Loading...
HomeMy WebLinkAboutChange Order - 1DocuSign Envelope ID: FA0B73D0-4F4C-4855-8224-FD954489991 B CONTRACT: CONTRACTOR: CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT 2023 Stormwater Facility Fencing Project CAG-23-366 Cortez Fencing LLC SUMMARY OF PROPOSED CHANGE: C.O.#1 Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below and shown in the contractor's proposal: ITEM Alteration Under This Change Order Unit Qty. Unit Price Total Price 5 -Greenfield II Pond -6- Foot Black Chain Link Fence 8 -Windwood Div. Ill Pond -8-Foot Black Chain Link Fence 13 -Greenfield II Pond - 4-Foot X 6-Foot Black Chain Link Gate 14 -Windwood Div. Ill Pond -6-Foot Black Chain Link Fence 15 -Magnussen East Pond -Removal of Structures and Obstructions 16 -Magnussen East Pond -6-Foot Black Chain Link Fence 17 -Magnussen East Pond -16-Foot X 6-Foot Black Chain Link Gate 18 -Magnussen East Pond -6-Foot Dark Green Plastic Slats REVISED ITEM: Decreased the length of 6-Foot Black Chain Link Fence to be installed at the Greenfield II Pond from 283 LF to 278 LF. REVISED ITEM: Decreased the length of 8-Foot Black Chain Link Fence to be installed at the Windwood Div. Ill Pond from 371 LF to 295 LF. NEW ITEM: Added one 4-Foot X 6-Foot Black Chain Link Gate to be installed at the Greenfield II Pond. NEW ITEM: Added 78 LF of 6-Foot Black Chain Link Fence to be installed at the Windwood Div. Ill Pond. NEW ITEM: Added the Removal of Structures and Obstructions at the Magnussen East Pond. NEW ITEM: Added 237 LF of 6-Foot Black Chain Link Fence to be installed at the Magnussen East Pond. NEW ITEM: Added one 16-Foot X 6-Foot Black Chain Link Gate to be installed at the Magnussen East Pond. NEW ITEM: Added 109 LF of 6-Foot Dark Green Plastic Slats to be installed at the Magnussen East Pond. Subtotal 10.1% Sales Tax Total LF -5 LF -76 EA 1 LF 78 LS 1 EA 237 EA 1 LF 109 $56.99 $69.00 $2,600.00 $56.99 $3,900.00 $56.99 $4,399.00 $63.00 -$284.95 -$5,244.00 $2,600.00 $4,445.22 $3,900.00 $13,506.63 $4,399.00 $6,867.00 $30,188.90 $3,049.08 $33,237.98 ORIGINAL CONTRACT AMOUNT $153,366.65 CURRENT CONTRACT AMOUNT $153,366.65 ESTIMATED NET CHANGE THIS ORDER $33,237.98 ESTIMATED CONTRACT TOTAL AFTER CHANGE $186,604.63 SIGNATURES: Eddie Cortez Kevin Evans Project Engin revin Evans�'i9J=�=!ijW=i/i=f,1=c•� ... ----------------------- Approved By: f,,_�_• _• ____________________ _ 'Fll'r�fr;�Mce Water Engineering Manager Approved By: G=D�=us=;7�d$=yfr=o.k ___________________ _ r:���W1ttty Systems Director Approved By: �artin Pastucha Mar"t'l'/13p��'t8�ttl'tPW Administrator Date: 11/8/2023 11: 39 PM CST Date: 11/9/2023 9: 11 AM PST Date: 11/9/2023 9: 53 AM PST 11/9/2023 I 3:57 PM PSTDate: ------- 11/27/2023 I 5:27 PM PSTDate: ______ _ H:\File Sys\SWP -Surface Water Projects\SWP-27 -Surface Water Projects (CIP)\27-3677 Stormwater Facility FENCE Project\4500 2023\1600 Construction\1606 Change Orders\Change Order 1\6-CO#l.doc CAG-23-366,CO #1-23