D Southwest 16th Tech Center LUA-96-034, SA, SM,ECF REPORT AND DECISION OF APRIL 16,1996 Page 7 of 9 9. The applicant will need to coordinate with the City's Transportation Systems Division for the road improvement project on SW 16th Street. Roadway grades and elevations of the proposal and the City will need to coincide. Storm Drainage 10. A System Development Charge (SDC) for storm water is applicable to the project and would be assessed at the rate of$0.129 for new impervious surface area. 11. The applicant shall provide a drainage report which addresses the King County Surface Water Manual core and special requirements. 12. The applicant may be required to provide a FEMA Elevation Certificate due to the location of the project within the flood plain. Wastewater 13. The applicant will be required to provide an appropriate removal system for fats, oils, or grease if the project includes any uses that would generate the same. 14. The side sewers will be required to have a 2% grade to the right-of-way. One sewer clean- out shall be located within five feet of the building and one clean-out is required every 100 feet. 15. The applicant is required to provide a plan and profile for the sewer. These drawings will need to show the finish floor elevations of the buildings and slopes of the wastewater pipes. 16. The minimum pipe cover required for wastewater pipes is two (2) feet. 17. The applicable System Development Connection charge is $0.078 per square foot of site area. Credits may be given if partial charges have been previously paid for the site. 18. If the floor elevation is below 22 feet as shown on the applicant's submittals, then a backflow prevention device will be required on the sewer system. Water 19. A 12-inch water line is located in both SW 16th Street and Raymond Avenue SW. Available fire flow is 5,600 gpm. Preliminary fire flow required by the Fire Department is 4,500 gpm. A sufficiently sized loop system is required. 20. The proposed project is located in the Downtown 196 mapped water zone. 21. The relocation in the water loop system will require a new 15-foot utility easement. 22. Construction plans and profile drawings are required for water drawing submittals. 23. The applicant is required to pay a water System Development Charge of $0.113 per square foot of site area. Credit may be given if connection charges have been previously paid for the site. SITEERC.DOC City of Renton PB/PW Departurew_- Environmental Determination& - ,.`_inistrative Land Use Action R&D Southwest 16th Tech Center LUA-96-034, SA, SM,ECF REPORT AND DECISION OF APRIL 16,1996 Page 8 of 9 Fire 24. The preliminary fire flow requirement for Building A is 4,500 gpm. A total of five hydrants are required. The primary hydrant is to be located within 150-feet of the building, and four additional hydrants are required within 300-feet of the building. A looped fire main is required for Building A. 25. The preliminary file flow requirement for Building B is 4,500 gpm. A total of five fire hydrants are required. The primary hydrant is to be located within 150-feet of the building, and four additional hydrants within 300-feet of the building. A looped fire main is required for Building B. 26. The applicant is required to pay the applicable Fire Mitigation Fee as discussed in the Mitigation Measures above. The fee is assessed at a rate of $0.52 per square foot of new building area. Credit may be given for the area of existing structures that are demolished for the proposal. Building A would be 129,000 sf in size, therefore the estimated Fire Mitigation Fee would be $67,080. Building B would be 202,000 sf in size, therefore the estimate Fire Mitigation Fee would be $105,040. The fee is payable at the time of the issuance of the building permit. 27. The applicant shall provide fire sprinklers and fire alarm systems for both of the proposed new buildings. Separate plans and permits are required for each system. 28. Since the building is speculative in nature, and no tenant has been identified, additional fire and building requirements will be based on the use of the building and the type of operation to be conducted. The applicant shall provide information regarding the storage and use of any flammable, combustible liquids or gases, or any hazardous materials. 29. The applicant's plans shall reflect Code requirements for a minimum 20-foot wide paved roadway with an inside turning radius of 25-feet and an outside turning radius of 45 feet. Parks and Recreation 30. The owner/tenant shall maintain landscaped areas outside of the property line but within the street right-of-ways. Police Services 31. The applicant is advised to coordinate with Renton Police Crime Prevention for recommendations to reduce possibility of crime during construction and operation of the facility. Building Construction 32. The applicant will need to provide a current soils report which addresses the potential for liquefaction and proposed mitigation. Wetlands& Creeks 33. The applicant will need to meet the requirements of the City's Wetland Ordinance with regard to the regulated wetland (Wetland C). SITEERC.DOC City of Renton PB/PW Departure.... Environmental Determination&.,..:.inistrative Land Use Action R&D Southwest 16th Tech Center LUA-96-034, SA, SM,ECF REPORT AND DECISION OF APRIL 16,1996 Page 9 of 9 34. A Shoreline Substantial Development Permit is needed to allow development within 200 feet of Springbrook Creek. 35. The applicant shall meet requirements for public access as part of the Shoreline Substantial Development Permit. Solid Waste 36. Garbage and recyclable deposit areas and collection points shall be easily and safely accessible to hauling trucks. SITEERC.DOC II L T - i 'D ®I •50. SW 16h1 STREET LD((�1 , ,--_..mre L'Isc't _ °drChl__ ._-_._ RELOCATE CO F.H. CURE PROPOSED NEW-I •I CURB C�SrGtects x f angeo<WS,group.ardN10a10 -� MTV NFW -- R��e•xR•a lJxyle' !' NEW e.CONE SIDEw.ix__ PROPOSED CU1 NEW ._ r-'aCURBB•.E s+c • TMwTO..WA r.....r..n.seo _ 1 --T-- _ .WA.oe,oa m0erno-oeA ..-._em-a Gam) i�J J,`�� -RELOUI[•..C r.N -I:EI, C S�DEM.V - TTYS:e. --_ 'RCLOGIC E\si•G r.H. Ar=i-_ o ---Q=---1= 3G0/:-5:J:a =:]f,._.IT'=.. 301W M--V .. : iJ• . _ „ N eRze•te•E T I 11 I T I I I, I. I i t l ': n I I !! l`I �" S..DJ• II III II' IJ I!l l iliii !, _�' I` > ' ^{, NEW UNOSGPP,G M--' e �'i t -flfl:.^� r-" __1 _- - It3EW N:PACING 1 i._ --B'�-_J10e-112,_-�F-.UffB:J2L�+. rSiRW�9 PtP30e min.i~• 1 e!"1 .aJ'JI• W • f•i-j-1•"ra'••'T'+'-�-^ r-'* .:4•+��.!;fFf., I•I ! C__- .�.47i $y *--t-- rArox:OVARr25"� V2¢ c.J-:_ 1 rn •__-_ i':._ -_ I __ I __ untie ARG• ,-w: -- -�src s10EWALr. �` \' =1_ ._ =i#' -i _ 1 PT EXISTING BUILDINGS j ..I II. e F e5.000u 1�{i1-- IL, _ REMOVE asrc r4 -4 r Ji_3+'Id.'.�1J,'f �_ a._ \ LV, f__ • G 1 __ I i..__ ' 'p ... _RE401C rvsT'0 \ ,�\ a .__ - l,-- -111 I i-_ -_ i CURD Dr consultants a i. _ • BUILDING yI• .y�� ,\ 0 �.- 129.0005r • _ FIT -- •- r1...1...:; • m,\\\\ :.---.1. _- _ _r...e 0c4ctme sv¢s' • _-_ ------ - -vsmlG £\\••.' _-L -li,i.. i I ,/ - --PEYM FJIST'G P.NNC r. i CORB C:1 _ 1 \\'' t- - U 5.... �U N0 •-MOWEMST'G rN - __. __ T �y ' I II o LJ `—\ SITE PLAN `\\,,, 1 ".,�{ o- BUILDING B - -I. jIII '}}�.. f: �,_, .�-V--'-.-------- - \;, :�.` _ :. 20E000 Y ----- ' .l z BCF:_dE P70.T �.I J 1 ° v. f - •- + 4-._._.uos-11: ..., L�I^. —_ Y_.'...c4uae cIr PrOfeCi title' LEGAL DESCRIPTION: i., F 3. - -- -- I- DwPSTEa�P¢\tLE Aau- i __us i z.._�1-. - r.. __ W/e•FEN E!cAi[ \ 5• 7.1 - ALL OF 10D BLDCXS 32,JJ AND JA OF C.D.WLL TO[ARLINGTON GARDENS ' ��''" 1 I Ia I:: •'I!l.I ,� `•• ^\ 1 10007062*100007.CT FOR: ADDITION TO THE CRY OF WATTLE,DN,1,ACCORDING TO THE PUT THEREOF. - `'! I • b' RECORDED IN VOLUUE 17 OF PUTS,PACE(5)21,W KING COUNTY,WASHINGTON; YS .A4. '. F__ �'rIMIN w- I zr TOGETHER WITH VACATED AVENUE AVENUE(92N0 AVENUE SOUM)AND VACATED y'•`\..) l -_ •-� fife:^mil' - EVWS AVENUE(BJRD AVENUE SOUTH)ADJOINING: ` i"�_._ /pE t\� - - Twin"=: csrrEA EXCEPTING FROM ALL Or Pit FOREGOING ANY PORTION THEREOF C00 EASTERLY OF A _ \. „.`'L\11:I•I I: X-1To, FEI�.CE s i(TC�U -_ P.._ i UNE AO FEET WEST Or AND PARALLEL WIN THE EAST UHF OF SECTION 24,TOWNSHIP �A'N^ir.i•.• • 1. •L-,_ - _l RY)L('1:'EI.USOCA CAM.\ 23 NORD.RANGE 4 FAST,50r CONVEYED OERIOAN,IN KING COUNTY,WFAR STREET AND �20A„b• •\ I•A _ f�T- ED(CEPT THAT PORT..THEREOF CONVEYED TO THE CRY OF RENTON FOR STREET BY N iPta•1- IC \�\ { AT.:. •K •C,___.- 1' DEED RECORDED UNDER RECORDING NUMBER 781204Te83;AND \\ --p i i EXCEPT THAT PORTION THEREOF CONVEYED TO THE CITY OF moon BY DEW - ^--%_.-- _� I• Y W RECORDED UNDER REGORGING NUMBER e911030e00. SEE ELEVAipNS BRCS FOR EXTERIOR UGNTING `� '. ! i -- 1,__ - e = I 6)6 • Jy 1 I� ED' +°. STATISTICS: — 1 R V%t 'I J CI ' _'' l;.\`� - !J p L 1 2 L I 1'CGT WA , 20NE: CO 1 :;4...T . .y' . \ 1- I I'-_J.i _NEN r.N • PIE AREA 22.4 ACRES '21\"�: ' 4 ,\ • I`�1 PE4O.E FASi'G F.H PEm+ous AREA me ACRES ; r �,� J �4 ;�- i»et title: - PERV•XX25 AREA 4.6 ACRES - • : 6! • I \I k, LOT TR'LE: ix ' OCCUPANCY: • 5-1.a 3 t-- y CIMTRUCTION TYPE VAN SPRINK EREO _ T _I I- '• �. - T'-T_--_ 1 ----MI; 1 CU99 CUT �T c PLAN BULDOIG AREA [ f - BU4pNG A; I2\.000 sr 0.11 F • I. 5I P 1'' \ i MADAM B. 28T,000 Sr ' I!J \\', _ __- - • I, TOTAL REWCR� OFT b000 Sr %„ le"' 't'II T. •Pr 4 1 i 1T-_:Li:. PJA__.SUr+"''l YANUFACNWNG I/f 000 °y 1 n•ll -^ \\• \t__ ��- J --._ _.__ __ ;}^-2� if -1Jr ICY,A. WAREHOUSE: • 1/1500 ;:;)w+. ^ �%' 'I �L \ " I�4----T� L_______t_�� I I 3:.�T'^ ..---------� .. 11 OFFICE: J/1000 :C:i Y�!\� '' -:�;•::L 111 0. \ I • ---'- ----'-- -' 4WUrACTL'RWG 111.W0 SY2.R.: 1,1 STALLS is`i \ ' .. _ J.:. 'ii Apt ,'`E✓•. •�� it ...REHOUSE 1e0,D00 SO.rt.: 120 STAus -+4,.(�;.-; I _ _.T_ • _.T - _._1__---- -I--- CHYME 125.00p 50.R.: 5]5 STALLS 4 _y, -- \ -:.., I ' -- 1 __ ..____._ ._..A 1 •TOTAL PARTYING REWIRED: e09 STAGES I i f - -• -J I; PARKING PROWDEn �.' • •. j 25 _ "•.. :I : • \ •' \Y• J y _. _ 111.000 S0 FT.: 123 STALLS • ' I,•.• 'I `•T'•h4' '. (. \ •.- 1 I; • 0 WAREHOUSE 1e0,000 SO FE: 120 STALLS ^• , ( __.___-__.._..___ OFFICE 125,000 SO.VT: 375 STALLS i.}j,JA K•e•-=J _.._L Amu PAWING PRONGED: me PARES / . . �}`(�E�Lr.� Mg i •• —_.-_- 1A 00 LIFE LANDSCAPE REOD: 00.0004O2-T0,515 sr ./ /-••�•• -T_ l PROVIDED: 60.000 Sr .. '' / ._: ,.:•___)-. • job Tlp ■tell no, P 0JNG AREA . - PARKING LANDSCAPE AREA REPO: 00.2 0e.os-,>see SF '•` SW 19T1 STREET l tr\ PARKING LANDSCAPE AREA PRvwEo: J>.tDo sr r ;i I VICINITY MAP: _.... \( 9 _(tIOT OPEl) S/ _---_ r, _ CITY OF R�NTON ENVIRONMENTAL REV(EW COMMITTEE EE T ING N TICE . _ >:<::<<: : :::>:;: :<:> :gm:::.<M T 0 APRIL 16, 1996 . • To: Gregg Zimmerman, Planning/Building/Public Works Administrator Sam Chastain, Community Services Administrator Lee Wheeler, Fire Chief From: Jim Hanson & Mike Kattermann Meeting Date: Tuesda y, April 16, 1996 y Time: 9:OG AM Location: Third Floor Conference`Room Agenda listed below. R&D Facility/SW 16th Technical Center(New) (Henning/6186) LUA-96-034,SA,SM,ECF The applicant proposes to develop a new one-story structure (Building A) and an addition to an existing structure (Building B) on a partially developed 22-acre site. Building A would be 129,000 sq. ft. in size, while Building B would result in the addition of 202,000 square feet. to an existing 85,000 sq. ft. building. A total of 618 parking spaces would serve the site. These would be speculative buildings, with office, and high-tech manufacturing uses anticipated. Three wetlands are present on the site. Three wetlands are present on the site. Two small wetlands are not regulated and would be filled. A third wetland (approximately 16,000 square feet) is subject to the requirements of the Wetlands Management Ordinance. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires Environmental Review, Site Plan Approval, and a Shoreline Substantial Development Permit. Location: 801 SW 16th Street. Chevron/McDonalds on Fourth (New) (Henning/6186) LUA-96-037,SA,V,ECF The applicant requests Environmental Review (ECF) for redevelopment of the subject property with a Chevron Gas Station and convenience store with a McDonald's quick-serve restaurant. Three new underground fuel storage tanks would also be installed. The proposal also requires Site Plan Review and is subject to a public hearing since the adjacent property to the south is zoned and designated for residential use. Location: 3209 NE 4th Street (at Monroe Ave NE). Arterial Commercial(CA) Zone Code Amendments (New) (Cohen/5578) LUA-96-044,ECF Code Amendment to allow bus, truck and recreational vehicle sales as a secondary use in the CA zone. Repairs of these vehicles would be allowed as an accessory use to sales. Location: South of SW Grady Way and West of SR 167 and Rainier Avenue South. Interim Transit Hub (Discussion) (Pywell/5586)) LUA-96-025,ECF Review comments received. cc: J.Covington,Executive Assistant to the Mayor L.Warren,City Attorney (R) F. Kaufman,Hearing Examiner S.Carlson, Economic Development Director(R) J.Gray,Fire Prevention A.Larson,Fire Prevention(R) P.Pierce,P/B/PW Admin. El; Rig APR 121996 CITY OF RENTON CITY OF RENTON PUBLIC WORKS ADMIN. PLANNINGBUILDING/PUBLIC WORKS MEMORANDUM DATE: April 10, 1996 TO: Gregg Zimmerman FROM: Ron Olsen STAFF CONTACT: Ron Straka(X-5548)Q . Scott Woodbury(X-5547) SUBJECT: USE OF THE WETLAND MITIGATION BANKING PROJECT PRIOR TO ITS CONSTRUCTION As you had requested, we have evaluated whether there is sufficient area on the wetland mitigation banking sites to construct the wetland mitigation required for the SW 16th Street Technical Center Project (LUA-96-034). The two mitigation banking sites total 44.80 acres.- Site 1 is 30.97 acres consisting of 12.19 acres of uplands and 18.78 acres of wetlands. Site 2 is 13.93 acres and consists of 7.24 acres of upland and 6.69 acres of wetlands on fill. If all of the upland area on both sites is converted to wetland, then a total of 19.43 acres of wetlands would be created. Of this amount, at least 4.11 acres must be used to mitigate for'the Glacier Park impacts per the Wetland Mitigation Bank Agreement (King County Recording No. 9206241805) and 4.08 acres would need to be reserved to mitigate for City transportation projects. Assuming a 1:1 replacement ratio based on acreage alone and subtracting these prior obligations leaves a total maximum of 11.24 acres available for compensating wetland impacts from other projects. Attached is a copy of existing condition plans for Sites 1 and--2 with probable locations for constructing the Technical Center's wetland mitigation shown. It is our opinion that wetlands could be created in these areas without triggering any federal permits or state permits other than SEPA environmental review. There is, therefore, little risk of being denied the permits to construct the mitigation solely for the SW 16th Street Technical Center on the mitigation bank sites, as the authority to do so would lie with the City alone. We hope that this information is helpful. If you have any questions, please contact Ron Straka at X-5548 or Scott Woodbury at X-5547. H:DOCS:96-237:SW:ps Attachment i lsi /' Parcel 8W l Parcel SE I LottLas 4 I l areas to be dcveicpcd .---\,.._.....7. : ..s.....f I I i I l,ot 2 / ♦44.00 acre �+� �.`,,�,♦♦♦♦1♦11♦1111♦♦♦� C 1111.° Ilem Ille 1%11, ‘• N . ' - li /4 ‘• . A 4 _ il I ® 051 acres�- I 2.26 acres .�111♦ 1 eifrcgau •1�1�1�1�1/11♦♦ ♦1.00 acres iv , / ` - " S • A i�o - 11".11/ 1�' / f f • /1♦/ / ,� Mitigation Bank Site 2 I Total Site Area 13.93 acres e�i Total Wetlands 6,0 a I acres • f/ Total Upland 7,2..y 7-10 acres II iez se/ .1�� / j ����� fi wettarscis 4E0 acres imMallti wcttaruis VW acres H. Ezisting Conditions �, r, Parc212 43 iad S 1/2 EE (-/ !l�.J�J 5ca'tc:r=2C0' C+�a Ev�ca ac+a Amcices . . . ', • , .,1... . . • . POSS tais•E Amer* Goma.? • • .• ••• •••.•.:•.•.•••._•.si *44 . AMA • • SW.•+••• OA....AA... ,y i , .... 4. ,•& . /•". • 4: •• • 4. , - • • . • ••4; \ • • • • • • ••••••,••• -4° . • •• • • It 1///,,,4 7 *A\ /, • o ••• s• \ ,. • • • . ••••...# ••• •.-.• • S.•:•• 4%... •• ••-•• #.4 • :••• 4 4416 II/I 7 #,,, --4bsb, •A, / / • _ ... 1 N. it / • 40 II 4:1 4 6..• _ 0 4 It •• • . < I 4• ••• . •• •• • . / • * • / ' #rr, .• • . / • • • . • • • • • ' :• ) • • •• • • / . • • •••1 , • / , 7 , "Toil Site Area 30.97 acres ,00" ' eatitemasisla w ell dncls 4.03 acres Total Wetland Area 18.7E3 acres pamPRE1 wetlands Miltitgatilam Bank Silto 1 6calc: 1"=200' Total Upland Area 12,19 acres 0 14.75 acres oimillums } lEzilottiing Condiltriono azza_rot- L- c---3)cco a 1Pair-oc11--11__ _ _ 04/08/96 11:52 FAX 206 236 6160 O'KEEFE DEVELOP 14002 APR• ', 8-96 NON 11 :06 FARAMET'"-KIKKLHNU rw' AU. cu000moyc I . UL!VL . /);., DEPARTMENT OF THIS ARMY 4 •. + ��.�, SEATTLE DISTRTGT, CORPS OF ENGINEERS w �i, ;Oa c•„r 1' P.O. BOX 3755 c i 0 ,,,,,y SEATTLE,WASHINGTONI 98t24.2Z55 r '°ir a, ,t' REPLY TO • A?YIWTtON Or Regulatory Branch APR 4 I996 Mr. Tom Lee O'Keefe Development Corporation 7900 Southeast 28th Street, Suite 400 Mercer Island, Washington 98040 Reference: .96-4-00161 O'Keefe Development Corporation Dear Mr. Lee: We have determined that there are no jurisdictional wetlands on your property at the southwest corner of Southwest 16th Street and Raymond Avenue Southwest at Renton, Washington. The waterfilled depressions on the site were created in dry land incidental to construction activity and therefore are not waters of the United States. Springbrook Creek and Rolling Hills Creek, which flow along the southwest and south property lines of the site, respectively, are waters of the U.S. below the ordinary high water mark. Both creeks are adjacent to and below the headwaters of the Green River. Excavation, mechanized vegetation removal, or placement of fill material below the ordinary high water marks of the two creeks would require a Department of the Army permit . Streams and creeks are dynamic ecosystems highly subject to change and Federal regulations are also subject to change. Therefore, this jurisdictional determination may be considered valid for only 5 years from the date of this letter, unless new information warrants revision of the delineation prior to this date. If you have any questions, please call Mr. Evan Lewis at telephone (206) 764-6908 . Sin erely, . ikei440-66,7 -- „Ige n R. Uhrich ief, Environmental and Processing Section O'KEEFE DEVELOPMENT CORPORATION April 5, 1996 9661 0 ddV Attn.: Jennifer Henning ivu1N ��p City of Renton �NINNb7d LN3w 013n�Q 200 Mill Avenue South Renton, WA. 98055 RE: Southwest 16th Tech Center(Group Health Site)- Army Corps Position On Wetlands Dear Jennifer, After meeting with the Army Corps of Engineers on site on March 5, 1996 and a subsequent phone conversation with Evan Lewis of the Corps on Monday, April 1st, 1996, I was informed that the U.S. Army Corps of Engineers was not going to take jurisdiction or regulate a wetland found on fill at the Group Health site located on the corner of southwest 16th and Raymond Avenue. Mr. Lewis said a letter confirming this will be forth coming. This will allow us to pursue the wetland bank as an option; or if it is not an option, we would intend to move the wetlands to a more advantageous location on the site that would better suit both the redevelopment and the wetland. Please feel free to call me with any questions regarding the above statements. Sincerely, O'KEEFE DEVELOPMENT CORPORATION omas M. ee Vice President TML:lmk cc: Larry Benaroya 7900 S.E. 28th Street, Suite 400 Mercer Island, Washington 98040 (206) 236-6200 Fax (206) 236-6160 @iE ..., , ..„ . . . r • • O v L't�� DEVELOPMENT PLANNING DIE :I 1 C!TY OF PENTON 1.% ' , ,ametrix, Inc. JAN 2 5 1996 • ,• '�G/u/sultans in Enninee�rp,�.=rr ,�vrl�l Sciences ake Washington Blvd. N.E. Kirkland.WA 98033-7350 :;•. =22-8880•Fax:206-889-8808 — Renee Naness January 19, 1996 - ' 55-2942-01 (01) m: Kirk T akey, Wetland Ecologist eg Jim Kelley, Ph.D., Senior Wetland Ecologist ii I� •: Delineation of wetlands on the Group Health Cooperative Distribution Center, Renton site. y 's memorandum describes a wetland reconnaissance and delineation completed by Parametrix, 1 c. to describe and delineate wetlands, streams, and required buffers on the 22.5-acre Group ealth Cooperative (GHC) Distribution Center at 801 S.W. 16th Street within the City limits 'f Renton, Washington. •The study delineated three wetland areas that have developed on fill material. The wetland areas on-site total about 0.44 acre (19,267 ft2). Two small streams are also present along the south and west boundaries of the site. Wetlands on the site may not be regulated by Section 404 of the Clean Water Act (Administered by the Army Corps of Engineers) because they have developed on fill. Two wetlands are exempt from the City of Renton wetland management standards due to their small size (<5,000 ft2) while one wetland (16,718 ft2) is a Category 3 wetland. METHODS On August 24, 1995, Parametrix staff conducted a wetland reconnaissance to identify and delineate wetlands and the ordinary high water mark (OHWM) of Spring Brook and Rolling Hills creeks. Wetlands were evaluated and delineated by Parametrix staff using the methodology outlined in the Wetland Delineation Manual (Environmental Laboratory 1987). The City of Renton, the Corps of Engineers, and Washington's Department of Ecology all require use of this manual and delineations were completed using the "routine" methodology, as identified in the 1987 Manual. Field data, including information on vegetation, soils, and hydrology, were collected and recorded on data sheets to document the characteristics of the project area (Appendix A). Wetland plants of the State of Washington (Reed 1988), as amended by the U.S. Army Corps of Engineers, Seattle District (Reed 1993) provided information on the indicator status of vegetation in the project area (Table 1). Scientific and common plant names used in this letter report are consistent with Hitchcock and Cronquist (1981) (Appendix B). Wetland communities identified and delineated within the project corridor were classified using the U.S. Fish and Wildlife Service Classification of Wetlands and Deepwater abitats of the United States (Cowardin et al. 1979). FHA New File project AgseL P IL-,vt-rvi- File Name: ^try �-I-A-Nn.S Copies'lb: I-01E 4 Printea on Recycled Paper Table 1. Key to Wetland Indicator Status. Category Symbol Definition Obligate Wetland Plants OBL Plants that almost always(>99%of the time) occur in wetlands, but which may rarely (<1% of the time) occur in non- wetlands. Facultative Wetlands Plants FACW Plants that often (67 -99% of the time) occur in wetlands, but sometimes (1 - 33% of the time) occur in non-wetlands. Facultative Plants FAC Plants with a similar likelihood (33•-67% of the time) of occurring in both wetlands and non-wetlands. Facultative Upland Plants FACU Plants that sometimes (1 - 33% of the time) occur in wetlands, but occur more often (67 - 99% of the time) in non-wetlands. Obligate Upland Plants UPL Plants that rarely (<1% of the time) occur in wetlands, but almost always(>99%of the time) occur in non-wetlands. Soils maps in the Soil Survey King County Area, Washington (Snyder et al. 1973) and the Hydric Soils of the United States (Soil Conservation Service 1991) provided information on soils. Soils in the project area were examined by digging a sample pit to a depth of at least 20 inches to observe soils and determine hydrologic conditions. The Munsell Color System (Kollmorgan Corporation 1994) was used to describe soil colors for low chroma and mottling, as these are indicators of wetland hydrology and hydric soils. Following the delineation and flagging of the wetlands and after determining the OHWMs of Spring Brook and Rolling Hills creeks, flag locations were mapped by Parametrix registered land surveyors. RESULTS UPLAND AREAS Most of the site, which was determined to be non-wetland, is a mosaic of forest, shrub, and herbaceous vegetation. The dominant tree in the forested areas is Populus trichocarpa,but there are a few scattered Alnus rubra. The understory in the forested areas is dominated by Rubus discolor and Rubus ursinus, and Solanum dulcamara, with Urtica dioica the dominant herb. The shrub areas are dominated by Rubus discolor, and the herbaceous clearings are dominated by Agrostis tenuis,Bromus inennis, Tanacetum vulgare,and Plantago lanceolata. Wetland Delineation- GHC Renton Site January 19, 1996 Commercial Real Estate (55-2947-01) 2 Parametrix, Inc. • Soils on the site are mapped in the Soil Survey King County Area Washington (Snyder et al. 1973) as the non-hydric Urban land, with a significant amount of the area surrounding the project site also mapped as urban land. Urban land consists of soil that has been modified by the additions of fill material. Fill observed on-site ranges from about 3 ft to more than 12 ft thick. Fill on the site was a mix of extremely compact brown (10YR 4/3) gravelly sandy clay loam to a very loose olive brown (2.5Y 4/3) sandy loam. A small amount of waste material, mainly consisting of asphalt fragments, was found immediately adjacent to 84th Avenue South. In addition to the areas mapped as urban land, the other soil mapping units on the site include a small area of Woodinville silt loam and the Puget silty clay loam. The area mapped as Woodinville silt loam is located in the southeast corner of the site, and the Puget silty clay loam is associated with Spring Brook along the western project boundary. The Puget Series consists of poorly drained hydric soils that formed in alluvium, under sedges and grasses, in small depressions located in river valleys. The Woodinville Series are located on nearly level and gently undulating, poorly drained hydric soils that also formed on alluvium, under sedges and grass, adjacent to rivers and streams. To assist in the verification that fill material had been placed on the site, and to determine the approximate timing of the fill, available aerial photographs spanning a 24-year period (1965-1989) were reviewed (Table 2). The examination of these photographs (in stereo pairs, where possible) revealed that the site had been filled prior to 1965, with additional fill material added between 1965-1969. The review also revealed that the GHC Distribution Center was completed in 1978. Table 2. Aerial photographs reviewed to evaluate fill material at the Group Health Cooperative Distribution site'. Date Scale Flight Photo Number Remarks 5-11-65 1:60,000 WF WF-8-37 The western portion of the site contains new fill material, and the eastern portion of the site is dominated by herbaceous species. 3-24-69 1:48,000 SEABLOCK2 HH-7-3-24 Additional fill material was placed on both the west and east sides of the site. 2-20-70 1:24,000 SEABLCOV 7-7-131 Vegetation is apparent on the fill material. 5-24-70 1:12,000 KP-70 9-30-79 Additional vegetation is apparent on the fill material, with small trees apparent in the central portion of the site. 10-16-71 1:58,000 NASA 189 184-3-236 Small trees apparent on most of the fill material, with larger trees in the central portion of the site. A patch of monotypic herbaceous vegetation is apparent in the southern portion of the site. Wetland Delineation - GHC Renton Site January 19, 1996 Commercial Real Estate (55-2947-01) 3 Parametrix, Inc. Table 2. Aerial photographs reviewed to evaluate fill material at the Group Health Cooperative Distribution site (continued)1. Date Scale Flight Photo Number Remarks 5-7-78 1:24,000 CR-78 22-24-5E Vegetation patterns on the site is similar to the 1971 aerial photographs. Construction of the GHC Distribution Center appears to be complete. 6-26-79 1:24,000 SEABLOCK 31-783 Riparian vegetation is visible along Spring Brook Creek. The tree canopy covers much of the western portion of the site. 6-24-81 1:12,000 SP-81 20-60-62 Similar to the 1979 aerial photographs. 1983-1984 1:12,000 OS 83-84 Orthophoto The western portion of the site is forested, enlargements S.E. 1/4 of and the eastern portion is dominated by T.23N.,R.4E. herbaceous species. 8-14-85 1:24,000 Sound Block SO BLK 15 Vegetation patterns on the site are similar to 85 No. 737 the 1983-84 aerial photographs. 7-18-88 1:36,000 88 Sound 25-1140 Trees in the central portion of the site are Block not as prevalent as in previous years. Shrubs are apparent in the southeast portion of the site. 7-23-89 1:12,000 SP-89 61-28 Vegetation patterns on the site are similar to the patterns observed during our site visit. 1 Aerial photographs obtained from the Suzzallo Map Collection, University of Washington. WETLAND AREAS Three wetland systems were identified and delineated on the fill material described above. The three wetlands included two shrub wetlands and a forested wetland. These wetlands are perched on compact fill material and thus may not be regulated as jurisdictional wetlands by the U.S. Army Corps of Engineers 1. Two small creeks, Spring Brook and Rolling Hills creeks occur on the west and south borders of the property, respectively. Because of the fill material, the two creeks are confined in U-shaped channels up to 10 ft deep below the fill surface. The wetlands identified and OHWMs of creeks are described below and identified on the survey map in Appendix C. I The Seattle District of the U.S. Army Corps of Engineers has recently excluded several wetlands from jurisdiction when it is clear they have developed on legally placed fill. Wetland Delineation - GHC Renton Site January 19, 1996 Commercial Real Estate (55-2947-01) 4 Parametrix, Inc. Wetland A Conditions Wetland A is a small depression occurring on fill. The area covers 1,437 ft2 and is located west of 84th Avenue South and south of the GHC Distribution Center. Wetland vegetation consists of Salix scoulerana (FAC), Phalaris arundinacea (FACW), and Agrostis tenuis(FAC). More than 50 percent of the dominant species within the wetland has an indicator status of FAC and/or FACW (Appendix A; Sample D-1); therefore, this plant community meets the criteria established for a hydrophytic plant community. Soils in Wetland A are mapped as Urban land in the Soil Survey King County Area Washington (Snyder et al. 1973). As mentioned above, Urban land is soil that has been modified by disturbance of the natural layers with the additions of fill material several feet thick. Soils in the wetland are a compact grayish brown (2.5Y 5/2) gravelly sandy clay with dark, yellowish brown (10YR 4/6) mottles. Because of the low chroma in the matrix and the presence of mottles, this soil meets the technical criteria for hydric soil. During our site visit, soils were not saturated; however, there was evidence of seasonal ponding, including silt stains on leaves and water marks on shrubs. Because of the evidence of seasonal ponding in this area, wetland hydrology was assumed to occur during the growing season, and the wetland hydrologic criteria are thus met. The U.S. Fish and Wildlife Service classification system (Cowardin et al. 1979) classifies Wetland A as a palustrine scrub/shrub (PSS) wetland. The presence of hydrophytic vegetation and hydric soil conditions, as well as topographic changes, were used to delineate the wetland boundary. Adjacent Uplands The area surrounding Wetland A consists of landscaping on the north side, 84th Avenue South to the east, and a mix of native and introduced shrubs and herbs to the south and west. The dominant shrub in the area to the south and west is Rubus discolor(FACU), and herbs include Agropyron repens(FAC-), Dactylus glomerata(FACU), Bromus inermis(UPL), and Chrysanthemum leucanthemun (UPL). Less than 50 percent of the dominant species in these upland areas are assigned a wetland indicator status of FAC, FACW, and/or OBL (Appendix A, Sample D-2); therefore, this plant community does not meet the criteria established for a hydrophytic plant community. Soils adjacent to Wetland A are mapped as Urban land in the Soil Survey King County Area Washington (Snyder et al. 1973). Soil in the upland areas surrounding Wetland A, which appear to be fill,are a light olive brown (2.5Y 5/3) compact gravelly sandy loam. Because Wetland Delineation - GHC Renton Site January 19, 1996 Commercial Real Estate (55-2947-01) 5 Parametrix, Inc. C of the high chroma in the matrix and the lack of mottles, this soil does not meet the technical criteria established for hydric soil. In addition to the soils described above, several piles of asphalt were also present in the vicinity of Wetland A. Wetland B Conditions Wetland B is a well-defined (up to 3 ft deep) depression occurring in fill material. The wetland covers 1,111 ft2. The wetland is located west of 84th Avenue South and south of Wetland A. The wetland is dominated by a shrub overstory of Salix scoulerana and Salix lasiandra (FACW+). Along the east side of the wetland, and at the base of the fill slope of 84th Avenue South, are several Populus trichocarpa(FAC). The herbaceous component is a mix of Phalaris arundinacea, Solanum dulcamara (FAC+), and Ranunculus repens (FACW). More than 50 percent of the dominant species within Wetland B have an indicator status of FAC and/or FACW (Appendix A; Sample C-1); therefore, this plant community meets the criteria established for a hydrophytic plant community. Soils in Wetland B, which consist of fill and are a dark gray (10YR 4/1) silty clay loam with strong brown (7.5YR 4/6) mottles. Because of the low chroma in the matrix and the presence of mottles, these soils meet the technical criteria for hydric soil. During our site visit, soils were not saturated; however, there was evidence of seasonal ponding, including silt stains on leaves and water marks on shrubs. Because of the evidence of seasonal ponding in this area, wetland hydrology was assumed to occur during the growing season. The U.S. Fish and Wildlife Service wetland classification system (Cowardin et al. 1979) classifies Wetland B as a palustrine scrub/shrub (PSS) wetland. Wetland B was delineated based on the presence of hydrophytic vegetation, hydric soil, and the well-defined topography of the depression. Adjacent Uplands The upland areas surrounding Wetland B consisted of 84th Avenue South to the east and a dense patch of Rubus discolor to the west. This dense patch of shade from the Rubus discolor prohibits the establishment of a significant herbaceous layer. Since the adjacent uplands are not dominated by any wetland plants, the plant community does not meet the criteria established for a hydrophytic plant community. Wetland Delineation- GHC Renton Site January 19, 1996 Commercial Real Estate (55-2947-01) 6 Parametrix, Inc. Soils adjacent to Wetland B consist of fill material and are a brown 10YR 4/3) siltyclay ( loam and appeared to be fill material. Because of the high chroma in the matrix and the lack of mottles, this soil does not meet the technical criteria established for hydric soil. Wetland C Conditions Wetland C occurs in a shallow depression that covers 16,718 ft2. The wetland is located west of 84th Avenue South and Wetland B. The wetland'is forested, with an overstory dominated by Populus trichocarpa. A shrub layer is absent and the herbaceous layer includes Phalaris arundinacea, Ranunculus repens, and Solanum dulcamara. More than 50 percent of the dominant species within the wetland has a wetland indicator status of FAC and/or FACW (Appendix A; Sample #7); therefore, this plant community meets the criteria established for a hydrophytic plant community. Soils in Wetland C are mapped in the Soil Survey King County Area Washington (Snyder et al. 1973) as the hydric Woodinville silt loam (SCS 1991). The Woodinville series is made up of nearly level and gently undulating, poorly drained soils that formed under grass and sedges, in alluvium. Soils observed in Wetland C.have a 12-inch surface layer composed of • fill. This soil is a brown (10YR 4/3) .compact gravelly sandy clay over a grayish brown (10YR 5/2) sandy clay with yellowish brown (10YR 5/4) mottles. Because of the low chroma in the matrix and the presence of mottles directly below the surface layer, this soil meets the technical criteria for hydric soil. During the site visit, soils were not saturated; however, due to the hydrophytic plant community and presence of hydric soil conditions, it is likely wetland hydrology is present during the early growing season. The U.S. Fish and Wildlife Service wetland classification system (Cowardin et al. 1979) classifies Wetland C as a palustrine forested (PFO) wetland. The presence of hydric soil and the topographic changes defining the depression were used to delineate the wetland boundary. Adjacent Uplands Upland areas north of Wetland C consist of Rubus discolor,while the area south of Wetland C is dominated by herbaceous species, including Agrostis tenuis (FAC), Bromus inermis (UPL), Anthoxoanthum ordoratum (FACU), and Plantago lanceolata (FAC+). Of the dominant species (Bromus inermis and Anthoxanthum ordoratum) in these upland areas, less than 50 percent is adapted to wetlands (Appendix A; Sample #6); therefore, this plant community does not meet the criteria established for a hydrophytic plant community. Wetland Delineation - GHC Renton Site January 19, 1996 Commercial Real Estate (55-2947-01) 7 Parametrix, Inc. ' C i Soils adjacent to Wetland C are composed of fill. The upland soils present in this area are fill soils. They are a brown (10YR 4/3) sandy loam. Because of the high chroma and the lack of mottles, this soil does not meet the technical criteria established for hydric soil. Spring Brook Creek Conditions Parametrix staff also identified and flagged the OHWM of Spring Brook Creek. Riparian vegetation within the OHWM of Spring Brook Creek includes areas with an overstory dominated by Alnus rubra (FAC) and Populus trichocarpa. The dominant shrub in these areas is Rubus discolor, other shrubs include Corpus stolonifera (FACW), and Spiraea douglasii (FACW). Herbaceous species in this riparian area are Phalaris arundinacea, Scirpus microcarpus (OBL), Typha latifolia (OBL), and Equisetum hyemale (FACW). Greater than 50 percent of the dominant vegetation within the OHWM and wetland fringe has an indicator status of FAC, FACW, and/or OBL (Appendix 1; Sample B-1); therefore, this plant community meets the criteria for a hydrophytic plant community. Soils along the Spring Brook Creek are mapped in the Soil Survey King County Area Washington (Snyder et al. 1973) as the non-hydric Puyallup fine sandy loam (SCS 1991). The Puyallup series is made up of well-drained soils that formed in alluvium, adjacent to streams in the river valleys under grass, hardwoods, and conifers. Soils within the OHWM of Spring Brook Creek are fill and/or dredged material. They are a dark grayish brown (2.5 • Y 4/2) to olive brown (2.5Y 4/3) sandy clay loam with dark yellowish brown (10YR 4/6) mottles. Because of this low chroma and the presence of mottles, this soil meets the technical criteria for hydric soil. The U.S. Fish and Wildlife Service (Cowardin et al. 1979) wetland classification system classifies Spring Brook Creek as a riverine, lower perennial, unconsolidated bottom (R2UB) wetland system. The wetland edge and OHWM of the creek were delineated based on the presence of hydrophitic vegetation and hydrologic indicators. Adjacent Uplands The area above the OHWM of Spring Brook Creek has an overstory dominated by Populus trichocarpa, with Rubus discolor the dominant shrub. Herbaceous species include Phalaris arundinacea, Equisetum hyemale, and Tanacetum vulgare (UPL). Greater than 50 percent of the dominant vegetation above the OHWM and adjacent to Spring Brook Creek is adapted to wetlands; for this reason, the plant community meets the criteria for a hydrophytic plant community. Soils east of Spring Brook Creek are mapped as Urban land in the Soil Survey King County Area Washington (Snyder et al. 1973). Soils in the upland area are fill and either a brown Wetland Delineation - GHC Renton Site January 19, 1996 Commercial Real Estate (55-2947-01) 8 Parametrix, Inc. (10YR 4/3) silty clay loam or an olive brown (2.5Y 4/3) sandy loam. Because of the high chroma in the matrix and the lack of mottles, these soils do not meet the technical criteria established for hydric soil. Rolling Hills Creek Conditions Rolling Hills Creek, a small stream that flows into Spring Brook Creek on the site, was examined. The creek is located just south of the property boundary in a ditch about 10 ft deep, and the OHWM was flagged. Vegetation within the OHWM includes Alnus rubra, Rubus discolor,and Phalaris arundinacea. Because greater than 50 percent of the dominant vegetation within the OHWM of Rolling Hills Creek is adapted to wetlands (Appendix 1; Sample A-1), this plant community meets the criteria for a hydrophytic plant community. Soils along the un-named stream are mapped in the Soil Survey King County Area Washington (Snyder et al. 1973), as the hydric Woodinville silt loam (SCS 1991); however, the soils appeared to be composed of dredge material from Rolling Hills Creek. Soils within the OHWM are a dark grayish brown (10YR 4/2) sandy clay loam with strong brown (7.5YR 4/6) mottles. Because of the low chroma in the matrix and the presence of mottles, this soil meets the technical criteria for hydric soil. Using the U.S. Fish and Wildlife Service (Cowardin et al. 1979) classification system, this un-named stream is a riverine, lower perennial, unconsolidated bottom (R2UB) wetland system. Adjacent Uplands The area above the OHWM of Rolling Hills Creek has an overstory dominated by Alnus rubra, with a shrub layer dominated by Rubus discolor and Cytisus scoparius (UPL). Herbaceous species consist of Phalaris arundinacea and Tanacetum vulgare (UPL). The dominant vegetation above the OHWM of Rolling Hills Creek (Appendix A; Sample A-2) is adapted to wetlands; this plant community, therefore, meets the criteria for a hydrophytic plant community. Soils north of the un-named stream are mapped in the Soil Survey King County Area Washington (Snyder et al. 1973) as the hydric Woodinville silt loam (SCS 1991). Soils were found to consist of fill and dredge material that was a dark grey (10YR 4/1) silty clay loam with yellowish brown (10YR 5/6) mottles. Because of the low chroma in the matrix and the presence of mottles, these soils meet the technical criteria established for hydric soil. While the upland area adjacent to Rolling Hills Creek has a hydrophytic plant community and contains soils with hydric morphology, topography and field observations suggest Wetland Delineation- GHC Renton Site January 19, 1996 Commercial Real Estate (55-2947-01) 9 Parametrix, Inc. wetland hydrology is not present. The area adjacent to the creek is at least ten ft above the OHWM of the creek and it is unlikely this area floods or becomes saturated. The soils adjacent to the creek appear to have been a hydric soil placed in the area during dredge/fill operations; therefore, we did not identify this area as wetland. Wetland Delineation- GHC Renton Site January 19, 1996 Commercial Real Estate (55-2947-01) 10 Parametrix, Inc. REGULATORY REQUIREMENTS CITY OF RENTON Ordinance No. 4346, Chapter 32 Wetland Management (City of Renton 1992) was used to evaluate and categorize wetlands on the GHC Distribution Center site. Wetland A and Wetland B are both hydrologically isolated wetlands formed on compacted fill material and are less than 5,000 ft2, therefore, these wetlands are not regulated under the City of Renton Ordinance. Wetland C is also a hydrologically isolated wetland that formed on compact fill material; however, since it is greater than 5,000 ft2, it meets the criteria of a Category 3 wetland. The City of Renton requires a 25-ft standard buffer for all Category 3 wetlands. The standard buffer widths for wetlands can be either increased or decreased (but not to less than 25 ft) by the City's Department Administrator. Buffer widths are generally •increased in unique situations, such as when endangered species are present, or when a larger buffer is necessary to protect a wetland functions or values. Wetlands on the Group Health Cooperative Distribution site do not contain endangered species, and since the wetlands do not provide high functional value, a larger buffer requirement is unlikely. Spring Brook Creek is regulated under the City of Renton's Shoreline Master Plan (City of Renton 1983). The portion of Spring Brook Creek within the project site is designated as an Urban environment. The Urban environment is defined as an area of high-intensity land use that includes residential, commercial, and industrial development. The Master Plan allows for the commercial and industrial development adjacent to shorelines designated as Urban environments. Commercial building must be located no closer than 50 ft to the water's edge; however, the Land Use Hearing Examiner may reduce this requirement for projects that allow public access to and along the water's edge. Industrial structures must be set back 25 ft from the water's edge, as long as they provide reasonable public access to and along the water's edge, or a 50-ft set back may be required. Rolling Hills Creek is also a regulated shoreline under the Shoreline's Master Program (SMP) (City of Renton 1983). The minimum setback would be 25 ft from the water's edge of Rolling Hills Creek for an industrial structure and 50 ft for a commercial building, as long as public access is provided to and along the water's edge. FEDERAL The U.S. Army Corps of Engineers is responsible for determining the jurisdictional status of all wetlands and special aquatic environments. This process includes confirmation of a wetland/upland boundary determination and the regulatory status of the wetland or special aquatic environment (i.e. above the headwaters, isolated, or adjacent), and the federal regulatory requirements for activities that may affect jurisdictional wetlands. Because the Wetland Delineation- GHC Renton Site January 19, 1996 Commercial Real Estate (55-2947-01) 11 Parametrix, Inc. wetland systems delineated on the site have developed on compact fill, they may not be regulated by the Corps as jurisdictional wetlands. RECOMMENDATIONS Parametrix, Inc. recommends that a wetland boundary verification and jurisdictional determination be submitted to the Army U.S. Corps of Engineers. This will allow the Commercial Real Estate Company to further evaluate the requirements of federal and local permits that affect the development potential of the site. Wetland Delineation- GHC Renton Site January 19, 1996 Commercial Real Estate (55-2947-01) 12 Parametrix, Inc. REFERENCES City of Renton. 1983 (Rev.). Shoreline Master Program. Adopted by Ordinance No. 3758. 45pp. City of Renton. 1992. Summary of Ordinance No. 4346, Chapter 32 Wetlands Management. Renton City Council. 45pp. Cowardin, L.M.,V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deepwater habitats of the United States. U.S. Fish and Wildlife Service. 103 pp. Environmental Laboratory. 1987. Corps of Engineers Wetlands Delineation Manual, Department of the Army,Waterways Experiment Station, Corps of Engineers. Vicksburg, Mississippi. 100 pp. Federal Interagency Committee for Wetland Delineation. 1989. Federal manual for identifying and delineating jurisdictional wetlands. U.S.Army Corps of Engineers, U.S. Environmental Protection agency, U.S. Fish and Wildlife Service, and U.S.D.A. Soil Conservation Service, Washington, D.C. Cooperative technical publication. 107 pp. Hitchcock, C.L.,and A. Cronquist. 1981. Flora of the Pacific Northwest. University of Washington Press, Seattle, Washington. 730 pp. Kollmorgan Corporation. 1994. Munsell Soil Color Charts. Kollmorgen Corporation, Baltimore, Maryland. Snyder E. Dale, Philip S. Gale, and Russell F. Pringle, 1973. Soil Survey King County Area, Washington. U.S. Department of Agriculture, Soil Conservation Service, in cooperation with Washington Agricultural Experimental Station, Agriculture Research Center. 100pp. + Maps. Reed, P.B. 1988. Wetland plants of the State of Washington - 1988 (as amended by the Seattle District of the U.S.Army Corps of Engineers). U.S.Department of the Interior, Fish and Wildlife Service. Washington, D.C. Reed, P.B. Jr., December 1993. Northwest Supplement (Region 9) species with a change in indicator status or added to the Northwest 1988 List, wetland plants of the state of Washington - 1988. U.S.Department of Interior, Fish and Wildlife Service. Washington DC. 26pp. Wetland Delineation- GHC Renton Site January 19, 1996 Commercial Real Estate (55-2947-01) 13 Parametrix, Inc. Soil Conservation Service. 1991. Hydric soils of the United States. United States Department of Agriculture. Washington D.C. Williams Walter R., Richard M. Laramie, and James J. Ames. 1975. A Catalog of Washington Streams and Salmon Utilization, Volume 1 Puget Sound Region. Washington Department of Fisheries, Olympia, Washington. • Wetland Delineation - GHC Renton Site January 19, 1996 Commercial Real Estate (55-2947-01) 14 Parametrix, Inc. APPENDIX A DATA SHEETS WETLAND DETERMINATION Applicant Application Project Name: Commercial Real Estate Co. Number: Name: Renton Site State: WA County: King Legal Description:Township: 23N Range: 4E Date: 8/24/95 Plot No.: Sample A-1 Section: 24 Vegetation [List the three dominant species in each vegetation layer (5 if only 1 or 2 layers).] Indicate species with observed morphological or known physiological adaptations with an asterisk. Species Indicator Status Species Indicator Status Trees Herbs 1. Alnus rubra FAC 7. Phalaris arundinacea FACW 2. 8. 3. 9. Saplings/Shrubs Woody vines 4. Rubus discolor FACU 10. 5. 11. 6. 12. % of species that are OBL, FACW, and/or FAC: 66% . Other Indicators: None Hydrophytic vegetation: Yes X No _ Basis: >50% FAC or FACW Soil Series and phase: Urban land On hydric soils list? Yes ; No X . Mottled:Yes X ; No . Mottle color: 7.5YR 4/6 ; Matrix color: 10YR 4/2 Gleyed: Yes X ; No . Other indicators: 10YR 4/1 gleyed Hydric soils: Yes X ; No ; Basis: Low chroma, mottles, gleyed Hydrology Inundated: Yes ; No X . Depth of standing water: 12" instream channel Saturated Soils: Yes X ; No . Depth to saturated soil: 12" at wetland edge Other indicators: water in stream channel 12 ft wide x —12 inches deep Wetland hydrology: Yes X ; No . Basis: hydrology within 12" of soil surface Atypical situation: Yes ; No X Normal Circumstances? Yes X ; No Wetland Determination: Wetland X ; Nonwetland Comments: Wetland fringe associated with a stream in a ditch; flagged Al through All Determined by: Kirk Lakey (Corps of Engineers Environmental Laboratory 1987) WETLAND DETERMINATION Applicant Application Project PP J Name: Commercial Real Estate Co. Number: Name: Renton Site State: WA County: King Legal Description:Township: 23N Range: 4E Date: 8/24/95 Plot No.: Sample A-2 Section: 24 Vegetation [List the three dominants species in each vegetation layer 5 if only1 or 2layers)] Indicate species g P� g Y ( with observed morphological or known physiological adaptations with an asterisk. Species Indicator Status Species Indicator Status Trees Herbs 1. 7. Phalaris arundinacea FACW 2. 8. 3. 9. Saplings/Shrubs Woody vines 4. Cytisus scoparius UPL 10. 5. 11. 6. 12. % of species that are OBL, FACW, and/or FAC: 50% . Other Indicators: None Hydrophytic vegetation: Yes X No _ Basis: >50% of dominant veg., FACW Soil Series and phase: Urban land On hydric soils list? Yes ; No X . Mottled:Yes X ; No . Mottle color: 10YR 5/6 ; Matrix color: 10YR 4/1 Gleyed: Yes ; No X . Other indicators: None Hydric soils: Yes X ; No ; Basis: Low chroma, mottles II Hydrology Inundated: Yes ; No X . Depth of standing water: 0 inches Saturated Soils: Yes ; No X . Depth to saturated soil: >20 inches Other indicators: None Wetland hydrology: Yes ; No X . Basis: Elevation and drainage patterns indicate hydrology is not present Atypical situation: Yes ; No X Normal Circumstances? Yes X ; No Wetland Determination: Wetland ; Nonwetland X Comments: Upland sample 10 ft above stream bed. Determined by: Kirk Lakey (Corps of Engineers Environmental Laboratory 1987) WETLAND DETERMINATION Applicant Application Project Name: Commercial Real Estate Co. Number: Name: Renton Site State: WA County: King Legal Description:Township: 23N Range: 4E Date: 8/24/95 Plot No.: Sample B-1 Section: 24 Vegetation [List the three dominant species in each vegetation layer(5 if only 1 or 2 layers).] Indicate species with observed morphological or known physiological adaptations with an asterisk. Species Indicator Status Species Indicator Status Trees Herbs 1. Alnus rubra FAC 7. Phalaris arundinacea FACW 2. Populus trichocarpa FAC 8. Scirpus microcarpus OBL 3. 9. Typha latifolia OBL Saplings/Shrubs (Herbs continued) 4. Rubus discolor FACU 10.Equisetum hyemale FACW 5. 11. 6. 12. % of species that are OBL, FACW, and/or FAC: 85% . Other Indicators: None Hydrophytic vegetation: Yes X No _ Basis: >50% FAC, FACW, and/or OBL Soil Series and phase: Urban land On hydric soils list? Yes ; No X . Mottled:Yes X ; No . Mottle color: 10YR 4/6 ; Matrix color: 2.5Y 4/3 Gleyed: Yes ; No X . Other indicators: None Hydric soils: Yes X ; No ; Basis: Low chroma with mottles Hydrology Inundated: Yes ; No X . Depth of standing water: 0 inches Saturated Soils: Yes ; No X . Depth to saturated soil: >20 inches Other indicators: topographic location indicates seasonal flooding is likely Wetland hydrology: Yes X ; No . Basis: hydric soil and topography Atypical situation: Yes ; No X . Normal Circumstances? Yes X ; No Wetland Determination: Wetland X ; Nonwetland Comments: Riparian vegetation along the stream bank, sample area was within the flood area of the stream; stream was flagged B1 through B32. Determined by: Kirk Lakey (Corps of Engineers Environmental Laboratory 1987) WETLAND DETERMINATION Applicant Application Project Name: Commercial Real Estate Co. Number: Name: Renton Site State: WA County: King Legal Description:Township: 23N Range: 4E Date: 8/24/95 Plot No.: Sample #1 Section: 24 Vegetation [List the three dominant species in each vegetation layer(5 if only 1 or 2 layers).] Indicate species with observed morphological or known physiological adaptations with an asterisk. Species Indicator Status Species Indicator Status Trees Herbs 1. Populus trichocarpa FAC 7. Solanum dulcamara FACW+ 2. 8. 3. 9. Saplings/Shrubs Woody vines 4. Rubus discolor FACU 10. 5. Rubus ursinus FACU 11. 6. 12. % of species that are OBL, FACW, and/or FAC: 50% . Other Indicators:_ None Hydrophytic vegetation: Yes X No _ Basis: >50% of dominant veg. FAC. Soil Series and phase: Urban land On hydric soils list? Yes ; No X . Mottled:Yes ; No X . Mottle color: -- ; Matrix color: 2.5Y 4/3 . Gleyed: Yes ; No X . Other indicators: None Hydric soils: Yes_; No X ; Basis: High chroma, no mottles Hydrology Inundated: Yes ; No X . Depth of standing water: 0 inches Saturated Soils: Yes ; No X . Depth to saturated soil: >20 inches Other indicators: None Wetland hydrology: Yes ; No X . Basis: No indicators of hydrology present. Atypical situation: Yes ; No X Normal Circumstances? Yes X ; No Wetland Determination: Wetland ; Nonwetland X Comments: Determined by: Kirk Lakey (Corps of Engineers Environmental Laboratory 1987) WETLAND DETERMINATION Applicant Application Project Name: Commercial Real Estate Co. Number: Name: Renton Site State: WA County: King Legal Description:Township: 23N Range: 4E Date: 8/24/95 Plot No.: Sample #2 Section: 24 Vegetation [List the three dominant species in each vegetation layer(5 if only 1 or 2 layers).] Indicate species with observed morphological or known physiological adaptations with an asterisk. Species Indicator Status Species Indicator Status Trees Herbs 1. Populus trichocarpa FAC 7. Tanacetum vulgure UPL 2. 8. Epilobium angustzfolium FACU+ 3. 9. Saplings/Shrubs Woody vines 4. Rubus discolor FACU 10. 5. Cornus stolonifera FACW 11. 6. 12. % of species that are OBL, FACW, and/or FAC: 40% . Other Indicators: None Hydrophytic vegetation: Yes _ No X . Basis: <50% dominant FAC & FACW Soil Series and phase: Urban land On hydric soils list? Yes ; No X Mottled:Yes ; No X . Mottle color: -- ; Matrix color: 2.5Y 4/3 Gleyed: Yes ; No X . Other indicators: None Hydric soils: Yes_; No X ; Basis: High chroma Hydrology Inundated: Yes ; No X . Depth of standing water: 0 inches Saturated Soils: Yes ; No X . Depth to saturated soil: >20 inches Other indicators: None Wetland hydrology: Yes ; No X . Basis: No indicators were present Atypical situation: Yes ; No X . Normal Circumstances? Yes X ; No Wetland Determination: Wetland ; Nonwetland X Comments: • Determined by: Kirk Lakey (Corps of Engineers Environmental Laboratory1987 1987) WETLAND DETERMINATION Applicant Application Project Name: Commercial Real Estate Co. Number: Name: Renton Site State: WA County: King Legal Description:Township: 23N Range: 4E Date: 8/24/95 Plot No.: Sample #3 Section: 24 Vegetation [List the three dominant species in each vegetation layer (5 if only 1 or 2 layers).] Indicate species with observed morphological or known physiological adaptations with an asterisk. Species Indicator Status Species Indicator Status Trees Herbs 1. Populus trichocarpa FAC 7. Equisetum hyemale FACW 2. 8. 3. 9. Saplings/Shrubs Woody vines 4. Rubus discolor FACU 10. 5. 11. 6. 12. % of species that are OBL, FACW, and/or FAC: 66% . Other Indicators: None Hydrophytic vegetation: Yes X No _ Basis: >50% of dominant FAC or FACW Soil Series and phase: Urban land On hydric soils list? Yes ; No X . Mottled:Yes ; No X . Mottle color: -- ; Matrix color: 2.5Y 4/3 Gleyed: Yes ; No X . Other indicators: None Hydric soils: Yes_; No X ; Basis: High chroma Hydrology Inundated: Yes ; No X . Depth of standing water: 0 inches Saturated Soils: Yes ; No X . Depth to saturated soil: >20 inches Other indicators: None Wetland hydrology: Yes ; No X . Basis: No wetland indicators present. Atypical situation: Yes ; No X Normal Circumstances? Yes X ; No Wetland Determination: Wetland ; Nonwetland X Comments: Determined by: Kirk Lakey (Corps of Engineers Environmental Laboratory 1987) WETLAND DETERMINATION Applicant Application Project Name: Commercial Real Estate Co. Number: Name: Renton Site State: WA County: King Legal Description:Township: 23N Range: 4E Date: 8/24/95 Plot No.: Sample #4 Section: 24 Vegetation [List the three dominant species in each vegetation layer (5 if only 1 or 2 layers).] Indicate species with observed morphological or known physiological adaptations with an asterisk. Species Indicator Status Species Indicator Status Trees Herbs 1. Populus trichocharpa FAC 7. Urtica dioica FAC+ 2. 8. Solanum dulcamara FACW+ 3. 9. Geranium viscosissimum FACU+ Saplings/Shrubs Woody vines 4. Rubus discolor FACU 10. 5. 11. 6. 12. % of species that are OBL, FACW, and/or FAC: 60% . Other Indicators: None Hydrophytic vegetation: Yes X No _ Basis: >50% of dominant species FAC Soil Series and phase: Urban land On hydric soils list? Yes ; No X . Mottled:Yes ; No X . Mottle color: -- ; Matrix color: 2.5Y 4/3 Gleyed: Yes ; No X . Other indicators: None Hydric soils: Yes_; No X ; Basis: Color criteria for hydric soils absent Hydrology Inundated: Yes ; No X . Depth of standing water: 0 inches Saturated Soils: Yes ; No X . Depth to saturated soil: >20 inches Other indicators: None Wetland hydrology: Yes ; No X . Basis: No indicators present Atypical situation: Yes ; No X Normal Circumstances? Yes X ; No Wetland Determination: Wetland ; Nonwetland X Comments: Determined by: Kirk Lakey (Corps of Engineers Environmental Laboratory 1987) WETLAND DETERMINATION Applicant Application Project Name: Commercial Real Estate Co. Number: Name: Renton Site State: WA County: King Legal Description:Township: 23N Range: 4E Date: 8/24/95 Plot No.: Sample #5 Section: 24 Vegetation [List the three dominant species in each vegetation layer (5 if only 1 or 2 layers).] Indicate species with observed morphological or known physiological adaptations with an asterisk. Species Indicator Status Species, Indicator Status Trees Herbs 1. Populus trichocarp FAC 7. Phalaris arundinacea FACW 2. 8. Agropyron repens FAC- 3. 9. Agrostis tenuis FAC Saplings/Shrubs Woody vines 4. 10. 5. 11. 6. 12. % of species that are OBL, FACW, and/or FAC: 100% . Other Indicators: None Hydrophytic vegetation: Yes X No _ Basis: >50% FAC or FACW Soil Series and phase: Urban land On hydric soils list? Yes ; No X . Mottled:Yes ; No X . Mottle color: -- ; Matrix color: 2.5Y 4/3 Gleyed: Yes ; No X . Other indicators: None Hydric soils: Yes_; No X ; Basis: No indicators present Hydrology Inundated: Yes ; No X . Depth of standing water: 0 inches Saturated Soils: Yes ; No X . Depth to saturated soil: >20 inches Other indicators: None Wetland hydrology: Yes ; No X . Basis: No indicators present Atypical situation: Yes ; No X . Normal Circumstances? Yes X ; No Wetland Determination: Wetland ; Nonwetland X Comments: Determined by: Kirk Lakey (Corps of Engineers Environmental Laboratory 1987) WETLAND DETERMINATION Applicant Application Project Name: Commercial Real Estate Co. Number: Name: Renton Site State: WA County: King Legal Description:Township: 23N Range: 4E Date: 8/24/95 Plot No.: Sample #6 Section: 24 Vegetation [List the three dominant species in each vegetation layer (5 if only 1 or 2 layers).] Indicate species with observed morphological or known physiological adaptations with an asterisk. Species Indicator Status Species Indicator Status Trees Herbs 1. 7. Agrostis tenuis FAC 2. 8. Bromus inermis UPL 3. 9. Anthoxanthum odoratum FACU Saplings/Shrubs (Herbs continued) 4. 10.Plantago lanceolata FAC 5. 11. 6. 12. % of species that are OBL, FACW, and/or FAC: 50% . Other Indicators: None Hydrophytic vegetation: Yes _ No X . Basis: <50% of the dominant Spy FAC. Bromus inermis and Anthoxanthum ordoratum are dominant Soil Series and phase: Urban land On hydric soils list? Yes ; No X . Mottled:Yes ; No X . Mottle color: — ; Matrix color: 10YR 4/3 Gleyed: Yes ; No X . Other indicators: None Hydric soils: Yes_; No X ; Basis: High chroma Hydrology Inundated: Yes ; No X . Depth of standing water: 0 inches Saturated Soils: Yes ; No X . Depth to saturated soil: >20 inches Other indicators: None Wetland hydrology: Yes ; No X . Basis: No indicators of hydrology were present Atypical situation: Yes ; No X . Normal Circumstances? Yes X ; No Wetland Determination: Wetland ; Nonwetland X Comments: Determined by: Kirk Lakey (Corps of Engineers Environmental Laboratory 1987) • WETLAND DETERMINATION Applicant Application Project Name: Commercial Real Estate Co. Number: Name: Renton Site State: WA County: King Legal Description:Township: 23N Range: 4E Date: 8/24/95 Plot No.: Sample #7 Section: •24 Vegetation [List the three dominant species in each vegetation layer(5 if only 1 or 2 layers).] Indicate species with observed morphological or known physiological adaptations with an asterisk. Species Indicator Status Species Indicator Status Trees Herbs 1. Populus trichocarp FAC 7. Phalaris arundinacea FACW 2. 8. Runnuculus repens FACW 3. 9. Solanum dulcamara FACW+ Saplings/Shrubs Woody vines 4. 10. 5. 11. 6. 12. % of species that are OBL, FACW, and/or FAC: 100% . Other Indicators: None Hydrophytic vegetation: Yes X No _ Basis: >50% dominant vegetation FAC or FACW Soil Series and phase: Woodinville On hydric soils list? Yes X ; No ' Mottled:Yes X ; No . Mottle color: 10YR 5/4 ; Matrix color: 10YR 5/2 Gleyed: Yes ; No X . Other indicators: None Hydric soils: Yes X ; No ; Basis: Low chroma with mottles Hydrology I Inundated: Yes ; No X . Depth of standing water: Saturated Soils: Yes ; No X . Depth to saturated soil: Other indicators: Slight evidence of seasonal ponding, silt stains on leaves, and water marks on shrubs . Wetland hydrology: Yes ; No X . Basis: Atypical situation: Yes ; No X Normal Circumstances? Yes X ; No . Wetland Determination: Wetland X ; Nonwetland Comments: The site consisted of a hydrophytic plant community with hydric soils, hydrology was assumed Determined by: Kirk Lakey (Corps of Engineers Environmental Laboratory 1987) WETLAND DETERMINATION Applicant Application Project Name: Commercial Real Estate Co. Number: Name: Renton Site State: WA County: King Legal Description:Township: 23N Range: 4E Date: 8/24/95 Plot No.: Sample #8 Section: 24 Vegetation [List the three dominant species in each vegetation layer (5 if only 1 or 2 layers).] Indicate species with observed morphological or known physiological adaptations with an asterisk. Species Indicator Status Species Indicator Status Trees Herbs 1. Populus trichocharpa FAC 7. Equisetum telmateia FACW 2. 8. Equisetum hyemale FACW 3. 9. Polystichum munitum FACU Saplings/Shrubs Woody vines 4. Rubus spectabilis FAC+ 10. 5. 11. 6. 12. % of species that are OBL, FACW, and/or FAC: 80% . Other Indicators: none Hydrophytic vegetation:Yes X No _ Basis: >50% of the dominant species are FAC or FACW Soil Series and phase: Urban land On hydric soils list? Yes ; No X . Mottled:Yes ; No X . Mottle color: ; Matrix color: 10YR 3/2 Gleyed: Yes ; No X . Other indicators: None Hydric soils: Yes_; No X ; Basis: High chroma and no mottles Hydrology Inundated: Yes ; No X . Depth of standing water: 0 inches Saturated Soils: Yes ; No X . Depth to saturated soil: >20 inches Other indicators: None Wetland hydrology: Yes ; No X . Basis:_No indicators present Atypical situation: Yes ; No X . Normal Circumstances? Yes X ; No Wetland Determination: Wetland ; Nonwetland X Comments: Determined by: Kirk Lakey (Corps of Engineers Environmental Laboratory 1987) WETLAND DETERMINATION Applicant Application Project Name: Commercial Real Estate Co. Number: Name: Renton Site State: WA County: King Legal Description:Township: 23N Range: 4E Date: 8/24/95 Plot No.: Sample #9 Section: 24 Vegetation [List the three dominant species in each vegetation layer(5 if only 1 or 2 layers).] Indicate species with observed morphological or known physiological adaptations with an asterisk. Species Indicator Status Species Indicator Status Trees Herbs 1. 7. Ranunculus repens FACW 2. 8. Phalaris arundinacea FACW 3. 9. Cirsium arvense FACU+ Saplings/Shrubs Woody vines 4. 10. 5. 11. 6. 12. % of species that are OBL, FACW, and/or FAC: 60% . Other Indicators: None Hydrophytic vegetation:Yes X No _ Basis: >50% dominant vegetation was FACW Soil Series and phase: Woodinville On hydric soils list? Yes X ; No Mottled:Yes ; No X . Mottle color: ; Matrix color: 10YR 4/3 Gleyed: Yes ; No . Other indicators: None Hydric soils: Yes_; No X ; Basis: High chroma Hydrology Inundated: Yes ; No X . Depth of standing water: 0 inches Saturated Soils: Yes ; No X . Depth to saturated soil: >20 inches Other indicators: None Wetland hydrology: Yes ; No X . Basis: No indicators of hydrology were present Atypical situation: Yes ; No X Normal Circumstances? Yes X ; No Wetland Determination: Wetland ; Nonwetland X Comments: Small upland island within wetland Area C Determined by: Kirk Lakey (Corps of Engineers Environmental Laboratory 1987) f,- WETLAND DETERMINATION (._ Applicant Application Project Name: Commercial Real Estate Co. Number: Name: Renton Site State: WA County: King Legal Description:Township: 23N Range: 4E Date: 8/24/95 Plot No.: Sample C-1 Section: 24 Vegetation [List the three dominant species in each vegetation layer (5 if only 1 or 2 layers).] Indicate species with observed morphological or known physiological adaptations with an asterisk. Species Indicator Status Species Indicator Status Trees Herbs 1. Populus trichocarp FAC 7. Phalaris arundinacea FACW 2. 8. Solanum dulcamara FACW+ 3. 9. Ranunculus repens FACW Saplings/Shrubs Woody vines 4. Salix scoulerana FAC 10. 5. Salix lasiandra FACW+ 11. 6. 12. % of species that are OBL, FACW, and/or FAC: 100% . Other Indicators: None Hydrophytic vegetation: Yes X No _ Basis: >50% of the dominant Spp. FAC or FACW Soil Series and phase: Woodinville On hydric soils list? Yes X ; No Mottled:Yes X ; No . Mottle color: 7.5YR 4/1 ; Matrix color: 10YR 4/1 Gleyed: Yes ; No X . Other indicators: None Hydric soils: Yes X ; No ; Basis: Low chroma and mottles Hydrology Inundated: Yes ; No X . Depth of standing water: 0 inches _ Saturated Soils: Yes X ; No . Depth to saturated soil: 12 inches Other indicators: Silt stains on trees and shrubs Wetland hydrology: Yes X ; No . Basis: Saturated soils Ca? 12" and evidence of ponding Atypical situation: Yes ; No X Normal Circumstances? Yes X ; No Wetland Determination: Wetland X ; Nonwetland Comments: All criteria was met. Area flagged Cl through C8. Determined by: Kirk Lakey (Corps of Engineers Environmental Laboratory 1987) WETLAND DETERMINATION Applicant Application Project Name: Commercial Real Estate Co. Number: Name: Renton Site State: WA County: King Legal Description:Township: 23N Range: 4E Date: 8/24/95 Plot No.: Sample D-1 Section: 24 Vegetation [List the three dominant species in each vegetation layer (5 if only 1 or 2 layers).] Indicate species with observed morphological or known physiological adaptations with an asterisk. Species Indicator Status Species Indicator Status Trees Herbs 1. 7. Phalaris arundinacea FACW 2. 8. Agrostis tenuis FAC 3. 9. Saplings/Shrubs Woody vines 4. Salix scoulerana FAC 10. 5. 11. 6. 12. % of species that are OBL, FACW, and/or FAC: 100% . Other Indicators: None Hydrophytic vegetation: Yes X No _ Basis: >50% of the dominant Spp. FAC or FACW Soil Series and phase: Urban land On hydric soils list? Yes ; No X Mottled:Yes X ; No . Mottle color: 10YR 4/6 ; Matrix color: 2.5Y 5/2 Gleyed: Yes ; No X . Other indicators: None Hydric soils: Yes X ; No ; Basis: Low chroma with mottles Hydrology Inundated: Yes ; No X . Depth of standing water: 0 inches Saturated Soils: Yes X ; No . Depth to saturated soil:- >12 inches Other indicators: Evidence of ponding; stains on the Salix sconterana Wetland hydrology: Yes X ; No . Basis: Evidence of surface ponding Atypical situation: Yes ; No X Normal Circumstances? Yes X ; No Wetland Determination: Wetland X ; Nonwetland Comments: Criteria was met; area flagged D1 through D8 Determined by: Kirk Lakey (Corps of Engineers Environmental Laboratory 1987) WETLAND DETERMINATION Applicant Application Project Name: Commercial Real Estate Co. Number: Name: Renton Site State: WA County: King Legal Description:Township: 23N Range: 4E Date: 8/24/95 Plot No.: Sample D-2 Section: 24 Vegetation [List the three dominant species in each vegetation layer (5 if only 1 or 2 layers).] Indicate species 1 with observed morphological or known physiological adaptations with an asterisk. Species Indicator Status Species Indicator Status Trees Herbs 1. 7. Agropyron repens FAC- 2. 8. Dactylis glomerata FACU 3. 9. Bromus inennis UPL Saplings/Shrubs Woody vines 4. 10.Chrysanthemum lencanthemum UPL 5. 11. 6. 12. % of species that are OBL, FACW, and/or FAC: 25% . Other Indicators: None Hydrophytic vegetation:Yes _ No X . Basis: <50% of the dominant species are FAC Soil Series and phase: Urban land On hydric soils list? Yes ; No X Mottled:Yes ; No X . Mottle color: ; Matrix color: 2.5Y 5/3 Gleyed: Yes ; No X . Other indicators: None Hydric soils: Yes_; No X ; Basis: High chroma Hydrology Inundated: Yes ; No X . Depth of standing water: 0 inches Saturated Soils: Yes ; No X . Depth to saturated soil: >20 inches Other indicators: None Wetland hydrology: Yes ; No X . Basis: No indicators of hydrology present Atypical situation: Yes ; No X Normal Circumstances? Yes X ; No Wetland Determination: Wetland ; Nonwetland X Comments: Not all of the wetland criteria were met; upland sample for Wetland D. Determined by: Kirk Lakey ' (Corps of Engineers Environmental Laboratory 1987) WETLAND DETERMINATION Applicant Application Project Name: Commercial Real Estate Co. Number: Name: Renton Site State: WA County: King Legal Description:Township: 23N Range: 4E Date: 8/24/95 Plot No.: Sample #8 Section: 24 Vegetation [List the three dominant species in each vegetation layer (5 if only 1 or 2 layers).] Indicate species with observed morphological or known physiological adaptations with an asterisk. Species Indicator Status Species Indicator Status Trees Herbs 1. Populus trichocharpa FAC 7. Equisetum telmateia FACW 2. 8. Equisetum hyemale FACW 3. 9. Polystichum munitum FACU Saplings/Shrubs Woody vines 4. Rubus spectabilis FAC+ 10. 5. 11. 6. 12. % of species that are OBL, FACW, and/or FAC: 80% . Other Indicators: none Hydrophytic vegetation:Yes X No _ Basis: >50% of the dominant species are FAC or FACW Soil Series and phase: Urban land On hydric soils list? Yes ; No X . Mottled:Yes ; No X . Mottle color: ; Matrix color: 10YR 3/2 Gleyed: Yes ; No X . Other indicators: None Hydric soils: Yes_; No X ; Basis: High chroma and no mottles Hydrology Inundated: Yes ; No X . Depth of standing water: 0 inches Saturated Soils: Yes ; No X . Depth to saturated soil: >20 inches Other indicators: None Wetland hydrology: Yes ; No X . Basis: No indicators present Atypical situation: Yes ; No X . Normal Circumstances? Yes X ; No Wetland Determination: Wetland _ ; Nonwetland X Comments: Determined by: Kirk Lakey (Corps of Engineers Environmental Laboratory 1987) APPENDIX B PLANT SPECIES IDENTIFIED ON GROUP HEALTH COOPERATIVE'S RENTON SITE Table 1A. Plant species occurring on the Group Health Cooperative Distribution Center. Scientific Name Common Name Wetland Indicator Status Trees: Alnus rubra Red alder FAC Populus trichocarpa Black cottonwood FAC • Shrubs: Cornus stolonifera Red-osier dogwood FACW Crataegus douglasii Douglas hawthorn FAC Oemleria cerasiformis Indian plum FACU Rubus discolor Himalayan blackberry FACU Rubus spectabilis Salmonberry FAC Rubus ursinus Pacific blackberry FACU Sambucus racemosa Red elderberry FACU Spiraea douglasii Douglas spiraea FACW Symphoricarpos albus Snowberry FACU Herbs: Agropyron repens Quackgrass FACU Agrostis tenuis Bentgrass FAC Anthoxanthum odoratum Sweet vernal-grass FACU Bromus inermis Smooth brome UPL Dactylus glomerata Orchardgrass FACU Epilobium angustifolium Fireweed FACU+ Equsetum hymale Scouring rush horsetail FACW Geranium viscosissimum Stinky geranium FACU+ Holcus lanatus Velvet grass FAC Juncus effusus Soft rush FACW Phalaris arundinacea Reed canarygrass FACW Polystichum munitum Sword fern FACU Pteridium aquilinum Bracken fern FACU Ranunculus repens Creeping buttercup FACW Solanum dulcamara Climbing nightshade FAC+ Tanacetum vulgare Common tansy UPL Urtica dioica Stinging nettle FAC • B-1 1 1 (. APPENDIX C SURVEYED WETLAND BOUNDARY It S.W. 16th ST n42-1 tHi- • • • J ♦ coSTMIC ■a \♦ ac `(✓♦ Oolnw unn • \♦ OQ 6 P FILE:C:\CAD\2942-01\W1471R1 n i © 75 150 SCALE IN FEET (`" E'~ ' Parametrlx. Inc. MY Of MOON CtV.1717 YM , T _ _ ac-! 1 I 1 GROUP HEALTH 1 / FACILITIES/ (APPROXIMATE) II 1 . U) IQ /44 -/ ' w icrwo . II > (7...T7.,U..R.) • ✓ • ✓ 0 1 0 �o`• + Z I cc I ® ;i .+IMF 1 1 I/ PC,uw'e' I (r.m.st do.f) ,d• I I ✓, i B=.G�' -- r.< . 1 ✓+ r� (1e.718.53/a ft.) r j+ ✓� � .r___. -r/✓0 \,* / ✓o su-J 1 il. 1 ✓+ sN,,£73® l`++ + +. • + + ♦ + I Figure 1 Delineated Wetlands and 1 Creeks - Group Health Distribution Center, Renton, WA. Development Services EIS REVIEW COMMENTS DEVELOPMENT SERVICES R & D Technical Center / SW 16th St. March 27, 1996 By Clinton Morgan TRANSPORTATION: 1. A traffic report will be needed which shows the existing trip ends and new trip ends generated by the proposed project. If significant, the report needs to indicate what impacts the new generated traffic volume will have on SW 16th Street and any local intersections. 2. There is a Transportation fee for new trips generated at $75 per trip. 3. Curb, gutters, sidewalks and street lighting will be required on SW 16th Street. A street lighting plan is required per City Standards and to extend the full length of the property frontage to the roadway. The open drainage ditch fronting on SW 16th Street would need to be tight line. Note: The City has a road improvement project for SW 16th Street that the above improvements will need to be coordinated with. Roadway grades and elevations need to coincide. 4. Construction drawings for street lighting and each utility drawings are to be on individual sheets. 5. Driveways to SW 16th Street to be kept to a minimum. 6. The Detention pond and parking lot to the west of Building "A" is located in the alignment of the Oakesdale Ave SW extension. The project needs to show an overlay from City drawings which shows the Oakesdale Ave SW extension. t4ofe Coordination with the City's Transportation plans will be necessary. A second route alternative would go through the south end of building "A". 7. The right-of-way near the Spring Brook Creek bridge abutment does not seem to match what is on City's Oakesdale Ave, SW extension drawing. The bridge abutment should be shown and tied at the existing Oakesdale intersection. 96CM068 City canton Department of Planning/Building/Pub __corks ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET • REVIEWING DEPARTMENT —ttun r--I- 1_ COMMENTS DUE: MARCH 25, 1996 APPLICATION NO: LUA-96-034,SA,V,SM,ECF DATE CIRCULATED: MARCH 19, 1996 APPLICANT: EDI LINARDIC(LDG ARCHITECTS) PROJECT MANAGER: JENNIFER �IENNING PROJECT TITLE: R&D-SW 16TH TECHNICAL CENTER _ WORK ORDER NO: 78072 ��,�L,Hil®Oty LOCATION: 801 SW 16TH STREET 1996 SITE AREA 22.24 ACRES BUILDING AREA(gross): 8 e'0 SQ.FT. BUILDING AREA(new expansi•ffdrelin4r1,61QP,Q SQ.FT. SUMMARY OF PROPOSAL The applicant proposes to develop a new on-story structure(Building A)and an addition to n existing structure(Building B)on a partially developed 22 acre site. Building A would be 129,000 sq. ft. in size,while the Building B would result in the addition of 202,000 sq.ft.to an existing 85,000 sq. ft. building. A total of 608 parking spaces would serve the site. These would be speculative buildings,with potential office, high-tech manufacturing and warehousing uses anticipated. The site'is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires environmental review, site plan review, shoreline substantial development permit and a variance to exceed the maximum 40 foot building setback in the Commercial Office Zone. A setback of 90 feet from the north property line and 115 feet from the east boundary is proposed to accommodate proposed landscaping, parking and circulation. A. ENVIRONMENTAL IMPACT(e.g.Non-Code)COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major Information Environment Minor Major Information Impacts Impacts Necessary Impacts Impacts Necessary Earth Housing Air Aesthetics Water Light/Glare Plants Recreation Land/Shoreline Use Utilities Animals Transportation T �� Environmental Health Public Services Energy/ Historic/Cultural Natural Resources Preservation B. ' POLICY-RELATED COMMENTS C. CODE-RELATED COMMENTS See aa.gcioe .. Aprre-vie.e) C�-ice-• We have reviewed this application with particular attention to those areas In which we have expertise and have Identified areas of probable Impact or areas where additional information Is needed to properly assess this proposal. G4 � / /996 Signature of Director or Authorized Represen Date DEVAPP.DOC Rw.10193 City c_ 1Iton Department of Planning/Building/Puy ;Yorks ENVIRONMENTAL 8 DEVELOPMENT APPLICATION REVIEW SHEET REVIEWING DEPARTMENT:StactLe joai.eLow -te- COMMENTS DUE: MARCH 25, 1996 APPLICATION NO: LUA-96-034,SA,V,SM, CF DATE CIRCULATED: MARCH 19, 1996 �.M OFREN 'O61N APPLICANT: EDI LINARDIC(LDG ARCHITECTS) PROJECT MANAGER: JENNIFER TOTH HEN ZI G u e-, PROJECT TITLE: R&D-SW 16TH TECHNICAL CENTER WORK ORDER NO: 78072 1996 LOCATION: 801 SW 16TH STREET ��d� b® r g!v..... � jai SITE AREA 22.24 ACRES BUILDING AREA(gross): 85,000 SQ.FT. BUILDING AREA(new expansion gross): 416,000 SQ.FT. SUMMARY OF PROPOSAL: The applicant proposes to develop a new on-story structure(Building A)and an addition to an existing structure(Building B)on a partially developed 22 acre site. Building A would be 129,000 sq. ft. in size,while the Building B would result in the addition of 202,000 sq.ft.to an existing 85,000 sq. ft. building. A total of 608 parking spaces would serve the site. These would be speculative buildings,with potential office, high-tech manufacturing and warehousing uses anticipated. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The,project requires environmental review, site plan review, shoreline substantial development permit and a variance to exceed the maximum 40 foot building setback in the Commercial Office Zone. A setback of 90 feet from the north property line and 115 feet from the east boundary is proposed to accommodate proposed landscaping, parking and circulation. A. ENVIRONMENTAL IMPACT(e.g.Non-Code) COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major Information Environment Minor Major Information Impacts impacts Necessary impacts Impacts Necessary Earth Housing Air Aesthetics Water _ - Light/Glare Plants Recreation Land/Shoreline Use Utilities S-j-o r Pr? i/ f-" Animals Transportation Environmental Health Public Services Energy/ Historic/Cultural Natural Resources Preservation B. POLICY-RELATED COMMENTS C. CODE-RELATED COMMENTS We have reviewed this application with particular attention to those areas in which we have expertise and have Identified areas of probable Impact or areas where additional in rmation is needed to property assess this proposal. &,--2--/--&--r-7 5- / jA, 312'-C Signature of Director or Authorized Representative G��� � Date DEVAPP.DOC Rev.10/93 Development Services Review Comments R & D Technical Center / SW 16th St. March 27, 1996 By Clinton Morgan STORM DRAINAGE: 1. Spring Brook Creek actual location may not be within the Drainage District #1 legally described boundary. If not, Drainage District #1 may claim adverse possession of property. This has happened in the past. If true this could change the location from where the off-set to the Building is measured. The right-of-way near the Spring Brook Creek bridge abutment does not seem to match what is on City's Oakesdale Avenue SW extension drawing. The bridge abutment should be shown and a tie-in at the existing Oakesdale intersection. A current title report needs to be provided and the developer's consultant needs to confirm the present location of Spring Brook Creek. 2. The City's Comprehensive Plan for Storm Drainage calls for widening of the Spring Brook Creek Channel which may have a major impact to the building set back. The City's Storm Drainage Division is working to determine what will be needed for the channel widening at this site. Coordination with the City's Storm Drainage Division will be needed. 3. The detention pond and parking lot to the west of Building "A" is located in the alignment of the Oakesdale Avenue SW extension. The project needs to show an overlay from City drawings which shows the Oakesdale Ave SW extension. Agreements with the Transportation Division will need to be coordinated. 4. The preliminary drainage calculation may have to be revised after the above comments have been resolved. 5. There is a surface water System Development Connection charge of $0.129 for new impervious surface area. This would best be calculated when the above comments have been addressed. The new impervious surface area may be impacted. 6. Drainage report to address King County Surface Water Manual Core and Special requirements. 7. Elevation Certificate will be require due to the flood plan impact. WASTE WATER (Sewer): 1. If the project produces fats, oils, or grease then an appropriate removal system will be required. 2. Side sewers to have a 2% grade to the right-of-way. A clean-out shall be located within five feet of the building and one clean-out every 100-feet. 3. Provide plan and profile. Show finish floor elevation and slopes of pipes. 4. Minimum pipe cover is two feet. 5. The System Development Connection charge is $0.078 per square of site. Calculation of the System Development Connection charge would best be done after resolution of storm drainage and transportation review comments which may have an impact on the area for calculating the charge. 6. Construction plans must comply with the City of Renton Drafting Standards. 7. If floor elevation is below 22-feet as shown than a back flow prevention device will be require on the sewer system. 96CM067 - CITY OF RENTON City a:.rltore Department of Planning/Building/Public Works ; 6q.EIVED ENVIRONMENTAL & DEVELOPMENT APPLICATION REWARE2145 §6tEET REVIEWING DEPARTMENT: P A 1 J U _ �li COMMENTS DUE: MARCH 25 §4 DIVISION APPLICATION NO: LUA-96-034,SA,V,SM,ECF DATE CIRCULATED: MARCH 19, 1996 APPLICANT: EDI LINARDIC(LDG ARCHITECTS) PROJECT MANAGER: JENNIFER TOTH HENNING PROJECT TITLE: R&D-SW 16TH TECHNICAL CENTER WORK ORDER NO: 78072 LOCATION: 801 SW 16TH STREET SITE AREA: 22.24 ACRES BUILDING AREA(gross): 85,000 SQ.FT. BUILDING AREA(new expansion gross): 416,000 SQ.FT. SUMMARY OF PROPOSAL: The applicant proposes to develop a new on-story structure(Building A)and an addition to an existing structure(Building B)on a partially developed 22 acre site. Building A would be 129,000 sq. ft. in size,while the Building B would result in the addition of 202,000 sq.ft.to an existing 85,000 sq. ft. building. A total of 608 parking spaces would serve the site. These would be speculative buildings,with potential office, high-tech manufacturing and warehousing uses anticipated. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires environmental review, site plan review, shoreline substantial development permit and a variance to exceed the maximum 40 foot building setback in the Commercial Office Zone. A setback of 90 feet from the north property line and 115 feet from the east boundary is proposed to accommodate proposed landscaping, parking and circulation. A. ENVIRONMENTAL IMPACT(e.g.Non-Code) COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major Information Environment Minor Major Information Impacts Impacts Necessary Impacts Impacts Necessary Earth Housing Air Aesthetics Water `/ Light/Clare Plants Recreation Land/Shoreline Use Utilities Animals Transportation Environmental Health Public Services Energy/ Historic/Cultural Natural Resources Preservation G P -�e--/ A 0-A - (7:t '(\1.)Y ire vi elf-6) Lam-, lo--r _/---- Z-- B. POLICY-RELATED COMMENTS C. CODE-RELATED COMMENTS We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas where add- a information is needed to properly assess this proposal. cf-- (-- -1--"e .--/., ri 9.- (--/7 '1---c .1-1-y7Z Signature of Director or Authorized Representative Date ` DEVAPP.DOC Rev.10/93 I Development Services EIS REVIEW COMMENTS DEVELOPMENT SERVICES R & D Technical Center / SW 16th St. March 27, 1996 By Clinton Morgan WATER: 1. A 12-inch water line is located on SW 16th St. and also Raymond Avenue SW. Fire flow available is 5,600 gpm. The preliminary fire flow required per Fire Department is 4,500 gpm. A sufficiently sized loop system is require. 2. The proposed project is located in the SE 24-23-4 quarter section map. 3. The proposed project is located in the Downtown 196 mapped water zone. 4. The site is not located in Aquifer Protection Area. 5. No proposed water improvements shown for the area on the City's Comprehensive Plan. 6. One fire hydrant will be required for each 1000 gallons of fire flow required. The first fire hydrant must be within 150 feet of the building, but not closer than 50- feet. The secondary hydrants must be within 300 feet of the building. 7. The relocation in the water loop system will require a new 15-foot utility easement. 8. A construction plan and profile drawing will be required for water. 9. A System Development Connection Charge is $0.113 per square feet of site. This will be calculated after issues have been resolved which may impact the area figure used in the calculation. 96CM069 City o. .__:7ton Department of Planning/Building/Puma,.Works n P si ENVIRONMENTAL & DEVELOPMENT APPLICATION IE'VIEW SHEET REVIEWING DEPARTMENT: k'� ��Y�. �rt'_li�y� g1/1 COMMENTS DUE: MARCH 2 -1'99_ APPLICATION NO: LUA-96-034,SA,V,SM,ECF DATE CIRCULATED: MARCH 1i9.,;?t996K,E&1110:k;d 3aI � Hg i Nal Nlib APPLICANT: EDI LINARDIC(LDG ARCHITECTS) PROJECT MANAGER: JENNIFE �-R TOTH-HEP NING PROJECT TITLE: R&D-SW 16TH TECHNICAL CENTER WORK ORDER NO: 78072 LOCATION: 801 SW 16TH STREET SITE AREA 22.24 ACRES BUILDING AREA(gross): 85,000 SQ.FT. BUILDING AREA(new expansion gross): 416,000 SQ.FT. SUMMARY OF PROPOSAL: The applicant proposes to develop a new on-story structure(Building A)and an addition to an existing structure(Building.B)on a partially developed 22 acre site. Building A would be 129,000 sq. ft. in size,while the Building B would result in the addition of 202,000 sq.ft.to an existing 85,000 sq. ft. building. A total of 608 parking spaces would serve the site. These would be speculative buildings,with potential office, high-tech manufacturing and warehousing uses anticipated. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires environmental review, site plan review, shoreline substantial development permit and a variance to exceed the maximum 40 foot building setback in the Commercial Office Zone. A setback of 90 feet from the north property line and 115 feet from the east boundary is proposed to accommodate proposed landscaping, parking and circulation. A. ENVIRONMENTAL IMPACT(e.g.Non-Code) COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major information Environment Minor Major Information Impacts Impacts Necessary Impacts Impacts Necessary Earth Housing Air Aesthetics Water Light/Glare Plants Recreation Land/Shoreline Use Utilities Animals Transportation Environmental Health Public Services Energy/ Historic./Cultural Natural Resources Preservation N8 I ► 9I- J tp(c7 /d eta.N B. POLICY-RELATED COMMENTS /1)4 . C. CODE-RELATED COMMENTS 5G( 4 ftac/�Gf 04.04,s'te,,? We have revi wed this application with particular attention to those areas in which we have expertise and have Identified areas of probable Impact or areas where addito all ii/nnf[orQm�ation'.ti.eded to property assess this proposal. MO 7 I 3/0 Signatu e f Director or Authorized R esentative Date DEVAPP. / Rev.1Q/93 1r. Oti�Y o� CITY OF RENTON FIRE PREVENTION BUREAU 41 MEMORANDUM � DATE: March 19, 1996 TO: Jennifer Toth-Henning, Senior Planner FROM: Jim Gray, Assistant Fire Marshal , SUBJECT: Southwest 16th Tech Center, Southwest 16th and Raymond Avenue Southwest FIRE COMMENTS: 1 . The preliminary fire flow requirement for Building A is 4,500 gpm. A total of five fire hydrants are required. The primary hydrant is to be located within 150-feet of the building, and four additional hydrants within 300-feet of the building. A looped fire main is required for Building A. 2. The preliminary fire flow requirement for Building B is 4,500 gpm. A total of five fire hydrants are required. The primary hydrant is to be located within 150-feet of the building, and four additional hydrants within 300-feet of the building. A looped fire main is required for Building B. 3. A fire mitigation fee is required for all new structures at $0.52 per square foot. The mitigation fees are as follows: Building A: 129,000 square feet x $0.52 = $ 67,080.00 Building B: 202,000 square feet x $0.52 = $105,040.00 The fire mitigation fee is required at the time of building permit issuance. 4. Sprinkler and fire alarm systems are required for both buildings. Separate plans and permits are required for each system. 5. Additional fire and building requirements will be based on the use of the building and type of operation to be conducted. The applicant shall provide information regarding the storage and use of any flammable, combustible liquids or gases, or any hazardous materials. 6. The fire access roadways requirements are a minimum 20-foot wide paved roadway with an inside turning radius of 25-feet and an outside turning radius of 45-feet. If you have any questions please call me. JEG:js TechCtr City of b'enton Department of Planning/Building/Pul;._ '1/orks ENVIRONMENTAL 8 DEVELOPMENT APPLICATION REVIEW SHEET REVIEWING DEPARTMENT: FaAs COMMENTS DUE: MARCH 25, 1996 APPLICATION NO: LUA-96-034,SA,V,SM,ECF DATE CIRCULATED: MARCH 19, 1996 APPLICANT: EDI LINARDIC(LDG ARCHITECTS) PROJECT MANAGER: JENNIFER TOTH HENNING PROJECT TITLE: R&D-SW 16TH TECHNICAL CENTER WORK ORDER NO: 78072 LOCATION: 801 SW 16TH STREET SITE AREA 22.24 ACRES I BUILDING AREA(gross): 85,000 SQ.FT. l BUILDING AREA(new expansion gross): 416,000 SQ.FT. SUMMARY OF PROPOSAL: The applicant proposes to develop a new on-story structure(Building A)and an addition to an existing structure(Building B)on a partially developed 22 acre site. Building A would be 129,000 sq. ft. in size,while the Building B would result in the addition of 202,000 sq.ft.to an existing 85,000 sq. ft. building. A total of 608 parking spaces would serve the site. These would be speculative buildings,with potential office, high-tech manufacturing and warehousing uses anticipated. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires environmental review, site plan review, shoreline substantial development permit and a variance to exceed the maximum 40 foot building setback in the Commercial Office Zone. A setback of 90 feet from the north property line and 115 feet from the east boundary is proposed to accommodate proposed landscaping, parking and circulation. A. ENVIRONMENTAL IMPACT(e.g.Non-Code) COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major Information Environment Minor Major Information Impacts Impacts Necessary Impacts Impacts Necessary Earth Housing Air Aesthetics Water Light/Glare Plants Recreation Land/Shoreline Use Utilities Animals Transportation Environmental Health Public Services Energy/ HistwfdCultural Natural Resources Preservation / Bc_R‘OUCY-RELATED COMMENTS )201 ALCOrr7/72tWQ/'//2e-- 7/GR/X-_ 711.-ee`-S re-3=7 /(f)'2 5icteJbohro ,„v acca — 4/ s CP lira ' �� � � C. CODE-RELATED COMMENTS eel- i We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas where additional information is needed to properly assess this proposal. 6_, ad) 9)/tp( cf, Signature of Dlrecfor rrr Authorized f2epresentative Date DEVAPP.DOC Rev.1ND3 City o ton Department,ofnnt lg/Building/Pu :.. Vorks ENVIRONMENTAL & DEVELOPM‘EJIT PPLICATION REVIEW SHEET • REVIEWING DEPARTMENT: �/ aktLe C,.,M ENTS DUE: MARCH 25, 1996 APPLICATION NO: LUA-96-034,SA,V,SM,ECF DATECIRCULATED: MARCH 19, 1996 APPLICANT: EDI LINARDIC(LDG ARCHITECTS) PROJECT MANAGER: JENNIFER TOTH HENNING PROJECT TITLE: R&D-SW 16TH TECHNICAL CENTER WORK ORDER NO: 78072 LOCATION: 801 SW 16TH STREET SITE AREA 22.24 ACRES BUILDING AREA(gross): 85,000 SQ.FT. BUILDING AREA(new expansion gross): 416,000 SQ.FT. SUMMARY OF PROPOSAL The applicant proposes to develop a new on-story structure(Building A)and an addition to an existing structure(Building B)on a partially developed 22 acre site. Building A would be 129,000 sq.ft. in size,while the Building B would result in the addition of 202,000 sq.ft.to an existing 85,000 sq. ft. building. A total of 608 parking spaces would serve the site! These would be speculative buildings,with potential office, high-tech manufacturing and warehousing uses anticipated. The site]is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires environmental review, site plan review, shoreline substantial development permit and a variance to exceed the maximum 40 foot building setback in the Commercial Office Zone. A setback of 90 feet from the north property line and 115 feet from the east boundary is proposed to accommodate proposed landscaping, parking and circulation. A. ENVIRONMENTAL IMPACT(e.g.Non-Code)COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major Information Environment Minor Major Information Impacts Impacts Necessary Impacts Impacts Necessary Earth Housing Air] Aesthetics Water IJght/Glare Plants Recreation Asorellne Use Utilities ansp Animals Transportation Environmental Health Public Services Energy/ Historic./Cultural Natural Resources Preservation Estimate 171 . 15 police calls for service annually , based on the size of the buildings . Most of these calls will occur during the construction phase , when thefts of building materials , tools , vandalism of property and burglary will occur This area of Renton has sustained a high number of property related crimes over the past year , due to the new construction. Recommend that the builders secure all of their materials and tools when the items are not in use , and that the site be well lit at night to help deter thieves . If the builders plan on using a portable construction trailer as a temporary office site , they should realize that B. POLICY-RELATED COMMENTS these have been particularly targeted by thieves . Recommend that any unit of this type have heavy-duty dead-bolt locks , auxiliary locking devices , and bars over any windows to help prevent entry to the building. All office machinery and tools need to have the serial., model numbers and descriptions of property recorded in the event they are stolen ; to help aid in locating the items . Recommend the use of a private security patrol to monitor the site during the hours of darkness and when employees are not at work . Once the site has been completed , common crimes in this area are thefts from employees ' vehicles , and an occasional burglary. The buildings all need auxiliary 1icihtinci on all exterior doors and all doors nee C. ' CODE-RELATED COMMENTS dead-bolt locks with at least a 1 1/2 " bolt . The site plans show that the site will be well lit , which will help to deter criminal activity. We have reviewed this application with particular attention to those areas In which we have expertise and have identified areas of probable impact or areas where additional information is needed to properly assess this proposal. Si ature of Dlrecto Authorized Representative Date DEVAPP.DOC RW.10N3 City of: anton Department of Planning/Building/Pub',___,,:'orks ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET REVIEWING DEPARTMENT:LeAtAt Ckav\ Si IC" COMMENTS DUE: MARCH 25, 1996 APPLICATION NO: LUA-96-034,SA,V,SM,ECF DATE CIRCULATED: MARCH 19, 1996 APPLICANT: EDI LINARDIC(LDG ARCHITECTS) PROJECT MANAGER: JENNIFER TOTH HENNING PROJECT TITLE: R&D-SW 16TH TECHNICAL CENTER WORK ORDER NO: 78072 CITY OF RENTON FikcE VED LOCATION: 801 SW 16TH STREET ryry ryry SITE AREA 22.24 ACRES BUILDING AREA(gross): 85,000It FT: 9 1996 il BUILDING AREA(new expansion. ross): 416,000 SQ.FT. SUMMARY OF PROPOSAL: The applicant proposes to develop a new on-story structure(Building�A)annd an�a)drdMn existing structure(Building B)on a partially developed 22 acre site. Building A would be 129,000 sq.ft. in size,while the Building B would result in the addition of 202,000 sq.ft.to an existing 85,000 sq. ft. building. A total of 608 parking spaces would serve the site. These would be speculative buildings,with potential office, high-tech manufacturing and warehousing uses anticipated. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires environmental review, site plan review, shoreline substantial development permit and a variance to exceed the maximum 40 foot building setback in the Commercial Office Zone. A setback of 90 feet from the north property line and 115 feet from the east boundary is proposed to accommodate proposed landscaping, parking and circulation. A. I ENVIRONMENTAL IMPACT(e.g.Non-Code) COMMENTS Element of the Probable Probable More Element of the Probable Probable More Environment Minor Major Information Environment Minor Major Information Impacts Impacts Necessary Impacts impacts Necessary Earth Housing Air Aesthetics Water Llght/Glare Plants Recreation Land/Shoreline Use Utilities Animals Transportation Environmental Health Public Services Energy/ Historic./Cultural Natural Resources Preservation B. POLICY-RELATED COMMENTS C. CODE-RELATED COMMENTS ma tAARLAyr R6poLr 18Hial (DILL, kitik 55 1R' AD'1N f[aL cot L(( Fa&1'(OUu fuo PUPose lrl��Tlb . We have ":w. "s applicatio ' parti•uiarattention to those areas in which we have expertise and have identified areas of probable impact or areas where a,• • a :on is• =- top pert),assess this proposal. 3 Signatu !Fr Director or Authorized Representative Date DEVAPP.•• Rev.101fl3 IIIIII .,,1.t,,,\ . 1:41.,,• MO 1 • PENDING APPLICATION PROJECT NAMFJNUMBER: R&D-SW 16TH TECHNICAL CENTER/LUA-96.034,SA,SM,V,ECF DESCRIPTION: The applicant proposes to develop a new on-story structure(Building A)and an addition to an existing structure(Building B)on a partially developed 22 acre site. Building A would be 129,000 sq.ft.in size, while the Building B would result In the addition of 202,000 sq.tt.to an existing 85,000 sq.ft.building. A total of 608 parking spaces would serve the site.These would be speculative buildings,with potential office,high-tech manufacturing • and warehousing uses anticipated. The site is located adjacent to Springbrook Creek,although no development is . proposed within 25 feet of the mean high water mark. The project requires environmental review,site plan review. shoreline substantial development permit and a variance to exceed the maximum 40 foot building setback In the Commercial Office Zone. A setback of 90 feet from the north property line and 115 feet from the east boundary is proposed to accommodate proposed landscaping,parking and circulation, GENERAL LOCATION: 801 SW 16th Street • PUBLIC APPROVALS: • Building Permit _Preliminary Plat _Short Plat Conditional Use Permit Rezone XXXX Site Plan Approval XXXX Environmental Review Shoreline Conditional Use XXXX VARIANCE: Permit _Fill&Grade Permit XXXX Shoreline Substantial _Other Development Permit The application can be reviewed in the Development Services Division located on the third floor of Renton City Hall. Comments will be accepted any time prior to Public Hearings,during Public Hearings,or prior to an administrative site plan approval.Comments for Substantial Shoreline Permits must be received within thirty(30)days from the last dale of • applicant's'Notice of Application'publication in the Valley Daily News. Far further information on the application,or it you wish to be made a PARTY OF RECORD and receive additional nolillcallons of the City's environmental • determinations,appeal periods and/or the public hearing date(s)for this project,please contact the Development Services Division at 235-2550. Iu \'a .co CITY OF RENTON • zowNG MAP s )` LEGEND� \(N- • . --\ ... „„„„, --0,,gaga& i......-----7-7.--:"......7 . \0100temmomM,„ .—.— F:!T SNNING ill iii . N•010.11,1 Ill IPLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION.:- . ' CERTIFICATION I, 1,11(1.(,1 .la,CYsor , hereby certify that 3 copies of the above document were posted/by me in 3 conspicuous places on or nearby the described property on tk,(G{Y Ii 22, l ci Gib b Signed: daythA J4,t/It46Y7 STATE OF WASHINGTON ) ) SS COUNTY OF KING ) 1 • I certify that I know or have satisfactory evidence that S— /}c lc S . , %o signed this instrument and acknowledged it to be his/her/their free and vol tary act for tt 4ysess6 ••,,a,,, and purposes mentioned in the instrument. �,IN,'�4 e. e• Dated: a S �I A r 1'� 161�7� `��(�,�L� .v1.1 !�! i It~`. ~a..* vr •.-'te Notary •Publi'b in and-for the StateM ashingttttt �lfi.:; `• :.• ,,� • /1 to v/-- /S/� Q-d •S E e'Le,t-c-iy. . ' n 01 • '- Notary (Print) ,ii-� rt� ti /fin ,v, c 4 e -(1-- ` • ,,'R- My appointment expires: ca • z 0)-°.s . . NOTARY.DOC „,.___., ,,,,, • • . NoTicE PENDING APPLICATION . PROJECT NAME/NUMBER: R&D-SW 16TH TECHNICAL CENTER/LUA-96-034,SA,SM,V,ECF DESCRIPTION: The applicant proposes to develop a new on-story structure(Building A)and an addition . to an existing structure (Building B) on a partially developed 22 acre site. Building A.would be 129,000 sq. ft. in size, while the Building B would result in the addition of 202,000 sq.ft. to an existing 85,000 sq. ft. building. A total of 608 parking"spaces would serve the site. These would be speculative buildings,with potential office,high-tech manufacturing and warehousing uses anticipated. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires environmental review, site plan review, shoreline substantial development permit and a variance to exceed the maximum 40 foot building setback in the Commercial Office Zone. A setback of 90 feet from the north property line and 115 feet from the east boundary is proposed to accommodate proposed landscaping,parking and circulation. GENERAL LOCATION: 801 SW 16th Street • PUBLIC APPROVALS: Building Permit Preliminary Plat Short Plat 'Conditional Use Permit Rezone XXXX Site Plan Approval I XXXX Environmental Review Shoreline Conditional Use XXXX VARIANCEr Permit Fill&Grade Permit XXXX Shoreline Substantial Other Development Permit The application can be reviewed in the Development Services Division located on the third floor of Renton City Hall. Comments will be accepted any time prior to Public Hearings, during Public Hearings, or prior to an administrative site plan approval. Comments for Substantial Shoreline Permits must be received within thirty(30)days from the last date of applicant's"Notice of Application”publication in the Valley Daily News. For further information on the application, or if you wish to be made a PARTY OF RECORD and receive additional notifications of the City's environmental determinations, appeal periods and/or the public hearing date(s) for this project, please contact the Development Services Division at 235-2550. IM \1% ..'co ''' • CITY OF RENTON z 1� ZONING MAP Z A J IM N -I — LEGEND yl CO O Q 51, .nIV P-1 IM6 •9p.. ..l.g,l...-I,1 \\ g. Q w•••r..141ut•w 1 V Q Iglu., t..ewe IIA. 1 N2 ®I....w.l.... �*•0111:1 a►�lith T =_= p„...wn..a.l agl�.".1. rill i . co —j o� ' ' lilt MI 0 GOO 120 o 0 1:7200 • e LONG RANGE PLANNING tEC11MCAL P ION LA 1 NW" PAGE - i t n 14324 4325 • PLEASEANClrUdE'THEP.FtOJEG.T:NUMBtIzt:WHEN:CALLINGFq.R:PROP.ER>;'1LMENT.II".ICA;. :.;:.>:>: R I I I N • Ujeti� ***FOR OFFICIAL. USE ONLY*** PROJECT NAME: S.W. 16th Tech Center • APPLICANT: Edi Linardic/L.D.G. Ardhitects • • • APPLICATION NO(S): • old e 63(1'1�N\V,S M t P • The following is a list of.property owners within 300 feet of the subject site. The. Development Services Division will notify these.individuals of the proposed development. ASSESSOR'S PARCEL NAME ADDRESS NUMBER Stoiiehenge, • 3605 132nd Ave. SE #300 • 192305909504 Bellevue, Wa 98006 192305901303 City of Renton . 200 Mill Ave S. 334040625504 Renton, Wa 98055 Bitney-Grouws Co 108 Factory Ave. N #1 334040612007 • Renton, Wa 98055 - Arthur Ness 7376 SW Durham Rd 334040626007 • Portland, Or 97224 Austin Co • 800 SW 16th St. 334040643002 Renton, Wa 98055 • RECEIVE*` • Holric Co. P.O..Box 179 334040514005 • map,,°j 5 1996 Renton, Wa 98057 • OPMaNT Leroy Nass • 15713 SE 128th • 334040515002 0Ev CI OFRENTONLNG N Renton, Wa 98056 Holmes Electric • P.O. Box 179 334040512504 ` Renton, Wa 98057 - • f Washington One Intrests 5350 S Staples#100 334040400304' ,`' • Attn Kathy Deurmyer Corpus Christi, Tx 78411 334040400403 ASSESSOR'S PARCEL g NAME ADDRESS NUMBER . . e Puget Power • P.O. Box 90868 334040400502 • Bellevue, Wa 98009 Renton Delaware Inc 225 Shorline Dr. #600 334040400007 Redwood City, Ca 94065 • Virgil Fox 921 Middle Fork Road .: 242304900408, Onalaska, Wa 98570 . • Drainage Dist 1 • 601 West Gowe St. 242304913104 Attn John Nelson Kent, Wa 98032 Longacres Joint Venture 921 Middle Fork Rd . 242304905605 • ' ' Onalaska, Wa 98057 • • • The Boeing Co. P.O. Box 3707 m/s/if09 242304902206 Seattle, Wa 98124 Winmar P.O. Box 21545 • 242304911504 • Seattle, Wa 98ppltification 242304902008 • I, ( s M-Aor a— , hereby.certify that the above list(s) of adjacent property owners and their addresses were taken from the records of the King County Assessor as,,o:rascrih'd by law. N , • ' ATTEST: Subscribed and sworn to before me, a . :r - Notary Public, in and for the State of Washington, 1 residing at 5tol- S.Ala skA on the /y44/1 day of f Arci' l a g b . . . • , • ! Gejituto4. - • Signed: h .4L1?. • • I • :``:i****'iE., :: ;2 ik"'** i s c i: :is ::i?<..: .; !<::.: is ::':.2:>2 i:` >;:::::::::::::: :< ::::: <:: ::::::::<:::>:::;: :;:;: .:: ::�...*:.For.Office:Use'Onl .:::::::;:: >:.;::...::..:.:..... :.. .....:..:..,.:..... .: >;:.:::.:: : CERTIFICATI:ON FOR:M'AILING> >: > > :::;::.-: .:::`` :.:-.a i .. �. ..F::• : :: :: ::<::: :::< .:`; <. ::t :e:•::: < . > » ; < : : <, t < fh ing:.: .f •re me n io ne:.odproject.,> ;_: ' t , , ereby certify hatnoico a.Peng : ao : ::;: . .::.: •;: .::..:::::::: :as f i : :� 1 � Iq� : t eh:lted:• d1aent ro ert . wner.:as::»w:�:;::.::m�a;;beed::;:; n<:::: ::!�- 4•:: �:::t:: ;..... ...:.::. >.:.:.;...:.;.. ...:... .:. .::..>r<;: o; a ::;<;:>:>s:: ;<:::::.: : :::>:c::.;:::,p:;: :P:: .: ::::< :::<::<;:::;:,; ::::: :: ::::>:::::::::>:: >::; `;: ::< : ::: :•::::::: > > <:::: :<:;:: :: ::»:::: ::::::::.:. <::: ::>:?. ::> < :::::: ::: ::>:;::pr :rid I w :. ::: >: : < < : : : > .:. • ::a>:is�::::•:::: r< T:'P. . ;e>::•::i:.: ' ; : i` ii: <` . i > ; ': 4:j. ?: ;i>i:' . :,';`>:<' : < •TT• T :F. ii:. :.y:.:.:.:;;:< :>::::wr::i: � : : f :>:.;>. .:i:a::;:i::.:::2:i: ^::i. :i; i i` >i<t'` , : , ;;: :: . . • • '>AES4 � edndsS�on:to.borem :::> : :: >::<: ::::>; : >::: ::::::.: :Noar .M for<the.: t t :of:Wahi tori: : : >>::.>::>:»:< : . it dti•-:.;1 • . . .....:. : ::.....::. •..::: : .::.. ..::.:..:::.:..::.•.i;? s . .a • :.:::: ... .....:...... .. ::;>:::.::::.. . ....... :: . ::;:::::;:: .:,:.. . . .. . MAILADJ REV.01/92 !/ , , NOTICE OF OPOSED SITE APPROVAL /;.--'IPLICATION RENTON, WASHINGTON A Site Approval (SA), Shoreline Substantial Development Permit (SM), Environmental Checklist Review (ECF), and Variance (V)Application has been filed and accepted with the Development Services Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. PROJECT NAME/NUMBER: R&D-SW 16TH TECHNICAL CENTER/LUA-96-034,SA,SM,V,ECF GENERAL LOCATION: ' 801 SW 16th Street GENERAL DESCRIPTION: The applicant proposes to develop a new on-story structure (Building A) and an addition to an existing structure (Building B) on a partially developed 22 acre site. Building A would be 129,000 sq. ft. in size,while the Building B would result in the addition of 202,000 sq.ft.to an existing 85,000 sq. ft. building. A total of 608 parking spaces would serve the site. These would be speculative buildings,with potential office, high-tech manufacturing and warehousing uses anticipated. The site is located adjacent to Springbrook Creek, although no development is proposed within 25 feet of the mean high water mark. The project requires environmental review, site plan review, shoreline substantial development permit and a variance to exceed the maximum 40 foot building setback in the Commercial Office Zone. A setback of 90 feet from the north property line and 115 feet from the east boundary is proposed to accommodate proposed landscaping, parking and circulation. PUBLIC APPROVALS: Environmental Review Site Plan Approval Shoreline Substantial Development Permit Variance Building Permit The application can be reviewed in the Development Services Division located on the third floor of Renton City Hall. Comments will be accepted anytime prior to Public Hearings, during Public Hearings, or prior to an administrative site plan approval. For further information on the application, or if you wish to be made a PARTY OF RECORD and receive additional notifications, by mail, of the City's environmental determinations, appeal periods and/or the public hearing date(s) for this project, please contact the Development Services Division at 235-2550. Please include the project NUMBER when calling for proper file identification. IM •►,A -- • — ;\ co -- , - - — - CITY OF REM ON. ' ND.\ IIM-- LEGEND ZONING MAP ;, v °9F ¢ I I N Ik 0 Den..mal.n v ®Single remll,lee Density Co • p Slnel.?amity ' 7 IMo O Or.U..?Pro .r.m,l P-1 a Sw i_ a r� / ®Mind Reel de ®rl.nn.a NdgnL.,nn.d D.ad.ml.l NN) N•I YuIU-rsmlly tam \ O YuIU-remlly V.Lan Center • y� • O YDIU-remit/c...hlly c.nl.r I�;I� J SIL 0 Nmu-r.mu,uaAen,re..d center Ir1= 0 Industrial—Light ��Ijl� 1,YI�.T N O ha.ttlat—Yrdlum �` r '11i'd_ �YW� I JI • u IM IndudWal—Ue.7 �� ` O Nlsed Crammer<lal !A4 . a� �/ .V. O hi or 4-- S rT� o Ye,..r YAll,n2, . n Un ' • 4 ©� �1.1 _ ` ®Ns1,hMrnuud Cummn<I.1 C.nirnlrne.Comm.rel.l I ®PlannrA Dlne./0...Id.nll.1 CO ©rel11.rase j —Mnlun my Limn. , r O, 600 1200 �L_ I • • 0 , 1:7200 LONG RANGE PLANNING U 09 W JTECIIHICAL SERVICES N G6 GENMALOT.DOC 1i i ii • `' 4324, 4325 ;; p . CITY JF RENTON lea Planning/Building/Public Works Department Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator March 18, 1996 Mr. Edi Linardic LDG Architects 1319 Dexter Avenue North, Suite#260 - Seattle, WA .98109 . . SUBJECT: - R&D Facility=SW 16th Tech.Center . . Project No. LUA-96-034,SA,SM,V,ECF Dear Mr. Linardic: The Development Planning Section of the City of Renton has formally accepted the above-referenced application for review. It is tentatively scheduled for consideration by the Environmental Review Committee on April 2, 1996. Prior to that review, you will be notified if any additional information is , required to continue processing your application for environmental review. Please contact me, at 277-6186, if you have any questions. Sincerely,llovib ‘411,,, fir:4\....f..e ,:i 1 ' enni er Toth Henning Project Manager cc: Group Health Cooperative/Owners • ACCPTLTR.DOC . 200 Mill Avenue South -Renton, Washington 98055 This oaoer contains 50%recycled material.25%nest consumer ::::C I:TY Q:F:R E NT. :N::.::•:: . : D IV I S:I`.O N • .. • .•. .ENT •EFiU:IC•ES S .•;::.:::• >::.:.. . .;:..: : :. . 'D.EUE;LOP.M::....•. .S;.:::::. .::........: :.;:.:..:>:;. ......... . .... .. . TE:R::A-P::P:LI:CATI:O:N . •: •:•:.OWNER(S.)iffairmomv......amignm--iimmrammiamismoimanommram___ PROJECT INFORMATION•(co.n;t) • Note::>If:there:ism:ore:than one legal owner,please;attach an EXISTING LAND USE'S): additional notarized;Master;application for;each owner: Partially developed NAME: Group Health Cooperative • ADDRESS: 509 Olive Way, Suite 900 EXISTING ZONING: CITY: ZIP: Seattle 98101 CO TELEPHONE NUMBER: PROPOSED LAND USE(S): (206)223-2611 R&D facility totalling 416,000 s.f. CONTACT PERSON/APPLICANT Remainder of site will be landscaping, required storm water retention and. • NAME: parking lot. Edi Linardic/LDG Architects • PROPOSED ZONING: ADDRESS: sarie 1319 Dexter Ave. North, Suite 260 CITY: Seattle ZIP' 98109 SITE AREA(SO. FT. OR ACREAGE): • 22.24 acres • TELEPHONE NUMBER: (206)283-4764 PROJECT VALUE: -. • PROJECT INFORMATION $5,000,000 PROJECT O_R DEVELOPMENT NAME: IS THE SITE LOCATED IN AN ENVIRONMENTALLY SENSITIVE AREA? • SW 16th •Z•ech Center Yes, it's within 200 feet of Springbrook - . - Creek. PROPERTY/PROJECT ADDRESS(S)/LOCATION: 801 $:W:.''16th Street IS THE SITE LOCATED IN AN AQUIFER PROTECTION AREA? Southwest corner of SW 16th Street No and Raymond Avenue S.W. KING COUNTY ASSESSOR'S ACCOUNT NUMBER(S): • IS THE SITE LOCATED IN THE SEWER MORATORIUM AREA? 334-040-5300-01 • No LEGAL DESCRIPTION OF PROPERTY (Attach separate sheet if needed) • MAR 15 .1996 Masser 12/92 oEvnLo. 4Erv•rPI Ar,i.,,..-. • • • ..:. • ...::... . . . .: . ..:..:, ::..:.:• ::•:< .. -• .TYPE OF•APPLI:CATION��&:.F.:LS. • - ermine• :.�:fee s. �':I'..��;C:it:����st�aff:wi I I�.det ,Cf e:ck:all;;:a Ircatiori ;f: : .,:e;s :that:a ;. .. ,Y SUBDIVISION: CI ANNEXATION • • • $ • -REZONE $ LOT LINE ADJUSTMENT $ -SPECIAL PERMIT • $ __ _ SHORT PLAT $ TEMPORARY PERMITS $ TENTATIVE PLAT $ • I CONDITIONAL USE PERMIT $ x SITE PLAN APPROVAL $ _ PRELIMINARY PLAT $ . 1 SPECIAL PERMIT ! $ FINAL PLAT $ -GRADE & FILL PERMIT $ • - - (NO. CU. YDS: . i ) , X VARIANCE • j $ PLANNED UNIT DEVELOPMENT: •$ • . (FROM SECTION: I ) _WAIVER •$ _ROUTINE VEGETATION _ PRELIMINARY . . N, MANAGEMENT PERMIT $ ' _ FINAL BINDING SITE PLAN $ . • SHORELINE REVIEWS: MOBILE HOME PARKS: $ '1 X SUBSTANTIAL DEVELOPMENT $ •TENTATIVE CONDITIONAL USE $ . _ PRELIMINARY •'•• ' ' • -VARIANCE . • $ _ FINAL _ _EXEMPTION I $ No Charge 1 REVISION I X ENVIRONMENTAL•REVIEW $ 1--1A-1A -Q(Q -0314 (This section to be completed by City staff) City File Number: ' ECF SA R SHPL CU LLA PP FP TP SP RVMP V AAD W PUD FPUD SM SME, PMHP FMHP BSP A TOTAL FEES: S TOTAL POSTAGE PROVIDED: $ • I AFFIDAVIT OF OWNERSHIP ; . I, (Print Name) O/ L- A/LDlL ,declare that I am'(please check one) _the owner of the property involved in this applicaltion, the authorized representative to act for the property owner (please attach proof of authorization), and that the foregoing statements and answers herein contained and the information herewith submitted are in all respects true and correct to the best of my knowledge and belief. ATTEST: Subscribed and sworn to before me,a Notary Public,in and for. (Name of Ow:ri /Representative) the State of Washington residing at 3407 $. 1.14.s�L c -_ , • on the/t/ DAY OF Marc(__ 19 0 . . I (Signatur of Owner/Representative) • ,.,,J, - (Signature of otary Pub 1 • , COMPENSATION AGREEMENT • ' . . . 1. j Should this application require City staff time in excess of the basic time frame(s)established by City of Renton Ordinance_#4322, I hereby agree to I • compensate the City of Renton for any and all extra labor and nonlabor costs incurred to accomplish the review and processing of this land use application. I ' �0,0AlliPte___ l ATTEST: Subscribed and sworn to before me, a Notary Public,in andfor (Print Name) •! the State of Washington residing at 51/17- S,�(GSIL� 9 on this Ad day of Marrtln 19 1Le 1 (Signature) Billing Address: , , (Signature of Notary Public) • LEGAL DESCRIPTION: ALL OF VACATED BLOCKS 32, 33 AND 34 OF. C.D. HILLMAN'S EARLINGTON GARDENS ADDITION TO THE CITY OF SEATTLE, DIV. 1,' ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME 17 OF PLATS, PAGE(S) 74, IN KING COUNTY, WASHINGTON; TOGETHER WITH VACATED KENNY AVENUE (82ND AVENUE SOUTH) AND VACATED EVANS AVENUE' (83RD AVENUE SOUTH) ADJOINING; . • . EXCEPTING FROM ALL OF THE FOREGOING ANY PORTION THEREOF LYING EASTERLY OF A LINE 40 FEET WEST OF AND PARALLEL WITH THE EAST LINE OF SECTION 24, TOWNSHIP 23 NORTH, RANGE, 4 EAST, WILLAMETTE MERIDIAN, IN KING COUNTY, WASHINGTON; AND EXCEPT THAT PORTION THEREOF CONVEYED TO THE CITY OF RENTON FOR STREET BY , DEED RECORDED UNDER RECORDING NUMBER 7812040683; AND • EXCEPT THAT PORTION THEREOF CONVEYED TO. THE CITY OF RENTON BY DEED RECORDED. UNDER RECORDING NUMBER 8911030809. • . . . . . • • • • • • • • • RECEN5) • • IOT 1 5 • PLANNIN.G ELoBm--1- N DE4 cm(oF BENTo . . . • • • PROJECT NARRATIVE . FOR THE PROPOSED SOUTHWEST 16TH TECH CENTER . R& D.SOUTHWEST 16TH.TECH CENTER FACILITY This.proposed project.is located at the southwest corner of S.W. 1.6th Street and Raymond Avenue S.W. in Renton. The existing property is partially developed and current use is warehouse, office, and medical.lab. The existing topography of the site is flat: ' ' . The project involves the construction of a new one-story building.totaling 129,000 sq. ft. and an addition of 202,000 sq. ft. to an existing building for a total of 416,000 sq. ft. with 6,08 parking stalls. The buildings will be used for office, high-tech manufacturing and warehousing. New storm water system, landscaping and asphalt parking areas will be constructed for the proposed project. The buildings will be constructed with concrete tilt-up walls with.insulated tinted glass and wood roofing. The buildings will be designed as spec buildings since no tenants have been secured at this time. The required approvals and permits for this project include site plan/SEPA review approval, variance and building permit. The property line to the south and to the west are bounded by Springbrook Creek. The bank of Springbrook Creek'has a steep slope of approximately 1 to.1. Vegetation consists of dense brush'. No - work is anticipated within 25 feet of.the.mean high-water mark. • II ' yvk 4 0° ® e\�o . • CONSTRUCTION MITIGATION PLAN FOR THE PROPOSED SOUTHWEST 16TH TECH CENTER Ft& D SOUTHWEST 16TH TECH CENTER FACILITY The proposed construction would start immediately after acquiring the,structural fill permit. Anticipated start date would be May 1, 1996. The fill should take approximately one month to place, baring any unforeseen settlement problems. The construction of the building will follow the fill and the anticipated start date would be July 1, 1996. The project should take approximately six months to construct, baring any unforeseen weather problems. The construction hours will be between 7:00 a.m. and 5:00 p.m. with weekend work as required to finish the project. The northerly portion of the site is developed while the southerly portion of the sites is covered with field grass, trees and is flat. Approximately 75,000 cubic yards of import will be delivered to this site for preload and sub base for parking. The haul route has not yet been selected, but will be provided for ' your approval prior to construction. Measures to minimize dust and mud are shown on the TESC drawings. The use of"quiet" equipment and limiting the work to the above stated hours will reduce noise impact. As a whole, the project will not create any additional impact to the surrounding environment. REC FIVED aP, 1 5 1.996 DEVECLIc..4;i8;.1:1, • VARIANCE REQUEST SOUTHWEST 16TH TECH CENTER This a request for a variance from Section 4-31-16D.3.b of the Zoning Code for the development of a 416,000 square foot R&D facility consisting of two single story buildings. Section 4-31-16D.3.b of the Zoning Code requires that buildings be setback not more that 40 feet from the property lines. The site is presently partially developed. There is a building of 93,000 square feet located along the north portion of the site. The building is setback from the north property line approximately 90 feet and 115 feet from the easterly property line. Thus,the present development does not comply with the Zoning Code building setback requirements. The present Zoning Code building requirement presents a hardship to the proposed development. The required building setback would create a project that would not be aesthetically pleasing since the building facade,which is over 800 feet long,would be setback only 40 feet from the property line.This is not enough to provide necessary landscaping and visual separation for both pedestrian and vehicle traffic. Present setbacks of between 80 to 100 feet is more appropriate.The required setback also creates hardship to adequately distribute the necessary parking for this project since the occupants would have to travel much greater distances to get from the parking area to building entrances. It is my understanding that this section of the Zoning Code is in the process of being amended by the Planning Commission and that the City Council is in favor of approving this amendment to the Zoning Code. The amendment would delete the requirement for the maximum building setback from the property lines. This request for the variance will not be materially detrimental to the public welfare or injurious to the property or improvements in the vicinity since the proposed variance would actually enhanced the project and the adjacent properties. Since the required building setbacks are also in process of being amended by the city,the present setback would create a hardship for this project,since all new developments would not be restricted by the present building setbacks and would be able to develop projects that have better parking layouts and have better curb appeal. R ECF: ED R 1 5 1996 DEvEL.O,rv;1„v 1 PLANNING CITY OF RENTON A. BACKGROUND 1. Name of proposed project, if applicable: Proposed SouthWest 16thTech Center 2. Name of applicant: LDG/Architects 3. Address and phone number of applicant and contact person: 1319 Dexter Ave. N., Suite 260 Seattle, WA 98109 . • Contact Person: Edi Linardic 4. Date checklist prepared: 3-6-96 5. Agency requesting checklist: City of Renton 6. Proposed timing or schedule(including phasing, if applicable): • Start preload of the whole site on June 11, 1996, with construction commencing on July 15, 1996. 7. Do you have any plans for future additions,expansion,of further activity related to or connected with this proposal? If yes,explain. No 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. Soils reports, wetland study and phase one study(see attached). 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. Yes, Springbrook Creek widening and Oaksdale Avenue extension, 10. List any governmental approvals or permits that will be needed for your proposal, if known. Site plan approval, shoreline substantial development permit and grading permit and building permit. 11. Give brief,&mplete description of your proposal, including the proposed uses and the size of the project and site. This project will involve 22.24 acres. Currently, the site has been partially developed, we intend to construct a R&D facility totaling 416,000 s.f. The existing building will be added on to the south and new building will be constructed to the west of the existing building. The buildings will be constructed with the concrete tilt-up walls and wood roof. The balance of the site will be landscaping, required storm water retention and parking lot. RECEIVED MAY 0 7 1996 1 DEVELOPMENT PLANNING CITY OF RENTON 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section,township, and range if know. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description,site plan,vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency,you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. Bounded by the Springbrook Creek long the west property line S.W. 16th Street to the North and Raymond Ave. S.W. to the East. B. ENVIRONMENTAL ELEMENTS 1. EARTH a. General description of the site(circle one); flat, rolling, hilly, steep slopes, mountainous, other b. What is the steepest slope on the site(approximate percent slope?) Less than 1%, except at the bank of the Springbrook Creek where slopes are 25%. c. What general types of soils are found on the site(for example,clay,sand,gravel, peat, muck)? If you know the classification of agricultural soils,specify them and note any prime farmland. Below the surface gravel medium dense mixtures of silty sand with gravel below this there are naturally occurring interbeds of post glacial peat and sand/silt deposits. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. There are no surface indications of any unstable soils. e. Describe the purpose,type,and approximate quantities of any filling or grading proposed. Indicate source of fill. A northern portion of the site has been developed. The present proposal will encompass the rest of the property. It will remain flat. Approximately 75,000 c.y. will be imported on to the site. The fill would be used for preloading and to elevate the building above the flood plain. Once the building pad has settled, any remaining fill would be spread across the site. f. Could erosion occur as a result of clearing,construction,or use? If so,generally describe. No. During construction of the undeveloped portion of the site, the accepted erosion control methods will be in utilized(see attached TESC plan). g. About what percent of the site will be covered with impervious surfaces after project construction(for example,asphalt or buildings)? 80% h. Proposed measures to reduce or control erosion,or other impacts to the earth, if any: There will be an erosion control plan submitted as part of our building permit set(see attached TESC plan). 2 2. AIR a. What types of emissions to the air would result from the proposal (i.e.,dust, automobile, odors, industrial wood smoke)during construction and when the project is completed? If any,generally describe and give approximate quantities if known. There will be some dust while the preload is unloaded and during construction. The type of emissions that could be emitted would be from automobile/trucks both during and after construction. b. Are there any off-site sources of emission or odor that may effect your proposal? If so, generally describe. No c. Proposed measures to reduce or control emissions or other impacts to air, if any: There are no measures proposed at this time to mitigate automobile emissions, due to the minimal emission. 3. WATER a. Surface Water: 1) Is there any surface water body on or in the immediate vicinity of the site(including year- round and seasonal streams,saltwater, lakes, ponds,wetlands)? If yes,describe type and provide names. If appropriate,state what stream or river it flows into. Springbrook Creek is located on the West property line and Rolling Hills Creek along the South property line. 2) Will the project require any work over, in,or adjacent to(within 200 feet)the described waters? If yes, please describe and attach available plans. Yes, roads, buildings, detention ponds and bio swales. Parking will be located a minimum of 55' from the 5' contour line and the building will be set back a minimum of 75'from the 5' contour line. The 55 foot portion of property parallel to the 5' contour line will be dedicated to the city of Renton for the widening and relocation of Springbrook Creek(see attached site plan). 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. A 16,718 sf wetland areas will be filled (see wetland report and site plan for dimensions and locations. Total fill amount is 300 cubit yards. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. No 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. Yes. Northerly and southerly portion of the site. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. None.We do not expect any waste material to be discharged to surface water. 3 b. Ground Water: 1) Will ground water be withdrawn,or will water be discharged to ground water? Give general description, purpose, and approximate quantities if known. No 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any(for example: Domestic sewage; industrial,containing the following chemicals...; agricultural; etc.). Describe the general size of the system,the number of such systems,the number of houses to be served (if applicable),or the number of animals or humans the system(s)are expected to serve. None c) Water Runoff(including storm water): 1) Describe the source of runoff(including storm water)and method of collection and disposal, if any(include quantities, if known). Where will this water flow? Will this water flow into other waters, if so,describe. All storm water runoff from this site will flow through a series of water quality swales and ponds prior to releasing into the Rolling Hills Creek which flows into Springbrook Creek. 2) Could waste material enter ground or surface waters? If so,generally describe. No. d) Proposed measures to reduce or control surface,ground, and runoff water impacts, if any: None. 4. PLANTS a. Check or circle types of vegetation found on the site: X deciduous tree: alder, maple, aspen, other evergreen tree: fir, cedar, pine, other X shrubs X grass pasture crop or grain X wet soil plants: cattail, buttercup, bullrush, skunk cabbage(see attached wetland report) X water plants:water lily, eel grass, milfoil, other(see attached wetland report) other types of vegetation b. What kind and amount of vegetation will be removed or altered? The undeveloped portion of the site is covered with field grass, trees and bushes which will be cleared prior to construction. No vegetation will be altered within 55' of the 5' contour line. c. List threatened or endangered species known to be on or near the site. No d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: Landscaping will be provided according to the zoning requirements. A landscape plan has been submitted as part of this package. 4 5. ANIMALS a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: Birds: hawk, heron, eagle, songbirds, other Mammals: deer, bear, elk, beaver, other none Fish: bass, salmon, trout, herring, shellfish, other b. List any threatened or endangered species known to be on or near the site. None c. Is the site part of a migration route? If so,explain Yes, Pacific flyway d. Proposed measures to preserve or enhance wildlife, if any: Provide temporary perch poles that would provide foraging opportunities for raptors. The perch poles can be removed after planted vegetation provides adequate perching habitat. Provide native species in landscaped areas, particularly where grass or meadow areas will be maintained. 6. ENERGY AND NATURAL RESOURCES a. What kinds of energy(electric, natural gas,oil,wood stove,solar)will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing,etc. Depending on the tenant there could be natural gas heating systems installed with electric powered lighting and cooling units. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. No c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: Energy efficient lighting would be installed as well as energy efficient heating systems per Washington Energy Code. 7. ENVIRONMENTAL HEALTH a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion,spill,or hazardous waste,that could occur as a result of this proposal? If so,describe. No. Current tenants that we are marketing to will not use any toxic or hazardous materials, nor do we believe that any other future tenants that would occupy the building would have need to use hazardous materials. 1) Describe special emergency services that might be required. Police, fire dept in case of emergency. Type of emergency will vary with the potential user of this site. 2) Proposed measures to reduce or control environmental health hazards, if any: 5 Future tenant will have to adhere to all required codes to minimize any environmental health hazard and provide a plan to control such event. b. Noise 1) What types of noise exist in the area which may affect your project(for example:traffic, equipment,operation,other)? General traffic noise generated by cars and trucks along adjacent streets and 1-405. 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis(for example:traffic,construction, operation,other)? Indicate what hours noise would come from the site. Short time noise would be construction related, expected hours of operation would be 7:00 a.m.- 5:00 p.m. ST. Long term noise would be general car and truck traffic noise during business hours. 3) Proposed measures to reduce or control noise impacts, if any: The noise impacts generated by this project are not unlike other uses in this area. 8. LAND AND SHORELINE USE a What is the current use of the site and adjacent properties? The site is partially undeveloped, sites to the north houses office/warehouse facility,to the southwest and west is Springbrook Creek, to the east is Raymond Ave S.W. b Has the site been used for agriculture? If so,describe. No c Describe any structures on the site. Presently, there are two structures on the site: a 4,100 s.f. metal shed and a 93,000 s.f. building used as warehouse, medical lab and office. d. Will any structures be demolished? If so,what? Yes, two metal sheds and about 8,000 s.f. of the existing building. e. What is the current zoning classification of the site? C.O. (Commercial Office) f. What is the current comprehensive plan designation of the site? Commercial g. If applicable,what is the current shoreline master program designation of the site? Urban h. Has any part of the site been classified as an "environmentally sensitive"area? If so, specify. 6 Yes, there are three wetland areas,two approximately 1500 s.f. each and one approximately 16,000 s.f. (see attached wetland report). We propose to fill these wetlands and provide mitigation through the City of Renton Wetland Mitigation Bank. i. Approximately how many people would reside or work in the completed project? Approximately 150-200 people will work once the project is complete. j. Approximately how many people would the completed project displace? The present tenant will relocate 300 employees to new location within greater Seattle. k. Proposed measures to avoid or reduce displacement impacts, if any: None. I. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: The architecture will be compatible with the surrounding uses. 9. HOUSING a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. None. b. Approximately how many units, if any,would be eliminated? Indicate whether high, middle,or low-income housing. None. c. Proposed measures to reduce or control housing impacts, if any: None. 10. AESTHETICS a. What is the tallest height of any proposed structure(s), not including antennas;what is the principal exterior building material(s) proposed. The building height is 31 ft., though there might be a need to raise the building height by six feet depending on future tenants needs. The building will be concrete tilt-up with storefront glass at the office area. b. What views in the immediate vicinity would be altered or obstructed? None c. Proposed measures to reduce or control aesthetic impacts, if any: Use of landscaping around the building, use horizontal lines to break up the height, setting building away from the property lines to minimize its impact from the street. 7 11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? Lighting in the parking lot area during evening hours. Shielded lights will be proposed to minimize spill over to the adjacent properties. b. Could light or glare from the finished project be a safety hazard or interfere with views? No. c. What existing off-site sources of light or glare may affect your proposal? None. d. Proposed measures to reduce or control light and glare impacts, if any: Provide shielded lights so there will be no spill over to adjacent properties. 12. RECREATION a. What designated and informal recreational opportunities are in the immediate vicinity? Springbrook Creek trail. b. Would the proposed project displace any existing recreational uses? If so,describe. No c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: Basketball court, outdoor seating and eating areas. 13. HISTORIC AND CULTURAL PRESERVATION a. Are there any places or objects listed on,or proposed for, national state,or local preservation registers known to be on or next to the site? If so,generally describe. No b. Generally describe any landmarks or evidence of historic,archaeological,scientific,or cultural importance known to be on or next to the site. None c. Proposed measures to reduce or control impacts, if any: None 8 14. TRANSPORTATION a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. The proposed site is bounded by S.W. 16th Street to the north, Raymond Ave S.W. The site is accessible from all the streets. b. Is site currently served by public transit? If not,what is the approximate distance to the nearest transit stop? Yes c. How may parking spaces would the completed project have? How many would the project eliminate? Approximately 622 parking stalls will be provided. d. Will the proposal require any new roads or streets,or improvements to existing roads or streets, not including driveways? If so,generally describe(indicate whether public or private)? Yes, relocate existing driveways on the S.W. 16th Street and install new curb, gutter and sidewalk. Relocate existing driveways on the Raymond Ave S.W. 16th Street. e. Will the project use(or occur in the immediate vicinity of)water, rail,or air transportation? If so,generally describe. No f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. Traffic study is underway. g. Proposed measures to reduce or control transportation impacts, if any: Due to the above average traffic use by the existing facility, there should minimal increase's, if any, by the proposed project on the current traffic systems. Currently, 90%of 300 employees drive single occupant vehicles. 15. PUBLIC SERVICES a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care,schools,other)? If so,generally describe. Yes, but no more than comparably sized developments. No additional fire service would be required except in case of emergency. There should not be any additional requirements for police or health care. b. Proposed measures to reduce or control direct impacts on public services, if any. Provide monitored security, smoke and fire detection, well lit pathways and building entrances. 9 16. UTILITIES a. Circle utilities currently available at the site. electricity, natural gas,water, refuse service, telephone, sanitary sewer, septic system, other. b. Describe the utilities that are proposed for the project,the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. All of the above circled utilities will be utilized by the new facility for the same reasons the existing facility used them. Electricity for HVAC and lighting natural gas for HVAC, water for fire protection, domestic service, garbage, telephone and sanitary sewers will be used. C. SIGNATURE I,the undersigned, state that to the best of my knowledge the above information is true and complete. It is understood that the lead agency may withdraw any declaration of non-significance that it might issue in reliance upon this checklist should there be any willful misrepresentation willful lack of full disclosure on my part. Proponent: Name Printed: 00( Gil-VW-0 I Date: ' 7 .9 10 ' . r • --a ENVIRONMENTAL INC. • PHASE I ENVIRONMENTAL SITE ASSESSMENT FOR GROUP HEALTH COOPERATIVE DISTRIBUTION AND SUPPORT SERVICES FACILITl RENTON, WASHINGTON ATC PROJECT NUMBER 80022.1601 MAY 11, 1995 REVISED MAY 30, 1995 • • • ,.• PHASE I ENVIRONMENTAL SITE ASSESSMENT FOR GROUP HEALTH COOPERATIVE DISTRIBUTION AND SUPPORT SERVICES FACILITY RENTON, WASHINGTON 'ATC PROJECT NUMBER 80022.1601 MAY 11, 1995 REVISED MAY 30, 1995 A10ENVIRONMENTAL INC. I e • Douglas K. Grove May 30, 1995 Contracts Manager GROUP HEALTH COOPERATIVE • 521 Wall Street Seattle, Washington 98121 RE ENVIRONMENTAL SITE ASSESSMENT DISTRIBUTION AND SUPPORT SERVICES FACILITY RENTON, WASHINGTON PROJECT NO. 80022.1601• Dear Mr. Grove: Attached is the Phase I Environmental Site Assessment for the above-referenced facility. The report includes an executive summary, site description, project area visit, geology and hydrogeology, historical and agency records review, findings and recommendations, plans, photographs and an appendix. ATC has prepared this Phase I Environmental Site Assessment using reasonable efforts in each phase of the work to estimate the liabilities associated with environmentally regulated substances in the project area. This report has been prepared solely for the internal use of Group Health Cooperative, and may not be relied upon by other persons for any reason. ATC makes no warranty, expressed or implied, as to the accuracy of information contained in the public records. This report is not definitive and should not be assumed to be a complete or specific definition of all conditions above or below grade. If you have any questions regarding this report, please call this office. Sincerely, ATC ENVIRONMENTAL INC. j012-4j./Laji /1/1rUf 0,4/fte J•ev---e-Piz--) • Neil R. GI am, CHMM Jane P. Rowcliffe, CSP Project Manager Director of Operations • Attachment ( Solutions For Environmental Concerns CO 6347 Seaview Ave.,NW • Seattle,WA 98107 • (206)781-1449 • FAX(206)781.1543 PHASE I ENVIRONMENTAL SITE ASSESSMEN 1 GROUP HEALTH COOPERATIVE DISTRIBUTION AND SUPPORT SERVICES FACILITY RENTON, WASHINGTON • TABLE OF CONTENTS 1.0 SUMMARY 2.0 INTRODUCTION 2.1 Special Terms and Conditions and Involved Parties 2.2 Purpose & Scope of Work 2.3 Previous EnvironmentaVGeotechnical Investigation 3.0 SITE DESCRIPTION 3.1 Location and Legal Description 3.2 Site and Vicinity Characteristics 3.3 Hazardous Materials 3.4 Other Conditions of Concern 4.0 ENVIRONMENTAL SETTING 4.1 Regional Physiographic Conditions 4.2 Soil/Geologic Conditions 4.3 Hydrogeologic Conditions 4.4 Assumptions/Opinions on Contaminant Mobility - Site Vulnerability 5.0 RECORDS REVIEW 5.1 Federal Records Sources 5.2 State Records Sources 5.3 Local Agency Sources 6.0 HISTORICAL USE INFORMATION 6.1 Aerial Photographs 6.6 Building Department Records 6.7 Personnel Interviews 7.0 RESULTS OF INVESTIGATION 7.1 Findings, Conclusions and Recommendations 8.0 SIGNATURES • 9.0 APPENDICES 9.1 Plans 9.2 Photographs 9.3 Previous Reports ATC ENVIRONMENTAL INC. i PROJECT NO.80022.1601 TPHASE I ENVIRONMENTAL SITE ASSESSMEr'i(` GROUP HEALTH COOPERATIVE DISTRIBUTION AND SUPPORT SERVICES FACIUTY RENTON, WASHINGTON 1.0 SUMMARY ATC Environmental Inc. was requested by Group Health Cooperative to provide a Phase I Environmental Site Assessment of the Distribution and Support Services Facility located at 801 SW 16th Street, Renton, Washington (project area). The following environmental conditions were observed in and around the project area: • The project area currently has a remediation system in place and in operation which is designed to clean up contamination from a leaking 250 gallon leaded gasoline UST located between the main building and the two-story storage building. • Suspect and confirmed asbestos-containing building materials are located in the project area building. Details of these environmental conditions are presented in the following sections of this report. • • ATC ENVIRONMENTAL INC. 1 PROJECT NO. 80022.1601 I•hASE I ENVIRONMENTAL SITE ASSESSMEN1 GROUP HEALTH COOPERATIVE DISTRIBUTION AND SUPPORT SERVICES FACILITY RENTON, WASHINGTON 2.0 INTRODUCTION 2.1 Special Terms and Conditions and Involved Parties ATC Environmental Inc. was requested by Group Health Cooperative to perform a Phase I Environmental Site Assessment of the project area. This report of findings and conclusions has been prepared for the exclusive use of Group Health Cooperative and its affiliates. 2.2 Purpose and Scope of Work The purpose of this Phase I Environmental Site Assessment is to identify and analyze recognized environmental conditions in connection with the project area. Recognized environmental conditions include the presence or likely presence of any hazardous substances or petroleum products on the project area under conditions that indicate an existing release, a past release, or a material threat of a release of any hazardous substances or petroleum products into structures on the project area or into the soil, groundwater, or surface water of the project area. The scope of work for this Phase I Environmental Site Assessment includes site reconnaissance, observation of adjacent properties, review of regulatory databases, review of site history and land use, visual inspection of the project area structures for suspect asbestos- containing materials, interviews, and report preparation. The scope of work for this project is in general conformance with the American Society of Testing and Materials (ASTM) Method E 1527 - 94 "Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process." 2.3 Previous Environmental/Geotechnical Investigations ATC reviewed the following reports which were provided to ATC by Group Health Cooperative: • Asbestos Survey - Distribution and Support Services Facility - Group Health Cooperative, Pickering Environmental Consultants, Inc., September 27, 1991 • Phase Two Environmental Site Assessment of Group Health DSSF, Pickering Environmental Consultants, Inc., April 1992 • Corrective Action Plan for Group Health DSSF, Pickering Environmental Consultants, Inc., September 1992 Details of these reports are discussed in other sections of this report. • ATC ENVIRONMENTAL INC. 2 PROJECT NO.80022.1601 PHASE I ENVIRONMENTAL SITE ASSESSMENT GROUP HEALTH COOPERATIVE DISTRIBUTION AND SUPPORT SERVICES FACILITY RENTON, WASHINGTON 3.0 SITE DESCRIPTION/SITE RECONNAISSANCE 3.1 Location and Legal Description • The project area is located in the Puget Sound region of western Washington and is part of the Seattle-Tacoma-Everett metropolitan area. The.project area is located within the City of Renton, King County, Washington. The project area address is 801 SW 16th Street, Renton, Washington. The project area consists of a single one-story concrete tilt-up building and two smaller maintenance/storage buildings situated on a roughly square-shaped lot. The lot is approximately 22.6 acres in area. 3.2 Site and Vicinity Characteristics 3.2.1 Site Improvements The project area is currently developed with three buildings and associated parking and landscaped areas. The main building is a concrete tilt-up building built in 1977 and consisting of 93,312 square feet. The second building is a two-story metal-sided building built in 1979 and consisting of 8,160 square feet. The third building is a one-story metal-sided building built in 1986 and consisting of 800 square feet. These project area developments comprise the northeastern third of the project area. The remainder of the project area is vacant, • undeveloped and mostly wooded. 3.2.2 Current Uses of the Property The project area is currently being used as a warehouse, distribution, and support services facility. The support services include purchasing, pharmacy specialty services, computer services, optical manufacturing, and laboratory services. The facility maintenance shop is located in the smallest of the project area buildings. The metal-sided two story building is used as storage. As indicated previously, two thirds of the project area is vacant and unused. 3.2.3 Current Uses of Adjoining Properties The surrounding areas are predominantly industrial, commercial, and undeveloped open space. The project area fronts on SW 16th Street on the north and is bounded by Raymond Avenue SW on the east. Springbrook Creek borders the west and southwest sides of the project area. North of the project area, across SW 16th Street, are several commercial developments and open space. From east to west these properties are The Austin Co., a wooded lot, and Loneacres Industrial Park. The Austin Co. is a office building and yard for an engineering and planning firm. Loneacres Industrial Park is a small industrial park with various tenants. Holmes Electric Co. is located northwest, across the intersection of SW 16th Street and Raymond Avenue SW. The Holmes Electric Co. site is an office and yard for an electrical contractor. East of the project area, across Raymond Avenue SW, is a preschool and daycare center. Also east of the project area is an office building complex surrounded by a large paved parking area. ATC ENVIRONMENTAL.INC. 3 PROJECT NO.800221601 . . . rPHASE I ENVIRONMENTAL SITE ASSESSMENT GROUP HEALTH COOPERATIVE DISTRIBUTION AND SUPPORT SERVICES FACILITY • RENTON, WASHINGTON West of the project area, across Springbrook Creek, is a Boeing office building complex. Southwest and south of the project area is open space consisting of grassy fields, wooded areas, and wetlands. 3.3 Hazardous Materials 3.3.1 Storage Tanks and Containers . Two underground storage tanks (UST's) were formerly present in the project area. Both tanks were removed in August, 1991. The first tank was a 6,000 gallon leaded gasoline UST located on the east side of the main building. This tank was used to fuel vehicles. No release from the tank was confirmed during tank removal. The second tank was a 250 gallon leaded gasoline UST located between the main building and the two-story storage building. This tank was used to fuel an emergency power generator. A release was confirmed during tank removal. With the discovery of the release, further investigation was conducted by Pickering Environmental Consultants, Inc in late 1991. This investigation involved soil sampling and the installation and sampling of eleven (11) groundwater monitoring wells. A remediation system was installed by Pickering in mid-1993. The system consists of nine (9) vapor extraction wells for a soil vapor extraction system and one (1) groundwater recovery well for a pump and treat system. The soil vapors are apparently vented untreated to the atmosphere under Puget Sound Air Pollution Control Agency (PSAPCA) permit. The pump and treat system pumps groundwater from the recovery well through an oil/water separator, air stripper, and then to the Metro sanitary sewer system. The discharge to the Metro system is permitted by Metro Discharge Authorization No. 430. The remediation system has apparently been in continuous operation since mid-1993. However, there is no evidence that there has been any monitoring or sampling to estimate the quantity of contaminants removed or to determine the the overall success of the system. It was indicated by Jim Douma of Group Health that the monitoring wells had been sampled in April, 1995. The analytical results of this sampling are presented in the report Groundwater Sampling - DSSF Site - for Group Health Cooperative, Pickering Environmental Consultants, Inc., May 24, 1995. Portions of the Pickering report provided to ATC by Group Health are included in the Appendix of this report. The following table presents these results as well as the MTCA Method A Cleanup Levels for groundwater. Well Sampled Benzene Toluene Ethylbenzene m,p-Xylene o-Xylene TPH Date Sampled (ppb) (ppb) (ppb) (ppb) (ppb) (ppm) BH 2, 12/91 28,000 44,000 3,600 15,000 5,700 190 BH 2, 4/95 20,000 14,000 1,300 4,500 2,100 71 BH 6, 12/91 25,000 19,000 2,000 8,200 3,000 99 BH 6, 4/95 18,000 9,300 1,700 5,700 2,300 •61 BH11, 2/92 2 2 <1 2 <1 <0.5 BH 11, 4/95 3.3 2.3 5.5 39 25 0.82 BH 12, 2/92 24 15 3 8 3 <0.5 BH 12, 4/95 <1 <1 <1 <1 <1 • <0.5 MTCA Method A 5.0 40.0 30.0 20.0 20.0 1.000 Cleanup Level ATC ENVIRONMENTAL INC. 4 PROJECT NO.80022.1601 • • PHASE I ENVIRONMENTAL SITE ASSESSMENT GROUP HEALTH COOPERATIVE DISTRIBUTION AND SUPPORT SERVICES FACILITY RENTON, WASHINGTON There is one 100 gallon diesel above-ground storage tank (AGST) located on the south side of the main building which serves an emergency power generator also at this location. The tank was observed to have a secondary containment. No spills or leaks were observed associated with the AGST. Hazardous materials are stored throughout the project area primarily in the Medical Laboratory, Maintenance Shop, Lens Laboratory,.Pharmacy Specialty Services, and in the warehouse area. There were no spills, leaks, or stains observed with any of the stored chemicals. All hazardous materials observed appeared to be stored properly and were in generally good condition. Material Safety Data Sheets (MSDS) were compiled for these materials in three-ring binders located in each department of the project area. Several drums of hazardous waste were located outside on the south side of the main building. The waste was indicated to be unusable laboratory chemicals which had been lab- ' packed and prepared for transport by Burlington Environmental. The drums appeared to be : intact with proper hazardous waste labeling indicating an accumulation start date of April 4, 1995. 3.3.2. Polychlorinated Biphenyls (PCB's) One pad mounted transformer is located on the north side of the project area building. A pole mounted transformer is located on the north perimeter of the project area along SW 16th t..: Street. A switch gear cabinet is located in the northwest corner of the project area along SW 16th Street. All three of these pieces of equipment are owned by Puget Power. In a telephone interview on May 3, 1995, Mr. Jeff Briggs of Puget Power indicated that the pad-mounted transformer and switch gear were manufactured as non-PCB. The.pole-mounted transformer has not been tested and must then be considered as PCB contaminated electrical equipment F,d according to federal regulations. It was indicated by Gary Betis, Maintenance Engineer, that the entire project area was relamped with assistance from Puget Power. All PCB ballasts were indicated to have been replaced with non PCB solid state ballasts. However, based on the construction date of the project area it is possible that ballasts containing PCBs may still be present. Labeling should be checked each time ballasts are replaced. 3.3.3 Asbestos-containing Materials ATC observed suspect asbestos-containing materials in the project area including resilient sheet flooring, carpet mastic, acoustic ceiling panels, sink undercoat material, and wallboard and associated joint compound. An asbestos survey was conducted in the project area by Pickering Environmental Consultants, Inc. (reference Asbestos Survey - Distribution and Support Services Facility - Group Health Cooperative, Pickering Environmental Consultants, Inc., September 27, 1991). Only select resilient sheet flooring in the Pharmacy Warehouse, Tape Lab, and Room 107 was identified as asbestos-containing. Select flooring material, drywall, 2 X 4 ceiling panel, pipe fitting, and cove base mastic were found to be non-asbestos. All suspect asbestos-containing materials observed in the project area were found to be in good condition and not damaged in such a manner that would pose a hazard of generating airborne asbestos fibers. ATC ENVIRONMENTAL INC. 5 k40/ ha/Yea(/277/r ' PHASE I ENVIRONMENTAL SITE ASSESSMENT — GROUP HEALTH COOPERATIVE DISTRIBUTION AND SUPPORT SERVICES FACILITY rG/ 7 -t/LY1L(�,/. RENTON, WASHINGTON 3.3.4 Waste Generation and Disposal The project area generates several waste streams including biomedical waste, low-level radioactive waste, as well as normal municipal solid waste and recyclables. The project area is a registered as a small quantity generator of hazardous waste. However, there does not appear to be a regular hazardous waste stream. There appears to be only irregular generation of hazardous waste occurring when certain chemicals used on-site are no longer needed and must be disposed of properly. As indicated previously, several drums of hazardous waste were located outside on the south side of the main building awaiting transport to a hazardous waste treatment/storage/disposal facility. Biomedical waste is generated in the project area as a result of the laboratory activities conducted on-site. The biomedical waste is stored in plastic bins labeled as "biohazard". Approximately 40 to 60 plastic bins are generated per week. The biomedical waste is picked up weekly by Stericycle of Washington, Woodinville, Washington. Low-level radioactive (radioisotope) waste in the form of iodine 125 and cobalt 57 is generated in the Medical Laboratory as part of certain analytical procedures. The waste is stored in 55-gallon drums. The waste is handled by Allied Technology Group and disposed of at the Hanford Reservation. Other waste generated in.the project area consists of nonhazardous municipal solid waste and recyclable materials. A trash dumpster is present along the east side of the project area in a brick-walled enclosure. 3.4 Other Conditions of Concern 4 3.4.1 Lead-based Paint Lead-based paint of the type that would typically be applied on project area surfaces was banned in 1978. Therefore, there is the potential for the presence of lead-based paint in the project area. 3.4.2 Radon Western Washington is considered,by the Washington State Health Department to be an area of low risk with respect to radon. The majority of the project area is above grade with no basement or crawlspace. The presence of structures below grade increases the potential for radon accumulation. 3.4.3 City of Renton Monitoring Well ATC observed a single groundwater monitoring well located in the wooded area on the western edge of the property near Springbrook Creek. Jim Douma of Group Health indicated that the well was installed and is owned by the City of Renton as part of their Oakesdale Avenue expansion project. The well is part of an easement granting the City of Renton permission to test the soils and groundwater. ATC spoke with Bob Mahn of the City of Renton. According to Mr. Mahn, the monitoring well is owned by the City of Renton, and was installed as part of the Oakesdale Corridor Expansion Project. The monitoring well is used to monitor groundwater levels. A draft report regarding the well installation is being reviewed by the City of Renton and will be available to the public in approximately five weeks. ATC ENVIRONMENTAL INC. 6 PROJECT NO.80022.1601 PHASE I ENVIRONMENTAL SITE ASSESSMENT GROUP HEALTH COOPERATIVE DISTRIBUTION AND SUPPORT SERVICES FACILITY ' RENTON, WASHINGTON 4.0 ENVIRONMENTAL SETTING 4.1 Regional Physiographic Conditions The project area is located in the Puget Sound Basin which lies between the Cascade Range to the east and the Olympic Mountains to the west. The landscape configuration of the Puget Sound Basin is a consequence of multiple Pleistocene glaciations resulting in a series of north-trending elongated ridges, or drift uplands, separated by deep troughs, the latter now occupied by marine waters, fresh-water lakes, or underfit streams. Holocene modification of the glaciated landscape is manifest in the development of sea cliffs, formation of cuspate forelands, erosion of the uplands by small streams, and major landscape modifications by man. Deposits of the most recent (Vashon) glaciation, which ended 13.5 thousand years ago in the Puget Sound area, consists of a mappable drift sequence of lacustrine deposits, advance outwash, till, and recessional outwash that collectively dominate the surface and shallow subsurface geology. Older glacial and nonglacial materials, mostly in the subsurface, are less well defined. Source: Galster and Laprade, Geology of Seattle, Washington, Bulletin of the Association of Engineering Geologists, August, 1991. The project area is located in a north trending flat-bottomed river valley drained principally by the Green River and more locally by Springbrook Creek, both of which flow northward. The project area is found at an elevation of approximately 20 feet above sea level which varies little over the project area and valley bottom. . Drift uplands surrounding the project area include the Des Moines Drift Upland to the west, the Covington Drift Upland to the east, and the Skyway Upland to the north. These upland areas crest at 300 to 400 feet above sea level. Source: USGS topographic map (metric), "Renton, Washington", 7.5 X 15 minute, 1983. 4.2 Soil/Geologic Conditions In general, the project area is underlain by Recent alluvium composed mostly of clayey silt and fine sand, locally peaty. The alluvium may be as much as 30 to 40 feet thick beneath the project area. Source: Geologic Map of the Renton Quadrangle - King County, Washington, USGS Quadrangle Map GQ-405. 4.3 Hydrogeologic Conditions Based on investigations conducted in the project area in response to the leaking UST, it appears that groundwater is approximately 10 feet below grade. Groundwater flow direction has been determined to be towards the south based on Pickerings April, 1992 report (reference Phase Two Environmental Site Assessment of Group Health DSSF, Pickering Environmental Consultants, Inc., April 1992). It should be noted that groundwater depth and flow direction may vary over time in response to season, precipitation, and other factors. 4.4 Assumptions/Opinion on Contaminant Mobility - Site Vulnerability There do not appear to be any significant off-site sources of contamination which could impact the project area. The groundwater gradients in the relatively flat-bottomed valley are assumed to be very gradual. Therefore, any potential off-site contaminants are not likely to disperse very widely over time. ATC ENVIRONMENTAL INC. 7 PROJECT NO. 80022.1601 • • PHASE I ENVIRONMENTAL SITE ASSESSMENT GROUP HEALTH COOPERATIVE DISTRIBUTION AND SUPPORT SERVICES FACILITY RENTON, WASHINGTON • 5.0 RECORDS REVIEW 5.1 Federal Records Sources National Priorities List (Superfund), United States Environmental Protection Agency (USEPA) ATC reviewed the National Priorities List (NPL) for listed sites located within one mile of the project area and to verify the project area status with regards to the NPL The NPL is a list of contaminated sites identified by the EPA for cleanup or remedial action under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The project area is not identified on the NPL. There are no sites located within a one mile radius of the project area. Source: National Priorities List (NPL), United States Environmental Protection Agency, most recent version updated to April 7, 1995. Comprehensive Environmental Response Compensation and Liability Information System (CERCLIS), United States Environmental Protection Agency (USEPA), ATC reviewed the Comprehensive Environmental Response Compensation and Liability Information System (CERCLIS) database for listed sites located within one-half mile of the project area and to verify the project area status with regards to the.CERCLIS database. The CERCLIS database is a list compiled by the EPA of sites that have been investigated or are currently being investigated for potential hazardous substance contamination for possible inclusion on the NPL The project area is not identified on the CERCLIS database. No sites within a one-half mile radius of the project area were identified on the CERCLIS database. Source: Comprehensive Environmental Response Compensation and Liability Information System, United States Environmental Protection Agency, database, updated to April 7, 1995. Resource Conservation and Recovery Act (RCRA) Notifiers List - Treatment, Storage, or Disposal (TSD) Facilities, United States Environmental Protection Agency(USEPA) ATC reviewed the Resource Conservation and Recovery Act (RCRA) Notifiers List for listed treatment, storage or disposal (TSD) facilities located within one mile of the project area and to verify the project area status as a possible listed TSD facility. Listed TSD facilities are those which treat, store, or dispose of hazardous wastes in quantities regulated and permitted under RCRA regulations. The project area is not listed as a TSD facility. There are no sites within one mile of the project area identified as a TSD facility. Source: Resource Conservation and Recovery Act (RCRA) Notifiers List - Generator facilities, United States Environmental Protection Agency, database, updated to April 10, 1995. Resource Conservation and Recovery Act (RCRA) Notifiers List - Generator Facilities, United States Environmental Protection Agency(USEPA) ATC reviewed the Resource Conservation and Recovery Act (RCRA) Notifiers List for listed generator facilities located within one quarter mile of the project area and to verify the project area status as a possible listed generator facility. Listed generator facilities are those which generate hazardous wastes in quantities regulated and permitted under RCRA regulations. ATC ENVIRONMENTAL INC. 8 PROJECT NO.80022.1601 . , F. PHASE I ENVIRONMENTAL SITE ASSESSMENT GROUP HEALTH COOPERATIVE DISTRIBUTION AND SUPPORT SERVICES FACILITY f RENTON, WASHINGTON I e Hazardous waste generators are classified based on the quantity of hazardous waste generated in a calender month as follows: Large quantity generator Generate 2.2 pounds or more of acutely hazardous waste and/or generate 2,200 or more pounds of hazardous waste, Small quantity generator Generate between 220 and 2,200 pounds of hazardous waste, Conditionally exempt generator Generate less than 2.2 pounds of acutely hazardous waste and/or generate less than 220 pounds of hazardous waste. The project area is listed as a RCRA hazardous waste generator. Eleven facilities within one- quarter mile of the project area are identified as generator facilities as follows. Name and Address I Proximity I Classification Dana Corp. 0.25 mile Small Quantity 1037 Thomas Ave. S.W. ' north Generator Atacs Products Inc. Adjoining to the Large Quantity 1120 SW 16th Street northwest Generator Automotive Engine Warehouse 0.25 mile Small Quantity 1150 Raymond Avenue S.W. north Generator - Sea Tac Disposal Inc. 0.25 mile Transporter 1201 Lind Avenue SW northeast Holmes Electric Inc. Adjoining to the Large Quantity 1422 Raymond Ave. S.W. northeast Generator Interior Construction Supply 0.25 mile Large Quantity 1520 SW Grady Way west Generator Austin Co. The 800 feet Large Quantity 1601 Lind Avenue SW east Generator Boeing Longacres Site Adjoining to the Large Quantity 1621 SW 16th St west • Generator BP Oil Co. Renton Terminal 0.25 mile Large Quantity 2123 Lind Avenue SW southeast Generator Waste Management Rainier Inc. 0.25 mile Small Quantity 316 SW 16th Street east Generator Group Health Distribution Fac Project Area Small Quantity 801 SW 16th Street Generator Cummins Northwest Inc. Renton 0.2 mile Large Quantity . 811 SW Grady Way north Generator Based on the information gathered during this investigation, including site observations, distance and location with respect to the project area, there is no evidence that these listed RCRA sites are impacting the project area. The project area is a listed RCRA site and is discussed in Section 3.3.4. Source: Resource Conservation and Recovery Act (RCRA) Notifiers List - Generator facilities, United States Environmental Protection Agency, dated April 10, 1995. ATC ENVIRONMENTAL INC. 9 PROJECT NO.80022.1601 PHASE I ENVIRONMENTAL SITE ASSESSMENT GROUP HEALTH COOPE RATIVE DISTRIBUTION AND SUPPORT SERVICES FACILITY RENTON, WASHINGTON • Emergency Response Notification System (ERNS), United States Environmental Protection Agency (USEPA) The Emergency Response Notification System (ERNS) is a database collected from spills reported to the EPA, U. S. Coast Guard, National Response Center, and Department of Transportation. ATC filed a Freedom of Information Act (FOIA) request to the EPA for any ERNS information regarding the project area. ATC has not yet received a response from the EPA; however, any significant information received will be forwarded under separate cover. 5.2 State Records Sources Washington Department of Ecology Confirmed and Suspected Contaminated Sites Report (C& SCS) ATC reviewed the Confirmed & Suspected Contaminated Sites Report (C & SCS) for listed sites located within one mile of the project area and to verify the project area status with regards to the list. This list identifies sites with potential or confirmed hazardous substance contamination and includes sites ranked using the Washington Ranking Model (WARM) and also includes National Priorities List (NPL) sites. The project area is not identified on the C & SCS report. Two sites within one half mile of the project area are identified on the report. Name and Address Proximity Site Status, Affected Media, and Contaminants Mobil/BP Bulk Facility 0.35 mile Independent Remedial Action 1 r 2423 Lind Avenue S.W. southeast WARM Bin#5 Confirmed impact to groundwater, soil and surface water from petroleum products. Renton Junction Landfill 0.5 mile Awaiting Site Hazard Assessment 1800 Monster Road west Suspected impact to groundwater, soil and surface water by unknown contaminants. Based on the information gathered during this investigation, including site observations, distance and location with respect to the project area, there is no evidence that these listed C&SCS sites are impacting the project area. Source: Confirmed & Suspected Contaminated Sites Report, Washington State Department of Ecology, dated November 7, 1994. ATC ENVIRONMENTAL INC. 10 PROJECT NO. 80022.1601 PHASE I ENVIRONMENTAL SITE ASSESSMENT GROUP HEALTH COOPERATIVE DISTRIBUTION AND SUPPORT SERVICES FACILITY RENTON, WASHINGTON t Washington Department of Ecology (WDOE) Leaking Underground Storage Tank (LUST) Facilities List The Leaking Underground Storage Tank (LUST) Facilities List is a list of those facilities with leaking UST's registered with the WDOE. The project area was not identified on the LUST Facilities List. Seven sites were identified on the LUST Facilities Ust within one-half mile of the project area as follows. • Name/Address Proximity Cleanup Status/Affected Media/Comments (per list) Ryerson Store 0.3 mile Cleanup Status: Conducted 600 SW 10th Street north Affected Media: Soil 'Completed. 2 diesel removed 8/93. 225 CY PCS to' Chevron Station #9-9114 0.4 mile Cleanup Status: In Progress 301 Grady Way S. northeast Affected Media:Soil and Groundwater 'High BTEX,TPH-G MW s 2,3; No free product observed.' Longacres Inc. Adjoining to Cleanup Status: In Progress 1621 SW 16th the west Affected Media:Soil and Groundwater 'Waste tank removed, overexcavated.' Longacres/Boeing Inc. 2 Adjoining to Cleanup Status: In Progress 1621 SW 16th the west Affected Media: Soil and Groundwater '2 UG removed 12193. Unknown amount of contaminat' Cummins Northwest 0.20 mile Cleanup Status: Conducted 811 SW Grady Way north Affected Media: Soil '4 tanks gasoline diesel removed. Cleanup complet' Metro Renton Treatment Plant 0.5 mile Cleanup Status: In Progress 1200 Monster Road SW northwest Affected Media: Soil '1 diesel 1 P;4 tanks removed. Cleanup complete' Waste Management Rainier 0.2 mile Cleanup Status: Monitoring 316 SW 16th east Affected Media:Soil and Groundwater 'Removed 1 gas. Add'I 500 CY PCS removed from are° Based on the information gathered during this investigation, including site observations, distance and location with respect to the project area, there is no evidence that these listed LUST sites are impacting the project area. The project area is apparently not listed as a LUST site with the DOE even though there is a confirmed release in the project area. ATC reviewed the Boeing/Longacres file at the DOE. Based on this review the Boeing/Longacres site appears to have the extent of contamination defined which does not appear to impact the project area. Additionally, Springbrook Creek would provide a geohydrogeological barrier to potential contaminants from Boeing. Source: Washington Department of Ecology Leaking Underground Storage Tank Facilities List updated to September 19, 1994. ATC ENVIRONMENTAL INC. 11 PROJECT NO.80022.1601 PHASE I ENVIRONMENTAL SITE ASSESSMENT GROUP HEALTH COOPERATIVE DISTRIBUTION AND SUPPORT SERVICES FACILITY RENTON, WASHINGTON Underground Storage Tank (UST) Sites List ATC reviewed the Washington Department of Ecology Underground Storage Tank - DMS Facility and Tank Data Listing dated October 28, 1994. The list identifies sites reported to the DOE as having underground storage tanks. The project area was not identified as a site with a underground storage tank. Six sites within one-quarter mile were identified as having underground storage tanks. Name and Address Proximity No. of Tanks/Age/Size/Status/Substance Group Health Distribution Project Area 1/unk yrsJ5-10k gals./Closure/Unleaded Support Services Gas 801 SW 16th Street Longacres Racecourse Inc. 0.25 mile 1(mec shop)/16 yrs./<1100 gals/Remy./ 1621 SW 16th west Unleaded Gas 2(mec shop)/unk. yrsJ<1100 gals.RemvJ Unleaded Gas 3(carp shop)/unk. yrsJ<1100 galsJRemvJ Unleaded Gas 4(bam area)/unk.yrsJ<1100 galsJRemvJ Leaded Gas 5(bam area)/unk.yrsJ<1100 galsJRemvJ Diesel Fuel Cumming Northwest Inc. 0.2 mile 1/unk yrsJ5-10k gals./RemvJUnleaded Renton north Gas 811 SW Grady Way 2/unk yrsJunk galsJRemvJUsed OiVW 3/unk yrsJunk gals./RemvJunk contents 4/unk yrs./Link galsiRemv/Heating Fuel Rainier Disposal Co. Inc. 0.2 mile 1/11 yrsJ5-10k gals./OperJUnleaded Gas 316 SW 16th east 2/11 yrsJ5-10k gals./OperJDiesel Fuel 3/11 yrsJ10-20k gals./Oper./Diesel Fuel 4/unk yrs./<1100 gals./Remv./Leaded Gas Gary Owen 0.25 mile 1/unk yrsJunk gals./RemviDiesel Fuel 208 SW 16th east 2/unk yrsJunk gals./RemvJDiesel Fuel 3/unk yrs./un k gals./Remy./Diesel Fuel Cascade Coffee Inc. 0.25 mile 1/unk yrsJunk gals./Remv./Leaded Gas 234 SW 16th Street east 2/unk yrs./unk gals./RemvJUnleaded Gas Abbreviations: Uk- Unknown, referring to age of tank. Rmvd - Removed, referring to tank which has been removed. Clsre - Closure, referring to tank which is presently not being used. Oper- Operational referring to the status of the tank as currently in use. Ld - Leaded gasoline, referring to the storage material of the tank. Unld - Unleaded gasoline, referring to the storage material of the tank. Dies - Diesel fuel, referring to the storage material of the tank. Source: Washington Department of Ecology UST List updated to October 28, 1994. ATC ENVIRONMENTAL INC. 12 PROJECT NO. 80022.1601 PHASE I ENVIRONMENTAL SITE ASSESSMENT GROUP HEALTH COOPERATIVE DISTRIBUTION AND SUPPORT SERVICES FACIUTY RENTON, WASHINGTON Active Landfills and Solid Waste Facilities, Washington State Department of Ecology(DOE) ATC reviewed the State of Washington - Solid Waste Facility Handbook for the locations of solid waste facilities located within one-half mile of the project area and to verify the project area status as a possible solid waste facility. The Solid Waste Facility Handbook list includes municipal solid waste landfills, inert/demolition landfills, limited purpose landfills, ash monofills, woodwaste landfills, compost facilities, sludge utilization facilities, tire pile sites, pile facilities, recycle centers, surface impoundments, transfer stations, and incinerators. The project area is not listed as a solid waste facility. No sites within a one-half mile radius of the project area are listed as a solid waste facility. Source: Municipal Solid Waste Landfills in the State of Washington - Solid Waste Facility Handbook, Washington State Department of Ecology, April, 1993. 5.3 Local Agency Sources Abandoned Landfills and Solid Waste Disposal Sites, Seattle-King County Department of Public Health ATC reviewed reports with the Seattle-King County Department of Public Health for the locations of abandoned landfills located within one-half mile of the project area and to verify the project area status as a possible landfill site. The project area is not listed as a site with abandoned landfills. One site within a one-half mile radius of the project area is listed as an abandoned landfill site. Name and Address Proximity Comments Renton Junction Landfill 0.5 mile Awaiting Site Hazard Assessment 0.) 1800 Monster Road west Suspected impact to groundwater, soil and surface water by unknown contaminants. Based on the distance and location with respect to the project area, there is no evidence that the listed landfill site is impacting the project area. Source: Abandoned Landfill Study in the City of Seattle, July 30, 1984; Abandoned Landfill Study in King County, April 30, 1985; and Seattle-King County Abandoned Landfill Toxicity/Hazard Assessment Project, December 31, 1986; Seattle-King County Department of Public Health. ATC ENVIRONMENTAL INC. • 13 PROJECT NO.80022.1601 PHASE I ENVIRONMENTAL SITE ASSESSM ENT GROUP HEALTH COOPERATIVE DISTRIBUTION AND SUPPORT SERVICES FACILITY RENTON, WASHINGTON 6.0 HISTORICAL USE INFORMATION 6.1 Aerial Photographs ATC reviewed available historical aerial photographs of the project area and surrounding areas in order to determine historical land use which may have involved hazardous substances, hazardous wastes, and petroleum products. The photographs were reviewed at the University of Washington, Suzzallo Library Map Room, Seattle, Washington. The photograph dates ranged from 1961 to 1989. The following are descriptions and interpretations from the historical aerial photograph review. 1961 The project area is mostly vacant and undeveloped. It appears as a grass covered field with four large widely separated trees. One house with an outbuilding appears at the center north of the project area along SW 16th Street. SW 16th Street is in place. Longacres racetrack is present to the west across Springbrook Creek. To the north are small agricultural fields and scattered houses and outbuildings. To the east and south are open fields and woodlands. 1965 The project area appears unchanged except that the house and outbuilding are now gone. The Austin Co. building appears to be under construction to the north. Interstate 405 is present further north. There are no other significant changes apparent in the project area and surrounding areas. 1970 There are no significant changes apparent in the project area and surrounding areas. 1985 The project area and surrounding areas are developed as today. 1989 There are no significant changes apparent in the project area and surrounding areas. 6.2 Building Department Records City of Renton, Building Department ATC reviewed Building Department files regarding the project area. Most permits in the file were related to minor improvements and remodeling of the project area. The records indicate that the main building was constructed in 1977, the two-story storage building in 1979, and the maintenance building in 1986. No environmental concerns were noted in the Building Department records review. Source: City of Renton, Building Department, records review on May 5, 1995. 6.3 Personnel Interviews ATC met with Mr. Jim Douma and Mr. Gary Betis, both of Group Health Cooperative, on the day of the site visit on May 2, 1995. Mr. Douma is the property manager of the project area. Mr. Betis is the maintenance engineer at the project area. Mr. Douma provided ATC with a tour of the project area. Mr. Douma and Mr. Betis provided information on waste handling, chemical storage, and other information discussed in other sections of this report. ATC ENVIRONMENTAL INC. 14 PROJECT NO. 80022.1601 J _ PHASE I ENVIRONMENTAL SITE ASSESSMENT GROUP HEALTH COOPERATIVE DISTRIBUTION AND SUPPORT SERVICES FACIUTY { RENTON, WASHINGTON t Introductions were provided to many of the department managers and key personnel who also provided pertinent information discussed in other sections of this report. ATC ENVIRONMENTAL INC. 15 PROJECT NO.80022.1601 PHASE I ENVIRONMENTAL SITE ASSESSMENT GROUP HEALTH COOPERATIVE DISTRIBUTION AND SUPPORT SERVICES FACILITY • RENTON, WASHINGTON 7.0 RESULTS OF INVESTIGATION • 7.1 Findings, Conclusions, and Recommendations Project Area LUST Remediation The project area currently has a remediation system in place and in operation which is designed to clean up contamination from a former leaking 250 gallon leaded gasoline UST. The tank was located between the main building and the two-story storage building. The system consists of nine (9) vapor extraction wells for a soil vapor extraction system and one (1) groundwater recovery well for a pump and treat system. The soil vapors are apparently vented untreated to the atmosphere under Puget Sound Air Pollution Control Agency (PSAPCA) permit. The pump and treat system pumps groundwater from the recovery well • through an oil/water separator, air stripper, and then to the Metro sanitary sewer system. The discharge to the Metro system is permitted by Metro Discharge Authorization No. 430. The remediation system has apparently been in continuous operation since mid-1993. Four on- site monitoring wells were recently resampled. (ref. Pickering Environmental Consultants, Inc. report, May 24, 1995.) Three of the wells indicated diminishing contaminant levels. However, the analytical results for two of these wells were still well above MICA Method A Cleanup Levels. One of the four wells revealed an increase in contaminant levels. Based on the recent analytical results from four on-site monitoring wells, it appears that there has been some decreasing levels of contamination in the groundwater. Two of the wells sampled, BH 2 and BH 6, are still well above the MICA Method A Cleanup Level. Based on the rate of contaminant decrease, it may be several years before contaminant levels are reduced below cleanup levels as the system is currently operated. Contaminant levels have increased in well BH 11. ATC recommends that the current remediation system be evaluated further and possibly reconfigured and redesigned to increase cleanup efficiency and reduce the length of time which the system will need to operate. Additionally, ATC recommends that sampling of groundwater be conducted on a more frequent basis (i.e. quarterly) to better track the remediation system's efficiency. Furthermore, ATC recommends limited soil sampling to determine if the soil vapor extraction system has been effective in cleaning up soil contamination. Asbestos-Containing Materials ATC observed suspect asbestos-containing materials in the project area including resilient sheet flooring, carpet mastic, acoustic ceiling panels, sink undercoat material, and wallboard and associated joint compound. Additionally asbestos containing resilient sheet flooring has been confirmed in selected areas of the project area. All suspect and confirmed asbestos- containing materials observed in the project area were observed to be in good condition and not damaged in such a manner that would pose a hazard of generating airborne asbestos fibers. ATC recommends sampling any suspect asbestos-containing materials prior to remodeling, renovation, or demolition activities which may occur in the project area. ATC ENVIRONMENTAL INC. 16 PROJECT NO.80022.1601 PHASE I ENVIRONMENTAL SITE ASSESSMENT GROUP HEALTH COOPERATIVE DISTRIBUTION AND SUPPORT SERVICES FACILITY �. : RENTON, WASHINGTON 8.0 SIGNATURES ATC's work was performed in a professional manner with the best interests of our client in mind. Our objective was to perform work with care, exercising the customary skill and competence of consulting professionals in the relevant disciplines. The conclusions presented in this report are professional opinions based solely upon visual observations of the site and vicinity and our interpretation of the available historical information and documents reviewed. The opinions and recommendations presented herein apply to site conditions existing at the time of our investigation and those reasonably foreseeable. ATC cannot act as insurers, and no expressed or implied representation or warranty is included or intended in our report except that our work was performed, within the limits prescribed by our Client and with the customary thoroughness and competence of our profession. Prepared by: Reviewed by: • lyncem- /N , CHMM ThRowdHffe, C Project Manager Director of Operations 40/9_S (J•/9-5 Date Date ATC ENVIRONMENTAL INC. 17 PROJECT NO.80022.1601 t REPORT OF SOILS INVESTIGATION PROPOSED SERVICE CENTER RENTON, WASHINGTON • itil,04 FOR THE GROUP HEALTH COOPERATIVE OF PUGET SOUND DAMES & MOORE January 3, 1975 Job Number 8521-003-05 i - I REPORT OF SOILS INVESTIGATION PROPOSED SERVICE CENTER RENTON, WASHINGTON for the GROUP HEALTH COOPERATIVE OF PUGET SOUND INTRODUCTION We present in this report the results of our soils investigation at the site of a proposed Service Center Complex to be constructed in Renton, Washington. The site, which is roughly triangular in shape, is located immediately south of SW 16th St and on the west side of the Raymond Ave SW right-of-way, as shown on the Plot Plan, Plate 1. A previous soils investigation has been performed by our office for a tract of land which included the present site. The results of this investigation were summarized in a report to the Metro Industrial District dated August 10, 1961. In the late summer of 1963, approxi- mately 2 ft of compacted granular fill was placed on this site. Our office provided inspection and testing of fill placement; the results were given to the District in a report dated October 8, 1963. A consul- tation concerning site development of this property was summarized in two letters to The Austin Company dated April 12 and April 22, 1974. SCOPE The purposes of this investigation are to explore the subsurface soil and groundwater conditions at the site, and to provide engineering recommendations for foundation support and site developmenZ;;,rspe�' , fically, our work includes the following: ro Ak 901 C1 y OF RLNTON -1- 'Dames $ MOORE 1. Design criteria for shallow foundations, including maximum allowable soil pressures for footing design, minimum footing widths, and minimum depth of footings. 2. Estimates of the magnitude of settlement for foundations designed as recommended. 3. Criteria for support of all floor slabs. 4. Estimates of floor slab settlement. 5. Recommendations for a surcharge program to minimize post- construction building settlement. 6. Recommendations concerning construction procedures, including site preparation, criteria for fill placement and compaction, • and for footing excavations. DESIGN CONSIDERATIONS We understand that the proposed development will include several buildings. The largest building will consist of a warehouse, storage, and service complex with the floor at truck-loading height. Floor loads in this structure will be variable; maximum storage loads in the central warehouse and receiving area have been estimated at 500 lb per sq ft. Lesser loadings are. anticipated in the peripheral storage and service areas. Expansion areas have been delineated on the north, south, and west sides of the warehouse complex. Other structures will include two 2-story office buildings in the northern portion of the site and a vehicle maintenance shop located south of the warehouse complex. Floor grade in these buildings will be at or slightly above finish yard grade. Anticipated floor loads in these buildings are not known. No infor- mation is presently available relative to structural loads in any of the -2- oAMES a MOORE t buildings. For analytical purposes, a maximum column load of 100 kips has been assumed. Final yard grade has not been established at this time; however, some amount of structural fill placement is anticipated in order to establish drainage across the site. Paved parking areas are planned in the north portion of the site between the two office buildings and to the west of the westernmost office building. Additional parking is to be provided south of the warehouse complex, adjacent to the proposed maintenance shop. The westernmost portion of the site will remain undeveloped at the present time. SITE CONDITIONS SURFACE CONDITIONS The site lies on the generally level terrain of the Green River' floodplain. The western boundary of the site is coincident with the alignment of an improved drainage channel which flows roughly from the' southeast to the northwest. The existing site grade was established by the placement of several feet of fill during 1963. The installation of this fill was observed and approved by our office. Some indications of earlier fill placement were noted during our current explorations. The horizontal and vertical extent of the earlier fill could not be deter- mined; however, it appeared to be limited to areas within the eastern • portion of the site. Elevations across the site vary generally from Elevation 20 in the southern portion to Elevation 23 along the northern property line, and Elevation 24 in the westernmost portion of the site. Isolated areas in the westernmost portion are at Elevation 26. Most of the proposed building areas lie at approximately Elevation 22. These -3- OAMES a MOORE . • elevations are based on U.S. Engineers Datum. At the present time the ground surface is covered with a moderate growth of grass and weeds, with occasional clusters of saplings to heights of less than 10 ft. Surface drainage at the site is relatively poor in its present condition, with localized areas of surface ponding during periods of rainfall. SUBSURFACE CONDITIONS • Subsurface conditions at the site were explored by drilling five borings at the locations shown on the Plot Plan. A detailed description of the fieldwork is presented in the Appendix, along with the logs of the borings. The results of our laboratory tests and a description of the testing procedures are also presented in the Appendix. The loca- tions of two borings performed in conjunction with our previous inves- tigation at this site are also shown on the Plot Plan. The surface soils across the site consist of fill. A thin layer of topsoil has developed, generally less than 2 in. thick. The fill on the eastern portion of the site consists of gray silty fine sand having some gravel. The remainder of the site is covered with a brown, slightly silty sand having a relatively uniform gradation. The fill soils are generally on the order of 2 and 3 ft thick, with up to 5 ft in localized areas. At the time of our explorations, the upper 6 to 12 in. of fill was in a loose, saturated condition. The remainder of the fill was dense. Two distinct native soil zones were noted during our field explo- rations; an upper zone consisting of relatively soft or loose deposits and a lower zone made up of dense sand and gravel. The total thickness of the upper soil zone and surface fill is on the order of 22 to 24 ft, -4- DAMES 8 MOORE .i . extending approximately to Elevation 0. The composition of the upper materials consists of soft to medium-stiff silts and clayey silts, and medium-dense slightly silty fine sands. In general, the finer- grained soils are found in the upper portion of this soil zone, grading to sands toward the bottom. The material in the upper soil zone has a greater proportion of sand in the western and southwestern portions of the site, in the vicinity of Borings 4 and 5. In the central building area the upper zone is primarily composed i . of the silt and clayey silt. The soils which lie just beneath the fill appear to be desiccated, resulting in a relatively stiff or dense condition within the upper 2 to 3 ft in comparison with the softer underlying soils. In general, the upper soil deposit is compressible and subject to settlement with the application of loads; however, the degree of compressibility varies for a given area, depending upon the relative proportion of silts and sands. No significant amount of highly compressible organic material such as peat was found in any of our borings; however, during our previous investigation, several swampy areas were noted just east of the site. Boring 2, which was placed at a location where an old meander scar might possibly encroach upon the site, encountered no evidence of organic soils. Although it is possible that some swampy areas may exist within the site, these areas would be isolated and limited in extent. The lower soil zone, which was encountered in our borings roughly • below Elevation 0, consists of dense silty sandy gravel with layers of sand. All of the borings were terminated in this competent stratum. Our current field explorations were conducted during a period of heavy rainfall; consequently most of the ground surface was covered with -5- DAMES 8 IAOORE standing water, making it difficult to establish the true groundwater level in the borings. A piezometer installed in Boring 5 indicated a water level at Elevation 16. Our laboratory tests indicated that the soils are saturated below this level. The water level should fluctuate somewhat with seasonal changes. Since our field explorations were performed at the start of the rainy season, we anticipate that the groundwater level may be somewhat higher during the winter months. CONCLUSIONS AND RECOMMENDATIONS GENERAL The subsurface conditions in the upper soil zone show significant variation, both horizontally and vertically, across the site. This variation poses a definite potential for moderately large differential as well as total settlements within the building areas. In order to develop satisfactory support for the structures using shallow founda- tions, we recommend that all footings be underlain by at least 3 ft of compacted fill. The purpose of this fill pad is to distribute the loads imposed by the footings within the fill, thereby reducing the load intensity which is transmitted to the more compressible underlying native soils. Significant settlement will occur within the warehouse complex under the influence of new fill required to establish floor grade and the imposed floor loads. Consequently, we recommend that surcharge fill be placed in advance of construction to preinduce a large portion of this settlement. Depending on the construction schedule and the magni- tude of floor loads, surcharge of the office building and shop areas may not be required. -6- OAMES a MOORE {f/ i FOUNDATION SUPPORT We conclude that the buildings may be safely supported on shallow footings founded within fill which is placed over the existing native soils, provided that the footings are separated from the native material by a minimum of 3 ft of properly compacted fill. On the basis of our explorations we feel that the existing fill across the site can be included in the provision of this thickness of fill, as long as the upper portion is properly compacted and any loose or water-softened material is removed and replaced with compacted fill. If the thickness of fill which is placed in building areas during site grading is not sufficient to provide a total thickness of 3 ft, it will be necessary to overexcavate the existing material and replace it with compacted fill. This zone of overexcavation and replacement should extend a minimum , of 18 in. out from each side of the footings. Overexcavation will not be necessary to provide the minimum 3 ft of fill beneath the footings for interior footings in the warehouse complex which are founded at minimum depth within the dock-height fill. We recommend that engineering inspection of the footing excavations and backfilling be provided to determine that the work is carried out as intended. We recommend that all footings have a minimum width of at least 18 in. and be founded not less than 18 in. below the lowest adjacent grade. Footings constructed in the manner described above may be designed using a maximum soil bearing pressure of 2,500 lb per sq ft. This value is intended to apply to the total of all loads--dead, . live, and seismic, exclusive of the weight of footings and any backfill over the footings. We estimate that the settlement of footings under the assumed structural loads will generally be on the order of 1 to 171 in. -7- OAMES 8 WMOORE I • �I • Some portion of this settlement will occur during construction; under a typical construction schedule, we anticipate that postconstruction • settlements will be less than 1 in. AREAL SETTLEMENT AND SURCHARGE REQUIREMENTS Our analyses for the warehouse complex indicate that the combina- tion of the dock-height fill and the anticipated floor loads will cause significant compression in.the underlying soil layers, resulting in total settlements on the order of 4 to 6 in. in those areas where the underlying native soils are composed of compressible silts. Approxi- mately 2 to 3 in. of this settlement will result from the weight of the dock-height fill. The magnitude of the remaining settlement would depend upon the intensity of the actual long-term floor loads. To reduce postconstruction settlement of the warehouse complex, we • recommend the use of a surcharge fill program to induce the major - portion of this settlement prior to the start of construction. To account for the varying design floor loads within the complex, we recommend that the thickness of surcharge be varied. The required thickness of surcharge fill for a given area is dependent upon the anticipated floor load within the area. For planning purposes, 1 ft of surcharge fill should be provided for each 100 lb per sq ft of design floor load, with a minimum surcharge thickness of 2 ft. The required thickness of surcharge should be measured from the design finish floor grade. Where transitions are required from heavier to more lightly loaded areas, we recommend that the greater thickness of surcharge extend 10 ft beyond the limits of the heavier load. The crest of the surcharge fill should extend at least 10 ft beyond the perimeter of the • area to be more heavily loaded in order to provide the necessary con- finement and consolidation load. -8- DAMES O MOORE t. Based on our analyses, we estimate that 90 percent of the settle- , ment resulting from the surcharge fill will take place within 75 days after placement of the fill. Assuming that the surcharge program is satisfactorily completed, we estimate that postconstruction settlement of floor slabs would be on the order of 12 in. for a maximum floor load of 500 lb per sq ft. In areas where future expansion is being considered, we recommend that the surcharge extend at least 25 ft beyond the limits of initial construction. Otherwise, the placement of new surcharge adjacent to the completed structure would be expected to cause a significant amount of additional settlement of this structure. In the areas to the north and south of the warehouse, it may be more practical to extend the surcharge across the entire expansion area during the initial surcharge period. We understand that the 2-story office buildings and the maintenance shop will have ground floor slabs at approximately the same grade as the adjacent yard area. Our analyses indicate that surcharging may not be necessary for these areas if floor loads are small and some differ- ential settlement can be tolerated. If construction is delayed for a period of time after the placement of any site fill in the building areas, settlement of the structures will be generally limited to that which results from structural and long-term live loads. We anticipate that 90 percent of the total settlement caused by fill placement will occur within 75 days after the fill is completed. We estimate that the settlement of floor slabs resulting from structural and long-term storage loads of 200 psf will be on the order of 1 in. Differential settlement may result in footings moving downward as much as in. below adjacent floor slabs, depending on construction timing. Settlements of -9- OAMES & MOORE • § to 1 in. should be anticipated for utility lines at their points of entryinto the building. The settlement estimates given above assume that no soft or loosened materials exist at the present ground surface. If the magnitude of settlement given above is not tolerable, or if the existing ground surface is disrupted during construction, preloading should be provided for the office buildings and the maintenance shop in accordance with the recommendations given earlier in this section. *We recommend that a series of settlement markers be installed in all preloaded areas prior to placement of any fill to monitor the rate and magnitude of settlement during the placement of structural and. surcharge fill. The settlement markers, if read on at least a biweekly basis during and after surcharge completion, would greatly facilitate the determination of the earliest practical surcharge removal date. SITE PREPARATION AND FILL PLACEMENT As discussed previously, the site is presently covered with grass. and clusters of brush. The necessity to strip the sod mat and topsoil from the existing surface will depend on the thickness of fill which will be placed to achieve the desired site grade. If pavement or building subgrades lie within 12 in. of the existing surface, all sod and organic material should be removed from the surface. Stripping should not be carried out during the wet winter months. If it is necessary to initiate fill placement during the rainy season, site grades should be adjusted to insure that pavement and building area subgrades are at an elevation at least 12 in. higher than the existing grade. If stripping is not accomplished, the existing growth of grass and brush should be mowed as closely as possible to the ground and the clippings removed from the site. Heavy construction traffic should be • -10- OAMES 1S MOORE ` i .. closely observed to determine that the existing ground surface is not disturbed or softened, particularly if work is attempted during the wet season. If construction traffic causes a significant disruption of the surface, an initial lift of fill consisting of clean, coarse sand or sand and gravel should be placed across the site to protect this sur- face. If construction during wetter months is a possibility, we recom- mend that planning and cost estimates include an allowance for this protective blanket. We recommend that all permanent new fill placed in building or pavement areas consist of well-graded predominantly granular pit-run material. The maximum percentage of silt- and clay-sized fines should be governed by weather and site conditions at the time of placement. During rainy weather the material should contain no more than 5 percent by dry weight passing a No. 200 mesh sieve. This fill should be placed in lifts having a maximum loose thickness of 8 in. and compacted to at least 95 percent of the maximum dry density as determined by AASHO Compaction Test Procedure T-180. Placement of surcharge fill may commence as soon as the structural fill is completed. We recommend that the permanent compacted structural fill be carried at least 6 in. above the planned floor slab subgrade in • order to allow for settlement during the surcharge period. No com- paction criteria are required for the surcharge fill which will be later removed. If the surcharge material is to be later used as structural fill outside the building area, we recommend that it consist of granular material as described above. All backfilling for utility trenches and other excavations in building and pavement areas should be placed and compacted in accordance with the recommendations given above for structural fill placement. -11- GAMES e. MOORE FLOOR SLAB SUPPORT Floor slabs may be supported on compacted granular fill. We recommend that slabs be directly underlain by at least 4 in. of clean free-draining coarse sand or sand and gravel which would retard the capillary rise of any water into the subslab area. We further recommend that a vapor barrier be installed between the base of the slab and the supporting soils. Ii PAVEMENT DESIGN • Assuming that all loose or softened areas in the existing fill are repaired, that all pavements are underlain by at least 12 in. of granu- lar subgrade compacted as recommended previously, and that.no unusual traffic loadings will be experienced, we suggest that the following pavement design section be used: Thickness in Inches • Auto Parking Truck Traffic Paving Course Areas Areas Asphaltic Concrete 2:' 2" Crushed Rock Base Course 4" 6" ' C K. TT P�S of wAs61/4, Mtn Yours very truly, w • z k DAMES MOORE • •94, _%,1% By ../ Al, / Gisn _? 'ONALR,s, ack K. Tuttle Partner • I , JKT:WJG:al 8521-003-05 -12- DAMES 8 MOORE APPENDIX FIELD EXPLORATIONS AND LABORATORY TESTS FIELD EXPLORATIONS Five exploration borings were drilled in this investigation with truck-mounted, cable-tool drilling equipment at the locations shown on the Plot Plan, Plate 1. The locations of two borings from a previous investigation are also shown on Plate 1. The borings drilled during this investigation ranged in depth from 2411 to 40 ft below the existing ground surface. Ground surface elevations at the boring locations were estimated from a topographic survey by Meriweather-Leachman, based on U.S.. Engineers Datum. The field explorations were continuously observed by one of our engineers who classified the soils encountered, kept a detailed log of the borings, and obtained soil samples for examination and testing in our laboratory. The boring logs are presented on Plates A-1 and A-2. The soils have been classified in accordance with the Unified Soil Classification System, which is described on Plate A-3. Relatively undisturbed soil samples were obtained from the borings using a Dames & Moore Type U Sampler, which was driven with a weight of 350 lb falling a distance of 18 in. The number of blows required to drive the sampler a distance of 12 in. into undisturbed soil is shown immediately above the sample notation on the log of the borings. The infiltration of surface water into the borings prevented the measurement of accurate groundwater levels in Borings 1 through 4. A piezometer was installed in Boring 5 to permit more accurate water level measurements after completion of the boring. An observation made after the completion of our exploration indicated a groundwater level at A-1 OL\ME.S a AAOORE Elevation +16. This water level will probably fluctuate with seasonal variations in rainfall. LABORATORY TESTS Laboratory tests were performed on representative soil samples to evaluate strength and consolidation characteristics of the various soils. Soil strengths were evaluated by performing direct shear tests in accordance with the procedures described on page A-3. The results of the direct shear tests are presented in tabular form on Plate A-4. Two consolidation tests were performed for use in our settlement analyses. The equipment and methods used for the consolidation tests are described on page A-4. The results of the tests are presented graphically on Plates A-5 and A-6. Moisture and density determinations were made in conjunction with each of the above tests and on other selected samples for correlation purposes. These data are presented on the test summary plates and on the boring logs adjacent to the sample notations. A-2 DAMES e MOORS METHOD OF PERFORMING DIRECT SHEAR AND FRICTION TESTS • DIRECT SHEAR TESTS ARE PERFORMED TO DETERMINE THE SHEARING STRENGTHS OF SOILS. FRICTION TESTS ,411 ARE PERFORMED TO DETERMINE THE FRICTIONAL RE- SISTANCES BETWEEN SOILS AND VARIOUS OTHER MATE- RIALS SUCH AS WOOD, STEEL, OR CONCRETE. THE TESTS • •'"f,"' ARE PERFORMED IN THE LABORATORY TO SIMULATE ; ANTICIPATED FIELD CONDITIONS. 41111 EACH SAMPLE IS TESTED WITHIN THREE BRASS RINGS, TWO AND ONE-HALF INCHES IN DIAMETER AND ONE INCH DIRECT SHEAR APPARATUS WITH IN LENGTH. UNDISTURBED SAMPLES OF IN-PLACE SOILS ELECTRONIC RECORDER ARE TESTED IN RINGS TAKEN FROM THE SAMPLING (IN E OFFICE) 1 DEVICE IN WHICH THE SAMPLES WERE OBTAINED. LOOSE SAMPLES OF SOILS TO BE USED IN CON- 1 STRUCTING EARTH FILLS ARE COMPACTED IN RINGS TO PREDETERMINED CONDITIONS AND TESTED. 1 1 DIRECT SHEAR TESTS A THREE-INCH LENGTH OF THE SAMPLE IS TESTED IN DIRECT DOUBLE SHEAR. A CONSTANT PRES- SURE, APPROPRIATE TO THE CONDITIONS OF THE PROBLEM FOR WHICH THE TEST IS BEING PER- FORMED, IS APPLIED NORMAL TO THE ENDS OF THE SAMPLE THROUGH POROUS STONES. A SHEARING 111 FAILURE OF THE SAMPLE IS CAUSED BY MOVING THE CENTER RING IN A DIRECTION PERPENDICULAR 11 TO THE AXIS OF THE SAMPLE. TRANSVERSE MOVEMENT OF THE OUTER RINGS IS PREVENTED. THE SHEARING FAILURE MAY BE ACCOMPLISHED BY APPLYING TO THE CENTER RING EITHER A CONSTANT RATE OF LOAD, A CONSTANT RATE OF DEFLECTION, OR INCREMENTS OF LOAD OR DE- 1 FLECTION. IN EACH CASE, THE SHEARING LOAD AND THE DEFLECTIONS IN BOTH THE AXIAL AND TRANSVERSE DIRECTIONS ARE RECORDED AND PLOTTED. THE SHEARING STRENGTH OF THE SOIL IS DETERMINED FROM THE RESULTING LOAD-DEFLECTION CURVES. FRICTION TESTS IN ORDER TO DETERMINE THE FRICTIONAL RESISTANCE BETWEEN SOIL AND THE SURFACES OF VARIOUS MATERIALS, THE CENTER RING OF SOIL IN THE DIRECT SHEAR TEST IS REPLACED BY A DISK OF THE MATERIAL TO BE TESTED. THE TEST IS THEN PERFORMED IN THE SAME MANNER AS THE DIRECT SHEAR TEST BY FORCING THE DISK OF MATERIAL FROM THE SOIL SURFACES. A-3 DAMES 8 MOORE :i 1• METHOD OF PERFORMING CONSOLIDATION TESTS CONSOLIDATION TESTS ARE PERFORMED TO EVALUATE THE VOLUME CHANGES OF SOILS SUBJECTED TO INCREASED LOADS. TIME-CONSOLIDATION AND PRESSURE-CONSOLIDATION CURVES MAY BE PLOT- TED FROM THE DATA OBTAINED IN THE TESTS. ENGINEERING ANALYSES BASED ON THESE CURVES PERMIT ESTIMATES TO BE MADE OF THE PROBABLE MAGNITUDE AND RATE OF SETTLEMENT OF THE TESTED SOILS UNDER APPLIED LOADS. EACH SAMPLE IS TESTED WITHIN BRASS RINGS TWO AND ONE- HALF INCHES IN DIAMETER AND ONE INCH IN LENGTH. UNDIS- ii r—s'` `" TURBED SAMPLES OF IN-PLACE SOILS ARE TESTED IN RINGS TAKEN FROM THE SAMPLING DEVICE IN WHICH THE SAMPLES 1!11 WERE OBTAINED. LOOSE SAMPLES OF SOILS TO BE USED IN CONSTRUCTING EARTH FILLS ARE COMPACTED IN RINGS TO PREDETERMINED CONDITIONS AND TESTED. II • II IN TESTING, THE SAMPLE IS RIGIDLY CONFINED LATERALLY DEAD LOAD-PNEUMATIC BY THE BRASS RING. AXIAL LOADS ARE TRANSMITTED TO THE CONSOLIDOMETER ENDS OF THE SAMPLE BY POROUS DISKS. THE DISKS ALLOW DRAINAGE OF THE LOADED SAMPLE. THE AXIAL COMPRESSION OR EXPANSION OF THE SAMPLE IS MEASURED BY A MICROMETER DIAL INDICATOR AT APPROPRIATE TIME INTERVALS AFTER EACH LOAD INCREMENT IS APPLIED. EACH LOAD IS ORDINARILY TWICE THE PRECEDING LOAD. THE IN- CREMENTS ARE SELECTED TO OBTAIN CONSOLIDATION DATA REPRESENTING THE FIELD LOADING CONDITIONS FOR WHICH THE TEST IS BEING PERFORMED. EACH LOAD INCREMENT IS ALLOWED TO ACT OVER AN INTERVAL OF TIME DEPENDENT ON THE TYPE AND EXTENT OF THE SOIL IN THE ch FIELD. O . c A-4 LPL GAMES C MOORE Nts.. •. tavil 111111, UNITED ACCESS FREEWAY NO. 405 ______._..-------7 • .----J--1 {------ I • {----- . • • • • . .. 1 . SW. Om ST. PROPOSED 2 STORY rd,....,OFFICES 3 �o • o • \ r -I61-4 r----, EXPAWSION I I ,I - V EXPANSION PROPOSED BUILDING COMPLEX 1 \ • N W Q . O 2 44 a a • 2 • L EXPANSION mli N... • PROPERTY LINE AND PROPOSED APPROXIMATE LOCATION MAINTENANCE • OF DRAINAGE DITCH SHOP t� • � • 61-2 ,16 KEY:AN \ I iqpr BORINGS PERFORMED DURING THIS INVESTIGATION_411 \ 61-2 PREVIOUS BORINGS BY DAMES E. MOORE PLOT PLAN FEET 100 O 100 200 REFERENCE: SITE PLAN NO. S. GROUP HEALTH OAM!>!I< 8 MOOR! COOPERATIVE SERVICE CENTER C.. r. • MAJOR DIVISIONS GRAPH LETTER TYPICAL DESCRIPTIONS • SYMBOL SYMBOL • +• i • •' +' :.• WELL-GRADED GRAVELS, GRAVEL- GRAVEL CLEAN GRAVELS 6.Pt �o GW SAND MI TURES, LITTLE OR NO FIN AND (LITTLE OR NO 6.$ • ••` • GRAVELLY FINES) ° imIEE:•t.:i::H ik?; ;lkii1...l4; POORLY-GRADED GRAVELS, GRAVEL- - ilo^ r.,st SAND MIXTURES, LITTLE OR SOILS ::t:��::°::::ijt:a'�� COARSE i:l ;al�.s+: NO FINES GRAINED r Mi I. . SILTY GRAVELS, GRAVEL-SAHO- SOILSMjIy I'i GM SILT MIXTURES YORE THAN 50 GRAVELS WITH FINES M•I�} !Li • OF COARSE FRAC- M iiI (APPRECIABLE AMOUNT TION pETAINED •• ON NO. 4 SIEVE OF FINES) �7-y �r� CLAYEY GRAVELS, GRAVEL•SAND- '*•.•e• w r GC CLAY YI%TURES ..* AI'•11 SW WELL-GRADED SANDS, GRAVELLY • SAND CLEAN SAND • SANDS, LITTLE OR NO FINES AND (LITTLE OR NO H • SANDY FINES SP POORLY-GRADED SANDS, GRAVELLY MORE THAN SO^/e SOILS SANDS, LITTLE OR NO FINES OF MATERIAL IS - i,�AW R THAN NO. ?If t`200 SIEVE SIZE ' � S M SILTY SANDS, SAND-SILT MIXTURES MORE THAN S0i SANDS WITH FINESOF COARSE FRAC- (APPRECIABLE AMOUNT cs, 'tii "ON PASSING OF FINES) r,�y f;•1'-°/. NO. 4 SIEVE y'rl' • SC CLAYEY SANDS, SAND-CLAY MIXTURES d ../ ' : •( ' I .I I INORGANIC SILTS AND VERY FINE ML SANDS, ROCK FLOUR, SILTY OR — CLAYEY FINE SANDS OR CLAYEY SILTS WITH SLIGHT PLASTICITY SILTS FINE LIQUID LIMIT / / NORPLAS CLAYS A LOW C MEDIUM ��� PLASTICITY, GRAVELLY CLASS, GRAINEDAND )Fee THAN SO / SANDY CLAYS, SILTY CLASS,LEAN • SOILS CLAYS / / CL CLAYS I i , , ORGANIC SILTS AND ORGANIC I I 11 1 OL SILTY CLAYS OF LOW PLASTICITY I I I i I I 1 1 I INORGANIC SILTS, WCACEOUS OR • 1111111 M H SILTY DIATOMACEOUS SOILS FINE SAND OR - MORE THAN 50 % SILTS LIQUID LIYI7 �/ INORGANIC CLAYS OF HIGH /. OF MATERIAL IS CAND LAYS R AT R THAN SO // CH PLASTICITY, FAT CLAYS M SALERL THAN NO. 200 SIEVE SIZE f,/ / / . / /j/ ORGANIC CLAYS OP MEDIUM TO HIGH /�;/ ',','i// OH PLASTICTY, ORGANIC SILTS / I PT PEAT, HUMUS, SWAMP SOILS =HIGHLY ORGANIC SOILS — WITH HIGH ORGANIC CONTENTS L =A NOTE' DUAL SYMBOLS ARE USED TO INDICATE BORDERLINE SOIL CLASSIFICATIONS. SOIL CLASSIFICATION CHART UNIFIED SOIL CLASSIFICATION SYSTEM • pAME8 a MOORS • BORING 3 BORING 4 • 25 25 ELEVATION 23 t II���II GRAY ILTY FINE TO MEDIUM SAND ELEVATION 22 I© SOD AND TOPSOIL IN UPPER 6" 27.7%-90 9 +'I`II® BROWN FINE SAND WITH SLIGHT SILT 20 2 1 GRAY MOTTLED BROWN SILT WITH TRACE OF 20 CONTENT (MEDIUM DENSE)(FILL) ML SAND AND LAYERS HAVING OECAYED,WOOD ,I( SM SOD ANO TOPSOIL IN UPPER 6" 37.2%79 , (MEDIUM STIFF) 2 DARK GRAYISH BROWN SILTY FINE SAND 32.3%-35 ■ ih WITH OCCASIONAL DECAYED W000 (LOOSE 45.2%7515 ' LAYERS OF CLAYEY SILT 15 , 11111 3 GRADES TO SOFT 38.9% 79 I 5 W 29.4%-90 • ' 1 w± 10 Id 10 I Z 14 1;1 SM GRAY SLIGHTLY S..TY FINE SAND WITH Z Z • ;;0 DECAYEDSWOODS(MEDIUMES OF ILT AND DENSE) OCCASIONAL Z 31 iI 0 �� , ' I GRADES TO DARK GRAY AND DENSE i < 5 I W 5 W 41 u, 24 11,1111 II "' 1 i 60 11 c ® t• GRAY SLIGHTLY SILTY FINE TO MEDIUM 1 BROWN SILT WITH SOME CLAY AND TRACE OF O 1, '� SANDY GRAVEL (DENSE) i 0 - - 34 SAND (MEDIUM STIFF) ([ 22.5".-101 . III * III�! a o Gm GRAY SILTY SANDY GRAVEL WITH LAYERS OF • ��• BORING COMPLETED 11-26-74 -5 ii,�(� SAND AND DECAYED WOOD AT ELVATION -2' _5 * BLOW COUNT AFFECTED BY GRAVEL (DENSE) • I��II BORING COMPLETED 11-26-74 * BLOW COUNT AFFECTED BY GRAVEL -10 BORING 5 25 ELEVATION 23 i BROWN SAND WITH ROOTS AND ORGANIC * 35.7X 77 2 dI�A R MATTTER6(FILL) SOD AND TOPSOIL IN 7 20 • I'I DARK GRAYISH BROWN SILTY FINE SAND WITH LAYERS OF BROWN CLAYEY SILT N 4 (LOOSE)(MEDIUM DENSE) 44.4.-74 , GRADES TO GRAY °o WATER LEVEL 12-5-74 15 2 4.8%-85 • I'I I 1 Z GRAY SILT WITH OCCASIONAL DECAYED • Z WOOD AND LENSES OF SILTY SAND 10 r- 7 (MEDIUM STIFF) 33.9v-87 ; 1111 Yt u W am SP DARK GRAY TO BLACK FINE SAND (MEDIUM Iu SM DENSE) 5 14 • GRADES TO GRAY WITH SLIGHT SILT CONTENT GRAY SLIGHTLY SILTY FINE TO COARSE 95 IlliiiSANDY GRAVEL (DENSE) • 1 BORING COMPLETED 11-27-74 PIEZOMETER INSTALLED -5 • • ' DAMES 6 MOORE (r,. • • BORING I BORING 2 • 25 25 ELEVATION 22 t ELEVATION 22* 11.3% 119 ?7 ��' GRAY SILTY FINE SAND WITH OCCASIONAL '111II GRAY SILTY FINE TO MEDIUM SAND WITH _ I AND TRACE OF ORGANIC MAFERIAL Y0 OCCASIONAL GRAVEL (OENSE)(FILL) 20 . il `I GRAVEL)(FILL) 10 ( II SOO AND TOPSOIL IN UPPER 6" GRADES TO MOTTLED GRAY AND BROWN 15.7%-103 • 1 mi. MOTTLED GRAY AND BROWN SILT WITH 4 1 WITH INCREASING SILT j FINE SAND AND OCCASIONAL ORGANIC 50.4%-69 .I 2 MATTER (MEDIUM STIFF) ML. GRAY CLAYEY SILT WITH OCCASIONAL 37.5%-81 . 15 LENSES OF FINE SANDY SILT 15 43.0%-77 GRADES TO SOFT GRADES TO GRAY WITH SOME SAND AND 5 LAYERS OF SILTY FINE SAND • 10 10 , • 29 BLACK FINE SAND WITH SLIGHT SILT W • CONTENT (MEDIUM DENSE) r. 1 r. 5 vl 1 s- GRAY SILT WITH TRACE OF FINE SAND Z 33.1%-91 • Z 5 19 IIllI© (MEDIUM STIFF) 0 5 • ZLACK FINE TO MEDIUM SAND WITH < i i* Z > 30 DARK GRAY FINE SAND WITH OCCASIONAL *.1 0 — (DENSE)NAL ZONES OF SILTY SAND 2B,6%96 LAYERS OF SANDY SILT (DENSE) t = _ GRAY FINE TO MEDIUM SANDY GRAVEL W 0 - > D = WITH ZONES HAVING SOME SILT CONTENT W ` K. ® (DENSE) 60 _-• GW GRAY FINE COARSE SANDY GRAVEL WIT '�`" TRACE OF SILT ice• _ ® :r -5 w -5 36 =- . • - 0 . k BORING COMPLETED 11-26-74 -10 — -10 EEE 43 9.2%-130 IS Elt -15 tfff 90 PE-7 Ill s m GRAY FINE TO MEDIUM SAND WITH OCCASIONAL FINE GRAVEL (VERY DENSE) ilJ • _20 _ BORING COMPLETED 11-25-74 * BLOW COUNT AFFECTED BY GRAVEL O p • r t V r li u KEY: ' rBLOWS REQUIRED TO DRIVE SAMPLER ONE FOOT MOISTURE 'WEIGHT. 350 LBS.. STROKE• 24 INCHES. CONTENT/ 68.4%-79 ■ INDICATES DEPTH AT WHICH UNDISTURBED DRY—J SAMPLE WAS EXTRACTED. DENSITY IN PCF ®INDICATES DEPTH AT WHICH DISTURBED SAMPLE WAS EXTRACTED. LOG OF BORINGS NOTE: THE DISCUSSION IN THE TEXT OF THIS REPORT IS pAMeS IS W NECESSARY FOR A PROPER UNDERSTANDING OF THE WOO NATURE OF THE SUBSURFACE MATERIALS. .3-7 BY JAM DATE 12- 17- 74 FILE 8521 -003 REVISIONS . CHECKED BY BY DATE MOISTURE DRY NORMAL YIELD P . BORING ELEVATION SOIL TYPE CONTENT DENSITY PRESSURE SHEAR % OF STRENGTH DRY WEIGHT LBS./CU.FT. LBS./SQ. FT LBS./SQ.FT. 1 13 . 0 CLAYEY SILT 43 . 0 77 800 300 2 16 . 5 SILT 37 . 5 81 1400 500 2 6 . 5 SILTY SAND 33 . 1 91 2100 1200 3 19 . 0 SANDY SILT 37 . 2 79 1200 300 3 13 .0 CLAYEY SILT 38 .9 79 500 200 3 3 . 5 . SILTY SAND 38 . 1 85 2700 1400 4 18 .0 SILTY SAND 32 . 3 85 900 500 4 12 . 0 SILTY SAND 29 . 4 90 2000 1100 5 20. 5 SILTY SAND 35 . 7 77 600 300 5 14.0 SILTY SAND 34.8 85 • 1200 500 .., $y Y�a it ' • 4 • I M0 M SUMMARY OF DIRECT SHEAR. TEST DATA , 8 • • LOAD INp LBS./SO. FT. • .00 .01 .02 .03 .04 I = = I V Z.05 rn io = 0.06 • i a .07 Z � 0 F- I Q I O co U.09 .10 nl i s .11 0 0 • .12 ' I • 0 w Y Y T I • .13 BORING ELE164TiQd SOIL TYPE MOISTURE CONTENT CRY DENSITY IN BEFORE AFTER LBS./CU.FT. 1 13 CLAYEY SILT 43.4% 36.5% 77 CONSOLIDATION TEST DATA o*MU: B MUORR ••IL IC••111•1 • C. • LOAD INp LBWS./S,O. FT.' • `� ' �� .0° 41' ;FPfi tov ra" , , , ,pd,�d�, / 00 .01 .02 • .03 .04 • 0.OS N r . W o 0.06 • r Z C • Z.07 0 I•- 0.08 -I 0 Z 0 .09 .10 r u .11 0 0 .12 • .13 • BORING ELE4%TION • SOIL TYPE MOISTURE CONTENT DRY DENSITY IN BEFORE AFTER LBS./CU.FT. 3 16 CLAYEY SILT 45.2% 38.2% 76 CONSOLIDATION TEST DATA • DAMES i MOOR■ SOIL rCCNAUIC•[••1 . ... .. ., .. .. . . ... •••••:** ''••• •-::- - '••••'• ••••—•-•- ' ''c".• . .-•.. .. .• . . . ..i...-. • !:..::: ::::::::. .:...;.: ....)::;:: ..i.:iii....... , !:i!!... !;!:.!......: .:-..!.:::.,:, ::::::,1 3 4:0 2:6:::.:,., CITY OF RENT . .....„. • ,:i:;:.,,... .,.....::. ......- .:::!...-, ::::: .::.:.,' U.S..SANK OF WASHINGTON .•.."1 9-1 0/21 s'.-•;.-... • AO RENTON BRANCH •'.. 1 250 •"•'''''•'• r. . . • •••• • • — - • PAi, $250 DOLLARS AND ZERO.•:?CEN148:: T.' ;,:.:., DATE .. 04j05/ . ..':,. *......- AMOUNT ***'k****:.2:50..'60:;:::.: ..--..•,.: ..J:.; ::,. i-:-..... ......i'f: .:. :.:::. VOID:AFTER•iii•M ONTOS ::•••'' .•••• •'''':'•':;, •-•....::::.....• .•:.-...'..-.. ••••41!....•••:„!•:.. .•':'• ...:•i:L.:.- '1.•:::;.:"'•••!,......,••'''' •,•-:',..?..• ...':•-•'+•.....:'•.••••"' - :,....,... ,:;...,. ...!-•:..!.. ••,•:•:.r...... ., .. TO THE ORDER OF ''.•.';:' i'.,;' ••..! ••;•:, :•5•:,' •:•'": .•:'-''''•• '..'•;•'',.•!:.. •!:.•!'.... '...,' :•••.. ,••••••••'• '..•-•••• ,•,•' ";.:•::..•.. .... :..• • ••• '•'•'.::: '"': 0.'KEE FE- .. . .... .. .. .„.._. ,iF•'.., ".:•'.- ....:! .;-. -- '...:....,:•-, :1! .:,i.,':,. ','.i..:-:'.. •7:::,.: .-:',..'• .-,...i. ::..,• "-'.'. 1319. DEkTER AVE N !Ifq60 il::::i. -:::!!'.' ,.!....:.:i .i.:-..! ..;:t,..• ,;.!..:.•....." :.,'..,..i:::: 1:.... ,.:": 1/4,..;...‘c:y1 '..:.::::: :-'•'''••••,..: '.::;:':.-,..-: SEATTLE-•;•.':N,WA 98109......i.:::: ..::::-,...!,,,,....„,.,..::',.:1'.. ,...'...:-..Z.,.. ,,...::::::,.....,.............!':::.', ••'...:..-...''i.!...::'' '''i.'•••••• !;.::--...':i.:.•!i.:.:"J• •.::', 11'43 4 CE:-'2 11' 1: L 2 5 00 0 I 0..:5 : :0. 2 L....? 0• 1-1 7 II' „.:...i::::,:- .!!•:::::- :...i';:,.*:, .:...,:!..., ...i...1. . .:!..;;.... _ •!;.::: ::::, ::;-:::: •••....:•:•! .'!::::.i..'. :::::. '1:1;.:: •:::1::,:i. ,..::: :::::•••::: .:.:•...., '...,.:::•i :I::: ;•:::::! :•,::::: :•::., .i::::. ....!iil ..-:::'-: ::.' :•ni: ..,:::•••;. ::.::, ::::::.: ::::,:' ::::,:!: ::: -;!::::,. •,-...---: :::: i:,]:::'; ,:•!::::! i:::.::' :::!:': '..:::•..: ::'•:::::1! :!...i: !.:'.i.]:'. .:::;.!:. :'..':•!:. .:::' .::::::., •I ...:.... •...:::::::•-•iiiIE5'..f*4i.i.i::::•.7.... :..?i:•i:ii::::::: :ii.:7::.:::Miiiii$:::::%iiii46•16:.i$g'i.i'Am .M":::::::":':::-FRE:.:1..-4.::.:.:::::.H.i.:::'.:':;:!"::::ii::::i.iib4i6k:6.Ato:.:i..iii CHECK AMOUNT .:::::::::::-.. CHECK NO 300164 O'KEEFE 04/05/96 250.00 0134026 I.'...'•}.....:ii.;ii.:.!.ilig'ili.i.ii.i.i.i....:.INVOi6 ;•!%:::•.....::li'iiiii!i::::.::::.81r..:1....',...:'- 4.1::..A0t.a.iii: -:.ig...i.i....al I.....:.!.;•1.............. Refund 0'Kee 250.00 • . • • • • • • CITY OF RENTON• 200 MILL AVE S.• RENTON,WASHINGTON 98055• PHONE(206) 235-2617• FAX(206)235-2513 DP31115 2/93 yead City of Renton Finance Departmi-,... Request for Clail or Treasurer's Check Date of Request - 2 - Date Required ( Requesting Department Authorized Signature 1 ' •• REASON FOR CHECK Deposit Refund Name (;) Amount -7,-50, al) Finance Receipt No R'1,;:r Cl D.(7 Receipt Date 3 Other - Describe Circumstances Requiring Issuance of Check: f-i Ir1; Wif iccr flu. hog ne eokf6i CHECK PREPARATION INSTRUCTIONS Amount $ ..17,5'). co Charge to Account(s) 07) eif5, Payable To „ C 'C(6 • Address cyc; A/ ct t" • fl Mail Check to Payee — CI?IL/4 tr, Return to Dept: Al.I 11 Soc Sec or IRS ID No Other: • CHECK AUTHORIZATION - Finance Department Use Only Approved /- .. 4 )4S Date -1 /C1 ,,.41.c 4,5/1-) /ti-' 0 Claims fl Treasurer's Check No: CTY006/7/89 4110 **************************************************************** City of Renton WA Reprinted: 03/15/96 12 : 04 Receipt **************************************************************** Receipt Number: R9601097 Amount : 3, 255 . 12 03/15/96 12 : 04 Payment Method: CHECK Notation: OKEEFE 1009 Init : JB Project # : LUA96-034 Type : LUA Land Use Actions Parcel No: 334040-5300 Site Address : 801 SW 16TH ST Location: 801 SW 16TH STREET Total Fees : 3 , 255 . 12 This Payment 3 , 255 . 12 , Total ALL Pmts : 3 , 255 . 12 Balance : . 00 **************************************************************** Account Code Description Amount 000 .345 . 81 . 00 . 0007 Environmental Review 500 . 00 000 .345 . 81 . 00 . 0016 Shoreline Subst Dev 500 . 00 000 .345 . 81 . 00 . 0017 Site Plan Approval 2, 000 . 00 000 .345 . 81 . 00 . 0019 Variance Fees 250 . 00 000 . 05 . 519 . 90 .42 . 1 Postage 5 . 12 - -03 41 stl v,s'441 •••••••••••••••••• •••• ••••••••••••••••••••••••••••••••••••.............................................. .......••••••••• •••• •••••.................................................... ••••• •••• •••••• ............................................ ••• •••••••••• ••••• .................................................................................................. ••• ............................................................................................................................................................................ •••••••••• ••• .............................................. •••••••••••• ••• .................................................... • ••• .............................................. ........................................... ••••••••••..................................................... le.l.00leooc000ioiomipooioNogPAM!1)titiftgINCIIIIIIIIII FOR GROUP HEALTH WASHINGTON. . • ••••••••OUR JOB NO. 5687 ' MARCH 1996 ' - CfP Prepared By: 9q,k. cL,„ ,;tv•- BARGHAUSEN CONSULTING ENGINEERS, INC. 18215 72ND AVENUE SOUTH KENT, WASHINGTON 98032 (206) 251 -6222 coHat, .2- 4lit to. - CIVIL ENGINEERING, LAND PLANNING, SURVEYING., ENVIRONMENTAL SERVICES ‘N,GEN'w, e57. 000'5 O'%/ nal Mole --whowiraf Xi cr ii 1 ,wZoA 4roa--irt/snldwo2 0 00o `Ors = J.0-1 Qv�b' 9n'l to 49 cle9v'Id Sii v✓s►'l an /v d 0 v' -AL VA QO? 4- W/ rvaLw5 viA9 Mid QQQ ctivrno/► ?/A 01 ad Oat/ 7,0f ) -. P0Z (00 a 4�?/)(- % 5 14210/1 CV] e '9°& • (1) N 1 ./v•z . Q'd • Cy/ Q'a = Zd N N N AAA N N Sn0 n gywi - Q Sb Z rye 000 potivaggy -AoQ 06 z /1/7 mmrm ?so 078 -L /1/-7 c 5-7105 ar "SAL y;1H 4 c'/► ) z $MCA allyf S(7O/A7JJd cn-aQ) -7-1,/ 6-e_ Z be '-v Snot4 zcedtyl 0_6a A ate) -7-1, Pea-ZIA/ • 3/13/96 Barghausen Engineers page 1 GROUP. HEALTH -- RENTON PRELIMINARY DETENTION CALCULATIONS BCE FILE 5687-PRE BASIN SUMMARY BASIN ID: Al NAME: 2YR/24HR PREDEVELOPED SBUH METHODOLOGY TOTAL AREA • 22.40 Acres BASEFLOWS: 0. 00 cfs RAINFALL TYPE TYPE1A PERVIOUS AREA PRECIPITATION • 2 . 00 inches AREA. . : 22 .40 Acres TIME INTERVAL 10. 00 min CN • 86. 00 TIME OF CONC • 80. 93 min IMPERVIOUS AREA ABSTRACTION COEFF: 0.20 AREA. . : 0. 00 Acres CN • 98. 00 TcReach - Sheet L: 300. 00 ns: 0.2400 p2yr: 2 . 00 s: 0. 0100 TcReach - Shallow L: 900. 00 ks:9. 00 s: 0. 0050 PEAK RATE: 1.72 cfs VOL: 1.58 Ac-ft TIME: 540 min BASIN ID: A2 NAME: 10YR/24HR PREDEVELOPED SBUH METHODOLOGY TOTAL AREA • 22 .40 Acres BASEFLOWS: 0. 00 cfs RAINFALL TYPE TYPE1A PERVIOUS AREA PRECIPITATION • 2 .90 inches AREA. . : 22 .40 Acres TIME INTERVAL 10. 00 min CN • 86. 00 TIME OF CONC • 80.93 min IMPERVIOUS AREA ABSTRACTION COEFF: 0. 20 AREA. . : 0. 00 Acres CN • 98 . 00 TcReach - Sheet L: 300. 00 ns: 0. 2400 p2yr: 2 . 00 s: 0. 0100 TcReach - Shallow L: 900. 00 ks:9 . 00 s: 0. 0050 PEAK RATE: 3 . 57 cfs VOL: 2 . 94 Ac-ft TIME: 510 min BASIN ID: A3 NAME: 100YR/24HR PREDEVELOPED SBUH METHODOLOGY TOTAL AREA • 22 .40 Acres BASEFLOWS: 0. 00 cfs RAINFALL TYPE • TYPE1A PERVIOUS AREA PRECIPITATION • 3 .90 inches AREA. . : 22 .40 Acres TIME INTERVAL • 10. 00 min CN • 86. 00 TIME OF CONC • 80. 93 min IMPERVIOUS AREA ABSTRACTION COEFF: 0.20 AREA. . : 0. 00 Acres CN • 98. 00 TcReach - Sheet L: 300. 00 ns: 0. 2400 p2yr: 2 . 00 s: 0. 0100 TcReach - Shallow L: 900. 00 ks: 9 . 00 s: 0. 0050 PEAK RATE: 5.98 cfs VOL: 4 . 58 Ac-ft TIME: 490 min 3/13/96 Barghausen Engineers page 2 GROUP HEALTH -- RENTON PRELIMINARY DETENTION CALCULATIONS i BCE FILE 5687-PRE BASIN SUMMARY BASIN ID: A4 NAME: 2YR/24HR POST-DEVELOPED SBUH METHODOLOGY TOTAL AREA • 22 .40 Acres BASEFLOWS: 0. 00 cfs RAINFALL TYPE • TYPE1A PERVIOUS AREA PRECIPITATION • 2 . 00 inches AREA. . : 4. 60 Acres TIME INTERVAL • 10. 00 min CN • 90. 00 TIME OF CONC • 10. 00 min IMPERVIOUS AREA ABSTRACTION COEFF: 0.20 AREA. . : 17 . 80 Acres CN • 98 . 00 PEAK RATE: 8 . 00 cfs VOL: 3 . 05 Ac-ft TIME: 480 min. BASIN ID: A5 NAME: 10YR/24HR POST-DEVELOPED SBUH METHODOLOGY TOTAL AREA • 22 .40 Acres BASEFLOWS: 0. 00 cfs RAINFALL TYPE • TYPE1A PERVIOUS AREA ' PRECIPITATION • 2 .90 inches AREA. . : 4 . 60 Acres TIME INTERVAL • 10. 00 min CN • 90. 00 TIME OF CONC • 10. 00 min IMPERVIOUS AREA ABSTRACTION COEFF: 0.20 AREA. . : 17.80 Acres CN • 98. 00 PEAK RATE: 12 . 21 cfs VOL: 4 . 68 Ac-ft TIME: 480 min BASIN ID: A6 NAME: 100YR/24HR POST-DEVELOPED SBUH METHODOLOGY TOTAL AREA • 22 . 40 Acres BASEFLOWS: 0. 00 cfs RAINFALL TYPE • TYPE1A PERVIOUS AREA PRECIPITATION • 3 . 90 inches AREA. . : 4 . 60 Acres TIME INTERVAL • 10. 00 min CN • 90. 00 TIME OF CONC • 10. 00 min IMPERVIOUS AREA ABSTRACTION COEFF: 0.20 AREA. . : 17 .80 Acres CN • 98. 00 PEAK RATE: 16. 90 cfs VOL: 6. 52 Ac-ft TIME: 480 min 3/13/96 Barghausen Engineers page 3 GROUP HEALTH -- RENTON PRELIMINARY DETENTION CALCULATIONS BCE FILE 5687-PRE HYDROGRAPH SUMMARY PEAK TIME VOLUME HYD RUNOFF OF OF Contrib NUM RATE PEAK HYDRO Area cfs min. cf-AcFt Acres 1 1.725 540 69034 cf 22.40 2 3 .573 510 128240 cf 22 .40 3 5.978 490 199695 cf 22 .40 4 7 . 996 480 132916 cf 22 .40 5 12 . 212 480 204036 cf 22 .40 6 16. 900 480 283996 cf 22.40 7 1. 724 700 132916 cf 22 .40 8 3 . 545 580 204036 cf 22. 40 9 7. 813 530 283996 cf 22 . 40 3/13/96 Barghausen Engineers page 4 GROUP HEALTH -- RENTON PRELIMINARY DETENTION CALCULATIONS BCE FILE 5687-PRE STAGE STORAGE TABLE TRAPEZOIDAL BASIN ID No. 1 Description: PRELIMINARY DETENTION POND Length: 100. 00 ft. Width: 180. 00 ft. Side Slope 1: 3 Side Slope 3 : 3 Side Slope 2 : 3 Side Slope 4 : 3 Infiltration Rate: 0. 00 min/inch STAGE <----STORAGE----> STAGE <----STORAGE----> STAGE <----STORAGE----> STAGE <----STORAGE----> (ft) ---cf--- --Ac-Ft- (ft) ---cf--- --Ac-Ft- (ft) ---cf--- --Ac-Ft- (ft) ---cf--- --Ac-Ft- 10.00 0.0000 0.0000 10.80 14944 0.3431 11.60 31000 0.7117 12.40 48204 1.1066 10.10 1808 0.0415 10.90 16889 0.3877 11.70 33087 0.7596 12.50 50438 1.1579 10.20 3634 0.0834 11.00 18852 0.4328 11.80 35192 0.8079 12.60 52689 1.2096 10.30 5476 0.1257 11.10 20832 0.4782 11.90 37315 0.8566 12.70 54960 1.2617 10.40 7335 0.1684 11.20 22830 0.5241 12.00 39456 0.9058 12.80 57249 1.3143 10.50 9212 0.2115 11.30 24846 0.5704 12.10 41616 0.9554 12.90 59557 1.3672 10.60 11105 0.2549 11.40 26879 0.6171 12.20 43793 1.0054 13.00 61884 1.4207 10.70 13016 0.2988 11.50 28931 0.6642 12.30 45990 1.0558 • 3/13/96 Barghausen Engineers page 6 GROUP HEALTH -- RENTON PRELIMINARY DETENTION CALCULATIONS BCE FILE 5687-PRE STAGE DISCHARGE TABLE MULTIPLE ORIFICE ID No. 1 Description: PRELIMINARY DISCHARGE Outlet Elev: 10. 00 • Elev: 8. 00 ft Orifice Diameter: 6.5977 in. STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> (ft) ---cfs (ft) ---cfs (ft) ---cfs (ft) ---cfs 10.00 0.0000 11.30 1.3468 12.60 1.9047 13.90 2.3328 10.10 0.3735 11.40 1.3977 12.70 1.9410 14.00 2.3625 10.20 0.5283 11.50 1.4467 12.80 1.9766 14.10 2.3918 10.30 0.6470 11.60 1.4942 12.90 2.0116 14.20 2.4208 10.40 0.7471 11.70 1.5402 13.00 2.0460 14.30 2.4495 10.50 0.8353 11.80 1.5848 13.10 2.0798 14.40 2.4778 10.60 0.9150 11.90 1.6282 13.20 2.1131 14.50 2.5058 10.70 0.9883 12.00 1.6705 13.30 2.1458 14.60 2.5335 10.80 1.0565 12.10 1.7118 13.40 2.1781 14.70 2.5609 10.90 1.1206 12.20 1.7521 13.50 2.2099 14.80 2.5880 11.00 1.1812 12.30 1.7915 13.60 2.2413 14.90 2.6148 11.10 1.2389 12.40 1.8300 13.70 2.2722 15.00 2.6414 11.20 1.2940 12.50 1.8677 13.80 2.3027 3/13/96 Barghausen Engineers page 7 GROUP HEALTH -- RENTON PRELIMINARY DETENTION CALCULATIONS BCE FILE 5687-PRE STAGE DISCHARGE TABLE NOTCH WEIR ID No. 2 Description: 10YR NOTCH WEIR Weir Length: 0. 7200 ft. Weir height (p) : 2 . 1300 ft. Elevation 12 . 13 ft. Weir Increm: 0. 10 STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> (ft) ---cfs (ft) ---cfs (ft) ---cfs (ft) ---cfs 12.13 0.0000 12.90 1.3058 13.70 2.8472 14.50 3.3345 12.20 0.0429 13.00 1.5212 13.80 2.9853 14.60 3.2757 12.30 0.1588 13.10 1.7347 13.90 3.1048 14.70 3.1849 12.40 0.3103 13.20 1.9439 14.00 3.2040 14.80 3.0604 12.50 0.4855 13.30 2.1464 14.10. 3.2810 14.90 2.9006 12.60 0.6774 13.40 2.3400 14.20 3.3343 15.00 2.7039 12.70 0.8807 13.50 2.5226 14.30 3.3621 12.80 1.0913 13.60 2.6923 14.40 3.3627 3/13/96 Barghausen Engineers page 8 GROUP HEALTH -- RENTON PRELIMINARY DETENTION CALCULATIONS BCE FILE 5687-PRE STAGE DISCHARGE TABLE COMBINATION DISCHARGE ID No. 3 Description: 2/10YR RELEASE Structure: 1 Structure: Structure: 2 Structure: Structure: STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> (ft) ---cfs (ft). ---cfs (ft) ---cfs (ft) ---cfs 10.00 0.0000 11.30 1.3468 12.60 2.5821 13.90 5.4376 10.10 0.3735 11.40 1.3977 12.70 2.8217 14.00 5.5665 10.20 0.5283 11.50 1.4467 12.80 3.0679 14.10 5.6729 10.30 0.6470 11.60 1.4942 12.90 3.3174 14.20 5.7552 10.40 0.7471 11.70 1.5402 13.00 3.5672 14.30 5.8116 10.50 0.8353 11.80 1.5848 13.10 3.8145 14.40 5.8405 10.60 0.9150 11.90 1.6282 13.20 4.0570 14.50 5.8403 10.70 0.9883 12.00 1.6705 13.30 4.2922 14.60 5.8092 10.80 1.0565 12.10 1.7118 13.40 4.5181 14.70 5.7458 10.90 1.1206 12.20 1.7950 13.50 4.7326 14.80 5.6484 11.00 1.1812 12.30 1.9502 13.60 4.9336 14.90 5.5154 11.10 1.2389 12.40 2.1403 13.70 5.1194 15.00 5.3452 11.20 1.2940 12.50 2.3532 13.80 5.2879 3/13/96 Barghausen Engineers page 9 GROUP HEALTH -- RENTON PRELIMINARY DETENTION CALCULATIONS BCE FILE 5687-PRE STAGE DISCHARGE TABLE RISER DISCHARGE ID No. 4 Description: 100YR RISE OVERFLOW Riser Diameter (in) : 12 . 00 elev: 13 . 00 ft Weir Coefficient. . . : 3 .782 height: 15. 00 ft Orif Coefficient. . . : 9.739 increm: 0. 10 ft STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> (ft) ---cfs (ft) ---cfs (ft) ---cfs (ft) ---cfs 13.00 0.0000 13.50 2.6743 14.10 3.9666 14.70 4.9311 13.00 0.0000 13.60 2.9295 14.20 4.1430 14.80 5.0741 13.10 0.3080 13.70 3.1642 14.30 4.3121 14.90 5.2131 13.20 0.8711 13.80 3.3827 14.40 4.4749 15.00 5.3486 13.30 1.6003 13.90 3.5879 14.50 4.6320 13.40 2.3919 14.00 3.7820 14.60 4.7839 3/13/96 Barghausen Engineers page 10 GROUP HEALTH -- RENTON PRELIMINARY DETENTION CALCULATIONS BCE FILE 5687-PRE STAGE DISCHARGE TABLE COMBINATION DISCHARGE ID No. 5 Description: 2/10/100YR RELEASE Structure: 1 Structure: Structure: 2 Structure: Structure: 4 STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> STAGE <--DISCHARGE---> (ft) ---cfs (ft) ---cfs (ft) ---cfs (ft) ---cfs 10.00 0.0000 11.30 1.3468 12.60 2.5821 13.90 9.0255 10.10 0.3735 11.40 1.3977 12.70 2.8217 14.00 9.3485 10.20 0.5283 11.50 1.4467 12.80 3.0679 14.10 • 9.6395 10.30 0.6470 11.60 1.4942 12.90 3.3174 14.20 9.8981 10.40 0.7471 11.70 1.5402 13.00 3.5672 14.30 10.124 10.50 0.8353 11.80 1.5848 13.10 4.1225 14.40 10.315 10.60 0.9150 11.90 1.6282 13.20 4.9281 14.50 10.472 10.70 0.9883 12.00 1.6705 13.30 5.8925 14.60 10.593 10.80 1.0565 12.10 1.7118 13.40 6.9100 14.70 10.677 10.90 1.1206 12.20 1.7950 13.50 7.4068 14.80 10.723 11.00 1.1812 12.30 1.9502 13.60 7.8631 14.90 10.729 11.10 1.2389 12.40 2.1403 13.70 8.2836 15.00 10.694 11.20 1.2940 12.50 2.3532 13.80 8.6707 3/13/96 Barghausen Engineers page 11 GROUP HEALTH -- RENTON PRELIMINARY DETENTION CALCULATIONS BCE FILE 5687-PRE LEVEL POOL TABLE SUMMARY • MATCH INFLOW -STO- -DIS- <-PEAK-> STORAGE < DESCRIPTION > (cfs) (cfs) --id- --id- <-STAGE> id VOL (cf) 2YR/24HR PRELIM 1.72 8.00 1 1 12.13 7 42262.41 10YR/24HR PRELIM 3.57 12.21 1 3 12.99 8 61680.84 100YR/24HR PRELIM 5.98 16.90 1 5 13.59 9 75978.94 !v iorim i yzoA) Swig L P95/6,3 eAks.s 'Jsa r re(o pry y3 Z re_44 w - ( St as jrn lr '02 C A5/-v-6, Q= <. 5( cPs v5ar- A/ = 6', 6, 62 F1-4-7- ZZZ 11111.1111 IL III ILI J E G i!N ( LoG/".`4A (JG�e-"pl o V1Nt/l 000 uf00 " go?o y vr//vvsi ze 2 q-CD cF s tA/At,g- = 5-31 -Cl gt nrr �Dc,J �P M)/P8Z� z q•31 Pr su2FAC- - - 61.3/'cr)C z.0 = 187e. s:r /8rZ4 c— �nvt qt({�� 1../g/6-9? z (73 L , -O A) WiD 7- I2 i' 0- _T 878 sh/i Zs Z 1'd-73 — ecrialO Z 7.2.s`F W t o c 7. 0i 44l�nJ Trapezoidal Channel Analysis & Design Open Channel - Uniform flow Worksheet Name: 5687 - GROUP HEALTH Comment : 200 LF BIOFILTRATION SWALE DESIGN Solve For Bottom Width Given Input Data: Left Side Slope 3.00: 1 (H:V ) Right Side Slope 3.00: 1 (H:V) Manning's n 0.350 Channel Slope 0.0200 ft/ft Depth 0.67 ft Discharge 1 .91 cfs Computed Results: Bottom Width. . . . 5.37 ft Velocity 0.39 fps Flow Area 4.95 sf Flow Top Width 9.39 ft Wetted Perimeter 9.61 ft Critical Depth 0. 15 ft Critical Slope 3.4611 ft/ft Froude Number 0.09 ( flow is Subcritical ) Open Channel Flow Module , Version 3.41 (c ) 1991 Haestad Methods , Inc. * 37 Brookside Rd * Waterbury , Ct 06708 Trapezoidal Channel Analysis & Design Open Channel - Uniform flow Worksheet Name: 5687 - GROUP HEALTKH Comment: 175 LF ACTUAL SWALE LENGTH DESIGN Solve For Depth Given Input Data: Bottom Width 7.25 ft Left Side Slope 3.00: 1 (H:V ). Right Side Slope 3.00: 1 (H:V ) Manning's n 0.350 Channel Slope 0.0200 ft/ft Discharge 1 .91 cfs Computed Results: Depth 0.58 ft Velocity 0.37 fps Flow Area 5.21 sf Flow Top Width 10.73 ft Wetted Perimeter 10.92 ft Critical Depth 0. 13 ft Critical Slope 3.6378 ft/ft Froude Number 0.09 ( flow is Subcritical ) Open Channel Flow Module , Version 3.41 (c ) 1991 Haestad Methods , Inc. * 37 Brookside Rd * Waterbury , Ct 06708 3/14/96 Barghausen Engineers page 1 GROUP HEALTH -- RENTON PRELIMINARY DETENTION CALCULATIONS BCE FILE 5687-PRE BASIN SUMMARY BASIN ID: B1 NAME: 1/3 2YR/24HR POST-DEVELOPED SBUH METHODOLOGY TOTAL AREA • 22 .40 Acres BASEFLOWS: 0. 00 cfs RAINFALL TYPE • TYPE1A PERVIOUS AREA PRECIPITATION • 0. 67 inches AREA. . : 4. 60 Acres TIME INTERVAL 10. 00 min CN • 90. 00 TIME OF CONC • 10. 00 min IMPERVIOUS AREA ABSTRACTION COEFF: 0. 20 AREA. . : 17. 80 Acres CN • 98. 00 PEAK RATE: 1.91 cfs VOL: 0.75 Ac-ft TIME: 480 min i \. ,_ GvA . (0 ' 0 '31 , .1.3A ,-- Parametrix, inc. anvalaatw.lnz 4,1 _sma._. m.i5.1k) 0 cz..z S.W. 6 Til 91, , \ 2.0-.0. 2141'. amagm....i.., .4111IIMMIMIMMOOMMink do or r pr op 111,1 iiFifli! !iuJ )110- 000 , 6 , F6CIITE �► �� ./ ) 00 00 ( Pp ' OYI A E op 4 volmr, \ 1 , 4,1 / 11 00% 0 ' ; . --. Pr00 % 0 0 . 1111 1 (0. 0oloodAur000 00 ,4,- ,,,,,,. ..., „ 4 A A A - a1 : M,,,,,,„, •likcce_ - .." WUIANI? " 13 ,..1,,m...4 • ••, sk ■cn.wo Y (1.m.0 r it) ..... • • • I y r • , � C t. J J wrn-AND "a " ./ surf µ• /• + �C1I{/M MLS Clmf(• ) FlLE:G\CAD\29a2—Ot\wu7t Rt Figure 1 4Nn I Delineated Wetlands and WY o 75 1soC Itit Creeks - Group Health IN FEET *..-- Distribution Center, Renton, WA. tOIJIIIALE