CONTRACT:
CONTRACTOR:
CITY OF RENTON
Public Works Department
CONTRACT CHANGE ORDER AGREEMENT
2023 Stormwater Facility Fencing Project CAG-23-366
Cortez Fencing LLC
SUMMARY OF PROPOSED CHANGE:
C.O.#1
Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra
work as outlined below and shown in the contractor's proposal:
ITEM Alteration Under This Change Order Unit Qty. Unit Price Total Price
5 -Greenfield II Pond -6-
Foot Black Chain Link
Fence
8 -Windwood Div. Ill Pond
-8-Foot Black Chain Link
Fence
13 -Greenfield II Pond -
4-Foot X 6-Foot Black
Chain Link Gate
14 -Windwood Div. Ill
Pond -6-Foot Black Chain
Link Fence
15 -Magnussen East Pond
-Removal of Structures
and Obstructions
16 -Magnussen East Pond
-6-Foot Black Chain Link
Fence
17 -Magnussen East Pond
-16-Foot X 6-Foot Black
Chain Link Gate
18 -Magnussen East Pond
-6-Foot Dark Green
Plastic Slats
REVISED ITEM:
Decreased the length of 6-Foot Black Chain Link Fence to be
installed at the Greenfield II Pond from 283 LF to 278 LF.
REVISED ITEM:
Decreased the length of 8-Foot Black Chain Link Fence to be
installed at the Windwood Div. Ill Pond from 371 LF to 295 LF.
NEW ITEM:
Added one 4-Foot X 6-Foot Black Chain Link Gate to be installed
at the Greenfield II Pond.
NEW ITEM:
Added 78 LF of 6-Foot Black Chain Link Fence to be installed at
the Windwood Div. Ill Pond.
NEW ITEM:
Added the Removal of Structures and Obstructions at the
Magnussen East Pond.
NEW ITEM:
Added 237 LF of 6-Foot Black Chain Link Fence to be installed at
the Magnussen East Pond.
NEW ITEM:
Added one 16-Foot X 6-Foot Black Chain Link Gate to be installed
at the Magnussen East Pond.
NEW ITEM:
Added 109 LF of 6-Foot Dark Green Plastic Slats to be installed at
the Magnussen East Pond.
Subtotal
10.1% Sales Tax
Total
LF -5
LF -76
EA 1
LF 78
LS 1
EA 237
EA 1
LF 109
$56.99
$69.00
$2,600.00
$56.99
$3,900.00
$56.99
$4,399.00
$63.00
-$284.95
-$5,244.00
$2,600.00
$4,445.22
$3,900.00
$13,506.63
$4,399.00
$6,867.00
$30,188.90
$3,049.08
$33,237.98
ORIGINAL CONTRACT AMOUNT
$153,366.65
CURRENT CONTRACT AMOUNT
$153,366.65
ESTIMATED NET CHANGE THIS ORDER
$33,237.98
ESTIMATED CONTRACT TOTAL AFTER CHANGE
$186,604.63
SIGNATURES:
Eddie Cortez
Kevin Evans Project Engin revin Evans�'i9J=�=!ijW=i/i=f,1=c•� ... -----------------------
Approved By: f,,_�_• _• ____________________ _
'Fll'r�fr;�Mce Water Engineering Manager
Approved By: G=D�=us=;7�d$=yfr=o.k ___________________ _ r:���W1ttty Systems Director
Approved By: �artin Pastucha
Mar"t'l'/13p��'t8�ttl'tPW Administrator
Date: 11/8/2023 11: 39 PM CST
Date: 11/9/2023 9: 11 AM PST
Date: 11/9/2023 9: 53 AM PST
11/9/2023 I 3:57 PM PSTDate: -------
11/27/2023 I 5:27 PM PSTDate: ______ _
H:\File Sys\SWP -Surface Water Projects\SWP-27 -Surface Water Projects (CIP)\27-3677 Stormwater Facility FENCE Project\4500
2023\1600 Construction\1606 Change Orders\Change Order 1\6-CO#l.doc
CAG-23-366,CO #1-23